1 jim plourde square d / schneider electric [email protected] +1.603.265.6556
TRANSCRIPT
![Page 2: 1 Jim Plourde Square D / Schneider Electric Jim.Plourde@US.Schneider-Electric.com +1.603.265.6556](https://reader035.vdocuments.us/reader035/viewer/2022062423/56649e9c5503460f94b9d527/html5/thumbnails/2.jpg)
2
M&V
Let’s play...
2
![Page 3: 1 Jim Plourde Square D / Schneider Electric Jim.Plourde@US.Schneider-Electric.com +1.603.265.6556](https://reader035.vdocuments.us/reader035/viewer/2022062423/56649e9c5503460f94b9d527/html5/thumbnails/3.jpg)
3
M&V
$1,200
This infamous quote by Marion Barry attempted to explain the
low crime rate in Washington DC"Outside of the killings, Washington has one of the lowest crime rates in the country." Mayor Marion Barry, Washington, DC.
![Page 4: 1 Jim Plourde Square D / Schneider Electric Jim.Plourde@US.Schneider-Electric.com +1.603.265.6556](https://reader035.vdocuments.us/reader035/viewer/2022062423/56649e9c5503460f94b9d527/html5/thumbnails/4.jpg)
4
Islands of Value
Independent and valuable systems, but none can singularly achieve M&V goals
![Page 5: 1 Jim Plourde Square D / Schneider Electric Jim.Plourde@US.Schneider-Electric.com +1.603.265.6556](https://reader035.vdocuments.us/reader035/viewer/2022062423/56649e9c5503460f94b9d527/html5/thumbnails/5.jpg)
5
Energy Savings are Dependant upon Performance and Usage
Options A&B are retrofit isolation
Options C&D are whole facility
![Page 6: 1 Jim Plourde Square D / Schneider Electric Jim.Plourde@US.Schneider-Electric.com +1.603.265.6556](https://reader035.vdocuments.us/reader035/viewer/2022062423/56649e9c5503460f94b9d527/html5/thumbnails/6.jpg)
6
![Page 7: 1 Jim Plourde Square D / Schneider Electric Jim.Plourde@US.Schneider-Electric.com +1.603.265.6556](https://reader035.vdocuments.us/reader035/viewer/2022062423/56649e9c5503460f94b9d527/html5/thumbnails/7.jpg)
7
Convergence of information for unique insight
Building and process automation systems (EMS, DCS, SCADA, historians)Active monitoring and control of physical infrastructure
Other energy-related data sources Weather feeds, occupancy, square footage
Utility data sources Billing systems, real-time pricing
Business systems (EAM, ERP)Organization and tracking of physical assets, resources, products
Power management systems
Enterprise energy management systemFinancial modeling and control, measurement and verification, and cost and reliability performance tracking
Active monitoring and control of power
infrastructure and energy use across
one or more facilities
![Page 8: 1 Jim Plourde Square D / Schneider Electric Jim.Plourde@US.Schneider-Electric.com +1.603.265.6556](https://reader035.vdocuments.us/reader035/viewer/2022062423/56649e9c5503460f94b9d527/html5/thumbnails/8.jpg)
8
5 Steps to M&V Success
Step 1: Define the baseline
Step 2: Develop Project Specific Measurement & Verification Plan
Step 3: Commissioning
Step 4: Post-Installation Verification
Step 5: Regular-Interval Verification During the Performance Period
![Page 9: 1 Jim Plourde Square D / Schneider Electric Jim.Plourde@US.Schneider-Electric.com +1.603.265.6556](https://reader035.vdocuments.us/reader035/viewer/2022062423/56649e9c5503460f94b9d527/html5/thumbnails/9.jpg)
9
M&V
$1,200
This famous quote from George Stephanopolous illustrated Bill
Clinton’s ability to keep promises
"The President has kept all the promises he intended to keep.Clinton aide George Stephanopolous.
![Page 10: 1 Jim Plourde Square D / Schneider Electric Jim.Plourde@US.Schneider-Electric.com +1.603.265.6556](https://reader035.vdocuments.us/reader035/viewer/2022062423/56649e9c5503460f94b9d527/html5/thumbnails/10.jpg)
10
How do you truly measure performance?
![Page 11: 1 Jim Plourde Square D / Schneider Electric Jim.Plourde@US.Schneider-Electric.com +1.603.265.6556](https://reader035.vdocuments.us/reader035/viewer/2022062423/56649e9c5503460f94b9d527/html5/thumbnails/11.jpg)
11
Measure and Verify Performance Contract Savings
By normalizing for external factors, such as weather, true savings can be measured.
![Page 12: 1 Jim Plourde Square D / Schneider Electric Jim.Plourde@US.Schneider-Electric.com +1.603.265.6556](https://reader035.vdocuments.us/reader035/viewer/2022062423/56649e9c5503460f94b9d527/html5/thumbnails/12.jpg)
12
M&V
$1,200
This famous quote by George W. Bush illustrated the mindset
of “undecided” voters"It's no exaggeration to say that the undecideds could go one way or another."George Bush.
![Page 13: 1 Jim Plourde Square D / Schneider Electric Jim.Plourde@US.Schneider-Electric.com +1.603.265.6556](https://reader035.vdocuments.us/reader035/viewer/2022062423/56649e9c5503460f94b9d527/html5/thumbnails/13.jpg)
13
M&V
$1,200
This campaign promise by Newt Gingrich illustrates lofty goals
in the heat of the moment
"“By the end of my second term, we will have the first permanent base on the moon, and it will be American.” – Newt Gingrich
![Page 14: 1 Jim Plourde Square D / Schneider Electric Jim.Plourde@US.Schneider-Electric.com +1.603.265.6556](https://reader035.vdocuments.us/reader035/viewer/2022062423/56649e9c5503460f94b9d527/html5/thumbnails/14.jpg)
14
Shooting for the moon?
1. Which facility is more efficient than the other?A. East BuildingB. West Building
We don’t really know just yet.
2. By removing variables that effect consumption, verifying the quality of data, etc, a different answer may emerge …
3. Once we have an accurate understanding of how these facilities are performing, a root-cause analysis process can begin.
![Page 15: 1 Jim Plourde Square D / Schneider Electric Jim.Plourde@US.Schneider-Electric.com +1.603.265.6556](https://reader035.vdocuments.us/reader035/viewer/2022062423/56649e9c5503460f94b9d527/html5/thumbnails/15.jpg)
15
What Don’t you know?
How does the increasing number of building occupants impact my carbon footprint?
![Page 16: 1 Jim Plourde Square D / Schneider Electric Jim.Plourde@US.Schneider-Electric.com +1.603.265.6556](https://reader035.vdocuments.us/reader035/viewer/2022062423/56649e9c5503460f94b9d527/html5/thumbnails/16.jpg)
16
Savings or no savings?
Energy savings program implemented.
![Page 17: 1 Jim Plourde Square D / Schneider Electric Jim.Plourde@US.Schneider-Electric.com +1.603.265.6556](https://reader035.vdocuments.us/reader035/viewer/2022062423/56649e9c5503460f94b9d527/html5/thumbnails/17.jpg)
17
M&V
What is:
"It isn't pollution that's harming the environment. It's the impurities in our air and water that are doing it."
Quotation made famous by Dan Quayle regarding environmental
pollution
![Page 18: 1 Jim Plourde Square D / Schneider Electric Jim.Plourde@US.Schneider-Electric.com +1.603.265.6556](https://reader035.vdocuments.us/reader035/viewer/2022062423/56649e9c5503460f94b9d527/html5/thumbnails/18.jpg)
18
![Page 19: 1 Jim Plourde Square D / Schneider Electric Jim.Plourde@US.Schneider-Electric.com +1.603.265.6556](https://reader035.vdocuments.us/reader035/viewer/2022062423/56649e9c5503460f94b9d527/html5/thumbnails/19.jpg)
19
M&V
What is:
“When I was in college , we used to take a popcorn popper, cause that was the only thing we were allowed to have, and fry squirrels in the dorm room."
Mike Huckabee explains his mis-application of technology
![Page 20: 1 Jim Plourde Square D / Schneider Electric Jim.Plourde@US.Schneider-Electric.com +1.603.265.6556](https://reader035.vdocuments.us/reader035/viewer/2022062423/56649e9c5503460f94b9d527/html5/thumbnails/20.jpg)
20
Operations and Facilities Dashboards
![Page 21: 1 Jim Plourde Square D / Schneider Electric Jim.Plourde@US.Schneider-Electric.com +1.603.265.6556](https://reader035.vdocuments.us/reader035/viewer/2022062423/56649e9c5503460f94b9d527/html5/thumbnails/21.jpg)
21
M&V
$200
This infamous quote(s) illustrated Dan Quayle’s firm grasp on geography
"It is wonderful to be here in the great state of Chicago"
Or
"I love California, I practically grew up in Phoenix."
![Page 22: 1 Jim Plourde Square D / Schneider Electric Jim.Plourde@US.Schneider-Electric.com +1.603.265.6556](https://reader035.vdocuments.us/reader035/viewer/2022062423/56649e9c5503460f94b9d527/html5/thumbnails/22.jpg)
22
Enterprise-wide energy intelligence, personalized for each stakeholder
Energy Manager• track KPIs• receive cost roll-ups• planning / budgeting• cost allocation
Building Manager• benchmark performance• track program metrics• validate ROI• drive best practices• improve procurement
Facilities & Operations• optimize demand management • decrease capital expenditures• improve reliability of energy
infrastructure
![Page 23: 1 Jim Plourde Square D / Schneider Electric Jim.Plourde@US.Schneider-Electric.com +1.603.265.6556](https://reader035.vdocuments.us/reader035/viewer/2022062423/56649e9c5503460f94b9d527/html5/thumbnails/23.jpg)
23
M&V
$1,200
This quotation by George W. Bush illustrated his
knowledge of budget analysis
"It's clearly a budget. It's got a lot of numbers in it."
![Page 24: 1 Jim Plourde Square D / Schneider Electric Jim.Plourde@US.Schneider-Electric.com +1.603.265.6556](https://reader035.vdocuments.us/reader035/viewer/2022062423/56649e9c5503460f94b9d527/html5/thumbnails/24.jpg)
24
Energy modeling
Cost allocation and rate engine
Powerful visualization and sharing
Data quality assurance
50%
![Page 25: 1 Jim Plourde Square D / Schneider Electric Jim.Plourde@US.Schneider-Electric.com +1.603.265.6556](https://reader035.vdocuments.us/reader035/viewer/2022062423/56649e9c5503460f94b9d527/html5/thumbnails/25.jpg)
25
“You know a design is good when you want to lick it.” —Steve Jobs
![Page 26: 1 Jim Plourde Square D / Schneider Electric Jim.Plourde@US.Schneider-Electric.com +1.603.265.6556](https://reader035.vdocuments.us/reader035/viewer/2022062423/56649e9c5503460f94b9d527/html5/thumbnails/26.jpg)
26
M&V
$4,000
“Stand up, Chuck, let ‘em see ya!”
-Joe Biden, to MO state Sen Chuck Graham, who is in a wheelchair
Joe Biden’s painful attempt to publicly acknowledge the work of state Senator Chuck GrahamFinal
Jeopardy!
![Page 27: 1 Jim Plourde Square D / Schneider Electric Jim.Plourde@US.Schneider-Electric.com +1.603.265.6556](https://reader035.vdocuments.us/reader035/viewer/2022062423/56649e9c5503460f94b9d527/html5/thumbnails/27.jpg)
27
Building EE overview-Community Kiosk