Notice of Project Western University Facilities Management Client Services 519-661-3304 ([email protected]) Project Number: Project Name: Asbestos Type 3 Type 2 Type 1 Contractor In House Team Other Shutdowns/Interruptions(Approximate Schedule): Electrical Power Domestic Water Steam Hot Water Heating Chilled Water Elevators Fire Alarms Roads / Lots ITS Other Issued By: Miniature Attached Date/Schedule: Contractor: Attached To Follow Special Conditions ( Noise, Odors, Asbestos, Etc.) Comments: Date: Date: Date: Date: Date: Date: Date: Date: Date: Date: Date: Date: Areas/Rooms Affected, Alternate Route/Service: Description/Reason for Project: Service to be interrupted: Building(s) Affected: Information Sheet Sent To Client #1 #3 #2 #4 #1 #2 #3 #4 Phone # Cell # Client Contact: Phone # Designer Consultant: Emergency Phone List: (to CCPS Only) Project Manager/ Co-ordinator: Signature/ Stamp: Cell # Note: Signature/ Stamp: Time: 9C4310 West Substation Expansion Print Form Submit by E-mail 5/1/14 to 4/30/15 Tonda Construction Limited (519-686-5200) The use of heavy equipment will create noise and equipment exhaust. TBA The construction site boundaries are west of Social Science, south of Social Science parking lot, east of the West Lane Service Entrance to UCC and north of UCC. The West Substation Expansion Project will expand the footprint of existing electrical substation moving westward towards the West Lane Service Road. The project when complete will increase the campus electrical capacity to meet the increasing demands for electricity. Roadway Sidewalks Loading Dock 88745 519-636-3548 N/A N/A Chorley & Bisset Dave Ostrom The main construction site for the Substation will be bordered by fixed construction fence, but work to install buried electrical duct banks along the full length of the West Lane Service Road will have temporary barricades and markings during these activities. Heavy equipment and construction activities will create temporary lane restrictions at times. Individual Service Interruption Notices will be issued for significant lane restrictions and lane closures. 7 am to 5 pm daily. Social Science Western Student Support Building (UCC) University Community Centre

Upload: others

Post on 04-Aug-2020

0 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: #1 Social Science Western Student Support Building (UCC) #2 Substation project May 1 2014 -… · Notice of Project Western University Facilities Management Client Services 519-661-3304

Notice of Project Western University

Facilities Management Client Services 519-661-3304 ([email protected])

Project Number:

Project Name:

Asbestos Type 3 Type 2 Type 1 Contractor In House Team Other

Shutdowns/Interruptions(Approximate Schedule):Electrical Power Domestic Water Steam Hot Water Heating

Chilled Water

Elevators

Fire Alarms

Roads / Lots

ITS Other

Issued By:

Miniature Attached Date/Schedule:

Contractor:

Attached To Follow

Special Conditions ( Noise, Odors, Asbestos, Etc.)

Comments:

Date:

Date:

Date:

Date:

Date:

Date:

Date:

Date:

Date:

Date:

Date:

Date:

Areas/Rooms Affected, Alternate Route/Service:

Description/Reason for Project:

Service to be interrupted:

Building(s) Affected:

Information Sheet Sent To Client

#1

#3

#2

#4

#1 #2

#3 #4

Phone # Cell #

Client Contact: Phone #

Designer Consultant:

Emergency Phone List: (to CCPS Only)

Project Manager/ Co-ordinator:

Signature/ Stamp:

Cell #

Note:

Signature/ Stamp:

Time:

9C4310

West Substation Expansion

Print Form

Submit by E-mail

5/1/14 to 4/30/15

Tonda Construction Limited (519-686-5200)

The use of heavy equipment will create noise and equipment exhaust.

TBA

The construction site boundaries are west of Social Science, south of Social Science parking lot, east of the West Lane Service Entrance to UCC and north of UCC.

The West Substation Expansion Project will expand the footprint of existing electrical substation moving westward towards the West Lane Service Road. The project when complete will increase the campus electrical capacity to meet the increasing demands for electricity.

Roadway Sidewalks

Loading Dock

88745 519-636-3548

N/A N/A

Chorley & Bisset

Dave Ostrom

The main construction site for the Substation will be bordered by fixed construction fence, but work to install buried electrical duct banks along the full length of the West Lane Service Road will have temporary barricades and markings during these activities. Heavy equipment and construction activities will create temporary lane restrictions at times. Individual Service Interruption Notices will be issued for significant lane restrictions and lane closures.

7 am to 5 pm daily.

Social Science Western Student Support Building (UCC)

University Community Centre

amerucci
Approved
Page 2: #1 Social Science Western Student Support Building (UCC) #2 Substation project May 1 2014 -… · Notice of Project Western University Facilities Management Client Services 519-661-3304

C���

��r�

�����

���

��D

����

����

����

��R

A�

����

����

���

�E

� P

LAN

Dr�

���

� N

��D

r��

S��

��

Dr�

���

� T�

���

�� �

��

Pr�

����

N��

D��

C��

���d

Pr�

����

T���

A �D

ETA

IL N

O�

DW

G� N

O� �

W�

ER

E D

ETA

ILE

D

A �