1 petroleum engineering 406 floating drilling lesson 10 the drilling riser
TRANSCRIPT
![Page 1: 1 Petroleum Engineering 406 Floating Drilling Lesson 10 The Drilling Riser](https://reader035.vdocuments.us/reader035/viewer/2022062216/56649dce5503460f94ac2463/html5/thumbnails/1.jpg)
1
Petroleum Engineering 406 Floating Drilling
Lesson 10
The Drilling Riser
![Page 2: 1 Petroleum Engineering 406 Floating Drilling Lesson 10 The Drilling Riser](https://reader035.vdocuments.us/reader035/viewer/2022062216/56649dce5503460f94ac2463/html5/thumbnails/2.jpg)
2
Lesson 10A - The Drilling Riser
Riser ComponentsRiser TensioningFatigueKill/Choke LinesInspection & MaintenanceReentry
![Page 3: 1 Petroleum Engineering 406 Floating Drilling Lesson 10 The Drilling Riser](https://reader035.vdocuments.us/reader035/viewer/2022062216/56649dce5503460f94ac2463/html5/thumbnails/3.jpg)
3
Riser system for a floating drilling rig
BOP
RISER JOINTSKILL AND CHOICE LINES
SLIP JOINT OUTER BARRELUPPER BALL JOINT
SLIP JOINT INNER BARREL
RISER TENSION
LOWER BALL JOINT
Mudline
Marine riser = drilling riser, get returns to surface, well control, communications link
![Page 4: 1 Petroleum Engineering 406 Floating Drilling Lesson 10 The Drilling Riser](https://reader035.vdocuments.us/reader035/viewer/2022062216/56649dce5503460f94ac2463/html5/thumbnails/4.jpg)
4
Integral Marine Riser Joints
Choke and kill lines are integral with the marine riser , flanged connections; clamp, etc
![Page 5: 1 Petroleum Engineering 406 Floating Drilling Lesson 10 The Drilling Riser](https://reader035.vdocuments.us/reader035/viewer/2022062216/56649dce5503460f94ac2463/html5/thumbnails/5.jpg)
5
Integral Marine Riser Connector
Flanged connection - 6 bolts
NOTE: Choke and Kill Lines
O-ring type seals- inspect when running
![Page 6: 1 Petroleum Engineering 406 Floating Drilling Lesson 10 The Drilling Riser](https://reader035.vdocuments.us/reader035/viewer/2022062216/56649dce5503460f94ac2463/html5/thumbnails/6.jpg)
6
Integral Marine Riser Connector
![Page 7: 1 Petroleum Engineering 406 Floating Drilling Lesson 10 The Drilling Riser](https://reader035.vdocuments.us/reader035/viewer/2022062216/56649dce5503460f94ac2463/html5/thumbnails/7.jpg)
7
Marine Riser
Flexible Joint
Flexible joint, binding from high tensile forces, inject lubricant, up to 1,500,000 lbf!
![Page 8: 1 Petroleum Engineering 406 Floating Drilling Lesson 10 The Drilling Riser](https://reader035.vdocuments.us/reader035/viewer/2022062216/56649dce5503460f94ac2463/html5/thumbnails/8.jpg)
8Upper Section Marine Riser System.
MARINE RISER DIVERTER ASSEMBLY
RISER TENSIONING
LINESTELESCOPIC JOINT
KILL AND CHOKE LINES
FLEXIBLE JOINT
![Page 9: 1 Petroleum Engineering 406 Floating Drilling Lesson 10 The Drilling Riser](https://reader035.vdocuments.us/reader035/viewer/2022062216/56649dce5503460f94ac2463/html5/thumbnails/9.jpg)
9
Control valve
Vent line
Mud returns
L.P. Annular
A diverter system.Re-directs flow from rig floor to blooey line (10”+), downwind, do not shut in, erosion -10E8
![Page 10: 1 Petroleum Engineering 406 Floating Drilling Lesson 10 The Drilling Riser](https://reader035.vdocuments.us/reader035/viewer/2022062216/56649dce5503460f94ac2463/html5/thumbnails/10.jpg)
10
Figure 6-6. Vertical steel loops used for kill / choke line transition around the ball joint.
![Page 11: 1 Petroleum Engineering 406 Floating Drilling Lesson 10 The Drilling Riser](https://reader035.vdocuments.us/reader035/viewer/2022062216/56649dce5503460f94ac2463/html5/thumbnails/11.jpg)
11
The Drilling Riser
Schematic diagram of riser with imposed forces
MEAN WATER LEVEL
RISER ELEMENT
Optimum riser tension to minimize damage to riser and wear-and-tear on tensioners, sag
![Page 12: 1 Petroleum Engineering 406 Floating Drilling Lesson 10 The Drilling Riser](https://reader035.vdocuments.us/reader035/viewer/2022062216/56649dce5503460f94ac2463/html5/thumbnails/12.jpg)
12
Str
ess
in r
iser
, ki
ps
Applied tension in riser, kips
Maximum stress
Minimum stress
Tension in riser must be not too low and not too high. Set at 118 kips - will fluctuate 100-136 kips ~ 15%
Mean tension
![Page 13: 1 Petroleum Engineering 406 Floating Drilling Lesson 10 The Drilling Riser](https://reader035.vdocuments.us/reader035/viewer/2022062216/56649dce5503460f94ac2463/html5/thumbnails/13.jpg)
13
Riser Considerations:
Riser Metallurgy is very important. Correct heat treatment is
essential. 80,000 psi min. yield strength and
good toughness is preferred. Preheating, welding & normalizing
after welding is critical for riser integrity & long life.
![Page 14: 1 Petroleum Engineering 406 Floating Drilling Lesson 10 The Drilling Riser](https://reader035.vdocuments.us/reader035/viewer/2022062216/56649dce5503460f94ac2463/html5/thumbnails/14.jpg)
14
Riser Considerations:
No Field Welding on Riser!
Fatigue of riser cannot be measured prior to some indication of failure.
Routine inspection required.
![Page 15: 1 Petroleum Engineering 406 Floating Drilling Lesson 10 The Drilling Riser](https://reader035.vdocuments.us/reader035/viewer/2022062216/56649dce5503460f94ac2463/html5/thumbnails/15.jpg)
15
Riser Considerations:
Fatigue is an embrittlement of the metal. It often starts in the vicinity of welds or other places of high stress concentration.
Fatigue is caused by cyclic loading.
![Page 16: 1 Petroleum Engineering 406 Floating Drilling Lesson 10 The Drilling Riser](https://reader035.vdocuments.us/reader035/viewer/2022062216/56649dce5503460f94ac2463/html5/thumbnails/16.jpg)
16
Riser Inspection:
Visual Inspection of the riser should occur every time the riser is run.
Check all the seals Check all the sealing areas
![Page 17: 1 Petroleum Engineering 406 Floating Drilling Lesson 10 The Drilling Riser](https://reader035.vdocuments.us/reader035/viewer/2022062216/56649dce5503460f94ac2463/html5/thumbnails/17.jpg)
17
Riser Inspection:
A complete inspection should be made annually.
Dyes: Will detect cracks. To use dyes, paint must be removed.Magnetic Particle Inspection: Sand blast areas around welds prior to magnetic particle inspection.
![Page 18: 1 Petroleum Engineering 406 Floating Drilling Lesson 10 The Drilling Riser](https://reader035.vdocuments.us/reader035/viewer/2022062216/56649dce5503460f94ac2463/html5/thumbnails/18.jpg)
18
Riser Inspection:
Ultra-Sonic Inspection: May detect cracks below the surface. This test is run inside pipe. Paint removal is not necessary.
X-Ray Inspection: Is for cracks inside the metal. It may miss surface cracks.
*No one technique will find all the cracks.
![Page 19: 1 Petroleum Engineering 406 Floating Drilling Lesson 10 The Drilling Riser](https://reader035.vdocuments.us/reader035/viewer/2022062216/56649dce5503460f94ac2463/html5/thumbnails/19.jpg)
19
Riser Instrumentation:
Heavy Gauge: Pointer attached to guide line moving in front of graduated board.
Riser Angle Indicator (at ball joint):
2/1y
2x
21
2/12y
2x
tantantan
![Page 20: 1 Petroleum Engineering 406 Floating Drilling Lesson 10 The Drilling Riser](https://reader035.vdocuments.us/reader035/viewer/2022062216/56649dce5503460f94ac2463/html5/thumbnails/20.jpg)
20
Riser Instrumentation:
Accurate Positioning System: For detecting and monitoring vessel
position.
![Page 21: 1 Petroleum Engineering 406 Floating Drilling Lesson 10 The Drilling Riser](https://reader035.vdocuments.us/reader035/viewer/2022062216/56649dce5503460f94ac2463/html5/thumbnails/21.jpg)
21
Ball Joint:
A Ball Joint Angle > 4 degrees is an indication that something is wrong!
Vessel is offset Riser tension is inadequate
![Page 22: 1 Petroleum Engineering 406 Floating Drilling Lesson 10 The Drilling Riser](https://reader035.vdocuments.us/reader035/viewer/2022062216/56649dce5503460f94ac2463/html5/thumbnails/22.jpg)
22
Ball Joint:
Must decrease ball joint angle before operations are resumed.
Remedial Action:
Decrease Offset
Increase Riser Tension
![Page 23: 1 Petroleum Engineering 406 Floating Drilling Lesson 10 The Drilling Riser](https://reader035.vdocuments.us/reader035/viewer/2022062216/56649dce5503460f94ac2463/html5/thumbnails/23.jpg)
23
Vessel to Seafloor Guidance System
Guidelines are used for guiding equipment from the vessel to the seafloor.
Selection and care of guidelines is critical.
![Page 24: 1 Petroleum Engineering 406 Floating Drilling Lesson 10 The Drilling Riser](https://reader035.vdocuments.us/reader035/viewer/2022062216/56649dce5503460f94ac2463/html5/thumbnails/24.jpg)
24
Vessel to Seafloor Guidance System
Guidelines should not be tensioned beyond 1/3 of breaking capacity
But…inadequate tension is the most common cause of failure in guidelines
![Page 25: 1 Petroleum Engineering 406 Floating Drilling Lesson 10 The Drilling Riser](https://reader035.vdocuments.us/reader035/viewer/2022062216/56649dce5503460f94ac2463/html5/thumbnails/25.jpg)
25
Vessel to Seafloor Guidance System
Tension should be maximum when landing the BOP stack, or when landing the riser onto the stack.
When the guidelines are not being used to run equipment, tension may be slacked off to ~ twice the weight of the line in seawater.
![Page 26: 1 Petroleum Engineering 406 Floating Drilling Lesson 10 The Drilling Riser](https://reader035.vdocuments.us/reader035/viewer/2022062216/56649dce5503460f94ac2463/html5/thumbnails/26.jpg)
26
Table 6-1. Recommendations for
Conventionally Used Guidelines
As water depth increases, larger diameter guidelines must be used.
Higher tensioning is required.
Don’t forget to limit tension to < 1/3 of breaking strength.