Session structure
•Overview
•Definition & examples
•Actions
•Outputs
•Challenges
•Exercises
Module 4 Control measures & risk reassessment
2
![Page 3: 1. Session structure Overview Definition & examples Actions Outputs Challenges Exercises Module 4 Control measures & risk reassessment 2](https://reader035.vdocuments.us/reader035/viewer/2022070411/56649cd65503460f9499d890/html5/thumbnails/3.jpg)
Overview
• Document existing and potential control measures
• Assess their effectiveness (validation)
• Recalculate risks accounting for existing control measures
• Prioritize risks
3
Module 4 Control measures & risk reassessment
![Page 4: 1. Session structure Overview Definition & examples Actions Outputs Challenges Exercises Module 4 Control measures & risk reassessment 2](https://reader035.vdocuments.us/reader035/viewer/2022070411/56649cd65503460f9499d890/html5/thumbnails/4.jpg)
Control measure definition:
Any action or activity that can be used to prevent, eliminate or reduce to an acceptable level any water safety hazard
4
Module 4 Control measures & risk reassessment
![Page 5: 1. Session structure Overview Definition & examples Actions Outputs Challenges Exercises Module 4 Control measures & risk reassessment 2](https://reader035.vdocuments.us/reader035/viewer/2022070411/56649cd65503460f9499d890/html5/thumbnails/5.jpg)
Examples – Control measures – low tech
Cover
Well headDesignated bucket
5
Module 4 Control measures & risk reassessment
![Page 6: 1. Session structure Overview Definition & examples Actions Outputs Challenges Exercises Module 4 Control measures & risk reassessment 2](https://reader035.vdocuments.us/reader035/viewer/2022070411/56649cd65503460f9499d890/html5/thumbnails/6.jpg)
Examples – Control measures
Module 4 Control measures & risk reassessment
6
Source water protected from livestock
Automated chlorine dosing system
Module 4 Control measures &
![Page 7: 1. Session structure Overview Definition & examples Actions Outputs Challenges Exercises Module 4 Control measures & risk reassessment 2](https://reader035.vdocuments.us/reader035/viewer/2022070411/56649cd65503460f9499d890/html5/thumbnails/7.jpg)
Actions
•Identify existing controls
•Document need for new control measures as necessary
7
Identify control measures
Assess effectiveness
Reassess risks Prioritize risks
Module 4 Control measures & risk reassessment
![Page 8: 1. Session structure Overview Definition & examples Actions Outputs Challenges Exercises Module 4 Control measures & risk reassessment 2](https://reader035.vdocuments.us/reader035/viewer/2022070411/56649cd65503460f9499d890/html5/thumbnails/8.jpg)
Actions continued...
•Assess effectiveness (normal & exceptional circumstances)
8
ValidationInvestigative activity to identify the effectiveness of
control measures. It provides the evidence that elements of the WSP can effectively meet the water
quality targets.
Module 4 Control measures & risk reassessment
![Page 9: 1. Session structure Overview Definition & examples Actions Outputs Challenges Exercises Module 4 Control measures & risk reassessment 2](https://reader035.vdocuments.us/reader035/viewer/2022070411/56649cd65503460f9499d890/html5/thumbnails/9.jpg)
Actions continued...
•Assess effectiveness (normal & exceptional circumstances)
•Monitoring
•Not in isolation but as part of process chain
•Data from studies / historical records
•Introducing contaminant – testing removal
•Sanitary surveys
9
Module 4 Control measures & risk reassessment
![Page 10: 1. Session structure Overview Definition & examples Actions Outputs Challenges Exercises Module 4 Control measures & risk reassessment 2](https://reader035.vdocuments.us/reader035/viewer/2022070411/56649cd65503460f9499d890/html5/thumbnails/10.jpg)
Actions continued...
• Reassess risks accounting for effectiveness of control measures
•Based on long-term average performance
•Highlight where controls are not in place
10
Module 4 Control measures & risk reassessment
![Page 11: 1. Session structure Overview Definition & examples Actions Outputs Challenges Exercises Module 4 Control measures & risk reassessment 2](https://reader035.vdocuments.us/reader035/viewer/2022070411/56649cd65503460f9499d890/html5/thumbnails/11.jpg)
Actions continued...
•Prioritize all identified risks
•Rank the reassessed risks
•Screen for critical risks
11
Module 4 Control measures & risk reassessment
![Page 12: 1. Session structure Overview Definition & examples Actions Outputs Challenges Exercises Module 4 Control measures & risk reassessment 2](https://reader035.vdocuments.us/reader035/viewer/2022070411/56649cd65503460f9499d890/html5/thumbnails/12.jpg)
Outputs
12
Module 4 Control measures & risk reassessment
![Page 13: 1. Session structure Overview Definition & examples Actions Outputs Challenges Exercises Module 4 Control measures & risk reassessment 2](https://reader035.vdocuments.us/reader035/viewer/2022070411/56649cd65503460f9499d890/html5/thumbnails/13.jpg)
Challenges
•Uncertainty in prioritizing risks
•Lack of knowledge
•Poor data
•Different approaches = different outcome
•Qualitative versus quantitative
•Assessing effectiveness of certain controls
•Catchment – how to measure/enforce?
13
Module 4 Control measures & risk reassessment
![Page 14: 1. Session structure Overview Definition & examples Actions Outputs Challenges Exercises Module 4 Control measures & risk reassessment 2](https://reader035.vdocuments.us/reader035/viewer/2022070411/56649cd65503460f9499d890/html5/thumbnails/14.jpg)
14
Exercise•In small groups•Part 1 (5 minutes)
• Match up hazardous events with suitable control measures
• Identify possible control measures for three hazardous events
•Part 2 (5 minutes)• Describe how these control measures can be validated
•Part 3 and 4 (20 minutes)• Reassess the likelihood and severity by considering the
implementation of control measures and rank the risks again from highest to lowest
Module 4 Control measures & risk reassessment