1 king fahd university of petroleum & minerals department of construction engineering &...

15
1 King Fahd University of Petroleum & Minerals Department of Construction Engineering & Management CEM 515: Project Quality Management Case study of 8-phases implementation HEALTH CARE FINANCES Professor Abdulaziz A. Bubshasit

Upload: marion-stanley

Post on 12-Jan-2016

213 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: 1 King Fahd University of Petroleum & Minerals Department of Construction Engineering & Management CEM 515: Project Quality Management Case study of 8-phases

1

King Fahd University of Petroleum & MineralsDepartment of Construction Engineering & Management

CEM 515: Project Quality Management

Case study of 8-phases implementationHEALTH CARE FINANCES

Professor Abdulaziz A. Bubshasit

Page 2: 1 King Fahd University of Petroleum & Minerals Department of Construction Engineering & Management CEM 515: Project Quality Management Case study of 8-phases

2

Outline• Introduction and case description

• Objective

• The eight step process

• Define Quality Issue

• Understand & Define the process

• Select Improvement Opportunities

• Analyze the improvement opportunity

• Take action

• Check results

• Implement the opportunity

• Monitor results

• Summary

Page 3: 1 King Fahd University of Petroleum & Minerals Department of Construction Engineering & Management CEM 515: Project Quality Management Case study of 8-phases

3

Introduction and case description

• HEALTH CARE FACILITIES CONSISTS OF SIX OPERATIONAL DEPARTMENTS.

• THIS FACILITY SERVES THE CHEMICALLY DEPENDENT PATIENTS AND THEIR FAMILIES.

• THIS CASE STUDY FOCUSES ON QUALITY IMPROVEMENT OF FINANCIAL DATA AND INFORMATION HANDALING MANAGEMENT.

Page 4: 1 King Fahd University of Petroleum & Minerals Department of Construction Engineering & Management CEM 515: Project Quality Management Case study of 8-phases

4

•Objective

• To improve the Quality System in the health care facilities.

• To eliminate the system defects and financial losses.

• To set a new system and procedure

Methodology : the eight steps of CDPM Improvement Methodology have been used

Page 5: 1 King Fahd University of Petroleum & Minerals Department of Construction Engineering & Management CEM 515: Project Quality Management Case study of 8-phases

5

DEFINE THE QUALITY ISSUE

UNDERSTAND AND DEFINE PROCESS

SELECT IMPROVEMENT OPPORTUNITIES

ANALYZE IMPROVEMENT OPPORTUNITIES

TAKEACTION

CHECKRESULTS

IMLEMENT IMPROVEMENT

MONITOR RESULTS

TOTALCUSTOMER

SATISFACTION

THE EIGHT STEP PROCESS

Page 6: 1 King Fahd University of Petroleum & Minerals Department of Construction Engineering & Management CEM 515: Project Quality Management Case study of 8-phases

6

PHASE 1: Define Quality Issue

Communicate

results & manage

stakeholder

relations

Inaccurate Financial reporting

FINANCIAL REPORTING DOES NOT MEET CUSTOMER NEEDS AND EXPECTATION

INPUT

FORM QUALITY TEAM

BRAINSTORMING METHOD

PROCESS

OUTPUT

Availability of financial data for decision making

CustomerReporting system

Must be meet

Page 7: 1 King Fahd University of Petroleum & Minerals Department of Construction Engineering & Management CEM 515: Project Quality Management Case study of 8-phases

7

PHASE 2: Understand & Define the process

Improve the financial

report system

Defined mission

statement

Providing info. To six operational departments

Defined process

Input

Work flow diagrams(Identify top-level &top-down

Process)

Major disconnects in logical and physical

data links

Inadequate manual filling procedures

Process

logical and physical Data link

manual filling procedures

Output

Page 8: 1 King Fahd University of Petroleum & Minerals Department of Construction Engineering & Management CEM 515: Project Quality Management Case study of 8-phases

8

Phase 3: Select Improvement Opportunities

logical and physical Data link

manual filling procedures

Input

Process

The improvement opportunities

Manual transfer of information in different

format between 6 departments.

Output

Statistical Analysis Method

Absence of physical data links between the six departments was costing $1540 a week in terms ofredundant labor

Page 9: 1 King Fahd University of Petroleum & Minerals Department of Construction Engineering & Management CEM 515: Project Quality Management Case study of 8-phases

9

Phase 4: Analyze the improvement opportunity

The improvement opportunities

Manual transfer of information in different

format between 6 departments.

Input

Cause-and-effect analysis diagram

Single source for data & information

Financial data considered

personnel data not

corporate data

Financial data shallbe corporate notpersonnel data

Process

Output

Project Objective

Page 10: 1 King Fahd University of Petroleum & Minerals Department of Construction Engineering & Management CEM 515: Project Quality Management Case study of 8-phases

10

Phase 5: Take action

Financial data shallbe corporate notpersonnel data

Input

Project Objective

BRINSTORMING &SELECTION TOOLS(TO CONFIRM CUSTOMER NEEDS)

USER ACCEPANCE TESTQFD “HOUSE OF QUALITY”

WBS DEVELOPED TO PROVIDE GRAPHIC

PICTURE OF DELIVERABLE

(HARDE &SOFT WARE, SCREENS, DATABASE)

New mental model of the new system designed.

New operation procedure.

OU

TP

UT

Page 11: 1 King Fahd University of Petroleum & Minerals Department of Construction Engineering & Management CEM 515: Project Quality Management Case study of 8-phases

11

Phase 6: check resultsPhase 6: check results

New mental model of the new system designed.

New operation procedure.

DATA STATISTICAL ANALYSIS

THE DEVELOPED USER ACCEPTANCEPLAN

IMPLEMENTED

Prototype system

reviewed and accepted

processinput

Accepted design and operation procedure of the new system

Project deliverable for implementation

Page 12: 1 King Fahd University of Petroleum & Minerals Department of Construction Engineering & Management CEM 515: Project Quality Management Case study of 8-phases

12

Phase 7: Implement the improvementPhase 7: Implement the improvement

Accepted new systemfor implementation

The new system is running

Writing manuals and procedures

Training and education

processinput

The new system along with all requiredprocedure, operation and maintenance

manuals and training guide.

Output

Page 13: 1 King Fahd University of Petroleum & Minerals Department of Construction Engineering & Management CEM 515: Project Quality Management Case study of 8-phases

13

Phase 8: Monitor results

New system improvement

opportunities

operational new system meeting customer needs

INPUT

New opportunities

From customer feedback

Move again into project definition

PROCESS

OUTPUT

Total customer satisfaction

Page 14: 1 King Fahd University of Petroleum & Minerals Department of Construction Engineering & Management CEM 515: Project Quality Management Case study of 8-phases

14

•Summary

• Third party auditing system is recommended and shall be part of the health care facility policy.

• More effective and advanced measurement tools shall be utilized to alert the top management in case of deficiencies or deviation

• One year plan a head should be established and maintained as road map to wards successes and prosperity.

• Customer should do this practice at the beginning by implementing all quality system requirements to prevent losses and unnecessary cost impact.

• All these data and procedure shall be maintained and made available as lesson learn to every body in the organization.