1 network status mailers’ technical advisory committee (mtac) – 2/22/06 paul vogel vice...
TRANSCRIPT
![Page 1: 1 NETWORK STATUS MAILERS’ TECHNICAL ADVISORY COMMITTEE (MTAC) – 2/22/06 Paul Vogel Vice President, Network Operations Management U.S Postal Service](https://reader030.vdocuments.us/reader030/viewer/2022032708/56649e855503460f94b8713b/html5/thumbnails/1.jpg)
1
NETWORK STATUS
MAILERS’ TECHNICAL ADVISORY COMMITTEE (MTAC) – 2/22/06
Paul VogelVice President,
Network Operations ManagementU.S Postal Service
![Page 2: 1 NETWORK STATUS MAILERS’ TECHNICAL ADVISORY COMMITTEE (MTAC) – 2/22/06 Paul Vogel Vice President, Network Operations Management U.S Postal Service](https://reader030.vdocuments.us/reader030/viewer/2022032708/56649e855503460f94b8713b/html5/thumbnails/2.jpg)
2
BOG approved PRC filing – 2/7/06
Notification of national network change to: NPMHU, Management Associations, NALC,
NRLCA, APWU House & Senate Oversight Committees GAO Trade Media & Local Media from 41 AMP sites
Filed case with PRC – 2/14/06
National Notification
![Page 3: 1 NETWORK STATUS MAILERS’ TECHNICAL ADVISORY COMMITTEE (MTAC) – 2/22/06 Paul Vogel Vice President, Network Operations Management U.S Postal Service](https://reader030.vdocuments.us/reader030/viewer/2022032708/56649e855503460f94b8713b/html5/thumbnails/3.jpg)
3
LPC/DPC Conversion Follow AMP Guidelines
RDC Conversion Process that blends the ‘principles’ of AMP with facility
planning concepts Detailed stakeholder communications plan
Network Implementation Process
![Page 4: 1 NETWORK STATUS MAILERS’ TECHNICAL ADVISORY COMMITTEE (MTAC) – 2/22/06 Paul Vogel Vice President, Network Operations Management U.S Postal Service](https://reader030.vdocuments.us/reader030/viewer/2022032708/56649e855503460f94b8713b/html5/thumbnails/4.jpg)
4
Saturday AMPs
Area Mail Processing (AMP)
Partial
Full
Network Transition Activities
![Page 5: 1 NETWORK STATUS MAILERS’ TECHNICAL ADVISORY COMMITTEE (MTAC) – 2/22/06 Paul Vogel Vice President, Network Operations Management U.S Postal Service](https://reader030.vdocuments.us/reader030/viewer/2022032708/56649e855503460f94b8713b/html5/thumbnails/5.jpg)
5
Area Mail Processing (AMP)s Approved in FY 2006
Area AMP Proposal ST Gaining Facility ST
NE Bridgeport P&DF CT Stamford P&DC CT
NE Waterbury P&DF CT So. Connecticut P&DC CT
NE NW Boston P&DC MA Boston P&DC MA
PA Marysville P&DF CA Sacramento P&DC CA
EA Greensburg PO PA Pittsburgh P&DC PA
EA Kinston P&DF NC Fayetteville P&DC NC
NY Monmouth P&DC NJ Kilmer / Trenton P&DC NJ
PA Pasadena P&DC CA Santa Clarita / Industry CA
PA Mojave PO CA Bakersfield P&DC CA
WE Olympia P&DF WA Tacoma P&DC WA
* Implemented as of 2/16/06
******
![Page 6: 1 NETWORK STATUS MAILERS’ TECHNICAL ADVISORY COMMITTEE (MTAC) – 2/22/06 Paul Vogel Vice President, Network Operations Management U.S Postal Service](https://reader030.vdocuments.us/reader030/viewer/2022032708/56649e855503460f94b8713b/html5/thumbnails/6.jpg)
6
Up to 90 Days
Up to 30 Days
“One Time Occurrence”
90 DaysUp to 180
Days
ENTIRE PROCESS IS UP TO 390 DAYS
End Employee Re-assignment
ENTIRE PROCESS COULD TAKE UP TO 360 DAYS.
Move Mail &Begin Employee Re-assignment
Feasibility & Announcement Communications
• Management Associations
• Unions• EAS & Craft
Employees• National & Local
Political Leaders• Major Mailers
![Page 7: 1 NETWORK STATUS MAILERS’ TECHNICAL ADVISORY COMMITTEE (MTAC) – 2/22/06 Paul Vogel Vice President, Network Operations Management U.S Postal Service](https://reader030.vdocuments.us/reader030/viewer/2022032708/56649e855503460f94b8713b/html5/thumbnails/7.jpg)
7
Area AMP Proposal ST Gaining Facility ST
CM Cumberland MPO MD Frederick P&DC MD
EA Canton P&DC OH Akron P&DC OH
EA Zanesville P&DC OH Columbus P&DC OH
GL Bloomington P&DC IN Indianapolis P&DC IN
GL Carbondale PO IL Saint Louis P&DC MO
GL Centralia PO IL Saint Louis P&DC MO
GL Fox Valley P&DC IN South Suburban P&DC IL
GL Gaylord MPO MI Traverse City P&DC MI
GL Oshkosh P&DF WI Green Bay P&DC WI
NE Binghamton P&DF NY Syracuse P&DC NY
Area Mail Processing (AMP) Studies In-progress
![Page 8: 1 NETWORK STATUS MAILERS’ TECHNICAL ADVISORY COMMITTEE (MTAC) – 2/22/06 Paul Vogel Vice President, Network Operations Management U.S Postal Service](https://reader030.vdocuments.us/reader030/viewer/2022032708/56649e855503460f94b8713b/html5/thumbnails/8.jpg)
8
Area AMP Proposal ST Gaining Facility ST
NE Burlington P&DF VT White River Jct P&DC VT
NE Cape Cod P&DF MA Brockton P&DC MA
NE Plattsburgh PO NY Albany P&DC NY
NE Portsmouth P&DF NH Manchester P&DC NH
NE Springfield P&DC MA Hartford P&DC CT
NE Utica P&DF NY Syracuse P&DC NY
NE Watertown PO NY Syracuse P&DC NY
NY Bronx P&DF (Dest) NY Morgan P&DC NY
NY Newark P&DC NJ DVD P&DC NJ
SE Saint Petersburg P&DC FL Tampa P&DC FL
Area Mail Processing (AMP) Studies In-progress
![Page 9: 1 NETWORK STATUS MAILERS’ TECHNICAL ADVISORY COMMITTEE (MTAC) – 2/22/06 Paul Vogel Vice President, Network Operations Management U.S Postal Service](https://reader030.vdocuments.us/reader030/viewer/2022032708/56649e855503460f94b8713b/html5/thumbnails/9.jpg)
9
Area AMP Proposal ST Gaining Facility ST
SE Jackson CSMPC TN Memphis P&DC TN
SE Daytona Beach P&DF FL Mid-Florida P&DC FL
SW Batesville PO AR Little Rock P&DC AR
SW Beaumont P&DF TX Houston P&DC TX
SW Dallas P&DC TX North Texas P&DC TX
SW Bryan PO TX Houston P&DC TX
SW McAllen PO TX Corpus Christi P&DF TX
SW Waco P&DF TX Fort Worth / Austin TX
WE Aberdeen CSMPC SD Dakotas Central P&DC SD
WE Carroll CSMPC IA Des Moines P&DC IA
Area Mail Processing (AMP) Studies In-progress
![Page 10: 1 NETWORK STATUS MAILERS’ TECHNICAL ADVISORY COMMITTEE (MTAC) – 2/22/06 Paul Vogel Vice President, Network Operations Management U.S Postal Service](https://reader030.vdocuments.us/reader030/viewer/2022032708/56649e855503460f94b8713b/html5/thumbnails/10.jpg)
10
Area AMP Proposal ST Gaining Facility ST
WE Glenwood Springs CSMPC CO Grand Junction CSMPC CO
WE Helena CSMPC MT Great Falls CSMPC MT
WE Hutchinson CSMPC KS Wichita P&DC KS
WE Kansas City P&DC KS Kansas City P&DC MO
WE LA Crosse CSMPC WI Rochester P&DF MN
WE McCook CSMPC NE North Platte CSMPC NE
WE Sheridan CSMPC WY Casper P&DC WY
WE Sioux City P&DF IA Sioux Falls P&DC SD
WE Twin Falls CSMPC ID Boise P&DC ID
WE Wheatland CSMPC WY Cheyenne P&DC WY
WE Yakima PO WA Pasco P&DF WA
Area Mail Processing (AMP) Studies In-progress
![Page 11: 1 NETWORK STATUS MAILERS’ TECHNICAL ADVISORY COMMITTEE (MTAC) – 2/22/06 Paul Vogel Vice President, Network Operations Management U.S Postal Service](https://reader030.vdocuments.us/reader030/viewer/2022032708/56649e855503460f94b8713b/html5/thumbnails/11.jpg)
11
Saturday AMPs
Area Mail Processing (AMP) Partial
Full
Regional Distribution Center (RDC) Activations Transitional Surface Transfer Center (STC) Activations
Bulk Mail Center (BMC) Transitions
Temporary Logistics & Distribution Center (L&DC) Activations
APPS Implementation
Network Transition Activities
![Page 12: 1 NETWORK STATUS MAILERS’ TECHNICAL ADVISORY COMMITTEE (MTAC) – 2/22/06 Paul Vogel Vice President, Network Operations Management U.S Postal Service](https://reader030.vdocuments.us/reader030/viewer/2022032708/56649e855503460f94b8713b/html5/thumbnails/12.jpg)
12
HASP-NORTH NJ (NJ)
HASP-HARRISBURG (PA)
HUB-TWIN CITIES (MN)
HASP-CAPITAL METRO (MD)
HASP-NORTHERN (MA)
HUB-VAN NUYS (CA)
HUB-BUSSE (IL)
HASP-INDIANAPOLIS (IN)
HASP-BRONX (NY)
HUB-SACRAMENTO (CA)
HASP-ATLANTA (GA)
HASP-SOUTHEASTERN (TN)
HASP-SOUTHWEST (TX)
HASP-BINGHAMTON (NY)
ORLANDO (FL) L&DC
PITTSBURGH (PA) L&DC
Existing HASPs
Existing Hub-&-Spoke (HASPs) Network
![Page 13: 1 NETWORK STATUS MAILERS’ TECHNICAL ADVISORY COMMITTEE (MTAC) – 2/22/06 Paul Vogel Vice President, Network Operations Management U.S Postal Service](https://reader030.vdocuments.us/reader030/viewer/2022032708/56649e855503460f94b8713b/html5/thumbnails/13.jpg)
13
Existing STCs
New STCs
STC-SOUTHERN CALIFORNIA (CA)
STC-NORTHERN CALIFORNIA (CA)
STC-SOUTHWEST (TX)
STC-BUSSE (IL)
STC-INDIANAPOLIS (IN)
STC-NORTHERN (MA)
STC-NORTH NJ (NJ)STC-PITTSBURGH (PA)
STC- ATLANTA (GA)
STC-ORLANDO (FL)
STC-HARRISBURG (PA)STC-BRONX (NY)
STC-CAPITAL METRO (MD)STC-CAPITAL METRO (MD)
STC-BINGHAMTON (NY)
STC-CHARLOTTE (NC)August 5, 2006
STC-SALT LAKE CITY (UT)April 22, 2006
STC-DENVER (CO)April 22, 2006
STC-PHOENIX (AZ)April 22, 2006
STC-MEMPHIS (TN)October 30, 2006
STC-KANSAS CITYOctober 30, 2006
STC-TWIN CITIES (MN)
2006 Surface Transfer Center (STC) Activations
![Page 14: 1 NETWORK STATUS MAILERS’ TECHNICAL ADVISORY COMMITTEE (MTAC) – 2/22/06 Paul Vogel Vice President, Network Operations Management U.S Postal Service](https://reader030.vdocuments.us/reader030/viewer/2022032708/56649e855503460f94b8713b/html5/thumbnails/14.jpg)
14
30 year old infrastructure & technology Updating Parcel Sorting Machines with:
– Composite Track– OCR capability– Intelligent crossovers
Deploying state of the art package sortation equipment – APPS
Leveraging technology– Surface Visibility– FAST
BMC Modernization
![Page 15: 1 NETWORK STATUS MAILERS’ TECHNICAL ADVISORY COMMITTEE (MTAC) – 2/22/06 Paul Vogel Vice President, Network Operations Management U.S Postal Service](https://reader030.vdocuments.us/reader030/viewer/2022032708/56649e855503460f94b8713b/html5/thumbnails/15.jpg)
15
Kansas City BMC Modernization