1 Office of Project Management Metrics Report Presentation Phil Braun Project Management Consultant – Alliant Energy – Office of Project Management

Upload: dorothy-jordan

Post on 24-Dec-2015

216 views

Category:

Documents


2 download

TRANSCRIPT

Page 1: 1 Office of Project Management Metrics Report Presentation Phil Braun Project Management Consultant – Alliant Energy – Office of Project Management

1

Office of Project ManagementMetrics Report Presentation

Phil Braun

Project Management Consultant – Alliant Energy – Office of Project Management

Page 2: 1 Office of Project Management Metrics Report Presentation Phil Braun Project Management Consultant – Alliant Energy – Office of Project Management

22

Framework Metric Report is run at least

monthly (some are every two weeks)

Every project is assigned two dates and two dollar amounts Triangle Inner – Finish date (based

on Project Schedule) and dollar amount are updated every two weeks

Triangle Outer (Goals) – Finish date and dollar amount to include contingency (Determined in Project Charter and Project Change Requests)

Comparing the current TI to the TO every reporting period = Remaining Contingency

Triangle Inner

Cost/Date

Triangle Outer

Cost/Date

Con

tinge

ncy

Page 3: 1 Office of Project Management Metrics Report Presentation Phil Braun Project Management Consultant – Alliant Energy – Office of Project Management

33

Metrics (continued) When completed, the final report will contain the following worksheets

in an Excel Workbook for each project governed by OPM: Accomplishments Dashboard Vendor Scorecard Change Management Dashboard Metrics Report Task Graphs Project Performance Graphs Resource Allocation Resource Non-Working Time Triangle & Benefit Summary Risk Matrix Issues Matrix Communications Matrix Training Matrix Decisions

(Updates at least monthly)

Page 4: 1 Office of Project Management Metrics Report Presentation Phil Braun Project Management Consultant – Alliant Energy – Office of Project Management

44

AccomplishmentsFollowing questions are answered by the Project Manager in the Accomplishments page in the project metrics report:

Review Date Project Driver (Time, Cost, Scope) Overall Project Health (Completed by OPM using Project

Dashboard) Executive Summary Key Decisions, Issues, and/or Risks Significant Accomplishments Since Last Meeting Major Work Planned Over Next Period Comments Follow up Items from previous meeting Outcome of Action Items from Previous Meeting

Page 5: 1 Office of Project Management Metrics Report Presentation Phil Braun Project Management Consultant – Alliant Energy – Office of Project Management

55

Project Dashboard Used to communicate status of the project. Information taken from latest metric report and put into

Microsoft Excel Dashboard is then made into .pdf file and placed on

Company Intranet Data entered into input area that drives formulas to

calculate variances and determine overall status color All Projects are rolled up to Portfolio Dashboard

Page 6: 1 Office of Project Management Metrics Report Presentation Phil Braun Project Management Consultant – Alliant Energy – Office of Project Management

66

Project Dashboard (continued)

Input area

InsertedCalculated

5% 7%

G G

15% 9.08100% MEDIUM100%72%

0 Yes-0.5

YELLOW

N/A 64%0 41%

GREEN 57%

4.5GREENOverall Project Health Indicator:

Overall ScoreProject Consultant: Mike Consultant Score:

Project Sponsor: Jane SmithProject Manager: Tom Project

Business Group: General Please update project description in the box located in the dashboardExecutive Sponsor: Joe Smith

Points Deducted: Project % Work Complete:Indicator (al caps): Calendar Duration % Complete:

Indicator (all caps:PMPA Score

Score: Project % Duration Complete:

Points Deducted: Does it Exist:Indicator (all caps): GREEN Points Deducted:

Previous (2 weeks Prior) Risk Indicator:Previous (3 weeks Prior)Average: Resource OverAllocation

Average Task Completion Rate RiskCurrent: Overall Risk Score:

Indicator (all caps): GREEN Indicator (all caps): GREENPoints Deducted: 0 Points Deducted: 0Time Contingency %: 5.04% Cost Contingency %: 7.51%TI Duration in Weeks: 32.29 Cost Contingency $: $15,574TO Duration in Weeks: 34.00 Triangle Outer Cost: $207,500

TI (Scheduled) End Date: December 19, 2008 CTD (From Cost Tab in Metrics): $110,071TO End Date: December 31, 2008

Project Start Date: May 7, 2008 Triangle Inner Cost: $191,926

Execute & ControlPrimary Driver: Time

Time Contingency Cost Contingency

Quantifable Benefit: N/A Phase: September 19, 2008

Input Data

Project Name: Example Project Status Date:

Page 7: 1 Office of Project Management Metrics Report Presentation Phil Braun Project Management Consultant – Alliant Energy – Office of Project Management

77

Project Dashboard (continued)Calculated Fields Time and Cost Contingency Color indicator based on matrix

1 to 24% 25 to 49% 50 to 74% 75 to 99% 100%Cost or Time Contingency:greater than 25% Green Green Red Red Red

20% to 24.9% Green Green Yellow Red Red15% to 19.9% Green Green Yellow Yellow Red10% to 14.9% Green Green Green Yellow Yellow5% to 9.9% Yellow Yellow Green Green Yellow0% to 4.9% Red Red Yellow Green Green

less than 0% Red Red Red Red Red

Calendar Duration

Red -1.5Yellow 0.5Green 0

Points Deducted

Page 8: 1 Office of Project Management Metrics Report Presentation Phil Braun Project Management Consultant – Alliant Energy – Office of Project Management

88

Project Dashboard (continued)Calculated Fields

Average Task Completion Rate:

Average Tak Completion Rate: Points DeductedRed Project has a task completion rate of less than 50% -1

Yellow Project has a task completion rate of 50 to 59% -0.5Green Project has a task completion rate of greater than 60% 0

Resource Over allocation

Resource Over allocation: Points DeductedYellow Project resources are over-allocated -0.5Green Project resources are not over-allocated 0

PMPA Score

PMPA Score: Points DeductedRed PMPA Score, equal to or less than 84% -1

Yellow PMPA Score, 85 to 94% -0.5Green PMPA Score, equal to or greater than 95% 0

Page 9: 1 Office of Project Management Metrics Report Presentation Phil Braun Project Management Consultant – Alliant Energy – Office of Project Management

99

Project Dashboard (continued)Overall score calculation

Every new project starts with a total of five (5) points.

The resulting score determines the overall project health indicator as follows: GREEN equal to or greater than 3.5 and up to 5 points; YELLOWYELLOW equal to or greater than 2 and up to 3.4 points; RED equal to 0 and up to 1.9 points

If a project is projecting over budget or late,then its Overall Health will be indicated as “RED.”

Page 10: 1 Office of Project Management Metrics Report Presentation Phil Braun Project Management Consultant – Alliant Energy – Office of Project Management

1010

Project Dashboard (continued)

Phase: Time

PLEASE CONTACT OPM FOR THE LATEST METRICS REPORT

Project Description

The purpose of the project is to complete a pilot implementation of a software package.

Project Manager: Tom Project Project Consultant: Mike Consultant

Executive Sponsor: Joe Smith Project Sponsor: Jane Smith

Triangle Outer Cost: $207,500 Triangle Inner Cost: $191,926

Triangle Outer Date: 12/31/2008 Triangle Inner Date: 12/19/2008

Calendar Duration % Complete: 57%

Project Details:Project Start Date: 5/7/2008 Business Group: General

Project % Duration Complete: 64% Project % Work Complete 41%

Resource Over-Allocation:Yes

PMPA Score 91%YELLOW

Average Task Completion Rate:48%

Overall Project Risk:9.08

RED MEDIUM

Key Indicators:

Time Contingency:5.04%

Cost Contingency:7.51%

GREEN GREEN

Status Date September 19, 2008 Execute & Control Primary Driver:

Project Name:Example Project

Project Dashboard

Overall Health: GREEN Quantifiable Benefit: N/A

Page 11: 1 Office of Project Management Metrics Report Presentation Phil Braun Project Management Consultant – Alliant Energy – Office of Project Management

11

Vendor Scorecard Vendor Scorecard is completed by the Project

Manager to track Vendor performance on a project. The following data is tracked: Overall Vendor Performance Project Name Vendor Name (one report done for each vendor if

multiple vendors on project) Type of Contract Contract Dollar Amount Purpose for Vendor Has this Vendor been used on a previous

contract? Current Risk Score for Vendor portion of Risk

Matrix and Risk Level for Vendor Questions on Vendor Performance Each section contains a comment area that can be

used if needed

Page 12: 1 Office of Project Management Metrics Report Presentation Phil Braun Project Management Consultant – Alliant Energy – Office of Project Management

12

Vendor Scorecard Questions Resource (Red, Yellow, Green, N/A – Answers)

Is the vendor providing enough resources to get the work done? Are the vendor resources knowledgeable about the product? Is the vendor responsive to questions and requests? Is the vendor Project Manager performing effectively?

Performance (Yes, No, or N/A – Answers) Are deliverables being completed on time? Is the cost still in-line with the current contract? Is the vendor providing tasks that are essential for project success and are

they updating those tasks on timely basis? Is the vendor meeting quality expectations?

Issues (Taken from Issues Log – Automatically calculates Red, Yellow or Green)

Customer Satisfaction (Yes, No, or N/A – Answers) Meets commitments made to Stakeholders? Is the Project Manager satisfied with the vendor? Is the Project Team satisfied with the vendor?

Escalation (Yes, No – Answers) Have you had to escalate any issues to the vendor’s management? If yes, were the issues resolved as expected?

Vendor Milestones (Green or Red based on if Milestone is completed on time) Updated from metrics report

Page 13: 1 Office of Project Management Metrics Report Presentation Phil Braun Project Management Consultant – Alliant Energy – Office of Project Management

13

Example of Vendor

Scorecard(Page 1)No

Score Risk Level9.5 MEDIUM

Green Red/Yellow/Green or N/AYellow Red/Yellow/Green or N/A

Red Red/Yellow/Green or N/AGreen Red/Yellow/Green or N/A

Yes Yes/No or N/AYes Yes/No or N/A

NoYes/No or N/A

Yes Yes/No or N/A

20 Total Issues2 Vendor Issues

10% Calculated

Comments on Issues

Is the vendor providing enough resources to get the work done?Are the vendor resources knowledgeable about the product?

Is the vendor providing tasks that are essential for project success and are they updating those tasks on a timely basis?Is the vendor meeting Alliant Energy's quality expectations?

Overall Performance Indicator: Yellow

Vendor Performance Scorecard

Type of Contract: Time and Materials

Purpose for Vendor: To install a very important system for the company

$2,568,235Contract Dollar Amount:

Is the cost still in-line with the current contract?

Overall Vendor Performance Yellow

Vendor Name:

Project Name: ABC Project

Ucandoit Corporation

Resource

Comments on Resource Section

Overall Issues Indicator: Green

Has this Vendor been used on a previous contract?

Current Risk score (Vendor)

Are deliverables being completed on time?

Is the vendor responsive to questions and requests?

Overall Resource Indicator: Yellow

Performance

Is the vendor Project Manager performing effectively?

Issues

Comments on Performance

Number of open issues on the issue log:Number of issues that are vendor related:Percent of issues related to vendor:

Page 14: 1 Office of Project Management Metrics Report Presentation Phil Braun Project Management Consultant – Alliant Energy – Office of Project Management

14

Example of Vendor

Scorecard(Page 2)

Yes Yes/No or N/AYes Yes/No or N/ANo Yes/No or N/A

Yes Yes/NoYes Yes/No

UID T.I Date T.O Date % CompleteDifference (in

days) Indicator1 27-Oct-08 22-Jan-09 100% 87 Green2 15-Mar-09 10-Feb-09 100% -33 Red3 23-Apr-09 9-May-09 0% 16 Green4 2-Sep-09 1-Sep-09 0% -1 Red5 2-Jul-09 23-Sep-09 0% 83 Green

Yellow

Vendor Milestone 1Vendor Milestone 2Vendor Milestone 3Vendor Milestone 4

Comments on Vendor Milestones

Overall Milestone Indicator: Red

Comments on Customer Satisifaction

Is the Project Team satisfied with the vendor?Is the Project Manager satisfied with the vendor?

EscalationHave you had to escalate any issues to the vendor's management?If yes, were the issues resolved as expected?

Overall Escalation Indicator: Yellow

Comments on Escalation

Vendor Milestones

Milestone Name

Vendor Milestone 5

Overall Customer Satisfaction Indicator: Yellow

Customer SatisfactionMeets commitments made to Alliant Energy Stakeholders?

Page 15: 1 Office of Project Management Metrics Report Presentation Phil Braun Project Management Consultant – Alliant Energy – Office of Project Management

15

Project Change Management Dashboard

Project Name:Status Date:

Yellow

1 No RED

2

Started

YELLOW

3Yes

GREEN

4 Started YELLOW

5No

RED

6 Started YELLOW

7No

RED

8 Yes GREEN

9 Started YELLOW

10 No RED

11Yes

GREEN

12No

RED

13 Started YELLOW

14 Yes GREEN

Project Change Management Dashboard

ABC Project

Have training programs dealing with all required aspects of the technology and on-going support been identified and developed?

Have training dates, funding and trainers been identified and scheduled?

Are the business units that will own and support the technology or integrated system aware change is coming?

Have the following questions been answered for each of the stakeholders? 1) why is this change happening 2) what's in it for me 3) what are the risks of not changing 4) what are organizational benefits

Are the business units that will own and support the technology or integrated system aware of the on-going operational support needs once the project is implemented?

Has management of the business units been involved in the project's development?

Does the communications plan include change management aspects related to the project or system being implemented?

Are the business units willing to take on the operation and on-going support of the technology or system?

Overall Change Management Status

5-Jun-09

Has the business units' staff been trained to operate and support the technology or integrated system?

Have the business units budgeted funds required to support the on-going operation?

Have the change management tasks required to transition the project to operations been defined and are they included in the project schedule?

Has the impact of changes to the workflow processes been evaluated, defined and explained to all who may be impacted by the change?

Have the technology end-users been involved in the project's development, including requirements definition, vendor selection, prototype evaluation, testing, etc.?

Do the business units have the required staff to operate and support the technology or integrated system?

Page 16: 1 Office of Project Management Metrics Report Presentation Phil Braun Project Management Consultant – Alliant Energy – Office of Project Management

1616

Metrics Report

The metrics report is ran by using a macro that exports a Microsoft Project schedule to a Crystal Reporting engine that then exports the following information to Microsoft Excel.

Metrics completed in categories: Project Plan Summary Date Summary/Task Summary Tracking Milestones Cost Summary/% Completion Rate Miscellaneous Comments Audit Summary Metrics Summary Project Plan Audit Project Plan Metrics

Page 17: 1 Office of Project Management Metrics Report Presentation Phil Braun Project Management Consultant – Alliant Energy – Office of Project Management

1717

Metrics Report (continued)

Project Plan Summary

Project Plan Summary:

Date Prepared: 22-Sep-08 Last Status Date: 05-Sep-08Project: Test Project Current Status Date: 19-Sep-08OPM Project ID: 200804 Difference: 14 daysProject Manager: Joe Smith Next Status Date (estimated): 03-Oct-08Project Sponsor: Jane Smith Difference: 14 daysScheduled Status Date: 19-Sep-08 Next Meeting Date: 08-Oct-08Report Completed By: Bob SmithReport Reviewed By: Jackie Smith

Page 18: 1 Office of Project Management Metrics Report Presentation Phil Braun Project Management Consultant – Alliant Energy – Office of Project Management

1818

Metrics Report (continued)

Date/Task Summary

Date Summary: Task Summary:

Baseline Finish Date: 30-Jan-09 Total Number of Tasks: 152Triangle Inner Date: 19-Dec-08 Total Remaining Tasks: 79Triangle Outer Date: 31-Dec-08 Total Remaining Hours: 1,373Time Contingency: 12 days Previous Total Remaining Hours: 1,462

Page 19: 1 Office of Project Management Metrics Report Presentation Phil Braun Project Management Consultant – Alliant Energy – Office of Project Management

1919

Metrics Report (continued)

Tracking Milestones List of Milestones set by Project Manager Fields Tracked include the following:

Task Name Triangle Inner Date Triangle Outer Date % Complete Difference in weeks

Page 20: 1 Office of Project Management Metrics Report Presentation Phil Braun Project Management Consultant – Alliant Energy – Office of Project Management

2020

Metrics Report (continued)

Cost Summary/% Completion Rate

Calendar Duration % Complete: 66%% Budget Consumed: 68%

Cost Summary: % Completion Rate:

Triangle Inner Cost: $4,208,539 Project Duration % Complete: 91%Triangle Outer Cost: $4,547,518 Project Work % Complete: 84%Cost Contingency: $338,979

Page 21: 1 Office of Project Management Metrics Report Presentation Phil Braun Project Management Consultant – Alliant Energy – Office of Project Management

2121

Metrics Report (continued)

Miscellaneous # Scope Change Requests

Approved changes to scope on the project PMPA Score

Internal score used to gauge strength of schedule CSAT (Customer Satisfaction) Score

Currently in progress to determine best way to capture metric

Miscellaneous:

# Scope Change Requests:PMPA Score: N/ACSAT Score: N/A

Page 22: 1 Office of Project Management Metrics Report Presentation Phil Braun Project Management Consultant – Alliant Energy – Office of Project Management

2222

Metrics Report (continued)

Comments Used to comment on changes that may need to be made to

schedule Used to relay information regarding schedule and metrics

report

Page 23: 1 Office of Project Management Metrics Report Presentation Phil Braun Project Management Consultant – Alliant Energy – Office of Project Management

2323

Metrics Report (continued)

Audit Summary

1.2.3.4.5.6.7.8.9.

10.11.12.

Audit Summary:

Tasks with remaining duration greater than 10 days: 0One start and one finish task? YesTasks with no predecessors: 1Tasks with no successors: 1Critical Path (number of tasks and percentage): 33 42%Constraints: 0Tasks with negative slack: 0Activities with actual dates in the future: 0Tasks not re-scheduled: 0Resource over-allocation: YesCost model applied: YesStandard settings applied (date checked): Yes 28-Jul-08

Page 24: 1 Office of Project Management Metrics Report Presentation Phil Braun Project Management Consultant – Alliant Energy – Office of Project Management

2424

Metrics Report (continued)

Metrics Summary

1. 132. 23. 64. 55. 06. 187. 128. 79. 15%

10. 26

Metrics Summary:

Tasks scheduled for completion by the current status date:Tasks scheduled for completion by the current status date and actually completed:Tasks scheduled for completion by the current status date that were deleted:Late Tasks:Tasks completed prior to the previous status date, but reported late:Total tasks deleted:Total tasks added:Grand total of tasks completed since the last status date:Percent complete ( #2 / ( #1 - #5 ) ):Tasks scheduled to be completed during the next period:

Page 25: 1 Office of Project Management Metrics Report Presentation Phil Braun Project Management Consultant – Alliant Energy – Office of Project Management

2525

Metrics Report (continued)

Project Plan Audit Displays activities that are on the Critical Path

Project Plan Metrics Displays following activities:

Tasks scheduled for completion by the current status date Tasks scheduled for completion by the current status date and

actually completed Tasks scheduled for completion by the current status date that

were deleted Late tasks Total tasks deleted Total tasks added Grand total of tasks completed since last status date Tasks scheduled to be completed during next period

Page 26: 1 Office of Project Management Metrics Report Presentation Phil Braun Project Management Consultant – Alliant Energy – Office of Project Management

26

Task GraphsTask Completion History Graph

Forecasted Project Completion Date

0

200

400

600

800

1000

1200

1400

1600

1800

7/11

/200

8

8/11

/200

8

9/11

/200

8

10/1

1/20

08

11/1

1/20

08

12/1

1/20

08

1/11

/200

9

2/11

/200

9

3/11

/200

9

4/11

/200

9

5/11

/200

9

6/11

/200

9

7/11

/200

9

8/11

/200

9

9/11

/200

9

10/1

1/20

09

11/1

1/20

09

12/1

1/20

09

1/11

/201

0

2/11

/201

0

3/11

/201

0

4/11

/201

0

5/11

/201

0

6/11

/201

0

7/11

/201

0

8/11

/201

0

9/11

/201

0

10/1

1/20

10

11/1

1/20

10

12/1

1/20

10

1/11

/201

1

2/11

/201

1

3/11

/201

1

4/11

/201

1

5/11

/201

1

6/11

/201

1

7/11

/201

1

8/11

/201

1

Tasks Total Closed Linear (Tasks) Linear (Total Closed)

T.O. Finish Date 8/31/11

T.I. Finish Date 4/13/11

0

10

20

30

40

50

60

6/12

/200

9

6/24

/200

9

7/10

/200

9

7/24

/200

9

8/5/

2009

8/24

/200

9

9/4/

2009

9/18

/200

9

10/2

/200

9

10/1

6/20

09

10/3

0/20

09

11/1

3/20

09

11/3

0/20

09

12/1

1/20

09

12/3

1/20

09

1/15

/201

0

1/29

/201

0

2/12

/201

0

2/26

/201

0

3/12

/201

0

3/26

/201

0

4/9/

2010

4/23

/201

0

5/6/

2010

5/21

/201

0

Status Date

Nu

mb

er o

f T

asks

0%20%40%60%80%100%120%140%160%

Scheduled

Completed

% Complete

Total % Complete

Forecasted Project

Completion Date

Approximately11/15/10

Page 27: 1 Office of Project Management Metrics Report Presentation Phil Braun Project Management Consultant – Alliant Energy – Office of Project Management

27

Task Completion History Graphs

Task Completion History Graphs Shows the Task completion rate by reporting period

Status Date Scheduled CompletedTotal Tasks Completed

12-Jun-09 15 14 1424-Jun-09 20 18 1910-Jul-09 25 16 2624-Jul-09 30 14 3405-Aug-09 22 17 2424-Aug-09 31 12 1404-Sep-09 30 19 2718-Sep-09 40 26 3302-Oct-09 33 26 3616-Oct-09 21 15 2630-Oct-09 25 21 3413-Nov-09 50 31 3430-Nov-09 31 20 2411-Dec-09 23 16 2131-Dec-09 26 14 1615-Jan-10 26 14 2029-Jan-10 50 19 2212-Feb-10 45 32 3526-Feb-10 47 36 3912-Mar-10 26 18 1926-Mar-10 24 16 2009-Apr-10 23 22 2623-Apr-10 31 27 2806-May-10 18 11 1521-May-10 12 11 18Total: 1153 756 67% Average 965 87% Average

Total % Complete% Complete

93% 93%90% 95%

47% 113%64% 104%

77% 109%39% 45%63% 90%65% 83%79% 109%71% 124%

70% 91%

84% 136%62% 68%

69% 73%

71% 78%77% 83%

54% 77%

67% 83%

38% 44%

54% 62%

65% 77%

92% 150%

96% 113%

61% 83%87% 90%

Page 28: 1 Office of Project Management Metrics Report Presentation Phil Braun Project Management Consultant – Alliant Energy – Office of Project Management

28

Forecasted Project Completion Date

Calculates Approximate finish date based on tasks being completed every reporting period

Uses trend lines for analysis

1/15/2010 1/29/2010 2/12/2010 2/26/2010 3/12/2010 3/26/2010 4/9/2010 4/23/2010 5/7/2010 5/21/2010Tasks 1051 1054 1073 1092 1100 1103 1107 1108 1115 1125Tasks Remaining 285 265 249 225 214 197 176 149 141 133Total Closed 766 789 824 867 886 906 931 959 974 992

Page 29: 1 Office of Project Management Metrics Report Presentation Phil Braun Project Management Consultant – Alliant Energy – Office of Project Management

29

Project Performance Graphs

91% 84%% Calendar Duration Complete 66% 68%

Current Period Percent Complete % Duration Complete % Work Complete

% Budget Consumed

Time & Cost Contingency Percent Complete

Time vs. Work

Current Period Time & Cost Contingency

Time Contingency Cost Contingency10% 8%

0%2%4%6%8%

10%12%14%16%

5/29

/200

9

6/28

/200

9

7/28

/200

9

8/27

/200

9

9/26

/200

9

10/2

6/20

09

11/2

5/20

09

12/2

5/20

09

1/24

/201

0

2/23

/201

0

3/25

/201

0

4/24

/201

0

5/24

/201

0

Status Date%

Co

nti

ng

en

cy

Time Contingency Cost Contingency

0%25%50%75%

100%

6/12

/200

9

7/12

/200

9

8/11

/200

9

9/10

/200

9

10/1

0/20

09

11/9

/200

9

12/9

/200

9

1/8/

2010

2/7/

2010

3/9/

2010

4/8/

2010

5/8/

2010

Status Date

% C

om

ple

te

% Duration Complete % Work Complete

% Calendar Duration Complete % Budget Consumed

Page 30: 1 Office of Project Management Metrics Report Presentation Phil Braun Project Management Consultant – Alliant Energy – Office of Project Management

30

Time & Cost ContingencyTime & Cost Contingency

Current Period Time & Cost Contingency

Time Contingency Cost Contingency10% 8%

0%2%4%6%8%

10%12%14%16%

5/29

/200

9

6/28

/200

9

7/28

/200

9

8/27

/200

9

9/26

/200

9

10/2

6/20

09

11/2

5/20

09

12/2

5/20

09

1/24

/201

0

2/23

/201

0

3/25

/201

0

4/24

/201

0

5/24

/201

0

Status Date

% C

on

tin

ge

ncy

Time Contingency Cost Contingency

Contingency is the difference between the Triangle Inner Date/Cost and Triangle Outer Date/Cost

Graph shows contingency history by reporting period

Status DateTime

Contingency Cost

Contingency29-May-09 11% 11%12-Jun-09 11% 11%26-Jun-09 13% 13%10-Jul-09 13% 13%24-Jul-09 13% 13%07-Aug-09 13% 9%24-Aug-09 13% 14%04-Sep-09 12% 14%18-Sep-09 13% 11%02-Oct-09 12% 7%16-Oct-09 10% 11%30-Oct-09 14% 11%13-Nov-09 14% 10%30-Nov-09 13% 9%11-Dec-09 14% 9%31-Dec-09 14% 9%15-Jan-10 13% 10%29-Jan-10 15% 9%12-Feb-10 9% 10%26-Feb-10 9% 9%12-Mar-10 10% 6%26-Mar-10 10% 6%09-Apr-10 10% 6%23-Apr-10 10% 9%06-May-10 5% 8%21-May-10 10% 8%

Page 31: 1 Office of Project Management Metrics Report Presentation Phil Braun Project Management Consultant – Alliant Energy – Office of Project Management

31

Percent Complete

91% 84%% Calendar Duration Complete 66% 68%

Current Period Percent Complete % Duration Complete % Work Complete

% Budget Consumed

Percent Complete

0%25%50%75%

100%

6/12

/200

9

7/12

/200

9

8/11

/200

9

9/10

/200

9

10/1

0/20

09

11/9

/200

9

12/9

/200

9

1/8/

2010

2/7/

2010

3/9/

2010

4/8/

2010

5/8/

2010

Status Date

% C

om

ple

te

% Duration Complete % Work Complete

% Calendar Duration Complete % Budget Consumed

Status Date% Duration Complete

% Work Complete

% Calendar Duration Complete

% Budget Consumed

12-Jun-09 51% 41% 40%26-Jun-09 55% 43% 41%10-Jul-09 57% 47% 43%24-Jul-09 58% 52% 44% 45%07-Aug-09 59% 53% 44% 45%24-Aug-09 61% 55% 46% 47%04-Sep-09 64% 55% 47% 47%18-Sep-09 65% 56% 48% 49%02-Oct-09 69% 59% 49% 53%16-Oct-09 70% 63% 50% 53%30-Oct-09 74% 66% 51% 53%13-Nov-09 76% 68% 52% 54%30-Nov-09 78% 70% 53% 56%11-Dec-09 79% 70% 54% 57%31-Dec-09 81% 72% 55% 59%15-Jan-10 81% 71% 56% 58%29-Jan-10 84% 74% 57% 59%12-Feb-10 85% 74% 58% 59%26-Feb-10 85% 75% 59% 61%12-Mar-10 86% 80% 61% 62%26-Mar-10 86% 81% 62% 62%09-Apr-10 89% 84% 63% 63%23-Apr-10 90% 85% 64% 65%06-May-10 91% 86% 65% 67%21-May-10 91% 94% 66% 68%

Note: Hid rows 142 through 165

Page 32: 1 Office of Project Management Metrics Report Presentation Phil Braun Project Management Consultant – Alliant Energy – Office of Project Management

32

Time vs. Work

•Graph is created in Microsoft Project using Analyze Timescaled Data in Excel… Add in.

•Graphs work to be completed over the length of the project.

Page 33: 1 Office of Project Management Metrics Report Presentation Phil Braun Project Management Consultant – Alliant Energy – Office of Project Management

33

Resource Allocation

Resource Name

5/21

/201

0 -

5/2

2/20

10

5/23

/201

0 -

5/2

9/20

10

5/30

/201

0 -

6/5

/201

0

6/6/

2010

- 6

/12/

2010

6/13

/201

0 -

6/1

9/20

10

6/20

/201

0 -

6/2

6/20

10

6/27

/201

0 -

7/3

/201

0

7/4/

2010

- 7

/10/

2010

7/11

/201

0 -

7/1

7/20

10

7/18

/201

0 -

7/2

4/20

10

7/25

/201

0 -

7/3

1/20

10

8/1/

2010

- 8

/7/2

010

8/8/

2010

- 8

/14/

2010

Crosby;Mason **Percent Allocation 0% 18% 0% 80% 98% 50% 60% 120% 180% 80% 0% 40% 0%*Capacity 8 40 32 40 40 40 40 40 40 40 40 40 40Project 123 0 7 0 32 39 20 24 48 72 32 0 16 0ABC Project 0 0 0 0 0 0 0 0 0 0 0 0 0Best Project Ever 0 0 0 0 0 0 0 0 0 0 0 0 0

Shepard;Noah **Percent Allocation 78% 78% 78% 78% 78% 78% 78% 78% 78% 78% 78% 78% 78%*Capacity 8 24 32 24 24 40 40 10 40 28 40 40 40Never Ending Project 0 0 0 0 0 0 0 0 0 0 0 0 0Best Project Ever 0 0 0 0 0 0 0 0 0 0 0 0 0Functional & Administrative Work 6.27 18.82 25.09 18.82 18.82 31.36 31.36 7.84 31.36 21.95 31.36 31.36 31.36

Harrell;Graham **Percent Allocation 0% 0% 46% 10% 23% 120% 136% 112% 68% 1% 0% 11% 85%*Capacity 8 40 32 40 40 40 40 40 40 40 40 40 40ABC Project 0 0 14.82 3.9 3.04 48 54.36 44.3 26.67 0 0 4.53 28Maintenance Project 0 0 0 0 6 0 0 0.47 0.67 0.47 0 0 6

Masthay;Tim **Percent Allocation 25% 12% 0% 7% 0% 0% 0% 0% 0% 0% 0% 0% 0%*Capacity 8 40 32 24 40 40 32 40 40 32 40 40 40XYZ Project 2.01 4.64 0 1.67 0 0 0 0 0 0 0 0 0ABC Project 0 0 0 0 0 0 0 0 0 0 0 0 0Functional & Administrative Work 0 0 0 0 0 0 0 0 0 0 0 0 0

Bryan;Chris **Percent Allocation 101% 100% 100% 100% 100% 100% 103% 106% 106% 106% 112% 153% 109%*Capacity 8 40 32 40 40 40 40 40 40 40 40 40 40Team Functional & Administrative Work 8.04 40.19 32.15 40.19 40.19 40.19 41.08 42.41 42.41 42.41 42.41 42.41 42.41ABC Project 0 0 0 0 0 0 0 0 0 0 2.37 18.6 1.2

Page 34: 1 Office of Project Management Metrics Report Presentation Phil Braun Project Management Consultant – Alliant Energy – Office of Project Management

34

Resource Allocation

Resource Name

5/21

/201

0 -

5/22

/201

0

5/23

/201

0 -

5/29

/201

0

5/30

/201

0 -

6/5/

201

0

6/6/

2010

- 6

/12/

201

0

6/13

/201

0 -

6/19

/201

0

6/20

/201

0 -

6/26

/201

0

6/27

/201

0 -

7/3/

201

0

7/4/

2010

- 7

/10/

201

0

7/11

/201

0 -

7/17

/201

0

7/18

/201

0 -

7/24

/201

0

7/25

/201

0 -

7/31

/201

0

8/1/

2010

- 8

/7/2

010

8/8/

2010

- 8

/14/

201

0

Crosby;Mason **Percent Allocation 0% 18% 0% 80% 98% 50% 60% 120% 180% 80% 0% 40% 0%*Capacity 8 40 32 40 40 40 40 40 40 40 40 40 40Project 123 0 7 0 32 39 20 24 48 72 32 0 16 0ABC Project 0 0 0 0 0 0 0 0 0 0 0 0 0Best Project Ever 0 0 0 0 0 0 0 0 0 0 0 0 0

*Capacity 8 24 32 24 24 40 40 10 40 28 40 40 40Never Ending Project 0 0 0 0 0 0 0 0 0 0 0 0 0Best Project Ever 0 0 0 0 0 0 0 0 0 0 0 0 0Functional & Administrative Work 6.27 18.82 25.09 18.82 18.82 31.36 31.36 7.84 31.36 21.95 31.36 31.36 31.36

*Capacity 8 40 32 40 40 40 40 40 40 40 40 40 40ABC Project 0 0 14.82 3.9 3.04 48 54.36 44.3 26.67 0 0 4.53 28Maintenance Project 0 0 0 0 6 0 0 0.47 0.67 0.47 0 0 6

*Capacity 8 40 32 24 40 40 32 40 40 32 40 40 40XYZ Project 2.01 4.64 0 1.67 0 0 0 0 0 0 0 0 0ABC Project 0 0 0 0 0 0 0 0 0 0 0 0 0Functional & Administrative Work 0 0 0 0 0 0 0 0 0 0 0 0 0

*Capacity 8 40 32 40 40 40 40 40 40 40 40 40 40Team Functional & Administrative Work 8.04 40.19 32.15 40.19 40.19 40.19 41.08 42.41 42.41 42.41 42.41 42.41 42.41ABC Project 0 0 0 0 0 0 0 0 0 0 2.37 18.6 1.2

Resource Name

Shows Percent of Allocation by

Week

Capacity (Includes Vacation and Holidays)

Shows all projects that resource is assigned to

Data is taken from Project Server 2007 – Resource Center and downloaded to Microsoft Excel.

Macro is then ran to format data and add color, format, etc.

Page 35: 1 Office of Project Management Metrics Report Presentation Phil Braun Project Management Consultant – Alliant Energy – Office of Project Management

35

Resource Non-Working TimeDate Resource Monday Tuesday Wednesday Thursday Friday Total

06/06/10 - 06/12/10 Jones;Khalil 8 8 1606/06/10 - 06/12/10 Williams;Patrick 8 8 8 8 3206/13/10 - 06/19/10 Peprah;Charlie 8 8 8 8 8 4006/20/10 - 06/26/10 Peprah;Charlie 8 8 8 8 8 4006/27/10 - 07/03/10 Jones;Khalil 8 806/27/10 - 07/03/10 Peprah;Charlie 8 8 8 8 8 4007/04/10 - 07/10/10 Peprah;Charlie 8 8 8 2407/18/10 - 07/24/10 Jones;Khalil 8 807/18/10 - 07/24/10 Williams;Patrick 8 8 8 2408/08/10 - 08/14/10 Williams;Patrick 8 8 8 2408/15/10 - 08/21/10 Williams;Patrick 8 8 8 8 8 4008/29/10 - 09/04/10 Jones;Khalil 8 8 16

• Resource Enters Non-Working time into Microsoft Outlook Add-In

• Time is placed in MS Outlook calendar and also placed into MS Project Server

• Resource Calendar impacts project schedule

• Report allows PM to see scheduled time off for team

Page 36: 1 Office of Project Management Metrics Report Presentation Phil Braun Project Management Consultant – Alliant Energy – Office of Project Management

3636

Triangle and Benefit Summary

Triangle Outer and Triangle Inner information Cost broken out by year and summed Scope – Must have and nice to have Explanation of benefits

Page 37: 1 Office of Project Management Metrics Report Presentation Phil Braun Project Management Consultant – Alliant Energy – Office of Project Management

3737

Matrix TypesRisk Matrix

Updated weekly Projects categorized as High, Medium or Low risk Following categories are used:

Technical, Quality & Performance Project Management Organizational Vendor Other External

Header of Risk Matrix

Risk Type # Risk Event Description and Resulting Effect

Quantify the Risk Effect

(Impact on Time, Cost, Quality, Benefit,

Customer Satisfaction)Probability

(1-5)Impact

(1-5)

Overall Risk (Calculated)<= 5: LOW6-10: MED> 10: HIGH Risk Detection Resp.

Risk Response Strategy (Mitigate, Transfer,

Avoid, Accept)

Page 38: 1 Office of Project Management Metrics Report Presentation Phil Braun Project Management Consultant – Alliant Energy – Office of Project Management

3838

Matrix Types (continued)Issues Matrix Used to track issues on the project

Header of Issue Matrix# Description of Issue Requested by Priority Impact Status Due Date Responsibility Resolution History

Date Resolved

Communications Matrix Used to track needed communications relevant to

project

#Audience

(Individual or Group)Communication

Description Purpose Vehicle Frequency

Target Completion

Date Status Resp. Notes

Header of Communications Matrix

Page 39: 1 Office of Project Management Metrics Report Presentation Phil Braun Project Management Consultant – Alliant Energy – Office of Project Management

3939

Matrix Types (continued)Decision Matrix Used to track decisions made by project team or

decisions that affect the project

Header of Decision Matrix

Training Matrix Used to track training needs for the project

Each project can develop and maintain their own training plan

# Decision Description Decision Makers Date

Page 40: 1 Office of Project Management Metrics Report Presentation Phil Braun Project Management Consultant – Alliant Energy – Office of Project Management

4040

Portfolio Dashboard

Project A

GREEN

RED

RED

GREEN

RED

Project H 65%

Project F 88%

Project K

RED57%

Project L

57% GREEN

71% GREEN

Project I

Project J

Project G 84%

Project D 53%

Project E 135%

Project B 95% RED

28% GREEN

OPM Projects Dashboard

Updated as of September 18, 2008

Insufficient data to determine overall health

Overall Project Status

24%

Project Name (Hyperlink to Project Dashboard)

Calendar Duration % Complete

Project C

YELLOW

RED

YELLOW

GREEN

Projects will remain on the Dashboard for 1 month after their completion.

The dashboard data is as good as the project data compiled to create it. Every effort is made to ensure accurate and timely data, and exceptions could exist. In this event, OPM maintains the right to adjust dashboard health indicators as appropriate. T

indicates the project sponsor, executives and others may need to intervene to get the project back on track if that is possible

The overall health of a project is indicated by the colors:

indicates that the project sponsor and others should investigate the reason(s) for concern

indicates that the overall health of the project at this time appears to be good, but it is merely an indicator and, of course, the health of a project could change as the project progresses

Legend

Page 41: 1 Office of Project Management Metrics Report Presentation Phil Braun Project Management Consultant – Alliant Energy – Office of Project Management

41

Examples

Examples of metrics reports are available as a hard copy here today

If you are interested in receiving a soft copy please email [email protected]