Page 1: 1 METTRE EN PLACE LES FLUX TIRES EN INJECTION PLASTIQUE

1

METTRE EN PLACE

LES FLUX TIRES

EN INJECTION

PLASTIQUE

Page 2: 1 METTRE EN PLACE LES FLUX TIRES EN INJECTION PLASTIQUE

2

M.I.F.A initialmaterial orders

5 ton lots per delivery

only product with this material 1 wk firm orders runs Tuesday to Tuesday order received

2 week lead time before 12:00 noon

export once per week

schedule changing all the time

Material: PP CABLE DUCT LH/RHDaily Req= 860

PLAN ISSUED EVERY THURSDAY

EVERY DAY MONITOR AGAINST MRP

1 x Deliveryper week

Logistics Production Quality

shift meetings x3

1 x Delivery

per week

10m 5m 25m MACHINE 1m 30m 15m 20m 10m 100m28 sec

goods inward

material store

material station

change time 18 min

W.I.P Label verification

Storage Lane

Decant Delivery Preparation

05 Dispatch

800kg 250kg Scrap 0.8% 1200parts 4000parts 1000parts

17.5days 5.4 days 1.3 days 4.6 days 1.1days 1 day

29.9 days

28 sec 28 sec

Runs once per week

CUSTOMER export

CUSTOMERSUPPLIER

KATEMS EXTERNAL STORAGE

Daily Meetings

MRP

PRODUCTION PLANNING

3

2

1Information on system incorrect

qtys and orders

1

Fork lift truck not in use

good use of separation lh & rhd

Poor Housekeeping Health & Safety

Lack of F.I.F.O

Wasted time"PEOPLE" and card board

"ENVIROMENTAL waste"

Storage cost and

transportation costs

QUALITY Open

boxes etc

Wasted time"PEOPLE" and card board

"ENVIROMENTAL waste"

Storage cost and

transportation costs

Lack of F.I.F.O

Poor Housekeeping Health & Safety

Poor Housekeeping Health & Safety

4

Hand feed machine from

dryer not connected to

system

plan changes due to inacurate information

1

Page 3: 1 METTRE EN PLACE LES FLUX TIRES EN INJECTION PLASTIQUE

3

Diminuer les stocks

Pour diminuer les stocks dans la perspective

lean: 2 actions simultanées

• Réduire la taille des lots

• Augmenter la fréquence des prélèvements

Page 4: 1 METTRE EN PLACE LES FLUX TIRES EN INJECTION PLASTIQUE

4

Diminuer les stocks

Nous avons commencé par la réduction de la taille des lots

Notre But:

Produire tous les jours la demande client tout en respectant la satisfaction client

En Priorité: le taux de service

la qualité

Page 5: 1 METTRE EN PLACE LES FLUX TIRES EN INJECTION PLASTIQUE

5

Réduction du temps C/O

En appliquant le principe suivant:

Pour réduire la taille des lots, il fallait avant tout réduire les temps de changement d’outils

Comment? S.M.E.D

Fiabilité du process

Amélioration Poste de Travail

Page 6: 1 METTRE EN PLACE LES FLUX TIRES EN INJECTION PLASTIQUE

6

Réduction du temps C/O

TOOL RACKS FOR PRESS 4

ALL TOOLS THAT ROTATE IN THE LEAN PROCESS IN PRESS 4 ARE SITUATED ON

THE TOOL RACK

THESE TOOLS ARE FULLY PREPPED SO TEAMLEADERS & SETTERS JUST NEED TO TAKE THE PREVIOUS TOOL OUT & PUT THE NEXT TOOL IN (THIS SAVES A LOT OF TIME

ON TOOL CHANGES)

Page 7: 1 METTRE EN PLACE LES FLUX TIRES EN INJECTION PLASTIQUE

7

Réduction du temps C/O

CURRENT (before) IMPROVED (after)

Page 8: 1 METTRE EN PLACE LES FLUX TIRES EN INJECTION PLASTIQUE

8

Réduction du temps C/O

Page 9: 1 METTRE EN PLACE LES FLUX TIRES EN INJECTION PLASTIQUE

9

M.I.F.A idéal

En appliquant le principe suivant:

Chaque emplacement de stock couvre un risque spécifique

Comment? Zones de prépa camionShop StockPool stock

Page 10: 1 METTRE EN PLACE LES FLUX TIRES EN INJECTION PLASTIQUE

10

M.I.F.A idéal

Comprendre le stock:

Stock de fonctionnement

Tampon variation clientTampon problèmes process

Stock sécurité

Zone de préparation camions

Pool stock

Shop stock

Plateforme

Page 11: 1 METTRE EN PLACE LES FLUX TIRES EN INJECTION PLASTIQUE

11

M.I.F.A idéal

Le M.I.F.A idéal: sur le coin d’une table

Presse

Shop stock

Zone prépacamion

Pool stock

Page 12: 1 METTRE EN PLACE LES FLUX TIRES EN INJECTION PLASTIQUE

12

Lisser les variations client

DESCRIPTION

BATTERY TRAY Week 41 Week 42 Week 43

Mo Tu We Th Fr Mo Tu We Th Fr Mo Tu We Th Fr

Batch 520 520 520 520 520 494 494 494 494 494 494 494 494 494 494

Customer Order 494 468 520 494 520 520 494 520 494 520 494 520 494 468 520

Pool stock= 156 p 182 234 234 260 260 234 234 208 208 182 182 156 156 182 156

Pool stock min= 104 p

Poll stock max= 260 p

Page 13: 1 METTRE EN PLACE LES FLUX TIRES EN INJECTION PLASTIQUE

13

Le pool stock

En appliquant le principe suivant:

Pour commencer, créer une zone de pool stock pour absorber les variations de la demande client

Comment?

Calculer les mini/maxi par référence en fonction de l’historique des prélèvements client

Page 14: 1 METTRE EN PLACE LES FLUX TIRES EN INJECTION PLASTIQUE

14

Le pool stockPOOL STOCK LEVELS

POOL STOCK

THIS INDICATES HOW MUCH STOCK WE ACTUALLY HAVE (IF THE BOXES EXCEED THE MAXIMUM RED LINE PRODUCTION NEEDS DECREASING & IF THEY ARE BELOW PRODUCTION NEEDS INCREASING)

MINIMUM LEVEL

MAXIMUM LEVEL

Page 15: 1 METTRE EN PLACE LES FLUX TIRES EN INJECTION PLASTIQUE

15

La zone de prépa camion

En appliquant le principe suivant:

Remplir progressivement la zone de préparation des camions pour tirer la production de la presse

Comment?

Prélèvements réguliers par la logistique vers une zone de préparation camions organisée selon les heures des camions et les docks destinataires chez le client

Page 16: 1 METTRE EN PLACE LES FLUX TIRES EN INJECTION PLASTIQUE

16

La prépa camiondans l’atelier

A ce stade:

Nous avons rencontré des difficultés avec la logistique pour effectuer les prélèvements réguliers

Notre contre-mesure:

Pour démontrer la faisabilité du concept, intégration de la zone de prépa camion dans l’atelier, au pied de la presse

Page 17: 1 METTRE EN PLACE LES FLUX TIRES EN INJECTION PLASTIQUE

17

La prépa camiondans l’atelier

THERE ARE 11 PALLETS FOR 11 INDIVIDUAL PICK-UPS PER DAY, THESE PALLETS ONLY CONTAIN THE PRODUCTS FOR THAT INPARTICULAR DELIVERY

WAREHOUSE STAFF AT 03.40 SHOULD BE ABLE TO COME AND PICK THERE COMPLETED ORDER FROM HERE

BATTERY TRAYSPRESS 1

SIDE DEFROSTER NOZZLEPRESS 3

ASSEMBLED FENDER PROTECTORSMOULDED ON PRESS 4, THEN TAKEN TO ASSEMBLY AREA TO HAVE FOAMS FITTED

Page 18: 1 METTRE EN PLACE LES FLUX TIRES EN INJECTION PLASTIQUE

18

La prépa camiondans l’atelier

DOCK SYSTEM

WAREHOUSE OPERATIVES THEN MAKE THERE ORDERS UP BY REMOVING THE COMPLETED

BOXES FROM THE BOTTOM 2 RACKS AND MATCHING THE DOCK NUMBER ON THE BOX TO

Page 19: 1 METTRE EN PLACE LES FLUX TIRES EN INJECTION PLASTIQUE

19

Le shop stock

En appliquant le principe suivant:

Le shop stock est le stock de pièces par références au pied de presse qui permet d’absorber les variations dues au process

Comment?

Flow racks en pied de presse

Page 20: 1 METTRE EN PLACE LES FLUX TIRES EN INJECTION PLASTIQUE

20

Le shop stockSHOP STOCK (RACKING SYSTEM)

OPERATORS TAKE THERE EMPTY BOXES FROM THESE RACKS

OPERATORS THEN PLACE THERE FINISHED PRODUCT INTO THE

CORRECT LOCATION BY MATCHING THE LABELS LOCATED ON THE

BOTTOM 2 RACKS

FRAME PILLAR TRIM RHD

I.B.C

FRAME PILLAR TRIM RHD EXPORT

FRAME PILLAR TRIM LHD

I.B.C

FRAME PILLAR TRIM LHD EXPORT

Page 21: 1 METTRE EN PLACE LES FLUX TIRES EN INJECTION PLASTIQUE

21

Le shop stock

Mais:

La mise en place des shop stock en pied de presse nous a obligé de remettre la zone de prépa camion en logistique

Avec toujours des difficultés pour effectuer des prélèvements réguliers

Page 22: 1 METTRE EN PLACE LES FLUX TIRES EN INJECTION PLASTIQUE

22

M.I.F.A

En appliquant le principe suivant:

Un retour sur le MIFA plus détaillé permet de voir qu’il faut organiser des prélèvements réguliers et passer en kanban

Comment? PitchKanbanSéquenceur

Page 23: 1 METTRE EN PLACE LES FLUX TIRES EN INJECTION PLASTIQUE

23

Conclusion

• Il est possible d’obtenir une réduction spectaculaire des stocks en restant en flux poussé

• Mais on rencontre vite des difficultés de gestion du stock

• Qui ne peuvent se régler que par un prélèvement régulier: passer en flux tiré

• Ce qui nécessite un travail sur la logistique

Page 24: 1 METTRE EN PLACE LES FLUX TIRES EN INJECTION PLASTIQUE

24

Présentation de l’équipe

L’équipe Lean Manufacturing

Jean-Claude ZAGO

Eric LESCAUT

Marc MERCIER

Le Directeur de Production du site

Craig BELL