1Pacini IT 5.1.2 16
Barcelona 12-15 May 2003
Improvement in the Distribution AssetsImprovement in the Distribution AssetsManagement by the Exploitation of theManagement by the Exploitation of theInnovative Component Technology andInnovative Component Technology and
Network Developing ModelNetwork Developing Model
M. Mazzoni, G. Pacini, P. PernaENEL Distribuzione
E. Colombo- CESI
![Page 2: 1 Pacini IT 5.1.2 16 Barcelona 12-15 May 2003 Improvement in the Distribution Assets Management by the Exploitation of the Innovative Component Technology](https://reader034.vdocuments.us/reader034/viewer/2022051201/5a4d1b517f8b9ab0599a7b73/html5/thumbnails/2.jpg)
2Pacini IT 5.1.2 16
Barcelona 12-15 May 2003
New Terms of Reference forDistribution Network Planning
–load growth generally reducing–new needs for load location–reduced capital recovery time–power quality tailored on customer
requirements and business objectives
![Page 3: 1 Pacini IT 5.1.2 16 Barcelona 12-15 May 2003 Improvement in the Distribution Assets Management by the Exploitation of the Innovative Component Technology](https://reader034.vdocuments.us/reader034/viewer/2022051201/5a4d1b517f8b9ab0599a7b73/html5/thumbnails/3.jpg)
3
Barcelona 12-15 May 2003
New Reliability Criteria
assessment of networkconfiguration based on “n-1” criterium
approaches based onprobabilistic methods aimed at quantifying
the costs of the reliability providedPacini IT 5.1.2 16
![Page 4: 1 Pacini IT 5.1.2 16 Barcelona 12-15 May 2003 Improvement in the Distribution Assets Management by the Exploitation of the Innovative Component Technology](https://reader034.vdocuments.us/reader034/viewer/2022051201/5a4d1b517f8b9ab0599a7b73/html5/thumbnails/4.jpg)
4
Barcelona 12-15 May 2003
New Reliability Criteria
Pacini IT 5.1.2 16
The probabilistic approaches consider the failure behaviour of network components and analyse the different possible network scenarios. The aim is to meet with the quality level imposed by the Regulators, whilst optimizing the investment levels.
![Page 5: 1 Pacini IT 5.1.2 16 Barcelona 12-15 May 2003 Improvement in the Distribution Assets Management by the Exploitation of the Innovative Component Technology](https://reader034.vdocuments.us/reader034/viewer/2022051201/5a4d1b517f8b9ab0599a7b73/html5/thumbnails/5.jpg)
5
Barcelona 12-15 May 2003
New Reliability Criteria
Pacini IT 5.1.2 16
In practice the objective is to fully exploit the capacity of network components on account of the employment of new technologies (particularly remote control, improved reliability of components, etc.) allowing to reduce the amount of non delivered energy in case of failure.
![Page 6: 1 Pacini IT 5.1.2 16 Barcelona 12-15 May 2003 Improvement in the Distribution Assets Management by the Exploitation of the Innovative Component Technology](https://reader034.vdocuments.us/reader034/viewer/2022051201/5a4d1b517f8b9ab0599a7b73/html5/thumbnails/6.jpg)
6
Barcelona 12-15 May 2003
Constraints & Opportunities of the IncomingScenario
•development of the net has to cope with the new national requirements (environmental aspects)
•technical solutions for connection have to comply with the new rules in terms of flexibility and reliability
•new schemes taking advantage of the innovative technology available on the market (prefabricated & compact solutions)
Pacini IT 5.1.2 16
![Page 7: 1 Pacini IT 5.1.2 16 Barcelona 12-15 May 2003 Improvement in the Distribution Assets Management by the Exploitation of the Innovative Component Technology](https://reader034.vdocuments.us/reader034/viewer/2022051201/5a4d1b517f8b9ab0599a7b73/html5/thumbnails/7.jpg)
7
Barcelona 12-15 May 2003
Constraints & Opportunities of the IncomingScenario
•evolution of the TLC allows to reduce the network redundancy
•new strategies in the development of the net (net reserve vs local reserve)
•new opportunities offered by the increasing diffusion of dispersed generation even if it means to solve new operating problems (voltage regulation, fault location, etc.)
Pacini IT 5.1.2 16
![Page 8: 1 Pacini IT 5.1.2 16 Barcelona 12-15 May 2003 Improvement in the Distribution Assets Management by the Exploitation of the Innovative Component Technology](https://reader034.vdocuments.us/reader034/viewer/2022051201/5a4d1b517f8b9ab0599a7b73/html5/thumbnails/8.jpg)
8
Barcelona 12-15 May 2003
Traditional: SS Local Back-upTraditional: SS Local Back-up
Ongoing: Network Back-upOngoing: Network Back-up
Models of Distribution Network Development
Pacini IT 5.1.2 16
![Page 9: 1 Pacini IT 5.1.2 16 Barcelona 12-15 May 2003 Improvement in the Distribution Assets Management by the Exploitation of the Innovative Component Technology](https://reader034.vdocuments.us/reader034/viewer/2022051201/5a4d1b517f8b9ab0599a7b73/html5/thumbnails/9.jpg)
9
Barcelona 12-15 May 2003
Net reserve vs local reserve
Models of Distribution Network Development
Pacini IT 5.1.2 16
![Page 10: 1 Pacini IT 5.1.2 16 Barcelona 12-15 May 2003 Improvement in the Distribution Assets Management by the Exploitation of the Innovative Component Technology](https://reader034.vdocuments.us/reader034/viewer/2022051201/5a4d1b517f8b9ab0599a7b73/html5/thumbnails/10.jpg)
10
Barcelona 12-15 May 2003
Means to Improve the New Distribution Network Model
Telecontrol
for a prompt exploitation of the
network reserve
Simplified and Satellite Substations
to strenghten the network and optimise length and losses of
MV linesPacini IT 5.1.2 16
![Page 11: 1 Pacini IT 5.1.2 16 Barcelona 12-15 May 2003 Improvement in the Distribution Assets Management by the Exploitation of the Innovative Component Technology](https://reader034.vdocuments.us/reader034/viewer/2022051201/5a4d1b517f8b9ab0599a7b73/html5/thumbnails/11.jpg)
11
Barcelona 12-15 May 2003
Expected Benefits of new network strategies
• greater loading factor of transformers• reduced length of MV lines• reduced power losses• reduced ground-fault current• higher power quality• a larger number of simplified HV/MV substation and some MV/MV satellite
substation increasing the power injection points
• additional investment in the HV network lower then the savings achieved in the MV networkPacini IT 5.1.2 16
![Page 12: 1 Pacini IT 5.1.2 16 Barcelona 12-15 May 2003 Improvement in the Distribution Assets Management by the Exploitation of the Innovative Component Technology](https://reader034.vdocuments.us/reader034/viewer/2022051201/5a4d1b517f8b9ab0599a7b73/html5/thumbnails/12.jpg)
12
Barcelona 12-15 May 2003
Innovative Component Technology HV Highly Integrated Switchgear (HIS)
• Very compact design• SF6 insulation• Fast and reliable installation at site• Reduced ground area and need for civil work• Factory assembled and tested• Life Cycle Cost Convenience
Pacini IT 5.1.2 16
![Page 13: 1 Pacini IT 5.1.2 16 Barcelona 12-15 May 2003 Improvement in the Distribution Assets Management by the Exploitation of the Innovative Component Technology](https://reader034.vdocuments.us/reader034/viewer/2022051201/5a4d1b517f8b9ab0599a7b73/html5/thumbnails/13.jpg)
13
Barcelona 12-15 May 2003
TWO CB “Y2” TYPE ELECTRICAL DIAGRAM (red line)
Innovative Component Technology
Pacini IT 5.1.2 16
![Page 14: 1 Pacini IT 5.1.2 16 Barcelona 12-15 May 2003 Improvement in the Distribution Assets Management by the Exploitation of the Innovative Component Technology](https://reader034.vdocuments.us/reader034/viewer/2022051201/5a4d1b517f8b9ab0599a7b73/html5/thumbnails/14.jpg)
14
Barcelona 12-15 May 2003
Innovative Component Technology
« Y2 » SIMPLIFIED SCHEME CONNECTIONPacini IT 5.1.2 16
![Page 15: 1 Pacini IT 5.1.2 16 Barcelona 12-15 May 2003 Improvement in the Distribution Assets Management by the Exploitation of the Innovative Component Technology](https://reader034.vdocuments.us/reader034/viewer/2022051201/5a4d1b517f8b9ab0599a7b73/html5/thumbnails/15.jpg)
15
Barcelona 12-15 May 2003
Innovative Component Technology MV Compact Design Switchgear in Container
• Air insulated• Fast and reliable installation at site• 68% volume reduction vs. traditional• Factory assembled• Reduced need for civil work• Life cycle cost Convenience
Pacini IT 5.1.2 16
![Page 16: 1 Pacini IT 5.1.2 16 Barcelona 12-15 May 2003 Improvement in the Distribution Assets Management by the Exploitation of the Innovative Component Technology](https://reader034.vdocuments.us/reader034/viewer/2022051201/5a4d1b517f8b9ab0599a7b73/html5/thumbnails/16.jpg)
16
Barcelona 12-15 May 2003
MV COMPACT DESIGN 24kV SWITCHGEAR IN CONTAINER
Innovative Component Technology
Pacini IT 5.1.2 16
![Page 17: 1 Pacini IT 5.1.2 16 Barcelona 12-15 May 2003 Improvement in the Distribution Assets Management by the Exploitation of the Innovative Component Technology](https://reader034.vdocuments.us/reader034/viewer/2022051201/5a4d1b517f8b9ab0599a7b73/html5/thumbnails/17.jpg)
17
Barcelona 12-15 May 2003
• HV EQUIPMENT•SINGLE BAY MODULE (LINE OR CABLE CONNECTION)• NEW “Y2” AND SINGLE BAY MODULE VERSIONS FOR INDOOR INSTALLATIONS
• MV EQUIPMENT • MV COMPACT SIX LINE SWITCHGEAR IN CONTAINER• MV SATELLITE SWITCHGEAR IN CONTAINER• COMPACT DESIGN SWITCHGEAR UPRATE ( busbar rated current 1600A, short circuit current 16kA)
Innovative Component TechnologyNew Developments
Pacini IT 5.1.2 16
![Page 18: 1 Pacini IT 5.1.2 16 Barcelona 12-15 May 2003 Improvement in the Distribution Assets Management by the Exploitation of the Innovative Component Technology](https://reader034.vdocuments.us/reader034/viewer/2022051201/5a4d1b517f8b9ab0599a7b73/html5/thumbnails/18.jpg)
18
Barcelona 12-15 May 2003
Innovative Component Technology
New Developments
SINGLE BAY MODULE (LINE OR CABLE CONNECTION)FOR A THIRD LINE BAY OR REMOTE TRANSFORMER
CABLE SEALING ENDAIR BUSHING
Pacini IT 5.1.2 16
![Page 19: 1 Pacini IT 5.1.2 16 Barcelona 12-15 May 2003 Improvement in the Distribution Assets Management by the Exploitation of the Innovative Component Technology](https://reader034.vdocuments.us/reader034/viewer/2022051201/5a4d1b517f8b9ab0599a7b73/html5/thumbnails/19.jpg)
19
Barcelona 12-15 May 2003
Innovative Component TechnologyNew Developments
USE OF HV «Y2 » MODULE FOR “H” SCHEME FOR INDOOR SUBSTATION (CABLE CONNECTION)
Pacini IT 5.1.2 16
![Page 20: 1 Pacini IT 5.1.2 16 Barcelona 12-15 May 2003 Improvement in the Distribution Assets Management by the Exploitation of the Innovative Component Technology](https://reader034.vdocuments.us/reader034/viewer/2022051201/5a4d1b517f8b9ab0599a7b73/html5/thumbnails/20.jpg)
20
Barcelona 12-15 May 2003
Innovative Component TechnologyNew Developments
SATELLITE SUBSTATION ELECTRIC DIAGRAM Pacini IT 5.1.2 16
IN FEED n°1
IN FEED n°2
L 1 L 2 L 3 L 4 L 5
TR AUX. SERVICE