1 re-gas compressors to 2.20 mpa - me new oil mist adsorbers in compressors at 20k hrs - me service...
DESCRIPTION
Cable and fibre installation plans Ruggedised fibres from 3 PC’s in MLCR to 3x VME Crates in hall Slow controls crate in Tr1 rack holds both 1553, 10M cable to Tr2 VLSB readout crates in both Tr1&Tr2 racks Tracker1 rack already has 3 fibres laid in place Tracker2 needs doing Timing/triggering cables – Speak to Paul, uses few VME modules VLSB cables limited to 9.8 metres in length (AFE’s to VME crate) Get latest rack positions from Ian – needs minor update 3TRANSCRIPT
![Page 1: 1 Re-gas compressors to 2.20 Mpa - Me New oil mist adsorbers in compressors at 20k hrs - Me Service cold heads - Sumitomo Replace broken insulating vac](https://reader035.vdocuments.us/reader035/viewer/2022062413/5a4d1b6c7f8b9ab0599b3c76/html5/thumbnails/1.jpg)
1
• Re-gas compressors to 2.20 Mpa - Me• New oil mist adsorbers in compressors at 20k hrs - Me• Service cold heads - Sumitomo• Replace broken insulating vac valve – Alan & Me• Service ITC503’s and MKS937’s? - Me• Service CCG’s - Me• Service turbos – Dave Hands ex DL
Repairs and maintenance of cryostats and compressors before hall installation
![Page 2: 1 Re-gas compressors to 2.20 Mpa - Me New oil mist adsorbers in compressors at 20k hrs - Me Service cold heads - Sumitomo Replace broken insulating vac](https://reader035.vdocuments.us/reader035/viewer/2022062413/5a4d1b6c7f8b9ab0599b3c76/html5/thumbnails/2.jpg)
Cryo, Electronics and other installation issues • Computers, interfaces & VME crate topology – Caen VME x2• Which computers in what racks • Another Vesda and commissioning – Fire suppression Ltd• New Dry pumps instead of oil based backing pumps –
Alan/Me• 4 x new Turbo controllers - Me• Magnetic shielding for turbos and ??? – Mike C.• Helium bottle & pipework for cassettes• Chilled water for compressors – sorted?• Rack smoke detectors like old system?
2
![Page 3: 1 Re-gas compressors to 2.20 Mpa - Me New oil mist adsorbers in compressors at 20k hrs - Me Service cold heads - Sumitomo Replace broken insulating vac](https://reader035.vdocuments.us/reader035/viewer/2022062413/5a4d1b6c7f8b9ab0599b3c76/html5/thumbnails/3.jpg)
Cable and fibre installation plans
• Ruggedised fibres from 3 PC’s in MLCR to 3x VME Crates in hall • Slow controls crate in Tr1 rack holds both 1553, 10M cable to Tr2• VLSB readout crates in both Tr1&Tr2 racks • Tracker1 rack already has 3 fibres laid in place• Tracker2 needs doing
• Timing/triggering cables – Speak to Paul, uses few VME modules • VLSB cables limited to 9.8 metres in length (AFE’s to VME crate)• Get latest rack positions from Ian – needs minor update
3
![Page 4: 1 Re-gas compressors to 2.20 Mpa - Me New oil mist adsorbers in compressors at 20k hrs - Me Service cold heads - Sumitomo Replace broken insulating vac](https://reader035.vdocuments.us/reader035/viewer/2022062413/5a4d1b6c7f8b9ab0599b3c76/html5/thumbnails/4.jpg)
4
Rack layout for ground floor by Q7,8,9,
![Page 5: 1 Re-gas compressors to 2.20 Mpa - Me New oil mist adsorbers in compressors at 20k hrs - Me Service cold heads - Sumitomo Replace broken insulating vac](https://reader035.vdocuments.us/reader035/viewer/2022062413/5a4d1b6c7f8b9ab0599b3c76/html5/thumbnails/5.jpg)
5
Rack layout for North Mezz extension platform
![Page 6: 1 Re-gas compressors to 2.20 Mpa - Me New oil mist adsorbers in compressors at 20k hrs - Me Service cold heads - Sumitomo Replace broken insulating vac](https://reader035.vdocuments.us/reader035/viewer/2022062413/5a4d1b6c7f8b9ab0599b3c76/html5/thumbnails/6.jpg)
6
Hall – Ground floor
![Page 7: 1 Re-gas compressors to 2.20 Mpa - Me New oil mist adsorbers in compressors at 20k hrs - Me Service cold heads - Sumitomo Replace broken insulating vac](https://reader035.vdocuments.us/reader035/viewer/2022062413/5a4d1b6c7f8b9ab0599b3c76/html5/thumbnails/7.jpg)
7
Hall – Mezz level