INVESTIGATION AND INVESTIGATION AND REMEDIATION OF SITES REMEDIATION OF SITES CONTAMINATED WITH CONTAMINATED WITH
PETROLEUM PETROLEUM HYDROCARBONS IN HYDROCARBONS IN
LITHUANIALITHUANIA
Hydrogeological Company “Grota”Hydrogeological Company “Grota”
Ramunė ŠečkuvienėRamunė Šečkuvienė
33
Lithuania exclusively usesLithuania exclusively usesonly groundwater foronly groundwater forpotable water resources potable water resources
Petroleum is not only thePetroleum is not only themain source of energy atmain source of energy atpresent day, however, itpresent day, however, itconsidered to be the mainconsidered to be the mainsource of groundwater source of groundwater contamination in Lithuaniacontamination in Lithuania
44
OUTLINEOUTLINE• Background Background
information.information.• Assessment and Assessment and
remediation standards.remediation standards.• CContamination ratingontamination rating..• Cleaning technologies Cleaning technologies
and results. and results. • Example sites.Example sites.• Theoretic and real Theoretic and real
possibilities of cleaning possibilities of cleaning subsurface and subsurface and groundwater from PH in groundwater from PH in Lithuania.Lithuania.
• Groundwater monitoring Groundwater monitoring of contaminated sites.of contaminated sites.
55
Background informationBackground information– Number and total area of sites Number and total area of sites contaminated with PH is relativelycontaminated with PH is relativelythe the biggestbiggest, compeering with other , compeering with other polluted areas.polluted areas.– There are more than 650 petrolThere are more than 650 petrolstations in Lithuania and 250 of stations in Lithuania and 250 of them are old ones. The total amount them are old ones. The total amount of contaminated of contaminated aarea there exceeds rea there exceeds 3-5 mln. m3-5 mln. m22..– Total area of oil business objects Total area of oil business objects in Lithuania makes up 600 - 700 ha, in Lithuania makes up 600 - 700 ha, but contaminated groundwater but contaminated groundwater below it occupies 52-62 mln. below it occupies 52-62 mln. mm22..– Former Soviet Union objectsFormer Soviet Union objectsmmakeake a a single pollution source. single pollution source. The indirect data show that such The indirect data show that such objects occupies about 3 mln. objects occupies about 3 mln. mm22..
66
LAND 9-2002 – LAND 9-2002 – Remediation and pollution limitation Remediation and pollution limitation requirements of subsurface and groundwater contaminatedrequirements of subsurface and groundwater contaminated
with petroleum hydrocarbonswith petroleum hydrocarbons
Local groundwater monitoring implementation order Local groundwater monitoring implementation order
Environment monitoring lEnvironment monitoring laaww
Environment protection lawEnvironment protection law
Assessment and remediation standardsAssessment and remediation standards
77
Main pollution level indicesMain pollution level indices
IndexIndexDimDimensiensionon
Pollution levelPollution level
BackBackgrougroundnd
LowLow MediuMediumm
HighHighVery highVery high
Max depth of oil Max depth of oil penetrationpenetration -- 00
To 60-70To 60-70% % of vadose of vadose
zone depthzone depth
To To groundwgroundw
ater ater capillary capillary
zonezone
To To shalloshallo
w w groungroundwatedwate
rr
To shallow To shallow groundwategroundwate
rr
Oil content in Oil content in vadose zone soilvadose zone soil
g/g/kgkg
<0.0<0.055
0.05-150.05-15 0.05-0.05-1515
>0.0>0.055
>0.05>0.05
Oil content in top Oil content in top soils of shallow soils of shallow aquiferaquifer
g/g/kgkg
<0.0<0.055
<0.05<0.05 0.05-50.05-5 5-255-25 >25>25
Oil content in Oil content in shallow shallow groundwatergroundwater
Mg/lMg/l 00 <1<1 1-101-10 10-10-5050 >50>50
Free phase of Free phase of petroleum product petroleum product on shallow aquiferon shallow aquifer
-- 00 00 00EpisoEpisodicdic
ConstatnConstatntt
88PH contamination level in LithuaniaPH contamination level in Lithuania
99
Shallow aquifer contamination ratesShallow aquifer contamination rates in large oil storagesin large oil storages
Territory
Shallow aquifer
pollution area,
km2
Max concentration
of PH in water,
mg/l
Alytus oil storage 0.405 12.8
Train accident site at Juodšiliai 0.18 7-12
Kaunas oil storage 0.0239 1320
Klaipėda oil storage 0.0535 188
Varėna oil storage 0.01 94.8
Viduklė oil storage 0.044 0.19
Vilnius oil storage 0.3 77
1010
Contamination of shallow aquifer at Contamination of shallow aquifer at former military sitesformer military sites
Military site
Shallow
aquifer
pollution area,
km2
Max
concentration
of PH in
water, mg/l
Kėdainiai landing-field 0.4 26
Pagėgiai oil storage 0.14 13
Pajuostė landing-field 0.13 6.4 – 4.2
Karmėlava rocket fuel storage 0.008 3.1
Pilainiai engineering regimental
oil storage0.03 0.22
Alytus landing party 0.001 51.47
Pabradė oil storage 0.021 15
Kazlų Rūda oil storage 0.03 22.5
Valčiūnai oil storage 0.1 38
Raudondvaris rocket base 0.01 0.64
Kairiai tank-borne infantry 0.03 3.15
Zokniai landing-field 1 10.5
Nemenčinė civil defence center 0.03 35
“Šiaurės miestelis” (“Northern town”)
in Vilnius0.014 1.3
1111
Cleaning technologiesCleaning technologies
• Ex situEx situ: bioremediation using bacteria and : bioremediation using bacteria and some plants.some plants.
• In situIn situ: pump and treat; vacuum : pump and treat; vacuum extraction; bioremediation using bacteria.extraction; bioremediation using bacteria.
Hydrogeological Company “Grota” is Hydrogeological Company “Grota” is probably the one in the country who probably the one in the country who has the biggest experience using the has the biggest experience using the in situin situ site remediation methodology. site remediation methodology.
1212
Bioremediation siteBioremediation site
Petroleum hydrocarbons spilled out on the railway Petroleum hydrocarbons spilled out on the railway
Remedied territoryRemedied territory
Ex situ
Ex situ
1313
Water level
Free phase PH layer
Free phase PH layer level
Pump
To abstergent facilitySurface
““ Pu
mp
and
tre
at”
on
Pu
mp
and
tre
at”
on
th
e s
urf
ace
the s
urf
ace
““ Pu
mp
and
treat” m
eth
od
Pu
mp
an
d tre
at” m
eth
od
schem
esch
em
eIn s
itu
In s
itu
1414
Vacu
um
extra
ction sy
stem
Vacu
um
extra
ction
syste
mV
acu
um
extr
act
ion s
yst
em
Vacu
um
extr
act
ion s
yst
em
on
th
e s
urf
ace
on
th
e s
urf
ace
Vacuum pumpUnderground
container
Pumpingpipe
Air flow
Free phase of PH
Air flow
PH-water-gasseparator
Container forPH
Water cleaningsystem Gas cleaning
Air outgo
Water outgo
LEGEND
PH gas
PH adsorbedinto the soil
PH dissolvedinto the water
1515
Info about the biggest contaminated Info about the biggest contaminated sitessites
Indicator Vilnius oil
storage
Train accident
site at Juodšiliai
Alytus oil
storage
Investigation wells, number 162 140 57
Contaminated aquifers:
Contaminated soil thickness, m 5-7 2-4 7-11
Index a III-IV,
ag III-II vr-žm ag III bl
a III,
ag II žm – I dn
Lithology
Various grained
sand, gravel;
K = 120; 2-5 m/d
Fine, sometimes
various grained
sand;
K = 0.9-8.9;
11-32 m/d
Fine and medium
grained,
somewhere clayey
sand and gravel;
K = 1-20 m/d
36 23 15
Monitoring:
- observation wells, number
- observation period, years 10 5 4
1616
PH appeared in springs PH appeared in springs near the circular road near the circular road crossing. Furthermore, crossing. Furthermore,
Vilnius oil storage Vilnius oil storage is nearby two drinking is nearby two drinking
water wellfields and it is water wellfields and it is located located
1090 m from river Neris. 1090 m from river Neris.
Vilnius oilstorage
Vingiswellfield
II Geležinkeliečiųwellfield
The 3-rd health preservation belt of wellfield
The 2-nd health preservation belt of wellfield
1717
Diesel fuel spilled out of Diesel fuel spilled out of four tanks-cars and spread four tanks-cars and spread
over the land surface in over the land surface in a plot 182 m long and a plot 182 m long and
2-18 m wide. The polluted 2-18 m wide. The polluted area is situated at the area is situated at the
southern outskirts of southern outskirts of JuodJuodššiliai settlement. The iliai settlement. The
nearest dug well providing nearest dug well providing drinking water is 62 m from polluted area.drinking water is 62 m from polluted area.
Train accident siteat Juodšiliai
Paneriaiwellfield
Th
e 3
-rd h
ealth
pre
serv
atio
n
belt o
f wellfi
eld
1818
Contamination of shallow Contamination of shallow aquifer in Alytus oil aquifer in Alytus oil storage caused the storage caused the
pollution of deep aquifers pollution of deep aquifers in Vidzgiris wellfield.in Vidzgiris wellfield.
Alytus oilstorage
The 3-rd health preservation belt of wellfield
The 2-nd health preservation belt of wellfield
Vidzgiriswellfield
1919
The results of cleaningThe results of cleaning
IndicatorVilnius oil
storage
Train
accident site
at Juodšiliai
Alytus oil
storage
Contamination area, m2 318000 4485 405000
- shallow aquifer 318000 4485 405000
- soil 228800 1803 285000
- free phase PH layer 132000 600 18125
Extracted PH amount, m3 2704 20 94
Extraction beginning date 1989 2000 1996
Extraction period, years 9 7 months2.5 (with
breaks)
2020
Viln
ius
oil
stora
ge b
efo
re a
nd
aft
er
rem
ed
iati
on
Viln
ius
oil
stora
ge b
efo
re a
nd
aft
er
rem
ed
iati
on
2121
Boundary of dissolved PH spreading in shallow aquiferBoundary of dissolved PH spreading in shallow aquifer
Boundary of capillary PH spreading in the aeration zoneBoundary of capillary PH spreading in the aeration zone
Boundary of former PH spilled out on the groundBoundary of former PH spilled out on the ground
LEGENDLEGEND
Residual pollution of subsurface and shallow groundwater Residual pollution of subsurface and shallow groundwater with PH after the cleaning of the railway accident sitewith PH after the cleaning of the railway accident site
2222
2 8
R o tu ð ësa ik ð të
Rût
ø g-
vë
Kep
ykl o
s g-
vë
0 0 2 0 0 4 0 0
The 3-rd health preservative The 3-rd health preservative belt of wellfieldbelt of wellfield
The 2-nd health preservative The 2-nd health preservative belt of wellfieldbelt of wellfield
Vidzgiris wellfield
Vidzgiris wellfieldNemunasNemunas
Situation in Situation in Alytus oilAlytus oilstoragestorage
after remediationafter remediation
2323
Info about some objects, where Info about some objects, where remediationremediation is in processis in process
Indicator Passengers and
shipment terminal
Petrol station in Panevėžys
Investigation wells, number 33 21
Contaminated soil thickness,
m 1.3-4.5 1-2.5
Contaminated aquifers:
Index a III a III
Lithology
Various grained
sand, gravel;
K = 6.8 – 29.5 m/d
Fine grained clayey
sand;
K = 0.3 m/d
8 3
Monitoring:
- observation wells, number
- observation period, years 5 8
2424
Curon
ian S
pit
Curon
ian S
pit
Balt
ic S
ea
Balt
ic S
ea
Passengers andPassengers andShipment terminalShipment terminal
Current territory was built Current territory was built near Curonian Spit in 1977. near Curonian Spit in 1977. It is being used to serve the It is being used to serve the
port of Klaipėda. port of Klaipėda. The investigations have The investigations have
shown that bigger part of the shown that bigger part of the territory was contaminated with PH. And the territory was contaminated with PH. And the
free phase PH layer have been detected on the surface of shallow free phase PH layer have been detected on the surface of shallow groundwater in the southern part of it.groundwater in the southern part of it.
2525
Indicator
Passengers
and
Shipment
Terminal
Petrol station in Panevėžys
Contamination area, m2 5700 2790
Extracted PH amount, m3 2.5 1
Extraction beginning date 2003 2003
Extraction period, years 3 3
The results of cleaningThe results of cleaning
2626
Boundary of liquid PH accumulated on Boundary of liquid PH accumulated on shallow groundwater before cleaningshallow groundwater before cleaning
Boundary of liquid PH accumulated on Boundary of liquid PH accumulated on shallow groundwater after one year shallow groundwater after one year remediation workremediation workBoundary of liquid PH accumulated on Boundary of liquid PH accumulated on shallow groundwater after two years shallow groundwater after two years remediation workremediation work
LEGENDLEGEND
Residual pollution of shallow groundwater Residual pollution of shallow groundwater with liquid PH after 3 years cleaning processwith liquid PH after 3 years cleaning process
2727
Theoretic and real possibilities of cleaning Theoretic and real possibilities of cleaning subsurface and groundwater from PH in subsurface and groundwater from PH in
LithuaniaLithuania• Requirement for remediation of the territories contaminated with petroleum Requirement for remediation of the territories contaminated with petroleum
hydrocarbons depends on the risk to the clean nature and human health.hydrocarbons depends on the risk to the clean nature and human health.
• According to Lithuanian specific conditions the main pupose of the limitation of According to Lithuanian specific conditions the main pupose of the limitation of
subsurface contamination first of all is linked with grounwater protectionsubsurface contamination first of all is linked with grounwater protection..
• The principal task is the stopping of spreading of contaminant in aquifersThe principal task is the stopping of spreading of contaminant in aquifers. .
• Free liquid phase hydrocarbon layer on gruondwater table is the main factor Free liquid phase hydrocarbon layer on gruondwater table is the main factor
stimulating the spreading of contamination in aquifersstimulating the spreading of contamination in aquifers..
• The principal condition for remediation of the territories with high and very high The principal condition for remediation of the territories with high and very high
contamination levels is the removal of free phase petroleum poduct.contamination levels is the removal of free phase petroleum poduct.
2828
Groundwater monitoring Groundwater monitoring of contaminated sitesof contaminated sites
• In sites contaminated with PH In sites contaminated with PH
during remediation process and during remediation process and
after it observation net were being after it observation net were being
appointed.appointed.
• After the remediation process only After the remediation process only
adsorbed PH remained in the soil. adsorbed PH remained in the soil.
Thus, hydrogeodinamic and Thus, hydrogeodinamic and
hydrogeochemical monitoring is hydrogeochemical monitoring is
being held in such sites.being held in such sites.
• The destruction of pollutant is much The destruction of pollutant is much
faster after the free phase of PH faster after the free phase of PH
extraction from the water surface.extraction from the water surface.
2929