  • 8/17/2019 1 SATIP-A-004-02 Hydro Test of Plant Piping-Rev 1

    1/2

    RH1 RH1This is in conjunction with SATIP-L-350-01or with

    the applicable piping/equipment SATIP.

    Review of Test Package Preparation

    1.3Line Flushing or Internal Cleanliness

    Procedure

      * See Note 1 (General Notes)

    1.4 Lay-Up Procedure SAIC-A-2007 RH1

    W1

    SAIC-A-2003

    SAIC-A-2016SATR-A-2001

    R1

    SAIC-L-2001

    W1

    W1 S

    R2

    H1SAIC-A-2009

    MECHANICAL

    RH1

    RH1

    PROJECT PHASE &

     Activi ty Code

    SAUDI ARAMCO ID/PID - REV 1 - 5/18/05 (Standards Cutoff - August 2004)

    RH1

    DISCIPLINE:

    REMARKSQUALITY

    PROCEDURE

    1.0

    Hydrostatic testing Procedure

    DOCUMENT REVIEW

    SAIC-A-20011.1

    SATR-A-2002

    SATR-A-2003

    SATR-A-2004

    SATR-A-2005SATR-A-2006

    SATR-A-2001

    for test

    Manifold)

    SAIC-A-2009

    3.3

    3.0 APPLICATION

    3.1

    3.6

    SAIC-A-2013

    Pneumatic Testing of Reinforcing padscovering Pressure containing Welds SAIC-A-2016

    Filling & Pressurization SAIC-A-2013

    SAIC-A-2008 R1RH1

    MATERIAL RECEIVING

    Test Preparation & Verification ofTesting equipment (including safety

    requirements)

    SAIC-A-2008

    SATR-A-2014

    Verification of Testing Media for

    Hydrostatic Testing

    Forms SATR-A-2003 & SATR-A-2004 shall be

    used for 24-hr recorded hydrostatic test, Ie;underground piping or piping whose joints are

    covered before pressure testing.

    W1

    H1 H1

    SAIC-A-2015

    SATR-A-2001H1 H1

     APPROVED DATE

    25-May-05

    SAUDI

     ARAMCO

    CONTRACTOR/SUBCONTRACTOR

    Hydrostatic Testing of On-Plot Piping

    SAUDI ARAMCO TYPICAL INSPECTION PLANSATIP No.

    SATIP-A-004-02

    ITEM

    NO. TASK / ACTIVITY

    CNTRCTR

    QUALITY

    RECORD

    WBS/BI/JO/NO.PROJECT TITLE:

    INSPECTION RESPONSIBILITY

     ASSIGNMENTS

    2.1

    2.0

    1.2

    3.4

    SAIC-A-2015Visual Inspection at Test Pressure3.5

    Pre-Test Punch Listing SAIC-A-2010 SATR-A-2007

    In Conjunction with SATIP-L-350-01

    In Conjunction with SATIP-L-350-01

    3.2 Internal Cleanliness or Flushing SAIC-L-2017SAIC-L-2017

    SATR-A-2008H1 H1

    Page 1 of 2

  • 8/17/2019 1 SATIP-A-004-02 Hydro Test of Plant Piping-Rev 1

    2/2

    MECHANICAL

    PROJECT PHASE &

     Activi ty Code

    SAUDI ARAMCO ID/PID - REV 1 - 5/18/05 (Standards Cutoff - August 2004)

    DISCIPLINE:

    REMARKSQUALITY

    PROCEDURE

     APPROVED DATE

    25-May-05

    SAUDI

     ARAMCO

    CONTRACTOR/SUBCONTRACTOR

    Hydrostatic Testing of On-Plot Piping

    SAUDI ARAMCO TYPICAL INSPECTION PLANSATIP No.

    SATIP-A-004-02

    ITEM

    NO. TASK / ACTIVITY

    CNTRCTR

    QUALITY

    RECORD

    WBS/BI/JO/NO.PROJECT TITLE:

    INSPECTION RESPONSIBILITY

     ASSIGNMENTS

    4.2 Lay-up SAIC-A-2018 H1 W1

    Hold: QA/QC organization shall be notified of the timing of inspection or test in advance. Inspection or test shall not be carried out without the QA/QC organization representative inattendance.

    SATR-A-2009

    4.0 POST- TEST

    Witness: QA/QC organization shall be notified of the timing of Inspection or test in advance. However, the inspection or test shall be performed as scheduled if the QA/QC

    organization representative is not present.

    If the Main Contractor delegates the assigned responsibility to the Subcontractor, then the Main Contractor will have the same degree of responsibility as assigned to Saudi Aramco.

    LEGEND

    W1 H2

    R1W2

    5

    3

    1

    2

    R2

    Sample Hold Point for QC Inspection or Test

    100% Review of Documents

    sample Review of Documents Surveillance

    RH1

    RH2

    100% Review and Approval of Documents

    Sample Review and Approval of Documents

    S

    GENERAL NOTES

    The first three incidents of each Inspection or testing activity listed require 100 % participation by Saudi Aramco Site Inspection Personnel. After this period, Saudi Aramco Inspection may adjust

    the levels of Saudi Aramco participation based upon the Contractor’s performance.

    Surveillance: QA/QC organization to monitor work in progress without notice from Construction Organization.

    4

    H1

    100% Witness Inspection/Test

    Sample Witness Inspection/Test

    100% Hold Point for QC Inspection or Test

    SAIC-A-2017 W1 S4.1 De-Pressurization & Water Disposal SAIC-A-2017