Facilities and Services Division Process Definition: Client Relationships
QMS-FS-PRO-63-001 Rev 0A
Page 1 of 15
UNCONTROLLED WHEN PRINTED
Process Definition:
Client Relationships
1. SUMMARY
1.1. This document defines the processes provided by the Client Relationships Team in detail.
1.2. The relationship between this Business Unit process and the other Business Unit processes
within the Facilities and Services Division (F&S, or the Division) management system is
illustrated in the process flow map included in the Quality Manual.
2. REVISION AND APPROVAL
Rev. Date Nature of Changes Approved By
0 07/12/2016 Original for Issue Sharyn Sinclair-Hannocks
0A 11/4/2017 QMS Review Darren Knights
3. PROCESS DEFINITION
3.1. The Division’s Maintenance Portfolio is responsible for the management and delivery of best
practice maintenance, minor capital works at the ANU, and managing the asset life cycle and
asset management plans (AMPs) across the University.
3.2. The Client Relationship team works within the Maintenance Portfolio and is the first point of
contact for College and School Facility Managers and other stakeholders across the
University for Portfolio related services, including but not limited to: maintenance services
(corrective, preventative, statutory), minor capital works, asset management planning and
specialist engineering advice.
3.3. The Client Relationship team is responsible for the successful management of the client
relationship function, with a focus on developing and maintaining key client relationships
across the University for all Maintenance Portfolio related services.
3.4. The Client Relationship team reports to the Associate Director – Maintenance and is a key
Business Unit within the Maintenance Portfolio. The Client Relationship team use their
technical expertise to diagnose, implement and deliver client focused solutions, services and
strategies that supports the delivery of Maintenance Portfolio services, including corrective,
preventative and statutory maintenance services, minor capital works, asset management
planning and specialist engineering advice, consistent with the values and priorities of the
Division and University.
4. BUSINESS UNIT PROCESS OBJECTIVES AND METRICS
4.1. The Client Relationships process objectives and metrics have been derived from, and align
with, the Goals detailed in the F&S 2016 Strategic Business Plan.
4.2. The objectives for the Client Relationships process are defined in detail below and reviewed
during the conduct of quarterly management reviews; see the documented procedure
Management Review.
Facilities and Services Division Process Definition: Client Relationships
QMS-FS-PRO-63-001 Rev 0A
Page 2 of 15
UNCONTROLLED WHEN PRINTED
4.3. In addition, each process objective has at least one metric (or KPI) with which management
can measure the effectiveness of the Business Unit process. These are also defined below
and reviewed quarterly in records of management reviews.
Goal 1 – Develop and maintain key client relationships across the University for maintenance
related services (Meets F&S Divisional Goals 1 & 5)
Team Objective KPI Lead By By When
Coordination and continuous
performance monitoring
PDR process implemented CRM Ongoing
Ensure agreed service standards
are met
Negotiation of standards with
clients
ADM with
CRM
Ongoing
Develop client focused solutions
that support continuous
improvement
Key scheduling and client
engagement processes mapped
CRM with
CSOs / CROs
4th QTR 2016
Continuous Improvement of
Client Relationship and
Scheduling processes
CRM with
CSOs / CROs
Ongoing
Develop new Client
Relationships webpage
CRM Ongoing
Follow up with clients to
determine client satisfaction
Design and develop survey
methodologies comparative
with previous surveys
CRM with
CRO’s
TBD
Goal 2 – Develop and maintain professional and effective working relationships (Meets F&S
Divisional Goal 4)
Team Objective KPI Lead By By When
Be responsive to, and work
closely with, other teams in the
Maintenance Portfolio to obtain
relevant technical advice and
expertise
Effective working relationships
established
CRM within Maintenance Management Team
Ongoing
Engage and work with
stakeholders across campus, and
other University staff to establish
and maintain effective
relationships and support the
provision of client focused
maintenance services
Development and
implementation of client
engagement strategies
CRM with CROs
2nd QTR 2017
Facilities and Services Division Process Definition: Client Relationships
QMS-FS-PRO-63-001 Rev 0A
Page 3 of 15
UNCONTROLLED WHEN PRINTED
Goal 3 – Management and timely processing of corrective maintenance service requests and
resulting Work Orders (Meets F&S Divisional Goals 2 & 3)
Team Objective KPI Lead By By When
Process Service requests in
MAXIMO into appropriate Work
Orders for the Service Delivery
Team to action.
Average number of days to
process Service Requests
(current year vs previous year)
CRM with Corrective Schedulers
Updated
daily
Rank Priority 1 to 4 Service
Requests to enable the Service
Delivery Team to respond
according to Priority assigned
- Priority 1 to 3 assigned SDT
for response action.
- Priority 4 assessed prior to
assignment to SDT for
response/action
CRM with Corrective Schedulers
Ongoing
daily
Treat all maintenance
emergencies as Priority 5
Priority 5 assigned to all
emergencies for SDT immediate
response/action
CRM with Corrective Schedulers
Ongoing
daily
Goal 4 – Identify and develop reporting metrics for the Client Relationship Team (Meets F&S
Divisional Goals 3 & 5)
Team Objective KPI Lead By By When
Develop Dashboard utilizing
MAXIMO datasets with CR
metrics
Number of Service requests per
Year
CRM Complete -
ongoing
review
Number of Service requests per
Month
CRM Complete -
ongoing
review
Average number of days to
process Service Requests
(current year)
CRM Complete -
ongoing
review
Average number of days to
process Service Requests
(previous year)
CRM Complete -
ongoing
review
Facilities and Services Division Process Definition: Client Relationships
QMS-FS-PRO-63-001 Rev 0A
Page 4 of 15
UNCONTROLLED WHEN PRINTED
5. PROCESS OWNERS AND RESPONSIBLE PARTIES
5.1. The owner of this process is the Client Relationships Manager. The Client Relationship
Manager is responsible for management of the Client Relationship team which includes Client
Relationship Officers and Corrective Schedulers, ensuring performance and service standards
are met, and developing and maintaining professional and effective working relationships and
being responsive and working closely with the other team leaders across the Maintenance
Portfolio.
5.2. The Client Relationship Manager will engage and work with key stakeholders across campus
(both internal and external to the Division), other University staff, external clients and
contractors in order to establish and maintain effective relationships and support the provision
of client focused maintenance services.
5.3. Under the broad direction of the Associate Director – Maintenance, the Client Relationship
Manager is responsible for:
5.3.1. Managing and leading the client relationship function for the Maintenance Portfolio
5.3.2. Developing client focused solutions for the delivery of maintenance services which are economically feasible and practical for the University including, but not limited to, providing expert and specialist advice to the Division’s Senior Management Team and as required, other key University stakeholders.
5.3.3. Providing strong leadership, supervision and guidance to the staff within the Client Relationship team to foster a standard of exemplary and professional client service, effectively managing staff and team performance, developing team skills, and leading the team to ensure deadlines and objectives are met.
5.3.4. Coordinating client relationship activities for a Portfolio of clients to support delivery of maintenance services (corrective, preventative, statutory), minor capital works, asset management planning and specialist engineering advice in accordance with ANU processes and procedures and utilising own expertise plus work with technical and trade specialist staff to coordinate and determine the technical and non-technical aspects of requirements.
5.3.5. Managing the expectations of a Portfolio of clients against the University capabilities and constraints including but not limited to internal or external resource availability and budget allocations.
5.3.6. Developing, consulting and implementing strategies, policies, processes and KPI’s for client services and stakeholder engagement that focus on best practice, supporting the provision of high quality service and continuous business improvement. Contribute to the overall improvement of the delivery of maintenance services and planning for the Portfolio.
5.3.7. Managing and coordinating the development, completion and follow up of client engagement plans and surveys for key University stakeholders.
Facilities and Services Division Process Definition: Client Relationships
QMS-FS-PRO-63-001 Rev 0A
Page 5 of 15
UNCONTROLLED WHEN PRINTED
6. TYPICAL PROCESS INPUTS
6.1. The typical required inputs for the Client Relationships processes are:
6.1.1. Technical and other information needed:
Service Requests
Work Orders
Technical Advice Requests
Programmed Maintenance (Statutory and Legislative)
Trade based corporate knowledge of the ANU Estate (ie. ANU Security)
E&TS input and advice ie. BMS, Fire, Engineering and Technical
Mapping, asset/building and custodian info from Archibus
Contracts, Quotations, Budgeting and Finance
ANU Executive and College/Division input
6.1.2. Resources needed:
MAXIMO Maintenance Management System
Desktop PCs
Microsoft Office Suite of programs, including:
MSExcel
MSOutlook
MSWord
MS One Note
iPad tablets
Mobile Phones
6.1.3. Personnel needed:
The Client Relationships Team comprises 5 full-time positions, as detailed below:
Position Level Position Title
ANU08 Client Relationship Manager
ANU06 Client Relationship Officer
ANU06 Client Relationship Officer
ANU05 Corrective Scheduling Officer
ANU05 Corrective Scheduling Officer
6.1.4. Special training needed:
MAXIMO Maintenance Management System
Microsoft Office suite of Programs (Excel, Word, Outlook, etc)
Facilities and Services Division Process Definition: Client Relationships
QMS-FS-PRO-63-001 Rev 0A
Page 6 of 15
UNCONTROLLED WHEN PRINTED
Incident Reporting
Email Communication
ANU Privacy Training
Workplace Communications
Maintaining a Positive Workplace Environment
Preventing Workplace Bullying
ANU Code of Conduct
COMCARE Work Health and Safety (WHS)
WHS for Managers
ANU Indigenous Cultural Awareness
ANU Career and Performance Development
7. TYPICAL PROCESS STEPS
7.1. The following process flow charts are typical of those activities undertaken by members of the
Client Relationship team:
QMS-FS-PRF-61-008 - Maintenance Enquiry
QMS-FS-PRF-63-002 – Service Request
QMS-FS-PRF-63-003 - Priority 5 Work Order Creation
QMS-FS-PRF-63-004 - Priority 1-4 Work Order Creation
QMS-FS-PRF-63-005 – Corrective Maintenance or Technical Advice Request
QMS-FS-PRF-63-006 – Client Management
QMS-FS-PRF-64-002 - Preventative and/or Statutory Maintenance
Facilities and Services Division Process Definition: Client Relationships
QMS-FS-PRO-63-001 Rev 0A
Page 7 of 15
UNCONTROLLED WHEN PRINTED
Service Delivery Team - Maintenance EnquiriesC
lien
tC
lien
t R
elat
ion
ship
Team
Wo
rker
s (L
/H,
Svc
Off
icer
s &
C
on
trac
tors
)
Serv
ice
Del
iver
y Te
amQMS-FS-PRF-61-008_Revision 0_20161207
Start EndMAXIMO Self HelpCheck W/O log for
relevant update
Relevantupdatefound?
Yes
Client enquires thru F&S CRT or SDT
No
MAXIMO Self HelpCheck W/O log for
relevant update
Relevantupdatefound?
CRT
Update Client with relevant
information
Update W/O log regarding enquiry and information
gained
Yes
Make enquiry via assigned Services
Supervisor
No
Requested information at
hand?
1. If Client enquiry via Email then attach original enquiry to Services Supervisor enquiry2. In the absence of Service Supervisor (including non-HDA periods) enquiry is to be escalated to SDM
Enquiry via Client or
CRT?Yes
CRT
Update Client with relevant
information
Update W/O log regarding enquiry and information
gained
Client
Provide relevant information on
enquiry to assigned Services Supervisor
No
Services Supervisor or
CRT?
ServicesSupervisor
Facilities and Services Division Process Definition: Client Relationships
QMS-FS-PRO-63-001 Rev 0A
Page 8 of 15
UNCONTROLLED WHEN PRINTED
Client Relationship Team: Service RequestC
lien
tSc
hed
ule
rsC
lien
t R
elat
ion
ship
Off
icer
sQMS-FS-PRF-63-002_Revision 1_20170216
Start
Raise SR via Maximo / Phone / Email
Assess Service Request
Further info from Client?
Yes
Contact client
NoInput info
above to SR
Further clarification discussions
between client and service
response team
No
YesWO
Required?
Input required:- Nature and type of work- Priority- Point of Contact details- Location & Bldg No- Asset number
Input required: - Confirm Priority- Asset No. - Budget Code
Considerations include:- SR lacks information- Not maintenance related- Heating or cooling (HVAC)
END
Select:: - Job Plan- Work type- Safety Plan- Team / trade group- Asset No.- Confirm Priority
Work Order P5(QMS-FS-PRF-63-003)Work Order P1 to P4(QMS-FS-PRF-63-004)
No
Facilities and Services Division Process Definition: Client Relationships
QMS-FS-PRO-63-001 Rev 0A
Page 9 of 15
UNCONTROLLED WHEN PRINTED
Maintenance: Priority 5 Work Order Creation – Client Relationship TeamSe
rvic
e D
eliv
ery
Team
Sch
edu
lers
Serv
ice
Co
ntr
acto
rO
ther
F&
S B
usi
nes
s U
nit
QMS-FS-PRF-63-003_Revision 1_20170216
Internal / External /
Other?
External
Nature of work may indicate external
provider from MUL
Multi User List (MUL)
InternalOther Issue Work Order to Service Supervisor
END
Issue Work Order to Service Contractor
Issue Work Order to Other F&S Team (eg
Security, CWR, G&G, etc)
Input from Service Request
QMS-FS-PRF-63-002
Notification of P5 call to Service
Supervisor
Undertake WorkIssue Invoice on
Completion of work
Work OrderQMS-FS-PRF-61-002
Completed by Other F&S Business Unit ie.
E&TS Technical Assistance
Facilities and Services Division Process Definition: Client Relationships
QMS-FS-PRO-63-001 Rev 0A
Page 10 of 15
UNCONTROLLED WHEN PRINTED
Maintenance: Priority 1-4 Work Order CreationSc
hed
ule
rsSe
rvic
e Su
per
viso
rSe
rvic
e C
on
trac
tor
Oth
er F
&S
Team
QMS-FS-PRF-63-004_Revision 1_20160216
Input Additional information
RaiseWork Order
CRO s to gather further information from Clients: - Confirm Priority - Asset No. - Nature and Type of Work - Budget Code - Safety Plan - SDT select Trade
Internal / External /
Other?
External
Nature of work may indicate external
provider from MUL
Multi User List (MUL)
Internal
Other
START
Allocate Work Order to Team Member
END
Issue Work Order to Other F&S Team (eg BMS, Security, CWR)
Undertake workIssue Invoice on
completion of work
Service Delivery?
No Yes
Work OrderQMS-FS-PRF-62-002
Issue Work Order to Service Supervisor
Upgradeto Priority
5?No
Priority 5Work Order Creation
Yes
Completed by Other F&S Business Unit ie. E&TS Technical Assistance
Facilities and Services Division Process Definition: Client Relationships
QMS-FS-PRO-63-001 Rev 0A
Page 11 of 15
UNCONTROLLED WHEN PRINTED
Child SR or TAR Required?
Service Delivery – Corrective Maintenance and/or Technical Advice Request
ETS
Team
Pro
gram
Off
ice
Serv
ice
Del
iver
yC
on
trac
tor
Clie
nt
Rel
atio
nsh
ip
Team
QMS-FS-PRF-63-005_Revision 1_20170216
Client Service Request Received
Monitor all WO’s and TARs
Raised
Provide advice as required
WO or TAR?WO
Allocate to Relevant Team Member
TAR
Investigate and Analyse
Complete TAR in Maximo
Client Satisfaction Review
Supervisor Assesses Job Requirements
Staff or Contractor?
Complete Works
Review WO Complete Works
Supervisor Review
Contractor
Staff
Complete WO in Maximo
Accept Invoice
Yes
No
Close WOor TAR
Issue Invoice
Verify Invoice with WO
Complete Job Paperwork
Service RequestQMS-FS-PRF-63-006
Facilities and Services Division Process Definition: Client Relationships
QMS-FS-PRO-63-001 Rev 0A
Page 12 of 15
UNCONTROLLED WHEN PRINTED
Client Management – Client Relationship Team
Clie
nt
Rel
atio
nsh
ip O
ffic
erC
lien
tC
lien
t R
elat
ion
ship
Man
ager
A/D
M
ain
ten
ance
QMS-FS-PRF-63-006_Revision 0_20161207
Schedule Client Engagements through clientrelationships.fs
calendar
Develop Client Engagement Strategy
(CES)
END
Confirm client acceptance in
clientrelationships.fs
Facilitate meetingswith Clients
Participate in meetings with CRO’s
Draft minutes of meetings / Client
Reports in OneNote
Save copy of minutes / Client Reports to
clientrelationships.fs calendar entry
Update calendar entry and notify meeting
participants
Clients review and comment on meeting
minutes
Standardised Agenda Items for Client Meetings1. Hot Topics a. Backlog Maintenance b. Incomplete/Outstanding Work Orders c. Performance Feedback d. Issues of concern2. F&S Report (Upcoming Activities) a. Programmed works b. Projects c. Service outages/disruptions3. Planned future works (client perspective)4. Other business
Draft Quarterly Client Engagement Report for
A/D Maintenance
Review Quarterly Client Engagement Report
Facilities and Services Division Process Definition: Client Relationships
QMS-FS-PRO-63-001 Rev 0A
Page 13 of 15
UNCONTROLLED WHEN PRINTED
Program Office – Preventative and/or Statutory Maintenance
ETS
Team
Pro
gram
Off
ice
Serv
ice
Del
iver
yC
on
trac
tor
Clie
nt
Rel
atio
nsh
ipQMS-FS-PRF-64-002_Revision 0_20161124
Works triggered via Maintenance
Regime
Review WO or TAR?
WO
TAR
Supervisor Assesses Job Requirements
Staff or Contractor?
Allocate Resources and
Complete Works
Review WO
Conduct Physical Audit of Percentage of completed WO’s
Review Invoice and attach Service
Reportto WO
Contractor
Staff
Mark WO as Completed in
Maximo (including Fault Codes)
Determine - Preventative or
Statutory?
End
Generate Service Report & Labour / Materials Invoice
Issue Invoice
Raise Service Request
Allocate Resources and
Complete Works
Generate Service Report
Client Satisfaction Review
Arethere gaps in the
process?Yes
No
E&TS TAR Process
WorkComplete?
No
Raise Child SR from Original WO
Yes
Service Request -
Service Delivery Team
Raise Corrective
Action Request (CAR)
Facilities and Services Division Process Definition: Client Relationships
QMS-FS-PRO-63-001 Rev 0A
Page 14 of 15
UNCONTROLLED WHEN PRINTED
8. TYPICAL PROCESS OUTPUTS
8.1. The typical results (outputs) of the process are as follows:
8.1.1. Product produced:
Service Requests
Work Orders
8.1.2. Documents or technical information produced:
Dashboard reporting
Minutes of CRO/CRM Client Meetings
Client Engagement Strategies
Client Engagement Plans
Master Client Engagement Spreadsheet
8.1.3. Records produced:
Client Relationship Activity/Issues logs or reports
Performance reports
8.1.4. Services produced:
Service Request to Work Order processing
Client relationships support services
9. RELATED RISKS
9.1. Management may elect to conduct a formal risk assessment for any of these risks; the
preferred method of risk assessment is the ANU Risk Management Framework.
9.2. The following risks and associated mitigation strategies (control measures) are identified
related to this process:
Facilities and Services Division Process Definition: Client Relationships
QMS-FS-PRO-63-001 Rev 0A
Page 15 of 15
UNCONTROLLED WHEN PRINTED
Risk
Like
liho
od
Co
nse
qu
ence
Ass
essm
en
t
Sco
re
Mitigation
Corrective scheduling resourcing
Po
ssib
le
Maj
or
Mo
der
ate
(6)
- Backup arranged from CROs with
in-house training
- Liaise with HR for professional
development / training solution
Lack of response to CRO/CRM
requests for information
Po
ssib
le
Maj
or
Mo
der
ate
(6)
- Awareness campaign targeting
Internal and External F&S
stakeholders
Building Custodians not aware of
their obligations
Like
ly
Maj
or
Hig
h
(9)
- Review and publish revised Building
Custodian guidelines