1 setis _steering group _27102011_mapping 1 mapping of set-plan projects an update

26
1 SETIS _STEERING GROUP _27102011_Mapping Mapping of SET-Plan Projects An Update

Upload: leah-kilgore

Post on 27-Mar-2015

213 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: 1 SETIS _STEERING GROUP _27102011_Mapping 1 Mapping of SET-Plan Projects An Update

1

SETIS _STEERING GROUP _27102011_Mapping 1

Mapping of SET-Plan Projects

An Update

Page 2: 1 SETIS _STEERING GROUP _27102011_Mapping 1 Mapping of SET-Plan Projects An Update

2

SETIS _STEERING GROUP _27102011_Mapping 2

Aim of Project Mapping

The Mapping of projects relevant to the SET-Plan was mandated by the Steering Group in October 2010 to:

Prioritise future efforts

Leverage on-going developments and knowledge at EU level

Facilitate joint programming

Page 3: 1 SETIS _STEERING GROUP _27102011_Mapping 1 Mapping of SET-Plan Projects An Update

3

SETIS _STEERING GROUP _27102011_Mapping 3

Current state

– Updated up to 2525thth October October

– Total questionnaires received: 262262 , budget: 5785 M€5785 M€

– Geographical coverage: 18 EU MSs + NO, IS and CH

– Increasing engagement:

• First submissions from FR and NL

• DE submission “Forschungsjahrbuch Erneuerbare Energien 2010”, but information does not contain all questionnaire fields

• DK contributed a large number (62) of (smaller) projects

– Analysis is ongoing

The filled in questionnaires are now online:

http://setis.ec.europa.eu/activities/project-mapping

Page 4: 1 SETIS _STEERING GROUP _27102011_Mapping 1 Mapping of SET-Plan Projects An Update

4

SETIS _STEERING GROUP _27102011_Mapping 4

Number of projectsreceived per EII - total: 262

SOLAR, 16

NUCLEAR, 26GRIDS, 16

WIND, 82

BIOENERGY, 35

CCS, 31

FCH2, 38

BIOENERGY BIOENERGY + FCH2 CCS CCS + BIOENERGY FCH2

GRIDS NUCLEAR SOLAR SOLAR-BIO SOLAR-GRIDS

WIND WIND-BIO WIND-GRIDS WIND-SOLAR-BIO WIND-SOLAR-GRIDS

Page 5: 1 SETIS _STEERING GROUP _27102011_Mapping 1 Mapping of SET-Plan Projects An Update

5

SETIS _STEERING GROUP _27102011_Mapping 5

Budget of projects received per EII – total: 5785 M€

NUCLEAR, 927

SOLAR, 155

WIND, 3211

BIOENERGY 446

CCS, 371

GRIDS, 217

FCH2, 295

BIOENERGY BIOENERGY + FCH2 CCS CCS + BIOENERGY FCH2

GRIDS NUCLEAR SOLAR SOLAR-BIO SOLAR-GRIDS

WIND WIND-BIO WIND-GRIDS WIND-SOLAR-BIO WIND-SOLAR-GRIDS

Page 6: 1 SETIS _STEERING GROUP _27102011_Mapping 1 Mapping of SET-Plan Projects An Update

6

SETIS _STEERING GROUP _27102011_Mapping 6

Number of projects per country

total: 262 projects

0

5

10

15

20

25

30

35

40

AT BE CH CZ DE DK EE EL ES FI FR IS IT NL NO PL PT RO SE SK UK

62

Page 7: 1 SETIS _STEERING GROUP _27102011_Mapping 1 Mapping of SET-Plan Projects An Update

7

SETIS _STEERING GROUP _27102011_Mapping 7

Budget per country total: 5785 M€

0

50

100

150

200

250

300

350

400

AT BE CH CZ DE DK EE EL ES FI FR IS IT NL NO PL PT RO SE SK UK

3031709

Page 8: 1 SETIS _STEERING GROUP _27102011_Mapping 1 Mapping of SET-Plan Projects An Update

8

SETIS _STEERING GROUP _27102011_Mapping 8

SET-Plan Project MappingResponses – Wind (excl. FP6/7 projects)

Country Number of projects

Budgets

(MEuro)

BE 8 2838.7

DK 44 67.1

EL 1 3.0

ES 5 146.6

FI 3 51.2

IT 1 6.5

NO 2 30.9

PT 2 20.1

SE 14 12.2

SK 1 1.1

UK 1 5.8

TOTAL 82 3183.2

• 1 project (Slovakia) is combined wind, solar & bioenergy.• 2 projects (Greece & Portugal) are combined wind, solar & grids.• The total budgets of these projects are equality divided among the technologies engaged.• 26 out of the 44 Danish projects & 9 out of the 14 Swedish projects are with the budget below the threshold (1M€)• Total budgets in wind is not changed significantly due to the small contribution of the new projects.

Wind Project Grouping (MEuro)

55.4, 2%

74.2, 2%

3053.6, 96% Onshore (18)

Offshore (31)

Other technologies(33)

Page 9: 1 SETIS _STEERING GROUP _27102011_Mapping 1 Mapping of SET-Plan Projects An Update

9

SETIS _STEERING GROUP _27102011_Mapping 9

Wind projects: Split per EII –IP activity

EII activity BE DE DK ES FI FR IT NO PT SE SK UK Ttl1.1 New WT, materials, components 2 2 20 3 6 3 12 1 1 501.2 Testing facilities 3 4 1 2 1 111.3 Mass production   1 2   1             42.1 Offshore - new structures   1 2 3     2 1       92.3 Tech from O&G       1     1         23.1 Grid – HVDC       1      1         23.2 System dynamics 1     2     1   1     53.3.1 Balancing     2 1               33.3.2 Market integration     2     1 2         54.1 Wind resources 1   12 1 1   1 1         174.2 Spatial planning             1     1     24.3 Public acceptance     1       1           2Total 7 4 45 13 10 1 3 11 1 15 1 1 112

Page 10: 1 SETIS _STEERING GROUP _27102011_Mapping 1 Mapping of SET-Plan Projects An Update

10

SETIS _STEERING GROUP _27102011_Mapping 10

SET-Plan Project MappingResponses – Bioenergy (excl. FP6/7 projects)

Country Number of projects

Budgets

(MEuro)

BE 2 14.4

ES 11 65.0

IT 14 16.0

NO 1 0.6

PL 2 34.7

SK 7 22.4

UK 4 304.9

TOTAL 41 458.0

• 4 projects (Spain) are combined bioenergy & CCS.• 1 project (Norway) is combined bioenergy & FCH2.

• 2 projects (Slovakia) are combined bioenergy & solar.• 1 project (Slovakia) is combined bioenergy, solar & wind.• The total budgets of these projects are equality divided among the technologies engaged.

Bioenergy Project Grouping (MEuro)

204.2, 44%

199.9, 44%

53.8, 12%Thermochemicalpathways (10 projects)

Biochemical pathways(19 projects)

Complementarymeasures & activities(12 projects)

Page 11: 1 SETIS _STEERING GROUP _27102011_Mapping 1 Mapping of SET-Plan Projects An Update

11

SETIS _STEERING GROUP _27102011_Mapping 11

Bioenergy Project Mapping: Split per EII IP activity

The classification presented here has been slightly changed & adapted from the implementation plan, which only involves activities in demonstration and flagship plants.

The total adds up to more than the total number of projects (41), because several projects are related to multiple activities in the implementation plan, hence these projects are counted more than once.

Country

Bioenergy EII activity BE ES IT NO PL SK UK Total*

Synthetic liquid fuels or hydrocarbons through gasification 1 1

Bio-synthetic gaseous fuels through gasification 1 2 2 5

CHP through thermochemical conversion (efficiency > 45%) 1 1 2 4

Bioenergy carriers through pyrolysis & torrefaction 1 1 2

Ethanol & higher alcohols from ligno-cellulosic feedstock 1 3 1 2 1 8

Hydrocarbons through synthesis from biomass 3 5 2 10

Bioenergy carriers by micro-organisms from CO2 & sunlight 3 3

Biomass feedstock for bioenergy 1 1 2

RD&D on emerging & innovative bioenergy value chains 1 4 1 3 9

Total activities* 2 10 14 1 6 7 4 44

Page 12: 1 SETIS _STEERING GROUP _27102011_Mapping 1 Mapping of SET-Plan Projects An Update

12

SETIS _STEERING GROUP _27102011_Mapping 12

SET-Plan Project MappingResponses – CCS (excl. FP6/7 projects)

Country Number of projects

Budgets

(MEuro)

CH 1 4.2

CZ 1 2.0

DE 6 110.0

ES 6 32.3

FI 1 20.0

IT 1 na

PL 1 4.2

PT 1 0.4

UK 10 58.2

TOTAL 27 231.0

• 4 projects (Spain) are combined CCS & bioenergy. 50% of their total budgets is allocated to CCS

• 1 project (Finland) deals with the whole CO2 chain (capture/transport/storage)

CCS Project Grouping (MEuro)

18.3, 8%

6.7, 3%

206.4, 89%

CO2capture/separation(24.7 projects)CO2 transport (0.7projects)

CO2 storage (1.7projects)

Page 13: 1 SETIS _STEERING GROUP _27102011_Mapping 1 Mapping of SET-Plan Projects An Update

13

SETIS _STEERING GROUP _27102011_Mapping 13

CCS Project Mapping: Split per EII IP activity

*The total adds up to more than the total number of projects (27), because several projects are related to multiple activities in the implementation plan, hence these projects are counted more than once.

Country

CCS EII activity CH CZ DE ES FI IT PL PT UK Total*

CCS Demonstration 1 1 1 3Capture

Pre-combustion 1 3 4Post-combustion 1 3 4 1 1 2 12Oxyfuel 1 2 1 1 5Compression 1 1Capture: generic 1 1

Transport 1 1Storage 1 1 1 1 1 5Policy/Regulatory 1 1 1 3Advanced fossil fuels 1 5 6

Total activities* 3 3 7 9 4 2 1 3 9

Page 14: 1 SETIS _STEERING GROUP _27102011_Mapping 1 Mapping of SET-Plan Projects An Update

14

SETIS _STEERING GROUP _27102011_Mapping 14

SET-Plan Project MappingResponses – FCH2 (excl. FP6/7 projects)

Country Number of projects

Budgets

(MEuro)

AT 1 4.8

BE 1 14.1

CH 1 5.0

DK 17 76.2

EE 1 1.2

FI 9 165.1

IS 1 3.0

IT 1 2.0

NO 3 5.6

PT 1 0.5

RO 2 15.2

TOTAL 38 292.7* 1 projects (Norway) is combined FCH2 & bioenergy. 50% of its total budget is allocated to FCH2.

Hydrogen & Fuel cells Project Grouping (MEuro)

37.7, 13%

254.9, 87%

Hydrogen (7 projects)

Fuel cells (31 projects)

Page 15: 1 SETIS _STEERING GROUP _27102011_Mapping 1 Mapping of SET-Plan Projects An Update

15

SETIS _STEERING GROUP _27102011_Mapping 15

SET-Plan Project MappingResponses – Solar (excl. FP6/7 projects)

Country Number of projects

Budgets

(MEuro)

BE 7 28.2

EL 1 3.0

ES 1 7.5

PT 4 93.0

SK 4 11.5

TOTAL 17 143.2

• 2 projects (Slovakia) are combined solar & bioenergy.• 1 project (Belgium) is combined solar & grids.• 1 project (Slovakia) is combined solar, bioenergy & wind.• 2 projects (Greece & Portugal) are combined solar, wind & grids.• The total budgets of these projects are equality divided among the technologies engaged.

Solar Project Grouping (MEuro)

49.2, 34%

94.0, 66%

PV (13 projects)

CSP (4 projects)

We have now info on ~ 40 projects from DE

Page 16: 1 SETIS _STEERING GROUP _27102011_Mapping 1 Mapping of SET-Plan Projects An Update

16

SETIS _STEERING GROUP _27102011_Mapping 16

Solar Project Mapping: Split per EII IP activity

Country

Solar energy EII activity BE EL ES PT SK Total*

Solar PVCost reduction

Advanced manufacture for cells & modules 2 2

Performance enhancement & lifetime extension 2 1 1 4

Materials development & sustainability 2 1 3

System integrationEnabling large scale deployment 2 1 1 1 5

Large scale PV power plants 320 20/80Solar resources & monitoring

Preparing for cost & penetration beyond 2020 levelsUltra low cost technologies 50 50-70% 60/40Very high efficiency approaches 50 70-90% 80/20Integration concepts for very high levels of penetration

Solar CSPDemonstration of innovative components 2Demonstration of innovative systems 1Demonstration of innovative configurations of plantsDemonstration of innovative concepts

Total activities* 8 1 1 4 3 17

Page 17: 1 SETIS _STEERING GROUP _27102011_Mapping 1 Mapping of SET-Plan Projects An Update

17

SETIS _STEERING GROUP _27102011_Mapping 17

SET-Plan Project MappingResponses – Grids (excl. FP6/7 projects)

Country Number of projects

Budgets

(MEuro)

BE 3 42.3

CZ 2 18.8

EL 1 3.0

ES 5 42.1

IT 2 93.5

PT 1 11.0

SK 2 7.8

TOTAL 16 221.6

Grids Projects Grouping (MEuro)

6.0, 3%

15.2, 7%

200.4, 90%

Transmission (3 projects)

Distribution (11 projects)

T&D (1 project)

•2 projects (EL + PT) are combined Wind-Solar-Grids. 33% of each budget is allocated to Grids.•1 project (BE) is combined Wind-Grids. 50% of the budget is allocated to Grids.

Page 18: 1 SETIS _STEERING GROUP _27102011_Mapping 1 Mapping of SET-Plan Projects An Update

18

SETIS _STEERING GROUP _27102011_Mapping 18

Number of Grid projects split per activity and country (1)

2.5 Joint task on IT system protocol and standards

113Total Transmission projects per country

1

ES

1RESPO

2.4 Improved defence and restoration plans

1Total T&D projects per country

2.1 Tools for improved system observability and market interactions

12.2 Integration of DSM in TSO

operation

2.3 Ancillary services by DSOs

1. Transmission networks

FREEGI activities BE CZ DE EL IT PT SKTot

projects addressi

ng activity

1.1 Pan EU grid architecture

1.2 Power technologies 41.3 Network management and control 2

1.4 Market rules 1

2. Coordination between T&D

2.5 Joint task on IT system protocol and standards

113Total Transmission projects per country

1

ES

1RESPO

2.4 Improved defence and restoration plans

1Total T&D projects per country

2.1 Tools for improved system observability and market interactions

12.2 Integration of DSM in TSO

operation

2.3 Ancillary services by DSOs

1. Transmission networks

FREEGI activities BE CZ DE EL IT PT SKTot

projects addressi

ng activity

1.1 Pan EU grid architecture

1.2 Power technologies 41.3 Network management and control 2

1.4 Market rules 1

2. Coordination between T&D

TWEN

TIES

PEG

ASE

GRID2025

AN

EMO

S.PL

US

ENERGOZ

FP projectsnational projects

Page 19: 1 SETIS _STEERING GROUP _27102011_Mapping 1 Mapping of SET-Plan Projects An Update

19

SETIS _STEERING GROUP _27102011_Mapping 19

Number of Grid projects split per activity and per country (2)

6SPARC3.6 Integration of EV and PHEV

3.7 Monitoring and control of LV networks

3.8 Automation and control of MV networks

3.9 Integration of methods and system support

3.10 Integration of integrated communication solutions

4

ES FREEGI activities BE CZ DE EL IT PT SKTot

projects addressi

ng activity

3. Distribution networks3.1 Smart Metering infrastructure 4

3.2 Smart metering data processing 4

3.3 DER hosting capacity of LV network 83.4 DER hosting capacity of MV

network 113.5 Integration of storage 7

Total distribution projects per country 3 1 1 3 2 2 2

6SPARC3.6 Integration of EV and PHEV

3.7 Monitoring and control of LV networks

3.8 Automation and control of MV networks

3.9 Integration of methods and system support

3.10 Integration of integrated communication solutions

4

ES FREEGI activities BE CZ DE EL IT PT SKTot

projects addressi

ng activity

3. Distribution networks3.1 Smart Metering infrastructure 4

3.2 Smart metering data processing 4

3.3 DER hosting capacity of LV network 83.4 DER hosting capacity of MV

network 113.5 Integration of storage 7

Total distribution projects per country 3 1 1 3 2 2 2

LIN

EA

RS

MA

RT

E

SM

AR

T R

EG

ION

G4V

MO

REM

ICR

OG

RID

SM

ER

GE S

MA

RT

CIT

Y

DENISE

STORE

PO

I

9 PILOT INO

VG

RID

REI

VE

ITM

SEN

ERG

OZ

S2G

GR

EE

N I

SL

AN

D

FP projects ERDF projectsnational projects

Page 20: 1 SETIS _STEERING GROUP _27102011_Mapping 1 Mapping of SET-Plan Projects An Update

20

SETIS _STEERING GROUP _27102011_Mapping 20

Ongoing efforts in EGII projects mapping

Distribution projects (AIT-Austria Institute of Technology)

•Collection of information on national Distribution projects (240)

Transmission projects (ENTSOE)

•Collection of information on Transmission projects (40)

JRC Smart Grid Pilot Projects Catalogue:•Collection of information on Smart Grid pilot projects (260)

•Projects mapped according to Smart Grid functionalities (EPRI methodology)

Page 21: 1 SETIS _STEERING GROUP _27102011_Mapping 1 Mapping of SET-Plan Projects An Update

21

SETIS _STEERING GROUP _27102011_Mapping 21

SET-Plan Project MappingResponses – Nuclear (excl. FP6/7 projects*)

Country Number of

projects

Allocated Budgets(MEuro)

BE* 1 60.0

CZ 1 na

FR* 1 650.0

IT 2 8.8

SE 1 5.0

TOTAL 6 723.8

* MYRRHA (FR) and ASTRID (BE) projects have been included since FP7 contribution is minor

** SUSEN project has been approved by national government, but approval by EC is pending

Nuclear Projects Grouping (MEuro)

Sodium Fast Reactors(SFR)

(1 project)90%

Lead cooled Fast Reactors

(LFR) (4 projects)

10%

Sodium Fast Reactors(SFR) (1 project)

Lead cooled Fast Reactors (LFR) (4 projects)

Page 22: 1 SETIS _STEERING GROUP _27102011_Mapping 1 Mapping of SET-Plan Projects An Update

22

SETIS _STEERING GROUP _27102011_Mapping 22

ESNII Project Mapping: Split per ESNII IP activity

*The total adds up to more than the total number of projects (8), because several projects are related to multiple activities in the implementation plan, hence these projects are counted more than once.

Page 23: 1 SETIS _STEERING GROUP _27102011_Mapping 1 Mapping of SET-Plan Projects An Update

23

SETIS _STEERING GROUP _27102011_Mapping 23

Mapping of SET-Plan Projects

The way forward

Page 24: 1 SETIS _STEERING GROUP _27102011_Mapping 1 Mapping of SET-Plan Projects An Update

24

SETIS _STEERING GROUP _27102011_Mapping 24

Formalisation of the role of actors

SETIS

Sherpas

distribute questionnaire

NationalPOs

ECPOs

data/ information input

SETIS

data/ information, analysis

Sherpas, SG

EIITeams

Page 25: 1 SETIS _STEERING GROUP _27102011_Mapping 1 Mapping of SET-Plan Projects An Update

25

SETIS _STEERING GROUP _27102011_Mapping 25

Rationale:

A simplified questionnaire was requested by the Steering Group in the last meeting

Better identify synergies & gaps between the EIIs Implementation Plans & National projects

Extract information in a more efficient way Simplify input and reduce workload of reporting

actors Facilitate analysis for purpose by SETIS

Development of a new questionnaire

Page 26: 1 SETIS _STEERING GROUP _27102011_Mapping 1 Mapping of SET-Plan Projects An Update

26

SETIS _STEERING GROUP _27102011_Mapping 26

Online (SETIS website) implementation:

Registration system with username and password

Multiple choices possible

Tick-off related priority activities and KPIs in the relevant

EII implementation plans (via drop-down menus)

User can extract information from the project database

Registered users receive alerts when new projects added

Available by end November 2011

New questionnaire/tool