1. water treatment plant termoenergo inŽenjering · 2015. 4. 16. · plant “visnjicka banja” -...

42
1. WATER TREATMENT PLANT TERMOENERGO INŽENJERING Bulevar Kralja Aleksandra 298 11 000 Belgrade Serbia Tel: +381 11 3806 172 +381 11 3806 173 Fax: +381 11 3806 251 E-mail: [email protected] OIL INDUSTRY OF SERBIA – OIL REFINERY “PANČEVO” (year 2003 – 2007.) TECHNICAL STUDY WITH ECONOMIC ELEMENTS FOR WATER TREATMENT PLANT (REVERSE OSMOSIS) TENDER DOCUMENTATION FOR NEW WATER TREATMENT PLANT AND MIXED BED EXCHANGERS WTP – DETAILED DESIGN FOR PUMS AND CONCOMITANT INSTALATIONS REPLACEMENT WTP – BASIC DESIGN FOR NEW WATER TREATMENT PLANT BASED ON REVERSE OSMOIS WTP – AS BUILT DESIGN OF WATER TREATMENT PLANT DETAILED DESIGN OF MIXED BED EXCHANGERS INSTALATION FOR DEMI WATER POLISHING - WTP IN HEATING PLANT “DUNAV” CHEMICAL INDUSTRY PANČEVO- “PETROHEMIJA PANČEVO” (year 1995, 2008.) WATER TREATMENT PLANT - DETAILED DESIGN OF EXPANSION AND RECONSTRUCTION

Upload: others

Post on 23-Jan-2021

0 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: 1. WATER TREATMENT PLANT TERMOENERGO INŽENJERING · 2015. 4. 16. · plant “visnjicka banja” - detailed design of pumping station in milesevska no 38 street - basic design with

1. WATER TREATMENT PLANT

TERMOENERGO INŽENJERING Bulevar Kralja Aleksandra 298 11 000 Belgrade Serbia Tel: +381 11 3806 172 +381 11 3806 173 Fax: +381 11 3806 251 E-mail: [email protected]

OIL INDUSTRY OF SERBIA – OIL REFINERY “PANČEVO” (year 2003 – 2007.)

TECHNICAL STUDY WITH ECONOMIC ELEMENTS FOR

WATER TREATMENT PLANT (REVERSE OSMOSIS)

TENDER DOCUMENTATION FOR NEW WATER

TREATMENT PLANT AND MIXED BED EXCHANGERS

WTP – DETAILED DESIGN FOR PUMS AND

CONCOMITANT INSTALATIONS REPLACEMENT

WTP – BASIC DESIGN FOR NEW WATER TREATMENT

PLANT BASED ON REVERSE OSMOIS

WTP – AS BUILT DESIGN OF WATER TREATMENT

PLANT

DETAILED DESIGN OF MIXED BED EXCHANGERS

INSTALATION FOR DEMI WATER POLISHING

- WTP IN HEATING PLANT “DUNAV”

CHEMICAL INDUSTRY PANČEVO- “PETROHEMIJA PANČEVO” (year 1995, 2008.)

WATER TREATMENT PLANT - DETAILED DESIGN OF

EXPANSION AND RECONSTRUCTION

Page 2: 1. WATER TREATMENT PLANT TERMOENERGO INŽENJERING · 2015. 4. 16. · plant “visnjicka banja” - detailed design of pumping station in milesevska no 38 street - basic design with

2. CITY DISTRICT HEATING

TERMOENERGO INŽENJERING Bulevar Kralja Aleksandra 298 street 11 000 Belgrade Serbia Tel: +381 11 3806 172 +381 11 3806 173 Fax: +381 11 3806 251 E-mail: [email protected]

BELGRADE DISTRICT HEATING SYSTEM (year 2006 – 2009.)

- BASIC AND DETAILED DESIGN OF RECONSTRUCTION

OF HEATING PLANT “KONJARNIK”

- BASIC DESIGN AND FEASIBILITY STUDY OF HEATING

PLANT “VISNJICKA BANJA”

- DETAILED DESIGN OF PUMPING STATION IN

MILESEVSKA NO 38 STREET

- BASIC DESIGN WITH FEASIBILITY STUDY FOR

RECONSTRUCTION OF HEATING PLANT “ZEMUN”

- DETAILED AND BASIC DESIGN OF PUMPING STATION

PPS1 IN BLOCK 38

- DETAILED AND BASIC DESIGN OF PUMPING STATION

PPS2 IN BLOCK 28

Page 3: 1. WATER TREATMENT PLANT TERMOENERGO INŽENJERING · 2015. 4. 16. · plant “visnjicka banja” - detailed design of pumping station in milesevska no 38 street - basic design with

DISTRICT HEATING OF ZAJECAR CITY (year 2007 – 2008.)

- CONCEPT DESIGN OF THE WHOLE ZAJECAR

- GENERAL DESIGN OF THE WHOLE ZAJECAR

- DETAILED DESIGN OF THE WHOLE ZAJECAR

- HEATING PLANT 3 X 16 MW (ENGINEERING)

- HEATING PLANT 3 X 10 MW

- STRATEGIC DEVELOPMENT PLAN

VRANJE - DISTRICT HEATING IN BLOCK 47 (year 2006.)

- BOILERHOUSE WITH STACK AND HEAVY FUEL OIL TANK

FARM

- DISTRIBUTION NETWORK FOR BLOCK 47

LOZNICA – DISTRICT HEATING FROM VISCOSE PLANT (year 2005.)

- TECHNICAL STUDY ON TUNING OF PRIMARY NETWORK

AND SUBSTATIONS

- TECHNICAL REVISION OF DESIGNS FOR

RECONSTRUCTION AND MODERNIZATION OF BOILERS

NO.1,2,3 IN POWERPLANT "VISKOZA"

- DETAILED DESIGNS FOR ERRECTION AND

CONNECTION OF BOILER NO.1

Page 4: 1. WATER TREATMENT PLANT TERMOENERGO INŽENJERING · 2015. 4. 16. · plant “visnjicka banja” - detailed design of pumping station in milesevska no 38 street - basic design with

DISTRICT HEATING OF SREMSKA MITROVICA CITY (year 2000, 2009.)

DETAILED DESIGN OF DISTRICT HEATING SYSTEM,

MAIN HOTWATER PIPELINE AND BRANCH SECTIONS

TECHNICAL INVESTMENT DOCUMENTATION FOR MAIN

HOTWATER PIPELINE AND BLOCK NETWORK

DETAILED DESIGN PROJECT FOR RECONSTRUCTION

OF PUMPING/HEAT EXCHANGE STATION

OBRENOVAC-ZABREŽJE DISTRICT HEATING (year 1998.)

- BASIC DESIGNS FOR OBRENOVAC-ZABREŽJE HEATING

- DETAILED DESIGNS FOR OBRENOVAC-ZABREŽJE

HEATING

PLJEVLJA DISTRICT HEATING FROM POWERPLANT PLJEVLJA (year 1996.)

- BASIC CONCEPT SOLUTION FOR PLJEVLJA HEATING

- DETAILED DESIGNS FOR PLJEVLJA DISTRICT HEATING

- DETAILED DESIGNS FOR DISTRIBUTION NETWORK

- DETAILED MECHANICAL DESIGN OF PUMP STATION

(REV.A)

- DETAILED DESIGN FOR MEASURING AND CONTROL OF

PUMP AND EXCHANGER STATION

Page 5: 1. WATER TREATMENT PLANT TERMOENERGO INŽENJERING · 2015. 4. 16. · plant “visnjicka banja” - detailed design of pumping station in milesevska no 38 street - basic design with

ŽUPSKI ALEKSANDROVAC – DISTRICT HEATING (year 1994.)

- BASIC DESIGN EXPANSION OF EXISTING BOILERHOUSE

"VINO ŽUPA" WITH 2 STEAM BOILERS (41 t/h) AND

PUMP/EXCHANGER STATION 34,7 MW

- PRIMARY HOTWATER NETWORK DESIGNS

- INVESTMENT PROGRAM

BEOGRAD DISTRICT HEATING FROM POWERPLANT “NIKOLA TESLA” (year 1994 – 1995.)

- BASIC TECHNOLOGICAL DESIGN FOR COUPLING OF

HEATING SYSTEMS OBRENOVAC AND BEOGRAD

(CONNECTION OF POWERPLANT UNITS I AND II WITH

UNITS III,IV,V,VI)

SMEDEREVO DISTRICT HEATING (year 1994 – 1997.)

- MAINS AND DISTRIBUTION NETWORK FROM PUMP

STATION TO SUBSTATIONS APPR. 32 KM AWAY

- CENTRAL PUMPING STATION

- TECHNICAL INVESTMENT PROGRAM FOR SMEDEREVO

DISTRICT HEATING

Page 6: 1. WATER TREATMENT PLANT TERMOENERGO INŽENJERING · 2015. 4. 16. · plant “visnjicka banja” - detailed design of pumping station in milesevska no 38 street - basic design with

IRON & STEEL CONCERN – “SARTID 1913” (year 1994 – 1997.)

- TECHNICAL DOCUMENTATION - PRELIMINARY

INVESTMENT PROGRAM FOR SMEDEREVO DISTRICT

HEATING FROM METALWORKS SMEDEREVO

- FEASIBILITY STUDY FOR SMEDEREVO DISTRICT

HEATING WITH WASTE HEAT FROM STEELWORKS

“SARTID 1913”

Page 7: 1. WATER TREATMENT PLANT TERMOENERGO INŽENJERING · 2015. 4. 16. · plant “visnjicka banja” - detailed design of pumping station in milesevska no 38 street - basic design with

2.COMPRESSOR STATIONS

TERMOENERGO INŽENJERING Bulevar Kralja Aleksandra 298 11 000 Belgrade Serbia Tel: +381 11 3806 172 Fax: +381 11 3806 251 E-mail: [email protected] www.termoenergo.com

ZASTAVA AUTOMOBILI

- DETAIL DESIGN OF COMRESSOR

STATIONKS1

CAPACITY 1 x 4680 + 1 x 2635 + 1 x 3050

Q=10 365 m3/h

- DETAIL DESIGN OF COMRESSOR

STATIONKS2 FOR MECHANICAL AND

PRESSING WORKSCAPACITY

1 x 4680 + 2 x 2635 + 1 x 3050 = Q=13 000

m3/h

- MECHANICAL DETAIL DESIGN OF

PRIMARY INSTALLATIONS FOR

COMPRESSED AIR AND I RECIRCULATION

SYSTEM AT PRODUCTION ZONE FOR

ZASTAVA 10

Page 8: 1. WATER TREATMENT PLANT TERMOENERGO INŽENJERING · 2015. 4. 16. · plant “visnjicka banja” - detailed design of pumping station in milesevska no 38 street - basic design with

ZASTAVA KOVAČNICA

- DETAIL DESIGN OF COMPRESS STATION

CAPACITY 4 x 4230 + 1 x 3050 = m3/h

Q=20 000 m3/h

JP “SRBIJAGAS

- UNDERGROUND STORAGE OF FGAS FUEL –

BANATSKI DVOR – PRODUCTION LINE FOR

GAS FUEL

NIS SRBIJE – RAFINERIJA NAFTE PANČEVO

- DETAIL DESIGN OF COMPRESS STATION FOR

RECIRCULATION OF GAS (HYDROGEN)

PRESSURE 42 BAR, PEL=1,7 MW

- DETAIL DESIGN OF BLOWER INSTALLATION

GB-2541S AT PLANT S-2450

- DETAIL DESIGN OF COMPRESS STATION FOR

INDUSTRIAL AIR

CAPACITY 2 x 5260, Q=10500 m3/h

Page 9: 1. WATER TREATMENT PLANT TERMOENERGO INŽENJERING · 2015. 4. 16. · plant “visnjicka banja” - detailed design of pumping station in milesevska no 38 street - basic design with

“British American Tobacco” – Duvanska industrija Vranje

- DETAIL DESIGN OF COMPRESS STATION

- DETAIL DESIGN OF BURNER INSTALLATION

GB-2541S AT PLANT S-2450

- DETAIL DESIGN OF VACUUM STATION

DIN “FABRIKA DUVANA” A.D. – NIŠ u sastavu Philip Morris Srbija

- DETAIL DESIGN OF COMPRESSOR STATION

SANATIONPROJEKAT SANACIJE

KOMPRESORSKE STANICE

TE “NIKOLA TESLA” A - OBRENOVAC

- DETAIL DESIGN OF COMPRESSOR STATION NEEDED FOR

VISUALISATION OF BURNING PROCESS AT BLOCKS A3-A6,

CAPACITY1670 m3/h, p= 8 barG

Page 10: 1. WATER TREATMENT PLANT TERMOENERGO INŽENJERING · 2015. 4. 16. · plant “visnjicka banja” - detailed design of pumping station in milesevska no 38 street - basic design with

3. MEDICAL CENTERS

TERMOENERGO INŽENJERING Bulevar Kralja Aleksandra 298 11 000 Belgrade Serbia Tel: +381 11 3806 172 +381 11 3806 173 Fax: +381 11 3806 251 E-mail: [email protected]

Hospital “Milenko Marin” – Loznica (year 2007.)

- GENERAL DESIGN FOR HEAT ENERGY UTILITY

Institute for oncology and radiology – Serbia (year 2000.)

- DETAILED DESIGN FOR RECONSTRUCTION AND

EXPANSION OF EXISTING INSTALLATIONS

(DEPARTMENT OF CHEMATOLOGY – CHILDREN WARD)

Medical center – Podgorica (year 1999 – 2000.)

- GENERAL DESIGN FOR HEAT ENERGY UTILITY

- GENERAL DESIGN OF VENTILATION AND

AIR-CONDITIONING SYSTEM

- TENDER DOCUMENTATION FOR EQUIPMENT DELIVERY

Page 11: 1. WATER TREATMENT PLANT TERMOENERGO INŽENJERING · 2015. 4. 16. · plant “visnjicka banja” - detailed design of pumping station in milesevska no 38 street - basic design with

Public hospital “Danilo I” – Cetinje (year 1999 – 2000.)

- DETAILED MECHANICAL, ELECTRICAL AND

INSTRUMENTATION DESIGN

City hospital “Dr. Miloš Pantić” – Valjevo (year 1998.)

- CONCEPT DESIGN FOR HOSPITAL COMPLEX

- DETAILED MECHANICAL DESIGN OF TECHNICAL

INSTALLATIONS

- DETAILED ELECTRICAL DESIGN

- DETAILED REGULATION AND CONTROL DESIGN

Public hospital “Đorđe Jovanović” – Zrenjanin (year 1990.)

- DESIGN DOCUMENTATION CONTROL

Page 12: 1. WATER TREATMENT PLANT TERMOENERGO INŽENJERING · 2015. 4. 16. · plant “visnjicka banja” - detailed design of pumping station in milesevska no 38 street - basic design with

3. POWER PLANTS

TERMOENERGO INŽENJERING Bulevar Kralja Aleksandra 298 street 11 000 Belgrade Serbia Tel: +381 11 3806 172 +381 11 3806 173 Fax: +381 11 3806 251 E-mail: [email protected]

THERMAL POWER PLANT KOSTOLAC B 2 X 350 MW (year 2007 – 2008.)

- DETAILED DESIGN OF ASH DISPOSAL SYSTEM

- TEHNICAL REVIEW OF TECHNOLOGICAL AND

MECHANICAL DESIGN PROJECTS OF ASH DISPOSTAL

SYSTEM

NEOPLANTA – NOVI SAD (year 1995.)

- DETAILED DESIGN OF EXISTING POWER PLANT

EXPANSION

Page 13: 1. WATER TREATMENT PLANT TERMOENERGO INŽENJERING · 2015. 4. 16. · plant “visnjicka banja” - detailed design of pumping station in milesevska no 38 street - basic design with

MILL “BOROVO” – BOROVO (year 1994.)

- DETAILED POWER PLANT DESIGN – ANALYSIS OF

PIPELINE RECONSTRUCTION (pressure 12 bar and 13

bar)

- STUDY WITH BASIC DESIGN FOR STABILITY AND

SAVING ENERGY FOR DP “PROIZVODNJA AUTO

GUMA “ BOROVO

- PROGRAM FOR REHABILITATION OF ENERGETIC

SYSTEM IN MILL “BOROVO”

“OHIS “ – SKOPLJE (year 1990.)

- DETAILED MECHANICAL DESIGN OF EXISTING POWER

PLANT EXPANSION

(existing boiler replacement by new boiler with capacity of 80 t/h

superheated steam, pressure 64 bar, temperature 500oC)

MILAN BLAGOJEVIĆ LUČANI

- DETAIL DESIGN OF PIPE RING GLAVNI PROJEKAT

CEVNOG PRSTENA VISOKOG PRSTENA ZA

POSTOJEĆU ENERGANU SA KOMPJUTERSKIM

PRORAČUNOM DOZVOLJENIH NAPONA

ŠEĆERANA “4 NOEMBRI” – BITOLJ (year 1990.)

- TECHNICAL DOCUMENTATION CONTROL FOR

EXISTING POWER PLANT EXPANSION AND OUTSIDE

INSTALATIONS

Page 14: 1. WATER TREATMENT PLANT TERMOENERGO INŽENJERING · 2015. 4. 16. · plant “visnjicka banja” - detailed design of pumping station in milesevska no 38 street - basic design with

OIL INDUSTRY OF SERBIA – OIL REFINERY “PANČEVO” (year 1991 – 2007.)

- BASIC DESIGN OF POWER PLANT EXPANSION

- TENDER DOCUMENTATION FOR EQUIPMENT

DELIVERY FOR POWER PLANT EXPANSION

- DETAILED DESIGN OF POWER PLANT

EXPANSION BY BOILER WITH CAPACITY OF

110 t/h, PRESSURE 45,6 bar, TEMPERATURE

412OC AND BY TURBOGENERATOR (POWER

12MW)

- DETAILED DESIGN OF POWER PLANT

EXPANSION (BOILER 1 AND BOILER 2)

- TENDER DOCUMENTATION FOR DELIVERY

OF NEW BOILER WITH CAPACITY OF 120 t/h

SUPERHEATED STEAM

- TENDER DOCUMENTATION FOR DELIVERY

OF TURBOGENERATOR

- TECHNICAL ANALYSIS OF NEW

BACKPRESSURE TURBOAGREGATE

CHARACTERISTICS

- DETAILED DESIGNS FOR NEW

TURBOAGREGATE T3 INSTALATION

- DETAILED DESIGNS FOR BOILER K2 (BF 9601)

INSTALATION

- STUDY FOR CHOICE OF NEW

TURBOAGREGATE CHARACTERISTICS IN THE

OLD PART OF POWER PLANT

- POWER PLANT – MECHANICAL AS BUILT

DESIGN OF THE BOILER BF-9602 AND

CONCOMITANT EQUIPMENT

Page 15: 1. WATER TREATMENT PLANT TERMOENERGO INŽENJERING · 2015. 4. 16. · plant “visnjicka banja” - detailed design of pumping station in milesevska no 38 street - basic design with

BLACK METALLURGY CONCERN - “US Steel” (Former “SARTID 1913”) (year 1990 – 1993., 2008 – 2009.)

- DOCUMENTATION NOSTRIFICATION FOR

BOILER 220 t/h, SUPERHEATED STEAM FOR

POWER PLANT No. 2

- DETAILED DESIGN PROJECT FOR

RECONSTRUCTION OF AGLOMERATION UNIT

“NATRON” - MAGLAJ

DETAIL DESIGN OF NEW PUMP STATION FOR BLOCK 1

OF EXISTING POWER PLANT

DETAIL DESIGN OF CONDENSATE COLLECTION

DETAIL DESIGN OF COMPRESSOR STATION

TE “NIKOLA TESLA” A - OBRENOVAC

DETAIL DESIGN OF CONNECTING TENT A AND TS 380/220

KV

DETAIL ELECTRICAL DESIGN OF RECONSTRUCTION

FOR THE MEASUREMENTS AND SIGNALISATION FOR

EXCAVATOR STATION FOR BLOCKS A1, A2 I A3

B.A.T. CIGARETTE FACTORY, IBADAN, NIGERIA

STEAM PLANT

OIL SUPP FOR BOILERS & GENSET

LPG INSTALLATION

COMPRESSED AIR INSTALLATION

VACUM INSTALLATION

Page 16: 1. WATER TREATMENT PLANT TERMOENERGO INŽENJERING · 2015. 4. 16. · plant “visnjicka banja” - detailed design of pumping station in milesevska no 38 street - basic design with

EXTERNAL PIPEWORK

ICN GALENIKA d.d. - ZEMUN

BASIC MECHANICAL DESIGN OF RECONSTRUCTION

FOR CONDENSATE SYSTEM – ENERGY SAVE

TECHNICAL REPORT ABOUT BOILER ROOM AND STEAM

CONDENSATE SYSTEM

BOILER ROOM –STUDY ABOUT RECONSTRUCTION OF

EXITING BOILER ROOM CONDITIONED BY

BRAKEDOWNS BOILER TPK BKG - 150

STUDY FOR CONSTRUCION OF BOILER CAPACITY 25

T/H OF STEAM

DETAIL DESIGN OF RECONSTRUCTION FOR BOILER

ROOM, INSTALLATION OF BOILER S - 2500 INSTEAD OF

BRAKEDOWND BOLIER

GENERAL DESIGN OF BOILER ROOM

RECONSTRUCTION

DETAIL DESIGN OF MEASURMENT AND REGULATION

FOR FEEDER TANK

DETAIL DESIGN OF BOILER INSTALLATION S - 2500

(MANUF. NO. 237) FOR PHASE I OF BOILER ROOM

ANALAYSIS OF POSSIBILITIES OF SUPPLY BOILER

ROOM WITH TOBACCO WATER

DETAIL MECHANICAL DESIGN OF NEW PIPELINE AND

GAS SPLITTER INSTALLATION

STUDY FOR NEW PIPELINE AND GAS SLITTER

INSTALLATION MANUF. NO. 156/97

DETAIL DESIGN OF BIOLER INSTALLATION NO. 2, S -

2500 OPTIMAL (MANUF. NO 214) FOR PHASE I OF

BOILER ROOM

DETAIL DESIGN OF BOILER INSTALLATION S - 2500

OPTIMAL (MANUF. NO 237) FOR PHASE I OF BOILER

Page 17: 1. WATER TREATMENT PLANT TERMOENERGO INŽENJERING · 2015. 4. 16. · plant “visnjicka banja” - detailed design of pumping station in milesevska no 38 street - basic design with

ROOM

DETAIL MECHANICAL AND ELECTRICAL DESIG OF NEW

LOADING STATION FOR OIL

Page 18: 1. WATER TREATMENT PLANT TERMOENERGO INŽENJERING · 2015. 4. 16. · plant “visnjicka banja” - detailed design of pumping station in milesevska no 38 street - basic design with

4. ENERGY SAVING

TERMOENERGO INŽENJERING Bulevar Kralja Aleksandra 298 11 000 Beograd Serbia Tel: +381 11 3806 172 +381 11 3806 173 Fax: +381 11 3806 251 E-mail: [email protected]

NIS SRBIJE – OIL REFINERY PANČEVO (year 1997 – 2007.)

- DETAILED DESIGN OF RAW WATER PREHEATING AND

CONDENSATE UTILIZATION

- BASIC DESIGNS FOR CONDENSATE RECOVERY FROM TANK

FARM SECTION AND BLOCKS V, VI, XXI

- DETAILED DESIGN FOR PROCESS CONDENSATE RETURN

FROM BLOCK 6 TO POWERPLANT

- DETAILED DESIGN OF RECONSTRUCTION AND OVERHAUL

OF STEAM TRACER SYSTEM IN SECTIONS S-2100 AND S-2200

- AS BUILT DESIGN MECHANICAL DOCUMENTATION OF STEAM

TRACER SYSTEM IN BLOCK V SECTIONS S-100, S-600, S-750,

S-850

- AS BUILT DESIGN MECHANICAL DOCUMENTATION OF STEAM

TRACER SYSTEM IN BLOCK V SECTIONS S-200, S-900, S-1500

- DETAILED DESIGN OF TANK FARM CONDENSATE

COLLECTING AND RECOVERY

- DETAILED CIVIL ENGINEERING DESIGN OF CONDENSATE

COLLECTING STATIONS IN TANK FARM BLOCK 12

- DETAILED CIVIL ENGINEERING DESIGN OF CONDENSATE

COLLECTING STATIONS IN TANK FARM BLOCK 8

Page 19: 1. WATER TREATMENT PLANT TERMOENERGO INŽENJERING · 2015. 4. 16. · plant “visnjicka banja” - detailed design of pumping station in milesevska no 38 street - basic design with

PHARMACEUTICAL FACTORY ZORKA PHARMA (year 2004.)

- TECHNICAL DOCUMENTATION ON RATIONAL HEAT ENERGY

UTILIZATION

NIS – OIL REFINERY NOVI SAD (year 2000.)

- DETAILED DESIGN OF CONDENSATE RECOVERY FROM

LUBEOIL PLANT I

METHANOL–ACETIC ACID COMPLEX MSK – KIKINDA (year 1998.)

- CONCEPTUAL DESIGN OF HEAT ENERGY UTILIZATION IN MSK

KIKINDA

ICN GALENIKA d.d. – ZEMUN (year 1998.)

- ENERGY SAVING - BASIC MECHANICAL DESIGN OF

CONDENSATE SYSTEM RECONSTRUCTION

NIS SRBIJE – OIL REFINERY BEOGRAD (year 1998.)

- BASIC DESIGN OF RATIONAL STEAM UTILIZATION AND

CONDENSATE RECOVERY IN REFINERY BEOGRAD

- DETAILED DESIGN OF CONDENSATE RECOVERY FROM

PROCESS PLANTS

Page 20: 1. WATER TREATMENT PLANT TERMOENERGO INŽENJERING · 2015. 4. 16. · plant “visnjicka banja” - detailed design of pumping station in milesevska no 38 street - basic design with

CHEMICAL INDUSTRY HIP - AZOTARA PANČEVO (year 1995.)

- CONCEPTUAL DESIGN OF HEAT ENERGY UTILIZATION

- DETAILED AUTOMATIC CONTROL DESIGN OF "BABCOCK &

WILCOX" BOILER

IRON & STEEL CONCERN - “SARTID 1913” (year 1994 – 1997.)

- DETAILED DESIGNS OF THE WASTE HEAT RECOVERY

SYSTEMS

PETROCHEMICAL INDUSTRY HIP PETROHEMIJA – PANČEVO (year 1994 – 1996.)

- DETAILED DESIGNS FOR RECONSTRUCTION, RECOVERY

AND UTILIZATION OF CONDENSATE

- CONDENSATE SYSTEM OF LDPE PLANT

- RECONSTRUCTION AND EXTENSION OF CONDENSATE

SYSTEM IN LDPE PLANT

PAPER MILL BEOGRAD (year 1992.)

- TECHNICAL ANALYSIS OF THE EXISTING STEAM AND

CONDENSATE SYSTEM

“NATRON” – MAGLAJ (year 1991.)

- DETAILED DESIGN OF CONDENSATE RECOVERY SYSTEM

Page 21: 1. WATER TREATMENT PLANT TERMOENERGO INŽENJERING · 2015. 4. 16. · plant “visnjicka banja” - detailed design of pumping station in milesevska no 38 street - basic design with

PAINT & LACQUER INDUSTRY DUGA – BEOGRAD (year 1990 – 1994.)

- BASIC MECHANICAL DESIGN OF CONDENSATE SYSTEM

RECONSTRUCTION AND EXTENSION

- FEASIBILITY STUDY FOR ENERGY PRODUCTION,

DISTRIBUTION AND UTILIZATION SYSTEM RECONSTRUCTION

Page 22: 1. WATER TREATMENT PLANT TERMOENERGO INŽENJERING · 2015. 4. 16. · plant “visnjicka banja” - detailed design of pumping station in milesevska no 38 street - basic design with

2a. HEATING PLANTS

TERMOENERGO INŽENJERING Bulevar Kralja Aleksandra 298 street 11 000 Belgrade Serbia Tel: +381 11 3806 172 +381 11 3806 173 Fax: +381 11 3806 251 E-mail: [email protected]

JKP “BEOGRADSKE ELEKTRANE”, BEOGRAD (year 2006 – 2009.)

- DETAILED DESIGN OF HEATING PLANT „Konjarnik“

- DETAILED DESIGN OF HEATING PLANT „Višnjička banja“

- TECHNICAL REVISION OF DCS AND BMS SYSTEMS FOR

HEATING PLANTS „Konjarnik“, „Dunav“, and „Voždovac“

- BASIC DESIGN OF HEATING PLANT „ZEMUN“

- DETAILED DESIGN OF PUMPING STATIONS PPS1 AND

PPS2

- DETAILED DESIGN OF PUMPING STATION IN

MILESEVSKA STREET

- DETAILED DESIGN OF INSTALAIONS FOR OIL

TRANSFER ON PIERS FOR BARGES AT RIVER SAVA IN

TO „NOVI BEOGRAD“

- DETAILED DESIGN OF RECONSTRUCTION FOR

EXISTING TS 10/0,4 AT LOCATION TO „KANAREVO

BRDO“

- DETAILED DESIGN OF RECONSTRUCTION AND

MODERNIZATION SECTION FOR TECHICAL WATER AND

WATER FOR FIRE PROTECTION

Page 23: 1. WATER TREATMENT PLANT TERMOENERGO INŽENJERING · 2015. 4. 16. · plant “visnjicka banja” - detailed design of pumping station in milesevska no 38 street - basic design with

JKP “BEOGRADSKE ELEKTRANE”, BEOGRAD

- DETAIL DESIGN OF PUMPING STATION PPS3 – M4

AT TO MILJAKOVAC

- DETAIL DESIGN OF RECONSTRUCTION AND

MODERNIZATION FOR CIRCULATION SYSTEM AT

TO "MIRIJEVO" 116 MW (2 x 58 MW)

- DETAIL DESIGN OF RECONSTRUCTION FOR PUMP

STATION AND EXCHANGER STATION AT TO

”DUNAV” 348MW (2x58 MW AND 2 x 116MW)

- DETAIL DESIGN OF RECONSTRUCION AND REPAIR

FOR FUNNELAT TO NOVI BEOGRAD

NIS SRBIJE - RAFINERIJA NAFTE PANČEVO

- DETAILED DESIGN FOR EXPANSION OF POWER PLANT WITH BOILER CAPACITY 110 T/H, PRESSURE 45,6 BAR, TEMPERATURE 412 OC

- DETAILED DESIGN OF BOILER INSTALATION BF-9602 CAPACITY 120 T/H PRESSURE OF STEAM 45,6 BAR I TEMPERATURE 412OC

- DETAILED DESIGN OF INSTRUMETATION FOR BOILER BF 9602 - DOCUMENTATION DONE FOR FOXBORO

ICN GALENIKA d.d. – ZEMUN

- DETAIL DESIGN OF BOILER S – 2500

(MANUFACTURER NO. 237) INSTALLATION IN FIRST

PHASE OF HEATING PLANT

- DETAIL DESIGN OF BOILER NO. 2 S – 2500 OPTIMAL

(MANUFACTURER NO. 214) INSTALLATION IN

SECOND PHASE OF HEATING PLANT

Page 24: 1. WATER TREATMENT PLANT TERMOENERGO INŽENJERING · 2015. 4. 16. · plant “visnjicka banja” - detailed design of pumping station in milesevska no 38 street - basic design with

„CRVENA ZASTAVA“ KRAGUJEVAC (year 2006 – 2007.)

- DETAILED DESIGN OF HEATING PLANT

- AS BUILT DESIGN OF HEATING PLANT

JAPAN TOBACCO INTERNATIONAL “SENTA” (year 2006.)

- DETAILED DESIGN OF HEATING PLANT

DIN “FABRIKA DUVANA” A.D. NIŠ - PHILIP MORRIS SRBIJA

- BASIC DESIGN FOR INSTALATION OF NEW STEAM

BOILER CAPACITY 5 T/H, 8 BAR

Page 25: 1. WATER TREATMENT PLANT TERMOENERGO INŽENJERING · 2015. 4. 16. · plant “visnjicka banja” - detailed design of pumping station in milesevska no 38 street - basic design with

CITY OF ČAČAK (year 2005.)

- DETAILED DESIGN OF HEATING PLANT

CITY OF LOZNICA (year 2005.)

- DETAILED DESIGN OF HEATING PLANT

JP “NOVI DOM” VRANJE –BLOCK 47

DETAIL DESIGN OF HEATING PLANT CAPACITY 2 x 5 MW

WITH OIL FUEL STORAGE

HOTEL INTERKONTINENTAL CG, D.P. BEOGRAD

BASIC DESIGN OF HOT WATER STEAM HEATING PLANT

CAPACITY 2 X 4 MW AND PRODUCTIONOF STEAM 6 T/H,

12 BAR

Page 26: 1. WATER TREATMENT PLANT TERMOENERGO INŽENJERING · 2015. 4. 16. · plant “visnjicka banja” - detailed design of pumping station in milesevska no 38 street - basic design with

Zastava automobili a.d. -Kragujevac

BASIC AND DETAIL DESIGN OF HOT WATER HEATING

PLANT CAPACITY 2 4 MW AND PRODUCTION OF STEAM

8 T/H, 12 BAR

Toplifikacija Moravija – Zaječar a.d.

BASIC AND DETAIL DESIGN OF HEATING PLANT

CAPACITY 3 x 16 MW AND OIL FUEL STORAGE

JP “Srbija Gas”, Podzemno skladište gasa – Banatski dvor

BASIC AND DETAIL DESIGN OF HETING PLANT AT

ENERGY SECTOR CAPACITY 2 MW

JP PTT “Srbija”, Printing office and paper warehose at Ada Huji

BASIC AND DETAIL DESIGN OF HEATING PLANT AND

OBJECTS SUPPLY WITH HEAT ENERGY

PKB “IMES”, PADINSKA SKELA

DETAIL DESIGN OF HEATING PLANT, TWO BOILERS

INSTALLATION OF 1,5 T/H, PRESSURE 8 BAR

DETAIL DESIGN OF BONE BURNING PLANT WITH STEAM

BOILER CAPACITY 1,5 T/H, PRESKA 8 BAR

Page 27: 1. WATER TREATMENT PLANT TERMOENERGO INŽENJERING · 2015. 4. 16. · plant “visnjicka banja” - detailed design of pumping station in milesevska no 38 street - basic design with

D.M.D. IBP “BEOGRAD“ – ZEMUN (year 2000.)

DETAILED DESIGN OF THE HEATING PLANT, CAPACITY

2x10 t/h

(WITH COMPANY “TEHNOCAD” – BELGRADE)

“Milan Blagojević – Namenska” Lučani

DETAIL DESIGN OF RECONSTRUCTION FOR HEATING

PLANT, STEAM BOILER TE-111, MAXIMAL PRODUCTION 16

T/H, PRESSURE 12,5 BAR

PD RB “Kolubara” - Lazarevac

DETAIL DESIGN OF HEATING PLANT FOR OIL FUEL,

CAPACITY 2 MW

Cementara “TITAN” – Kosjerić

DETAIL DESIGN OF OIL FUEL CHANGE WITH WOOD FUEL

Q=1 MW

HOSPITAL “DANILO I” – CETINJE (year 1999 – 2000.)

DETAILED DESIGN OF THE HEATING PLANT IN

HOSPITAL “DANILO I” CETINJE

Page 28: 1. WATER TREATMENT PLANT TERMOENERGO INŽENJERING · 2015. 4. 16. · plant “visnjicka banja” - detailed design of pumping station in milesevska no 38 street - basic design with

HOSPITAL CENTER “PODGORICA” (year 1999 – 2000.)

TENDER DOCUMENTATION FOR EQUIPMENT DELIVERY

AND WORKS IN HEATING PLANT AND CONCOMITANT

INSTALATIONS

ICN GALENIKA d.d. – ZEMUN (year 1997 – 2007.)

- HEATING PLANT – RECONSTRUCTION OF THE EXISTING

HEATING PALNT, CAUSED BY BOILER (TPK BKG – 150)

DAMAGE

- DETAILED DESIGN OF HEATING PLANT

RECONSTRUCTION, BOILER S-2500 INSTALATION

INSTEAD OF DAMAGED BOILER

- GENERAL DESIGN OF HEATING PLANT

RECONSTRUCTION

- DETAILED DESIGN OF BOILER “S – 2500“ INSTALATION

(Manufact. No. 214) IN THE FIRST STEP OF HEATING

PLANT RECONSTRUCTION

- DETAILED DESIGN OF BOILER No. 2 INSTALATION (S-

2500 OPTIMAL) IN THE FIRST STEP OF HEATING PLANT

RECONSTRUCTION

DETAILED DESIGN OF HEATING PLANT

Page 29: 1. WATER TREATMENT PLANT TERMOENERGO INŽENJERING · 2015. 4. 16. · plant “visnjicka banja” - detailed design of pumping station in milesevska no 38 street - basic design with

„STRAGARI“ COMPANY – STRAGARI (year 1992.)

STUDY OF RECONSTRUCTION FOR THE HEATING

PLANT WITH CAPACITY OF 25 t/h

PD RB “KOLUBARA” - LAZAREVAC

DETAILED DESIGN OF HEATING PLANT FOR SOLID

FUEL, CAPACITY 2 MW

Page 30: 1. WATER TREATMENT PLANT TERMOENERGO INŽENJERING · 2015. 4. 16. · plant “visnjicka banja” - detailed design of pumping station in milesevska no 38 street - basic design with

4a. PUBLIC COMPANY

TERMOENERGO INŽENJERING Bulevar Kralja Aleksandra 298 11 000 Belgrade Serbia Tel: +381 11 3806 172 +381 11 3806 173 Fax: +381 11 3806 251 E-mail: [email protected]

PUBLIC COMPANY – AIRPORT „NIKOLA TESLA“ BELGRADE (year 2003 – 2004.)

BASIC AND DETAILED DESIGNS – ADAPTION AND

REHABILITATION OF AIRPORT “BEOGRAD”, TERMINAL

T2 – CONNECTING PART AND VIP PARLOUR

- ELECTRICAL DESIGNS

- INFORMATION SYSTEMS

SYSTEMS OF DEVICES AND EQUIPMENT MONITORING

AND CONTROL AT THE AIRPORT

Page 31: 1. WATER TREATMENT PLANT TERMOENERGO INŽENJERING · 2015. 4. 16. · plant “visnjicka banja” - detailed design of pumping station in milesevska no 38 street - basic design with

5. PETROCHEMICAL COMPLEX

TERMOENERGO INŽENJERING Bulevar Kralja Aleksandra 298 11 000 Beograd Serbia Tel: +381 11 3806 172 +381 11 3806 173 Fax: +381 11 3806 251 E-mail: [email protected]

OIL INDUSTRY OF SERBIA – OIL REFINERY “PANČEVO” (oil production: 5 million tons per year) (year 1990 – 2007.)

- DETAILED DESIGN PLANT FOR STORAGE,

PREPARATION AND DOSING ADDITIVES IN DIESEL

FUEL

- HEATING OF SEDIMENTATION BASIN FOR HEAVY

FRACTION STORAGE

- DETAILED DESIGN BUILT SYSTEM FOR SUPPLY,

STORAGE AND IMPORT RAW MATERIAL IN SPLIT

SECTION OF PLANT FOR PRODUCING AROMATIC

MATERIALS IN S-3600

- DETAILED DESIGN OF RECONSTRUCTION SEAL OIL

SYSTEM - VACUUM DISTILLATION S-2200

- DETAILED DESIGN OF CENTRAL CONTROL FOR

TEMPERATURE REGULATION IN TANKS FARM

- DETAILED DESIGN OF POWER PLANT EXPANSION

WITH STEAM BOILER CAPACITY 110t/h , PRESSURE

45,6 bar, TEMPERATURE 412 oC, AND BACK PRESSURE

TURBINE WITH GENERATOR POWER 12MW

Page 32: 1. WATER TREATMENT PLANT TERMOENERGO INŽENJERING · 2015. 4. 16. · plant “visnjicka banja” - detailed design of pumping station in milesevska no 38 street - basic design with

- DESIGN OF MEASURING AND CONTROL EQUIPMENT

RECONSTRUCTION FOR MEASURING AND BALANSING

OF ENERGY PRODUCTION AND CONSUMPTION IN

RNP

- DETAILED DESIGN OF POLYMER BITUMEN PLANT S-

0290

- DETAILED DESIGN OF COMPRESSOR HOUSE FOR

HYDROGEN

- DESIGN OF WASTE GAS BURNING SYSTEM

RECONSTRUCTION, FROM RAW MATERIAL TANKS

FOR BITUMENA

- FCC –DESIGN OF OPERATING SYSTEM IN HDS PLANT

- LOW PRESSURE STEAM SYSTEM IN RNP-FLOW

CALCULATE

- PLANT S-2700 FLARE BURNER PA-2701 – DETAILED

DESIGN RECONSTRUCTION OF FLARE AND STEAM

DISTRIBUTION TO PA-2701

- TANK FARM – DETAILED MECHANICAL DESIGN FOR

RECONSTRUCTION OF BENZENE AND TOULENA

SYSTEMS IN RAILWAY FILLING STATION

- DESIGN OF ANALYZER SYSTEM FOR MONITORING

GAS EMISION FROM FLUE DUCT IN OIL REFINERY

PANCEVO - DOCUMENTATION BASED ON CONTRACT

WITH ABB

- DESIGN OF ANALYZER SYSTEM FOR PROCESS

CONTROL ON PLANT BITUMEN,HDS AND FCC IN OIL

REFINERY PANCEVO - DOCUMENTATION BASED ON

CONTRACT WITH ABB

- DETAILED DESIGN OF MONITORING SYSTEM FOR

STEAM BOILER BF 9602 – DOCUMENTATION BASED

ON CONTRACT WITH FOXBORO

- DETAILED DESIGN OF COMPRESSOR HOUSE FOR

INSTRUMENT AIR

- DETAILED DESIGN FOR INSTALLATION OF STEAM

BOILER BF-9602 CAPACITY 120 t/h PARE, PRESSURE

45,6 bar AND TEMPERATURE 412OC

Page 33: 1. WATER TREATMENT PLANT TERMOENERGO INŽENJERING · 2015. 4. 16. · plant “visnjicka banja” - detailed design of pumping station in milesevska no 38 street - basic design with

- DETAILED DESIGN OF LOW PRESSURE STEAM PIPES

IN OIL REFINERY PANCEVO.

- DETAILED DESIGN FOR RECONSTRUCTION OF STEAM

TRACING SYSTEM IN OIL REFINERY PANCEVO.

- DETAILED DESIGN FOR RECONSTRUCTION PIPES OF

HIGH PRESSURE STEAM IN OIL REFINERY PANCEVO

- DETAILED DESIGN OF TRUCK FILLING STATION

(PROJECT IS DESIGN FOR COMPANY ENERECO –

ITALIJA)

- DETAILED DESIGN OF TANKER FILLING STATION

(PROJECT IS DESIGN FOR COMPANY ENERECO –

ITALIJA)

- DETAIL DESIGN HIGH PRESSURE STEAM

CONNECTION PIPE BETWEEN OIL REFINERY AND

PETROCHEMICAL IN PANCEVO

- DETAIL DESIGN OF RECONSTRUCTION AND

SUPERSTRUCTURE TANK FB-9300 (VOLUME 1.000 m3)

I FB-9320 (VOLUME 1.500 m3) FOR DEMINERALISED

WATER.

- DETAIL MECHANICAL DESIGN OF TANK FB-0810

(VOLUME 6.750 m3) HEAVY SLOP.

- DETAIL MECHANICAL DESIGN FOR RECONSTRUCTION

OF TANK FB-0707 FOR PYROLITIC BENZINE

- DETAIL MECHANICAL DESIGN FOR RECONSTRUCTION

OF TANK FB-2001 (VOLUME 4.600 m3) FOR CATALYTIC

BENZINE

- DETAIL MECHANICAL DESIGN OF RECONSTRUCTION

TANK FB-0706 FOR BENZENE

- DETAIL MECHANICAL DESIGN OF TANK FB-0810

(VOLUME 10.000 m3) FOR HEAVY SLOP.

- DETAIL MECHANICAL DESIGN OF TANK FB-0706 FOR

ADDITIVES IN FUEL.

Page 34: 1. WATER TREATMENT PLANT TERMOENERGO INŽENJERING · 2015. 4. 16. · plant “visnjicka banja” - detailed design of pumping station in milesevska no 38 street - basic design with

NIS SRBIJE – OIL REFINERY NOVI SAD (oil production: 2,5 million tons per year) (year 2000 – 2007.)

- DETAIL DESIGN CONDENSATE RETURN

FROM PLANT "ULJARA I"

- DETAIL MECHANICAL DESIGN FOR

RESTITUTION TANK STORAGE FOR OIL

PRODUCTS

- DETAIL DESIGN PLANT FOR ISOMERATION

(PROJECT IS DESIGNING FOR FIRM PETROL

INVEST – SARAJEVO)

CHEMICAL INDUSTRY HIP - AZOTARA PANČEVO (year 1998 – 2000.)

- BASIC DESIGN FOR USING HEAT ENERGY

- DETAIL DESIGN BOILER AUTOMATION

“BABCOCK & WILCOX ”

NIS SRBIJE – OIL REFINERY BEOGRAD (year 1997 – 2002.)

- DETAIL DESIGN RECONSTRUCTION ENERGY

SYSTEM.

- DETAIL DESIGN FOR CONDENSATE

RECOVERY AND RETURN FROM PLANT.

Page 35: 1. WATER TREATMENT PLANT TERMOENERGO INŽENJERING · 2015. 4. 16. · plant “visnjicka banja” - detailed design of pumping station in milesevska no 38 street - basic design with

CHEMICAL INDUSTRY HIP PETROHEMIJA – PANČEVO (year 1994 – 2007.)

- RECONSTRUCTION SYSTEM FOR

IGNITION,MAINTENANCE AND CONTROL

FLAME START-UP BURNERS IN POWER

PLANT HIP PETROHEMIJA

- FUEL OIL STATION IN POWER PLANT

- DETAIL DESIGN RECONSTRUCTION

,RECOVERY, AND RETURNING CONDENSATE.

- DETAIL DESIGN FOR TRANSPORT MIXTURE

PARAFFIN FLUENT SOLVENT AND USED

COMPRESSOR OIL FROM COLLECT

RESERVOIR IN PENG PLANT TO FUEL OIL

HEADER PIPE.

- DETAIL DESIGN RECONSTRUCTION SYSTEM

FOR DOSING CHEMICALS IN PLANT FOR

PRIMARI FRACTION IN PLANT ETILEN

Page 36: 1. WATER TREATMENT PLANT TERMOENERGO INŽENJERING · 2015. 4. 16. · plant “visnjicka banja” - detailed design of pumping station in milesevska no 38 street - basic design with

05REKONSTRUKCIJA REZERVOARA I TANKVANA

TERMOENERGO INŽENJERING Bulevar Kralja Aleksandra 298 11 000 Beograd Serbia Tel: +381 11 3806 172 Fax: +381 11 3806 251 E-mail: [email protected] www.termoenergo.com

NIS SRBIJE - RAFINERIJA NAFTE PANČEVO

2004

- RECONSTRUCTION OF RESERVOIR FB-9320

Vn=1000 m3

- DESIGN OF VERTICAL RESERVOIR FB-9300

Vn=1000 m3

- DESIGN OF VERTICAL RESERVOIR FB-0810

Vn=6700 m3

2005

- RECONSTRUCTION OF RESERVOIR FB-0707

Vn=540 m3

- DESIGN OF VERTICAL RESERVOIR FB-0706

Vn=85 m3

- RECONSTRUCTION OF RESERVOIR FB-2001,

Vn=5000 m3

- DESIGN OF VERTICAL RESERVOIR FB-0810

Vn=10000 m3

Page 37: 1. WATER TREATMENT PLANT TERMOENERGO INŽENJERING · 2015. 4. 16. · plant “visnjicka banja” - detailed design of pumping station in milesevska no 38 street - basic design with

2006

- RECONSTRUCTION OF RESERVOIR FB-2002,

Vn=5000m3,

- RECONSTRUCTION OF RESERVOIR FB-1405,

Vn=21700 m3,

- RECONSTRUCTION OF RESERVOIR FB-2007

i FB-2008, Vn=1000 m3

(alkilat),

- DESIGN OF VERTICAL RESERVOIR WITH

STEEL EMERGENCY CONTAINERFB-0812

Vn=5000 m3

- SANATION OF RESERVOIR FB-1505,

Vn=21700 m3,

2007

- SANATION OF RESERVOIR FB-1204 AND

FIRE PROTECTION SYSTEM, Vn=21700 m3

- SANATION OF RESERVOIR FB-1501 Vn=5460

m3

- SANATION OF RESERVOIR FB-

1303/1304/1307 AND FIRE PROTECTION

SYSTEMVn=5000 m3

- SANATION OF RESERVOIR FB-1906 AND

FIRE PROTECTION SYSTEMVn=13000 m3

- SANATION OF RESERVOIR FB-1403 AND

FIRE PROTECTION SYSTEMVn=5460 m3

- SANATION OF RESERVOIR FB-1401 AND

FIRE PROTECTION SYSTEMVn=13040 m3

- SANATION OF RESERVOIR FB-1702 AND

FIRE PROTECTION SYSTEMVn=13000 m3

2008

- SANATION OF RESERVOIR FB-0403/0404 AND

FIRE PROTECTION SYSTEMVn=4500

- SANATION OF RESERVOIR FB-0401/0402 AND

FIRE PROTECTION SYSTEMVn=540 m3

- RECONSTRUCTION OF RESERVOIR R29,

Vn=60000 m3,

- SANATION OF RESERVOIR FB-1022 AND FIRE

PROTECTION SYSTEM, Vn=13000 m3

Page 38: 1. WATER TREATMENT PLANT TERMOENERGO INŽENJERING · 2015. 4. 16. · plant “visnjicka banja” - detailed design of pumping station in milesevska no 38 street - basic design with

NIS SRBIJE - RAFINERIJA NOVI SAD

2007

- RECONSTRUCTION OF RESERVOIR,Vn=30000m3,

2008

- RECONSTRUCTION OF RESERVOIR N11, Vn=15000

m3,

- RECONSTRUCTION OF RESERVOIR, Vn=30000 m3,

- SANATION OF RESERVOIR B6, B11, B14, B16, (benzin),

Vn=5000 m3,

- SANATION OF RESERVOIR B7 i B8, Vn=3000 m3,

- SANATION OF RESERVOIR B5, Vn=2000 m3,

- ADAPTATION OF RESERVOIR B2 i B3, Vn=1000 m3,

- ADAPTATION OF RESERVOIR G1, Vn=3000 m3,

DIREKCIJA ZA ROBNE REZERVE REPUBLIKE SRBIJE

2006/7

- DESIGN OF RESERVOIR D13, Vn=5000 m3,

- DESIGN OF RESERVOIR G8, Vn=5000 m3,

NIS SRBIJE A.D. Novi Sad, NIS - PETROL BEOGRAD, JUGOPETROL

2008

- RECONSTRUCTION OF RESERVOIR R29, Vn=60000

m3,

- SANATION OF EMERGENCY CONTAINER

- DELIVERY AND INSTALLATION OF GEAR

Page 39: 1. WATER TREATMENT PLANT TERMOENERGO INŽENJERING · 2015. 4. 16. · plant “visnjicka banja” - detailed design of pumping station in milesevska no 38 street - basic design with

6. PHARMACEUTICAL INDUSTRY

TERMOENERGO INŽENJERING Bulevar Kralja Aleksandra 298 11 000 Belgrade Serbia Tel: +381 11 3806 172 +381 11 3806 173 Fax: +381 11 3806 251 E-mail: [email protected]

HEMOFARM CONCERN – HEMOMONT d.o.o. (year 2005.)

- RECONSTRUCTION OF COMPLETE FACILITY IN ORDER TO

MEET GMP REQUIREMENTS

- HVAC SYSTEMS (11 AHU’S)

- CLEAN ROOMS – MECHANICAL, CIVIL, ELECTRICAL,

INSTRUMENTATION AND CONTROL DESIGNS

“Zorka pharma” (year 2004.)

- DOCUMENTATION FOR ENERGY SAVING – TECHNICAL

UTILITIES

Page 40: 1. WATER TREATMENT PLANT TERMOENERGO INŽENJERING · 2015. 4. 16. · plant “visnjicka banja” - detailed design of pumping station in milesevska no 38 street - basic design with

ICN Galenika d.d. – Zemun (year 1997 – 2007.)

- MECHANICAL DESIGN OF SYSTEM RECONSTRUCTION –

ENERGY SAVING – TECHNICAL UTILITIES

- TECHNICAL REPORT ON CLEAN STEAM SUPPLY AND

CONDENSATE SYSTEM

- DETAIL MECHANICAL, CIVIL, ELECTRICAL AND

INSTRUMENTATION DESIGN FOR HEATING PLANT

RECONSTRUCTION

- DETAIL INSTRUMENTATION AND CONTROL DESIGN FOR FEED

WATER SYSTEM

- DETAIL DESIGN OF GAS DISTRIBUTION SYSTEM IN ICN

- DETAIL DESIGN FOR STEAM BOILER INSTALLATION

- AS-BUILT DOCUMENTATION FOR STEAM BOILER

INSTALLATION

- DETAIL PROCESS-MECHANICAL AND ELECTRICAL DESIGN FOR

FUEL OIL STATION

Page 41: 1. WATER TREATMENT PLANT TERMOENERGO INŽENJERING · 2015. 4. 16. · plant “visnjicka banja” - detailed design of pumping station in milesevska no 38 street - basic design with

7. FOOD INDUSTRY

TERMOENERGO INŽENJERING Bulevar Kralja Aleksandra 298 11 000 Belgrade Serbia Tel: +381 11 3806 172 +381 11 3806 173 Fax: +381 11 3806 251 E-mail: [email protected]

Agricultural plant “Godomin” (year 2002.)

PROCESS – MECHANICAL, ELECTRICAL AND CIVIL

DESIGN OF SUPPLYING SYSTEM

Agricultural complex “Plantaže” – Podgorica (year 2002.)

DETAIL PROCESS-MECHANICAL AND ELECTRICAL

DESIGN FOR COOLING STATION

Sugar factory “4 noembri” – Bitolj (year 1991.)

DESIGN REVISION FOR POWER PLANT

RECONSTRUCTION

Page 42: 1. WATER TREATMENT PLANT TERMOENERGO INŽENJERING · 2015. 4. 16. · plant “visnjicka banja” - detailed design of pumping station in milesevska no 38 street - basic design with

08TRANSPORTATION OF ASH AND DROSS

TERMOENERGO INŽENJERING Bulevar Kralja Aleksandra 298 11 000 Beograd Serbia Tel: +381 11 3806 172 Fax: +381 11 3806 251 E-mail: [email protected] www.termoenergo.com

TE KOSTOLAC

- TRANSPORTATION OF ASH AND DROSS:

- PUMP STATION

- EXTERNAL DISTRIBUTION FROMPUMP STATION TO DUMP