Procedure:
Find the longest run from the gas meter to the farthest appliance. Use linear feet.
Add up the Btuh input of all appliances connected to this gas line.
Enter the table at the longest run column and don’t get out of it again.
Page 3
3
Longest run = 8 + 15 + 10 + 3 + 3 + 46 + 2 = 87 Linear Feet
Page 4
4
Total Btuh input of all appliances = 100 + 50 + 35 + 45 + 60 = 290,000 Btuh
Page 5
5
Longest run = 87’
Total input = 290 MBHPipe size = 1 ¼”
Page 8
8
1 ¼”
140 – 35 = 105,000 Btuh input
1”
Page 10
10
1 ¼”
105 – 45 = 60,000 Btuh input
1”
Page 12
12
1 ¼”1”
¾”
Boiler and Hot Water Heater branch line = 150,000 Btuh
Page 14
14
1 ¼”1”
¾”
1”
Hot Water Boiler branch line = 100,000 Btuh
Page 16
16
1 ¼”1”
¾”
1”
Hot Water Heater branch line = 50,000 Btuh
1”
Page 18
18
1 ¼”1”
¾”
1”
Clothes drier branch line = 35,000 Btuh
1” ¾”
Page 20
20
1 ¼”1”
¾”
1”
Range/Oven branch line = 45,000 Btuh
1” ¾”
½”
Page 22
22
1 ¼”1”
¾”
1”
¾”
½” ¾”
1”
Finished. Make-up your pipe and fitting list.