Land Development: Process & Technology
Storm Water PlanningStorm Drainage DesignStorm Water Management—Quantity Storm Water Management—Quality Utilities—Wastewater TreatmentUtilities—Water DistributionUtilities--Dry Utilities Erosion & Sediment ControlThe Site Design Process: Steps & Proc.The Site Design Process: Steps &Proc.Document Production—What & HowEngineer’s/Surveyor’s Roles During ConstructionFinal Exam
September 7September 14September 21September 28October 5October 12October 19October 26November 2November 9November 16
November 23November 30
Semester 2: Land Development Engineering LDE 201-213
![Page 2: 1 Land Development: Process & Technology Storm Water Planning Storm Drainage Design Storm Water Management—Quantity Storm Water Management—Quality Utilities—Wastewater](https://reader036.vdocuments.us/reader036/viewer/2022083009/5697bff61a28abf838cbe30a/html5/thumbnails/2.jpg)
2
Land Development: Process & Technology
Fairfax County Sequence LDE 310January 2011 TBD
Comprehensive PlanRezoning ZoningPlayers/Functions Site & Subdivision PlansOther Plans/ DPE/Peer Review
Land Development Engineering LDE 300 Administrative Requirements for Plan Submission & Site Completion (ARPSSC)
![Page 3: 1 Land Development: Process & Technology Storm Water Planning Storm Drainage Design Storm Water Management—Quantity Storm Water Management—Quality Utilities—Wastewater](https://reader036.vdocuments.us/reader036/viewer/2022083009/5697bff61a28abf838cbe30a/html5/thumbnails/3.jpg)
3
Land Development: Process & Technology
Land Development Engineering LDE 320
Loudoun County Sequence
Dates TBD
Welcome To Loudoun CountyLegislative ProcessSubdivision ProcessSite & Construction Plan ProcessBonding Process
![Page 4: 1 Land Development: Process & Technology Storm Water Planning Storm Drainage Design Storm Water Management—Quantity Storm Water Management—Quality Utilities—Wastewater](https://reader036.vdocuments.us/reader036/viewer/2022083009/5697bff61a28abf838cbe30a/html5/thumbnails/4.jpg)
4
Land Development: Process & Technology
Land Development Engineering LDE 330
Prince William County Sequence
DATE TO BE DETERMINED
Comprehensive Plan 9:00 -10:30 AM
Rezoning 10:30 AM - 12 Noon
Zoning 1:00 - 2:30 PM
Site & Subdivision Plan 2:30 - 4:00 PM
Legal Aspects 4:00 - 5:30 PM