1 Land Development: Process & Technology Storm Water Planning Storm Drainage Design Storm Water Management—Quantity Storm Water Management—Quality Utilities—Wastewater Treatment Utilities—Water Distribution Utilities--Dry Utilities Erosion & Sediment Control The Site Design Process: Steps & Proc. The Site Design Process: Steps &Proc. Document Production—What & How Engineer’s/Surveyor’s Roles During Construction Final Exam September 7 September 14 September 21 September 28 October 5 October 12 October 19 October 26 November 2 November 9 November 16 November 23 November 30 Semester 2: Land Development Engineering LDE 201-213

Upload: branden-riley

Post on 18-Jan-2016

213 views

Category:

Documents


1 download

TRANSCRIPT

Page 1: 1 Land Development: Process & Technology Storm Water Planning Storm Drainage Design Storm Water Management—Quantity Storm Water Management—Quality Utilities—Wastewater

1

Land Development: Process & Technology

Storm Water PlanningStorm Drainage DesignStorm Water Management—Quantity Storm Water Management—Quality Utilities—Wastewater TreatmentUtilities—Water DistributionUtilities--Dry Utilities Erosion & Sediment ControlThe Site Design Process: Steps & Proc.The Site Design Process: Steps &Proc.Document Production—What & HowEngineer’s/Surveyor’s Roles During ConstructionFinal Exam

September 7September 14September 21September 28October 5October 12October 19October 26November 2November 9November 16

November 23November 30

Semester 2: Land Development Engineering LDE 201-213

Page 2: 1 Land Development: Process & Technology Storm Water Planning Storm Drainage Design Storm Water Management—Quantity Storm Water Management—Quality Utilities—Wastewater

2

Land Development: Process & Technology

Fairfax County Sequence LDE 310January 2011 TBD

Comprehensive PlanRezoning ZoningPlayers/Functions Site & Subdivision PlansOther Plans/ DPE/Peer Review

Land Development Engineering LDE 300 Administrative Requirements for Plan Submission & Site Completion (ARPSSC)

Page 3: 1 Land Development: Process & Technology Storm Water Planning Storm Drainage Design Storm Water Management—Quantity Storm Water Management—Quality Utilities—Wastewater

3

Land Development: Process & Technology

Land Development Engineering LDE 320

Loudoun County Sequence

Dates TBD

Welcome To Loudoun CountyLegislative ProcessSubdivision ProcessSite & Construction Plan ProcessBonding Process

Page 4: 1 Land Development: Process & Technology Storm Water Planning Storm Drainage Design Storm Water Management—Quantity Storm Water Management—Quality Utilities—Wastewater

4

Land Development: Process & Technology

Land Development Engineering LDE 330

Prince William County Sequence

DATE TO BE DETERMINED

Comprehensive Plan 9:00 -10:30 AM

Rezoning 10:30 AM - 12 Noon

Zoning 1:00 - 2:30 PM

Site & Subdivision Plan 2:30 - 4:00 PM

Legal Aspects 4:00 - 5:30 PM