• Built in 1916• Main areas of research and development:
– Hydro Turbines• Francis
• Pelton
• Pump-Turbines
– Centrifugal Pumps– Pump and turbine control systems
• New areas of research and development:– Tidal energy– Wind energy– Wave energy
![Page 3: 1 WATERPOWER LABORATORY. 2 Built in 1916 Main areas of research and development: –Hydro Turbines Francis Pelton Pump-Turbines –Centrifugal Pumps –Pump](https://reader034.vdocuments.us/reader034/viewer/2022051401/5697bfd51a28abf838cad4d8/html5/thumbnails/3.jpg)
3
![Page 4: 1 WATERPOWER LABORATORY. 2 Built in 1916 Main areas of research and development: –Hydro Turbines Francis Pelton Pump-Turbines –Centrifugal Pumps –Pump](https://reader034.vdocuments.us/reader034/viewer/2022051401/5697bfd51a28abf838cad4d8/html5/thumbnails/4.jpg)
4
![Page 5: 1 WATERPOWER LABORATORY. 2 Built in 1916 Main areas of research and development: –Hydro Turbines Francis Pelton Pump-Turbines –Centrifugal Pumps –Pump](https://reader034.vdocuments.us/reader034/viewer/2022051401/5697bfd51a28abf838cad4d8/html5/thumbnails/5.jpg)
5
![Page 6: 1 WATERPOWER LABORATORY. 2 Built in 1916 Main areas of research and development: –Hydro Turbines Francis Pelton Pump-Turbines –Centrifugal Pumps –Pump](https://reader034.vdocuments.us/reader034/viewer/2022051401/5697bfd51a28abf838cad4d8/html5/thumbnails/6.jpg)
6
![Page 7: 1 WATERPOWER LABORATORY. 2 Built in 1916 Main areas of research and development: –Hydro Turbines Francis Pelton Pump-Turbines –Centrifugal Pumps –Pump](https://reader034.vdocuments.us/reader034/viewer/2022051401/5697bfd51a28abf838cad4d8/html5/thumbnails/7.jpg)
7
![Page 8: 1 WATERPOWER LABORATORY. 2 Built in 1916 Main areas of research and development: –Hydro Turbines Francis Pelton Pump-Turbines –Centrifugal Pumps –Pump](https://reader034.vdocuments.us/reader034/viewer/2022051401/5697bfd51a28abf838cad4d8/html5/thumbnails/8.jpg)
8
![Page 9: 1 WATERPOWER LABORATORY. 2 Built in 1916 Main areas of research and development: –Hydro Turbines Francis Pelton Pump-Turbines –Centrifugal Pumps –Pump](https://reader034.vdocuments.us/reader034/viewer/2022051401/5697bfd51a28abf838cad4d8/html5/thumbnails/9.jpg)
9
• Maximum head: 100 meter
• Open system head: 1,6 meter
• Maximum flow: 1,0 m3/s
• Maximum power: 700 kW
• The system is designed to operate in both open and closed loop.
![Page 10: 1 WATERPOWER LABORATORY. 2 Built in 1916 Main areas of research and development: –Hydro Turbines Francis Pelton Pump-Turbines –Centrifugal Pumps –Pump](https://reader034.vdocuments.us/reader034/viewer/2022051401/5697bfd51a28abf838cad4d8/html5/thumbnails/10.jpg)
10
976 power plants Installed capacity: 28.365 MW Production: 120 TWh
Norwegian Hydropower Status per 1st January 2006
Size Number Total Power
Annual
production
[MW] [ - ] [MW] [GWh/år]
Micro hydro 0 – 0,1 164 6 29
Mini hydro 0,1 - 1 192 91 375
Small hydro 1 - 10 293 1.035 4.850
Large hydro 10 -100 250 9.256 41.419
Large hydro > 100 77 17.977 73.455Source: Fakta 2006, Energi og vannressurser i Norge, OED
![Page 11: 1 WATERPOWER LABORATORY. 2 Built in 1916 Main areas of research and development: –Hydro Turbines Francis Pelton Pump-Turbines –Centrifugal Pumps –Pump](https://reader034.vdocuments.us/reader034/viewer/2022051401/5697bfd51a28abf838cad4d8/html5/thumbnails/11.jpg)
11
Installation of a Francis model turbine in the Waterpower Lab.
![Page 12: 1 WATERPOWER LABORATORY. 2 Built in 1916 Main areas of research and development: –Hydro Turbines Francis Pelton Pump-Turbines –Centrifugal Pumps –Pump](https://reader034.vdocuments.us/reader034/viewer/2022051401/5697bfd51a28abf838cad4d8/html5/thumbnails/12.jpg)
12
Installation of a Francis model turbine in the Waterpower Lab.
![Page 13: 1 WATERPOWER LABORATORY. 2 Built in 1916 Main areas of research and development: –Hydro Turbines Francis Pelton Pump-Turbines –Centrifugal Pumps –Pump](https://reader034.vdocuments.us/reader034/viewer/2022051401/5697bfd51a28abf838cad4d8/html5/thumbnails/13.jpg)
13
Efficiency of the model turbine
Q'p
Th
Where:h = Hydraulic efficiency [ - ] = Angular velocity [rad/s]T = Torque [Nm]p’= Differential pressure [Pa]Q = Flow rate [m3/s]
![Page 14: 1 WATERPOWER LABORATORY. 2 Built in 1916 Main areas of research and development: –Hydro Turbines Francis Pelton Pump-Turbines –Centrifugal Pumps –Pump](https://reader034.vdocuments.us/reader034/viewer/2022051401/5697bfd51a28abf838cad4d8/html5/thumbnails/14.jpg)
14
Power output 0,3 W