1 paris metro authority - methode-b.com · dubai taichung bengalore singapour seoul bejing kunming...

10

Upload: others

Post on 05-Oct-2020

0 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: 1 Paris metro authority - methode-b.com · Dubai Taichung Bengalore Singapour Seoul Bejing Kunming Shangaï Delhi Shenzhen Ningbo Guanghou Honk-Kong ... Manual train assumptions Interlocking
Page 2: 1 Paris metro authority - methode-b.com · Dubai Taichung Bengalore Singapour Seoul Bejing Kunming Shangaï Delhi Shenzhen Ningbo Guanghou Honk-Kong ... Manual train assumptions Interlocking

1 Paris metro authority 2 Source : http://www.alstom.com/products-services/product-catalogue/rail-systems/signalling/products/urbalis-400/

Page 3: 1 Paris metro authority - methode-b.com · Dubai Taichung Bengalore Singapour Seoul Bejing Kunming Shangaï Delhi Shenzhen Ningbo Guanghou Honk-Kong ... Manual train assumptions Interlocking
Page 4: 1 Paris metro authority - methode-b.com · Dubai Taichung Bengalore Singapour Seoul Bejing Kunming Shangaï Delhi Shenzhen Ningbo Guanghou Honk-Kong ... Manual train assumptions Interlocking

(y

Page 5: 1 Paris metro authority - methode-b.com · Dubai Taichung Bengalore Singapour Seoul Bejing Kunming Shangaï Delhi Shenzhen Ningbo Guanghou Honk-Kong ... Manual train assumptions Interlocking

3 system is here considered in its widest definition

Page 6: 1 Paris metro authority - methode-b.com · Dubai Taichung Bengalore Singapour Seoul Bejing Kunming Shangaï Delhi Shenzhen Ningbo Guanghou Honk-Kong ... Manual train assumptions Interlocking
Page 7: 1 Paris metro authority - methode-b.com · Dubai Taichung Bengalore Singapour Seoul Bejing Kunming Shangaï Delhi Shenzhen Ningbo Guanghou Honk-Kong ... Manual train assumptions Interlocking
Page 8: 1 Paris metro authority - methode-b.com · Dubai Taichung Bengalore Singapour Seoul Bejing Kunming Shangaï Delhi Shenzhen Ningbo Guanghou Honk-Kong ... Manual train assumptions Interlocking

4 CBTC or ETCS configuration data, IXL or RBC parameters, etc. 5 For example, “successive track circuits should have continuously increasing kilometer points”, “there exists a path between two distinct track circuits”, “signals should be positioned a minima 100 meters before the switch they protect”, etc.

Page 9: 1 Paris metro authority - methode-b.com · Dubai Taichung Bengalore Singapour Seoul Bejing Kunming Shangaï Delhi Shenzhen Ningbo Guanghou Honk-Kong ... Manual train assumptions Interlocking

-

-

-

-

-

-

-