1 paul drumm, 19 th May 2004 MICE RF Workshop @CERN By Phone at 16:00 FNAL: Al Moretti [email protected] LBNL: Derun Li [email protected] Mike Zisman [email protected] Present: CERN: Helmut Haseroth [email protected] Maurizio Vretenar [email protected] Han Broere [email protected] DL: Mike Dykes [email protected] Andy Moss [email protected] Peter Corlett [email protected] Joe Orrett [email protected] Geneva: Alain Blondel [email protected] RAL: Paul Drumm [email protected] Roy Church [email protected]

Upload: gerald-grant

Post on 01-Jan-2016

218 views

Category:

Documents


2 download

TRANSCRIPT

1paul drumm, 19th May 2004

MICE RF Workshop @CERN

By Phone at 16:00

FNAL:Al Moretti [email protected]

LBNL:Derun Li [email protected] Zisman [email protected]

Present:

CERN:Helmut Haseroth [email protected] [email protected] Broere [email protected]

DL:Mike Dykes [email protected] Moss [email protected] Corlett [email protected] Orrett [email protected]

Geneva:Alain Blondel [email protected]

RAL:Paul Drumm [email protected] Church [email protected]

2paul drumm, 19th May 2004

Meeting Outline: http://hep04.phys.iit.edu/cooldemo/rf/rfw1/rfw1.html

3paul drumm, 19th May 2004

• Discussion:– Practicality of realising a 4MW amplifier;

• 2 MW amplifier in bits

4paul drumm, 19th May 2004

• Discussion:– Practicality of realising a 4MW amplifier;

• 2 MW amplifier in bits – reconstruction• 4 MW – need to upgrade to a higher voltage• Tubes

– TH116 Tube no longer easily available» Old ISIS tubes removed at 2.3 MW

– TH170 alternative tube not a 4 MW tube– 4 MW split between 4 cavities

» Losses each time the power is split

– Concluded too many risks

5paul drumm, 19th May 2004

• …Discussion– Resolved to build two “2MW” circuits

• NF bunch rotation test circuit (88MHz)• Old circuit rebuilt to “2MW”

– 1 MW in Cavity ≈ 1.25 MW in the amplifier• “Old circuit” was limited to 1.8MW

– Output coupling redesign – Expect to obtain up to 2.8 MW with TH170 tube.

• Conclusion:– CERN will build two “2MW” power amplifiers

6paul drumm, 19th May 2004

Overall Picture

2 MW Amplifier

2 MW Amplifier

Master OscillatorControls etc

201 MHz Cavity Module

2 MW Amplifier

2 MW Amplifier

201 MHz Cavity Module

LBNL

CERN300 kW Amplifier

300 kW Amplifier

300 kW Amplifier

300 kW Amplifier

HT Supplies

Los Alamos

HT Supplies

Daresbury

7paul drumm, 19th May 2004

Timeline…• Daresbury

– Strip down and assess LBNL amplifiers 2004– Recondition LBNL circuits 2005– Develop Test stand 2005/6

• CERN– Rebuild 88MHz circuit back to 201 MHz 2005/6– Rebuild “old” circuit

• MICE – stage V– 4 amplifiers & 4 Cavities 2007?– ISIS old ISIS tubes close to 2MW per cavity…– Purchase TH116 tubes; above 2MW per cavity

• MICE – stage VI– 4 amplifiers & 8 Cavities– ISIS old ISIS tubes close to 1MW per cavity…– TH116 tubes; above 1MW per cavity

8paul drumm, 19th May 2004

9paul drumm, 19th May 2004

10paul drumm, 19th May 2004

11paul drumm, 19th May 2004

Other issues

• See meeting notes…– Phase adjustment needed?– Lifetime of old ISIS tubes at 2MW?– Fresh look at costs:

• DL can make in house…• Some spare CERN equipment (controls)• Various synergies…

– “rent” TH170 tube from CERN for tests– TH170 tubes - part of common funds?– Phase ±0.5o; Amplitude ±1% - sufficient?

200 250 300 350 4001

0.5

0

0.5

1

phase change (degees)MeV/c

degr

ees

±0.5o200-350 MeV/c

12paul drumm, 19th May 2004

Conclusion

• Robust Scheme for 8 MW / 4 Amplifiers– Identified major components– Plan for construction– Indicative Cost Estimates

• £620k refurbish LBNL circuits + missing components

• €100k to provide 2 amplifiers from CERN• €500k power splitting – Stage V to VI • Plus ~2 SY at DL• In the process of revising cost estimates…