1 virgo commissioning since the end of vsr1 e. tournefier for the commissioning team ilias wg1,...

26
1 Virgo commissioning since the end of VSR1 E. Tournefier for the commissioning team ILIAS WG1, Cascina March 5 th ,2008

Upload: virgil-davis

Post on 28-Jan-2016

214 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: 1 Virgo commissioning since the end of VSR1 E. Tournefier for the commissioning team ILIAS WG1, Cascina March 5 th,2008

1

Virgo commissioning since the end of VSR1

E. Tournefier for the commissioning team

ILIAS WG1, CascinaMarch 5th ,2008

Page 2: 1 Virgo commissioning since the end of VSR1 E. Tournefier for the commissioning team ILIAS WG1, Cascina March 5 th,2008

2

The end of VSR1: mystery death

• Noise structures (200-300 Hz + 600-1000 Hz) highly non-stationary: depend on the quality of the ITF alignment

realignments

Page 3: 1 Virgo commissioning since the end of VSR1 E. Tournefier for the commissioning team ILIAS WG1, Cascina March 5 th,2008

3

Mystery noise investigations

• Noise also seen in the suspended injection bench error signals investigations in laser lab, around injection tower (electronics, seismic noise, laser chiller, tapping tests,…) investigations on the injection suspended bench

Guilty = piezo-actuators on the suspended bench

Mechanism:Piezo driver noise => actuator motion => IB shaken => IMC length noise + jitter noise

External injection bench

Laser bench

Suspended bench

Tower window

Page 4: 1 Virgo commissioning since the end of VSR1 E. Tournefier for the commissioning team ILIAS WG1, Cascina March 5 th,2008

4

Dihedron resonance

Mystery noise = beam jitter

• Solution: low pass filter the signal of the piezo drivers impressive decrease of frequency noise and beam jitter noise (no more) mystery structures disappear from DF

Dark fringe

Frequency noise

Page 5: 1 Virgo commissioning since the end of VSR1 E. Tournefier for the commissioning team ILIAS WG1, Cascina March 5 th,2008

5

Noise budget at the end of VSR1

Control noises

Shot noise

Environmental noise

Actuacor noise

Eddy currents

Page 6: 1 Virgo commissioning since the end of VSR1 E. Tournefier for the commissioning team ILIAS WG1, Cascina March 5 th,2008

6

Noise budget now

Control noises Shot noise

Environmental noiseActuator noise

Eddy currents

Page 7: 1 Virgo commissioning since the end of VSR1 E. Tournefier for the commissioning team ILIAS WG1, Cascina March 5 th,2008

7

Summary

• Control noise reduction:– Longitudinal controls: use a second modulation frequency, noise subtraction,

…– Angular controls: more efficient filters, mirrors centering,…

• Actuator noise:– DAC noise filtering – Magnetic noise: replaced magnets on input mirrors (strength/5.5 + good

polarity)

• Environmental noise investigations– Noise sources: air conditioning (<150 Hz), electronic racks– Path to dark fringe:

injection beam jitter, diffused light on benches, detection/Brewster

• Environmental noise reduction:– Beam jitter reduced– Diffused light mitigation on end benches, improved telescopes – Air conditioning improvement started– Brewster => cryotrap to be installed soon

Page 8: 1 Virgo commissioning since the end of VSR1 E. Tournefier for the commissioning team ILIAS WG1, Cascina March 5 th,2008

8

Alignment noise reduction

• Post VSR1 alignment noise reductions:– More efficient filters– Mirror centering improved– NI+WI local control noise reduced The alignment noise is below V+ design above 20 Hz

• Ongoing improvements: – Find cleaner signals for BS and input mirrors (under drift control) New end benches and new quadrant on B1p have been installed

8MHz

-> Drift control (10mHz)

-> Drift control

see Maddalena’s talk

Page 9: 1 Virgo commissioning since the end of VSR1 E. Tournefier for the commissioning team ILIAS WG1, Cascina March 5 th,2008

9

Upgrade of the end benches

• New end benches telescopes + rearrangement – Hoping for better quality alignment signals– Galvos installed at that occasion (centring during science

operation)

– Better telescope helps to reduce diffused light

Remaining problem: quadrant signals polluted by air flux and bench motion

Telescope

Quadrantsetting

Now Virgo+

Galvos

Galvos

Page 10: 1 Virgo commissioning since the end of VSR1 E. Tournefier for the commissioning team ILIAS WG1, Cascina March 5 th,2008

10

Longitudinal noise reduction

Post VSR1 activities: 1/ Characterization of the ITF response (2 weeks immediately after the run):

- response of actuators (mechanics + electronics) / also a cross check for calibration- optical gains (W/m) : mirror displacement photodiode signals

2/ Improvement of the controls for noise reduction:- adapt filters and driving matrix to the actuator response- adapt the sensing matrix to the optical response- use cleaner signal from the second modulation frequency (8MHz) for MICH control- new filters for marionetta to avoid exciting 16/46 Hz resonances- and: better noise subtraction, more flexible Gc algorithm,…

8MHz

B2_8MHz

Page 11: 1 Virgo commissioning since the end of VSR1 E. Tournefier for the commissioning team ILIAS WG1, Cascina March 5 th,2008

11

Longitudinal control noise reduction

• Longitudinal control noises are not anymore limiting the sensitivity !• Longitudinal control noises are now limited by environmental noises

– Beam jitter subtraction imlemented for B2_8MHz– Long term solution: reduction of environmental noises

ACqB

mixACpB

Bd

A

MICH

PRCL

_5

__20Sensing for central cavity:New B2 signal (8MHz) + new sensing matrix

ACqB

MHzACpB

D

C

MICH

PRCL

_5

8__2

0

0

-VSR1- now

Environmental noise

error signals control signals

see Gabriele’s talk

Page 12: 1 Virgo commissioning since the end of VSR1 E. Tournefier for the commissioning team ILIAS WG1, Cascina March 5 th,2008

12

Environmental noises

• Test: switch OFF the air conditioning in ALL buildings (NE,WE, CE, MC) Identifed sources and path to dark fringe

- diffused light from end benches (now almost completely cured)- beam jitter induced by AC in laser lab- diffused light from Brewster/detection induced by Central hall + DAQ room AC

AC ONAC OFF

Central hall AC Water pump of CECleanRooms AC Laser lab

DAQ room (+CE hall)

North End AC

Other identified sources: electronic racks (peaks above 200 Hz)

Page 13: 1 Virgo commissioning since the end of VSR1 E. Tournefier for the commissioning team ILIAS WG1, Cascina March 5 th,2008

13

0 200 400 600 800 1000 1200 1400

new mount 2"

new mount 1"Y Axis

580 Hz

630 Hz

bench

frequency (Hz)

A.U

.

Beam jitter at the injection

• Mechanical resonances of the Beam Monitoring System mount + PZT seen in dark fringe

Mount + PZT replaced with better one:Move resonances at higher frequencies + they are less easily excited

• Identified vertical/horizontal resonance (~45/18Hz) of the injection bench beam jitter Damping of these resonances under study

Page 14: 1 Virgo commissioning since the end of VSR1 E. Tournefier for the commissioning team ILIAS WG1, Cascina March 5 th,2008

14

Diffused light at the detection

Detection benchesBS

• Many structures above ~100 Hz are coherent with the motion of the Brewster window

• Tapping tests Brewster is the most sensitive of all vacuum piecesBut difficult to make separate what comes from detection tower and from Brewster

Diffused light / modulation by Brewster? Diffused light by detection bench on tower walls or Brewster link / back into the

ITF?

Dark fringe

Coherence with Brewster Seismometer

Page 15: 1 Virgo commissioning since the end of VSR1 E. Tournefier for the commissioning team ILIAS WG1, Cascina March 5 th,2008

15

Diffused light at detection port

BSDetection benches

• Investigate the path for diffused light– Diffused light on the tower walls? baffles installed – no visible effect– Diffused light inside the Brewster link? better baffles have been installed

(any effect?)– Light diffused by detection optics?

bench rotation experiment-some unclear effect

– Coupling through the Brewster window? replace it with cryotrap next week

Page 16: 1 Virgo commissioning since the end of VSR1 E. Tournefier for the commissioning team ILIAS WG1, Cascina March 5 th,2008

16

Diffused light reduction (?) at detection

OB

rot

atio

n 10

0 r

ad

• Indication of light reflected/diffused by the detection bench:Dedicated experiment: rotate the suspended bench by 100 rad

30 Hz and 45 Hz bumps disappeared (related to air conditioning noise in central hall) No clear effect at higher frequenciesOther rotation experiments were not so clear (??)Which is the mechanism?

Page 17: 1 Virgo commissioning since the end of VSR1 E. Tournefier for the commissioning team ILIAS WG1, Cascina March 5 th,2008

17

‘Brewster noise’ variations with alignment

• Noise varies with the alignment/power on dark fringe• True only above 100 Hz • What about the low frequency which seemed to change with bench

rotation?

Page 18: 1 Virgo commissioning since the end of VSR1 E. Tournefier for the commissioning team ILIAS WG1, Cascina March 5 th,2008

18

Environmental noise reductions

• Diffused light at end benches well reduced (beam dump + new optics)• Beam jitter reduced (new BMS)• Air conditioning improved inside the DAQ room• Some pumps used for AC are OFF (do not seem needed…)=> Impact of AC well reduced

Page 19: 1 Virgo commissioning since the end of VSR1 E. Tournefier for the commissioning team ILIAS WG1, Cascina March 5 th,2008

19

New DAQ room air conditioning machine

430

UTA

120

200

70

32

90

60 232.5

119

301

137.5

157

233.

5

Page 20: 1 Virgo commissioning since the end of VSR1 E. Tournefier for the commissioning team ILIAS WG1, Cascina March 5 th,2008

20

Actuator noise reduction

• Reduction of the mirror actuator electronics noise during VSR1 (arm mirrors)

DACDSP CoilDriverGEmphasis

DeEmphasis DeEmphasis

Emphasis

Air conditioning OFF

Impact of DAC noise reduced:• BS:

– marionetta reallocation now working=> CD gain decreased by 4 (DAC + CD noise

reduction)• Arms:

gain decreased by factor 4 (reduced dynamic)=> new coil driver with several (switchable) low noise sectionsnext step: better emphasis filters

+ Improved measurement of low frequency DAC noise performed

No clear improvement observed…

Page 21: 1 Virgo commissioning since the end of VSR1 E. Tournefier for the commissioning team ILIAS WG1, Cascina March 5 th,2008

21

Actuator noise now

• Marionetta DAC noise below 20 Hz?• We’ll add some filtering this week, let’s see…

Eddy currents

Page 22: 1 Virgo commissioning since the end of VSR1 E. Tournefier for the commissioning team ILIAS WG1, Cascina March 5 th,2008

22

Magnetic noise?

• Direct coupling of magnetic noise through the magnets attached to the mirror• Magnetic lines injections, modelling => tentative projection (upper limit)

see Bas’s talk

Page 23: 1 Virgo commissioning since the end of VSR1 E. Tournefier for the commissioning team ILIAS WG1, Cascina March 5 th,2008

23

Magnetic noise?

• We replaced the magnets of the input towers with less strong ones (/5)+ restored the good polarity

No real improvement observed…

Dec 21st

Mar 3rdAC OFF

Page 24: 1 Virgo commissioning since the end of VSR1 E. Tournefier for the commissioning team ILIAS WG1, Cascina March 5 th,2008

24

Thermal effects

• Cleaning of the input mirrors was performed at the end of November– Some visual improvement was observed for both

WI mirror : Observation before cleaning : with an halogen lamp coupled to a fiber

some large particules on the coatings center part : a little bit ‘opaque’ (~ Ø1 cm) a lot of condensation points but not on the coating

Observation after cleaning : no more large particles center part : clearer(# Ø1 cm) visual aspect better than before cleaning

– But no clear improvement in the thermal effects:- thermal transient similar to before - increase of the sidebands power ~ 25% only

see Michele’s talk

Page 25: 1 Virgo commissioning since the end of VSR1 E. Tournefier for the commissioning team ILIAS WG1, Cascina March 5 th,2008

25

Thermal effects

• Before / after cleaning

Sidebands powerDark fringeLocking step

B5, carrier

Page 26: 1 Virgo commissioning since the end of VSR1 E. Tournefier for the commissioning team ILIAS WG1, Cascina March 5 th,2008

26

Plans before Virgo+ shutdown

• Replace Brewster with cryotrap next week

• Thermal Compensation System installation this month – TCS commissioning

• Understand effect of the magnets replacement (magnetic noise, Eddy currents)– Also replace those of the end mirrors?