ReadmeConsiderationsbulk density (tonne/m3)2.75swell factor (%)15dump/crusher distance (km)3gradient (%)5roll resistance (%)3g+r8sched days per year365MatchLoaderTruckBench hight992 type777 type6-8 metrs374 type8x6 type6 meters

Loading#CalcsUnitLoader 966 type H1Densidad aparente (Bulk density) tonne/m32.752Factor de esponjamiento (Swell factor)%15.003Densidad suelta (Loose bulk density) = (i1/(1+i2)tonne/m32.394Capacid. Nominal Cuchara (Rated bucket capacity)yd35.505Capacid. Nominal Cuchara (Rated bucket capacity) = (i4 / 1.33)m34.216Factor de llenado de cuchara (Bucket fill factor)0.907Toneladas/pasada (Tonne/pass) = (i3xi5xi6)tonne9.05m33.788Capacidad Nominal (Rated VOLVO size)tonnem315.009Nro. Pases tericos (Theoretical passes) = (i8 / i7)3.9610Nro. Pases (Passes) = (round i9)4.0011Capacidad prctica VOLVO (Practical truck size) = (i7 x i10)tonne36.2012Tiempo ciclo Pala - pase (Shovel cycle time)s40.0013Spot times40.0014Pala espera al camin (Shovel waiting truck)s35.0015Load time (i12xi10+i13+i14)s235.0016Tiempo carga (Load time) = (i15/60)min3.9217Gdia/da (Shift/day)2.0018Hrs/gdia (Hour/shift) = (24/i17)hr12.0019Hrs. Retraso fijo/gdia (Fixed delays hours/shift)hr4.0020Hrs disponible/gdia (Available hours/shift) = (i18-i19)hr8.0021Nro. Maximo VOLVO cargados/gdia (Max trucks loaded / shift) = (i20x60/i16)122.5515.319148936222Tasa de produccin maxima (Max production rate) = (i21xi11/i20)t/hr554.5623Das calendario/ao (Sched days/year)day/y365.0024Hrs/ao (hours/year) = (i17xi20xi23)h/y5840.0025Disponibilidad mecnica (Mechanical availability)0.8526Ineficiencia de operador (Operator ineffiency)1.0027Ineficiencia por altitud (Altitude inefficiency)0.9528Tasa de produccin estimada (Estimated production rate) = (i22xi25xi26xi27)t/h44829Produccin anual estimada (Estimated annual production) =(i28xi24)t/a2,615,180

Equipos(01) tractor D6 y D8(02) cargador frontal 966(03) excavadora PC600(04) excavadora CAT330(05) retroexcavadora(06) pala O&K y hitachi(07) cargador forntal 950(08) camion CAT777(09) camion 220 tn(10) volquete NL12 de 15m3(11) Perforadora rock drill(12) perf. ingersol rand(13) motoniveladora 140H(14) rodillo de 12 tn

TeoraCONSIDERACIONESSAE define dos mtodos para clasificar la capacidad del cucharn: a ras y con colmo. La capacidad a ras se aproxima al nmero de yardas cbicas que caben en un cucharn si el material est sin compactar y no tiene colmo. Rara vez se utiliza esta clasificacin.

El estndar del sector es la capacidad con colmo. Este mtodo presupone que el material se apilar en un cucharn con una pendiente 2:1. Es un indicador objetivo de la cantidad de material que cabe en un cucharn.