1 stockpile destruction: the malaysian experience
TRANSCRIPT
1
STOCKPILE DESTRUCTION:STOCKPILE DESTRUCTION:
THE MALAYSIAN EXPERIENCETHE MALAYSIAN EXPERIENCE
2
MALAYSIA AS STATE PARTY
• Signatory to the Ottawa Convention since 1997.
• Further ratified it on 22nd Apr 1999.
• Law enacted on 30th Oct 2000 – Anti-Personnel Mines Convention Implementation Act 2000.
• Successfully conducted the “Stockpile Destruction” on 15th – 23rd Jan 2001.
3
AIM
To Highlight The Conduct Of The Stockpile Destruction Operation
4
TYPES AND QUANTITIES OF APL
• PROM 1 (Yugoslavia)
• PAM 2 (Yugoslavia)
• PMA 3 (Yugoslavia)
11,990
37,738
44,993
A Total of 94,721 mines were destroyed
5
MINE AIRBURST PROM-1
6
MINE PAM-2
7
MINE PMA-3
8
LOCATION FOR THE DESTRUCTION AND QUANTITIES OF APL
9
LOC 1: ASAHAN RANGE, MALACCA(15 Jan – 23 Jan 2001: 9 Days)
• Mine AP PROM 1: 11,492
• Mine AP PAM 2 : 34,740
• Mine AP PMA 3 : 43,943
• Total : 90,175
10
LOC 2: KOTA BELUD, SABAH(15 Jan – 16 Jan 2001: 2 Days)
• Mine AP PROM 1: 198
• Mine AP PAM 2 : 498
• Mine AP PMA 3 : 1,050
• Total : 1,746
11
LOC 3: SEMPADI, SARAWAK(15 Jan – 18 Jan 2001: 4 Days)
• Mine AP PROM 1 : 300
• Mine AP PAM 2 : 2,500
• Total : 2,800
12
CONDUCT OF OPERATION
• Board of Officers Convened.
• Demolition ranges determined.
• Collection of APL.
• Preparation of demolition team and demolition ranges.
• APL re-packed and transported to demolition ranges.
• Preparation of APL at demolition range.
13
PREPARATION OF APL AT DEMOLITION RANGES
Temporary Storage Area
Segregation of Inner Packaging and Separation of Fuzes
14
WORKING AREA AT DEMOLITION RANGES
15
CONDUCT OF OPERATION
• Inspection and verification of mines by officials from NGO
• Confirmation on the quantities and types of mines reported.
• Verification of destruction method and safety procedures.
16
DESTRUCTION METHOD
• Destruction by Electrical Method.
• Preparation of demolition pits.• Mine AP PROM 1: 160 mines/pit.• Mine AP PAM 2 : 500 mines/pit.• Mine AP PMA 3 : 700 mines/pit.
• Mines and cables laid for disposal.
• Safety Checked by Safety Officer.
• Personnel Retreat To Safe Area.
17
CONDUCT OF OPERATION
• Connection of Cable Under Safety Officer’s Instruction.
• Firing Order Issued.
• Pit Inspected.
• Destruction Completed.
18
CONCLUSION
• Destruction of Stockpile At The 3 Selected Demolition Ranges Was Successfully Conducted.
• Financial Implications Total RM 6.98 mil (USD 1.84 mil).
• NGO Representatives From Land Mines Ban Research and Advocacy (Bangkok) and Philippine Campaign on Land Mines Ban Were Present To Witness.
• Malaysia Completed The Obligation Under Article 4.
19
Thank YouThank You