2
Total 2024 2023 2022 2021 2020 2019 2018 2017 2016 2015 2014 Year
47,711 4,800 6,000 4,800 3,600 4,100 2,050 3,950 8,067 3,145 1,719 5,480 MW
2014-2024 ADD-ON POWER CAPACITY
18
2014
2015
2016
2017
2018
2019
2020
2021
2022
2023
2024
30,000
40,000
50,000
60,000
70,000
80,000
90,000
100,000
110,000
Annual 4,260 MW add-on power in average
MW Generation Projects Plan
Power Generation Projects up to 2024
3
TYPICAL SCOPE OF WORK
Power Generation Projects up to 2024
A- Simple Cycle Units
It is only Gas Turbine Generator (GTG) units with all related Balance of Plant (BOP). Generally, the simple cycle plants we use “E” class GTG.
B- New CC Power Plants:
It is green field projects and the typical Gas Turbine class is “F” as minimum. The HRSG is open type for plants operating on NG (Natural Gas) and Vertical type for plants operating on oil with two or three pressure levels as general.
The typical scope of work for SEC projects as following:
4
TYPICAL SCOPE OF WORK
Power Generation Projects up to 2024
C- Conversion Projects :
Converting the existing simple cycle plant to a combined cycle plant. The conversion is done by adding the Heat Recovery Steam Generator (HRSG), Steam Turbine (STG) and related equipment for example Air Cooled Condenser (ACC) to the existing Gas Turbine (GTG).
The conversion configuration is variable from plant to other, and typically 3+3+1 or 4+4+1.
The conversion projects all are brown field projects.
D- Steam Power Plants
Currently SEC changed the design of the power boilers from Sub-critical to Super-Critical boilers (>220 Bar & 540 Co), the typical configuration is 4 boilers with 4 STG.
Moreover, the ESP and the FGD becomes must as the used fuel is Heavy Fuel Oil (HFO) with high Sulfur SOx content.
5
TYPICAL SCOPE OF WORK
Power Generation Projects up to 2024
Examples of main Services needed for future projects:
• Engineering, Procurement and Construction (EPC) work (Consortiums and JV are acceptable)
• Engineering work (Consultants)
• Construction / Erection work
• Electric work
• I&C work
• Mechanical work
• None Destructive Testing (NDT) work
6
TYPICAL SCOPE OF WORK
Power Generation Projects up to 2024
Examples of main Equipment / Systems needed for future projects:
• Gas Turbines Generator (GTG)
• Heat Recovery Steam Generators (HRSG)
• Steam Turbines Generator (STG)
• Synchronous Generators
• Transformers (GSU, SST and UAT)
• Condensers (Air and Wet)
• Switchgears (including all related components)
• Distribution Control System (DCS)
• Pumps (Water, Fuel and additives)
• Motors
• Compressors (Air and Gas)
7
Power Generation Projects up to 2024 A- SIMPLE CYCLE UNITS [In Isolated Power Plants]
Project 2014 2015 2016 2017 2018 2019 2020 2021 2022 2023 20241. Arar Ext 154 2. Sharorah Ext 128 60 60 3. Qurayat Ext 154 4. Rafha Ext 77
Total 633 MW
• Projects in Red color are under construction as of Sep. 2014• Projects in Blue color are under bidding stage as of Sep. 2014• Projects in Green color are planned as of Sep. 2014
Projects Status Under construction Under bidding Planned
Sub-Total 513 0 120
Total 633 MW
8
B- COMBINED CYCLE PROJECTSProject 2014 2015 2016 2017 2018 2019 2020 2021 2022 2023 2024
1. Qurayyah PP (ST) 500 2. PP 12 1310 682 3. Deba PP 600 4. PP 13 1165 582 5. Shuaiba PP 488 6. PP 14 1755 7. North Qassim PP 1800 8. South Madinah PP 3600 1800 9. Wad Al Shamal PP 1050
10. PP 15 1800 1800 1800 11. PP 16 1200 600 120012. Al Hotah (Al Kharj) PP 500 13. Al Rays PP 1800 180014. Ras Abu Qumais PP 1800 1800 15. Ras Al Khair PP 1800 1800 1800
Total 35,032 MW
Power Generation Projects up to 2024
• Projects in Red color are under construction as of Sep. 2014• Projects in Blue color are under bidding stage as of Sep. 2014• Projects in Green color are planned as of Sep. 2014
Projects Status Under construction Under bidding Planned
Sub-Total 6,482 1,650 28,700
Total 36,832 MW
9
B- COMBINED CYCLE PROJECTS
Power Generation Projects up to 2024
17%
5%
78%
Under construction Under bidding Planned
10
C- CONVERSION PROJECTSProject 2014 2015 2016 2017 2018 2019 2020 2021 2022 2023 2024
1. PP 10 (ST) 345 806
2. Qassim PP Conversion 360
3. Hail PP Conversion 120
4. PP 9 & Faras PP Conversion 240 250
5. Tehama PP Conversion 200
6. Wadi Al Dawassir PP Conversion 90
Total 2,411 MW
• Projects in Red color are under construction as of Sep. 2014• Projects in Blue color are under bidding stage as of Sep. 2014• Projects in Green color are planned as of Sep. 2014
Power Generation Projects up to 2024
Projects Status Under construction Under bidding Planned
Sub-Total 1,631 240 540
Total 2,411 MW
68%
10%
22%
Under construction Under bidding Planned
11
D- STEAM POWER PLANT PROJECTS
14
Project 2014 2015 2016 2017 2018 2019 2020 2021 2022 2023 2024
1. Rabigh 6 PP 2555
2. South Jeddeh PP 1980 660
3. Shugaig PP 2640
Total 7,835 MW
Power Generation Projects up to 2024
• Projects in Red color are under construction as of Sep. 2014• Projects in Blue color are under bidding stage as of Sep. 2014• Projects in Green color are planned as of Sep. 2014
Projects Status Under construction Under bidding Planned Sub-Total 7,835 0 0
Total 7,835 MW
12
GENERATION PROJECTS SUMMARY UP TO 2024
Total (MW)
Planned (MW)
Under Bidding (MW)
Under Construction
(MW)Owner
Conversion CC GT
47,711
540 28,700 120 1,890 16,461 SEC
29,360(60 %)
1,890(4%)
16,461(36%)
Total
17
Power Generation Projects up to 2024
36%
4%
60%
Under construction Under bidding Planned
13
SEC Planned Projects totaling 47,711 MW comprising of:
A- Simple Cycle Units: 633 MW C- Conversion Projects: 2,411 MW
B- New CC Power Plants: 36,832 MW D- Steam Power Plants: 7,835 MW
Power Generation Projects up to 2024
5%
77%
17%
1%
Conversion Projects New CC Power Plants Steam Power Plants Simple Cycle Units
14
16
1. PP92. PP10 CC
(ST)3. PP124. PP135. PP146. PP157. PP168. AlHotah
PP
Hail PP Conversion
Arar Ext.
Qurayat Ext.
Rafha Ext.
Faras PP Conversion
Sharorah Ext
Shugaig PP
Tehama PPConversion
Wadi AlDawassir PP Conversion
Deba PP
Shuaiba PP
Rabigh 6
Jeddah South
Madinah South
Waad Alshamal 1. Qassim CC
Conversion2. Qassim North
Qurayah CCPP (ST)
AlRays PP
Ras Abu Qumais PP
Ras Alkhair PP
15