1 risail automated approval process 2 what is the automated approval process? certain payment...
TRANSCRIPT
1
RISAIL Automated Approval Process
2
What is the automated approval process?
• Certain Payment Documents will automatically advance from 4IR (Ready for AP) status to 4IA (approved) status.
3
What Payment Documents are included in the automated approval
process?
• RISAIL Invoices and Direct Pay Documents under $500
4
Are there any exceptions?
• Payments to AI (Audit Info) Vendors• Payments with Vendor Backup Handling Code• Payments against Bond Accounts (funds 22&23)• Payments against Certificates of Participation-COPs
(fund 26)• Employee Reimbursement and Petty Cash Payments• Credit Memos• Batch Imports• Corrections Required
5
How will the automated approval process work?
• Agencies will continue to process payment documents in the RISAIL System.
• Payment Documents will continue to be signed by an Authorized Agent.
• Payment Documents will continue to be “Departmentally Approved” within the RISAIL System.
6
Process Continues...
• Invoices and Direct Pay Documents less than $500 and not “excluded” from the automated approval process must be kept aside.
• Payment documents greater than or equal to $500 and those that are part of the excluded items should continue to be sent to the Controller’s Office as usual.
7
Ok, So Now I Have These Documents, What’s Next?
• On a weekly basis, as documents are advanced from 4II (In Progress) to 4IR (Ready for AP) status, they can be considered on “hold” or in “suspense”.
Weekly Meaning:
Saturday 12:00 midnight to Friday 11:59pm
8
SUNDAY MONDAY TUESDAY WEDNESDAY THURSDAY FRIDAY SATURDAY12:01 am the beginning of the processing Week 1
Week 1 Week 1 Week 1 Week 1 Week 1
Week 1 ends 11:59 pm
12:01 am Week 1 documents will change from 4IR to 4IA status AND the beginning of the processing week 2.
3:00 Week 1 documents must be received by the Controllers Office
9
•Each Saturday, the documents on hold will be automatically advanced to 4IA (approved) status.
•This means, these documents will be part of the Monday morning check process and by approximately 9:00 am, will be in 4IP (paid) status.
10
E M E R G E N C Y ! ! !
• If you need a vendor paid immediately, we can still go ahead and manually approve a document less than $500 the old fashioned way.
11
Because the Controller is the Official State Record Keeper...
• Documents must be kept in order by RISAIL Location (example 68B) and by Department Approver (68MAF000)
• Payment Documents need to be placed in large envelope(s)
• A label must be completed and affixed to each envelope, placed on top of the flap.
12
SAMPLE LABEL Automated Approval
Certification Label
Package___of___ Week Ending: _ __________
Location:_ ______
Deparment Name:______________________
Fund/Agency_________
Total Payments Processed:$_______________
Total Number of Payments Processed __ _______
I certify that the items and totals included above areproper charges against the STATE OF RHODE ISLANDAND PROVIDENCE PLANTATIONS.
______________________________________Authorized Agent Date
Accounts and Control Only
Reviewed By_______________ Date___________
13
•By 3:00 each Wednesday all payment documents that were part of the previous week’s automated process must be delivered to a specified place/person in the Controller’s Office.
•You will be given a receipt as confirmation that your documents have been received.
14
Sample Receipt
Document Package Receipt
Week Ending____/____/____ Location:___________
Received By:______________ # of Packages_______
Date Received:____________
15
How will I keep track of all of my payment documents?
• You will have access to two reports that will aid in managing your documents
• These reports can be found on the Controller’s website
16
The “Potential” Report
• This report will list all payment documents that have the potential to be automatically advanced to 4IA status.
• “Potential” simply means that the documents can still be canceled or returned if needed.
17
Potential documents to be approved next Saturday
Location:68A Document Type: BSDI From: 052205
Person Municipal Invalid BankDate dept Dept Doc Doc class/item ACH Fund Vendor Vendor
Loc approved approved Type NBR missing Vendor Difference Amount Name Nbr
68A 5/24/2005 68LLB000 BSDI 568STP125 231.32 IBM 00156868A 5/24/2005 68LLB000 BSDI 568DRC203 Y Y Y 492.35 Providence 002589
Vendor Date Enter EffectiveGrp Entered By date
01 5/23/2005 568STP000 5/23/200501 5/24/2005 568DRC000 5/24/2005
18
The “Actual” Report
• The Actual Report will list all payment documents that have actually changed to 4IA (approved status) through the automated process.
• These documents must be included in the document package
• The Actual Report will be available Saturday morning. Those documents listed as 4IA will be advanced to 4IP on Monday. If a document remains in 4IA status on Monday, most likely the vendor is on Remit Hold.
• These documents must be included in the document package
19
•The Actual Report will list documents that have gone from 4IR or 4IA to a lesser status (4IRT-Returned or 4IC-Canceled)
•These documents must be NOT be included in the document package
The Actual Report
20
Actual Documents Approved
Location:68A Document Type: BSDI From: 052205
Person Municipal Invalid BankDate dept Dept Doc Doc class/item ACH Fund Vendor Vendor
Loc approved approved Type NBR missing Vendor Difference Amount Name Nbr
68A 5/24/2005 68LLB000 BSDI 568STP125 231.32 IBM 00156868A 5/24/2005 68LLB000 BSDI 568DRC203 Y Y Y 492.35 Providence 00258968A 5/24/2005 68LLB000 BSDI 568DRC204 18.00 Sercurity Concepts00118268A 5/25/2005 68LLB000 BSDI 568DRC207 75.00 Cranston 00158768A 5/25/2005 68LLB000 BSDI 568CDM022 256.00 Shur-Az 00895468A 5/26/2005 68LLB000 BSDI 568CDM029 443.66 Uniforms Inc 01785
Remit Hold68A 5/26/2005 68LLB000 BSDI 568CDM018 499.99 Lowes 01785
Changed to 4IRT68A 5/24/2005 68LLB000 BSDI 568DRC338 17.25 HomeDepot 001182
Actual Report Part I
21
Vendor Date Enter EffectiveGrp Entered By date
01 5/23/2005 568STP000 5/23/200501 5/24/2005 568DRC000 5/24/200501 5/24/2005 568DRC000 5/24/200503 5/25/2005 568DRC000 5/25/200501 5/25/2005 568CDM000 5/25/200501 5/26/2005 568CDM000 5/26/2005
01 5/26/2005 568CDM000 5/26/2005
01 5/24/2005 568DRC000 5/24/2005
Actual Report Part II
22
Now What?
• The Preaudit staff will verify that all document packages have been received.
• Through reports, audit testing, etc. we will still be reviewing transactions
• Remember, responsibility ultimately rest with the authorized agent
23
The Benefits
• You will know when your small dollar transactions will be processed.
• By eliminating the individual handling and processing of small $ transactions, all vendors will get paid quicker.
24