1 name of unit must never exceed two lines ref: for example project title / unit / yyyy.mm.dd 1...

11
1 Name of unit must never exceed two lines Ref: for example project title / unit / yyyy.mm.dd 1 Norwegian Joint Headquarters Ref: for example project title / unit / yyyy.mm.dd NJHQ orwegian Joint Headquarters 2014-03-05 Monterey Cdr S.G. Atle Selvaer, J7 CAX Manager

Upload: melinda-blush

Post on 01-Apr-2015

213 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: 1 Name of unit must never exceed two lines Ref: for example project title / unit / yyyy.mm.dd 1 Norwegian Joint Headquarters Ref: for example project title

1

Name of unit must neverexceed two lines

Ref: for example project title / unit / yyyy.mm.dd 1

Norwegian Joint Headquarters

Ref: for example project title / unit / yyyy.mm.dd

NJHQNorwegian Joint Headquarters

2014-03-05 Monterey

Cdr S.G. Atle Selvaer, J7 CAX Manager

Page 2: 1 Name of unit must never exceed two lines Ref: for example project title / unit / yyyy.mm.dd 1 Norwegian Joint Headquarters Ref: for example project title

2

Name of unit must neverexceed two lines

Ref: for example project title / unit / yyyy.mm.dd 2

Norwegian Joint Headquarters

Ref: for example project title / unit / yyyy.mm.dd

AIM

Inform about the Norwegian use of JTLS

Page 3: 1 Name of unit must never exceed two lines Ref: for example project title / unit / yyyy.mm.dd 1 Norwegian Joint Headquarters Ref: for example project title

3

Norwegian Joint Headquarters

Ref: for example project title / unit / yyyy.mm.dd

Permanent CAX organisationBackground:

• NJHQ were tasked to establish a national CAX capability in 2009

• CAX is recognised as a costeffective way to do Command Post Exercises

• A study came to the conclusion that this organisation needed a minimum of 7 specialists

• As of now I am the only one. (3 more accepted in near future)

• Beeing helped by R&A and NCI Agency

• Educating JTLS operators every year (building a pool)

Page 4: 1 Name of unit must never exceed two lines Ref: for example project title / unit / yyyy.mm.dd 1 Norwegian Joint Headquarters Ref: for example project title

4

Norwegian Joint Headquarters

Ref: for example project title / unit / yyyy.mm.dd

CAX in support of CPX• JTLS & JEMM as CAX tools• Stimulation of ”live” C2

systems• Integrated part of EXCON• Partners• Advantages of CAX

Page 5: 1 Name of unit must never exceed two lines Ref: for example project title / unit / yyyy.mm.dd 1 Norwegian Joint Headquarters Ref: for example project title

5

Norwegian Joint Headquarters

Ref: for example project title / unit / yyyy.mm.dd

CAX JEMM

Page 6: 1 Name of unit must never exceed two lines Ref: for example project title / unit / yyyy.mm.dd 1 Norwegian Joint Headquarters Ref: for example project title

6

Norwegian Joint Headquarters

Ref: for example project title / unit / yyyy.mm.dd

Operation Area

Page 7: 1 Name of unit must never exceed two lines Ref: for example project title / unit / yyyy.mm.dd 1 Norwegian Joint Headquarters Ref: for example project title

7

Norwegian Joint Headquarters

Ref: for example project title / unit / yyyy.mm.dd

EXCON during Gram exercises

EXCON

HICON SITCEN

MEL/MIL

EV MAN I EV MAN II EV MAN III EV MAN IV

SIMCON

LOCON

LAND AIR

SOF MARITIME

LOG CIS

INFO OPS

GREY CELL

MEDIA

SCENARIOSITFOR

INTELEVAL

Page 8: 1 Name of unit must never exceed two lines Ref: for example project title / unit / yyyy.mm.dd 1 Norwegian Joint Headquarters Ref: for example project title

8

Norwegian Joint Headquarters

Ref: for example project title / unit / yyyy.mm.dd

SIMCON

SIMCON

CAX manager

DB-manager Tech. control

CAX mentor

LOCON

Responsecell

Planners Battle captain

CAX operator (10)

CAXmentor

(3)MEL-MIL COORD

LANDMARAIRSOFLOG

Page 9: 1 Name of unit must never exceed two lines Ref: for example project title / unit / yyyy.mm.dd 1 Norwegian Joint Headquarters Ref: for example project title

9

Norwegian Joint Headquarters

Ref: for example project title / unit / yyyy.mm.dd

SITFOR

SITFOR

Planners

CAX operator (4)

CAXmentor

LAND/SOFMARAIRCIV Movement/SOF

Page 10: 1 Name of unit must never exceed two lines Ref: for example project title / unit / yyyy.mm.dd 1 Norwegian Joint Headquarters Ref: for example project title

10

Norwegian Joint Headquarters

Ref: for example project title / unit / yyyy.mm.dd

Manning

Primary Training Audience is the Norwegian Joint Hq and the Tactical Command Hq’s

Tactical Commands: TLC (Tactical Land Command)CTG 430.01 (Maritime)CTG 430.02 (SubOp Auth)NAOC (National Air Ops Centre)SOFCNLC (National Logistics Command)CYFOR

SIMCON: Total of 30

2-3 Tech Control from R&A + 1 Tech Control from NCI Agency5 specialists/Mentors from NCI Agency1 Cax Manager NJHQ1 Database Manager NDRE (Norwegian Defence & Research Establishment)2-3 CIS Tech Support (local)1-2 NEC CCIS Specialists (Air Tasking Interface issues)14 JTLS Operators

Page 11: 1 Name of unit must never exceed two lines Ref: for example project title / unit / yyyy.mm.dd 1 Norwegian Joint Headquarters Ref: for example project title

11

Norwegian Joint Headquarters

Ref: for example project title / unit / yyyy.mm.dd

Ambitions 2014 – 20xx

Database development for several exercises, Table TopsEducate/enable CAX org. For JTLS in wargaming/Budget Based Wargaming (BBW)Participate in relevant environments for lifting competance level/LO exchangeExploit excisting Intentional Agreements with partners for mutual cooperationEvaluation and Analysis tools to be used in a systemised wayDevelop/design JTLS tool for Exercise Coop with Civilian AuthoritiesContribute to National Concept Development & Experimentation projects.