1 jigs drawing now online and ready for review: tcp: d1002140d1002140 erm: d1002201d1002201 bs/fm:...

7
1 Jigs drawing now online and ready for review: TCP : D1002140 ERM : D1002201 BS/FM : D1002147 FOR THIS MEETING: QUESTIONS REGARDING BS/FM JIG DESIGN: : We are proposing one holder for both prisms (shown in slides 2-5), with their respective prism positions set in the holder before bonding. 1. Confirm respective prism position (as in D1000576 & D0901076) main sapphire prism (D080765) coincident with COM secondary prism (D0902368) position – confirm respective angle…..see slides to follow (especially slide 5) 2. V-blocks: what is the preferred approach Modify existing V-blocks at Hanford [D1001685 V-block Assembly (2 off)] (slide 6 to clarify issues) Are there any specific requirements for a BS/FM V-block (i.e. is there something already in use? Are there special clamping requirements? NOTES FOR DISCUSSION AT DESIGN MEETING (26/10/10)

Upload: savanah-lynam

Post on 01-Apr-2015

212 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: 1 Jigs drawing now online and ready for review: TCP: D1002140D1002140 ERM: D1002201D1002201 BS/FM: D1002147D1002147 FOR THIS MEETING: QUESTIONS REGARDING

1

Jigs drawing now online and ready for review:

TCP: D1002140

ERM: D1002201

BS/FM: D1002147

FOR THIS MEETING: QUESTIONS REGARDING BS/FM JIG DESIGN::

We are proposing one holder for both prisms (shown in slides 2-5), with their respective prism positions set in the holder before bonding.

1. Confirm respective prism position (as in D1000576 & D0901076)

main sapphire prism (D080765) coincident with COM

secondary prism (D0902368) position – confirm respective angle…..see slides to follow (especially slide 5)

2. V-blocks: what is the preferred approach

Modify existing V-blocks at Hanford [D1001685 V-block Assembly (2 off)] (slide 6 to clarify issues)

Are there any specific requirements for a BS/FM V-block (i.e. is there something already in use?

Are there special clamping requirements?

NOTES FOR DISCUSSION AT DESIGN MEETING (26/10/10)

Page 2: 1 Jigs drawing now online and ready for review: TCP: D1002140D1002140 ERM: D1002201D1002201 BS/FM: D1002147D1002147 FOR THIS MEETING: QUESTIONS REGARDING

2

BS/FM jig: basic views, simplified design compared with TCP/ERM (alignment guides removed)

Page 3: 1 Jigs drawing now online and ready for review: TCP: D1002140D1002140 ERM: D1002201D1002201 BS/FM: D1002147D1002147 FOR THIS MEETING: QUESTIONS REGARDING

3

Prototype holder (made from POM) and mock prisms

LIP (R185mm) CONTACTS WITH MASS

X XX

Only 2 pins for secondary prism

Page 4: 1 Jigs drawing now online and ready for review: TCP: D1002140D1002140 ERM: D1002201D1002201 BS/FM: D1002147D1002147 FOR THIS MEETING: QUESTIONS REGARDING

4

Alignment onto mass, extra clearance to access screws

Reference the fiducial line on mass with straight edge on jig itself

Extra clearance

Round nosed spring plunger (both sides)

Page 5: 1 Jigs drawing now online and ready for review: TCP: D1002140D1002140 ERM: D1002201D1002201 BS/FM: D1002147D1002147 FOR THIS MEETING: QUESTIONS REGARDING

5

From D0901076-v3

Confirm respective prism position: (1) or (2) or other?

1

2

Page 6: 1 Jigs drawing now online and ready for review: TCP: D1002140D1002140 ERM: D1002201D1002201 BS/FM: D1002147D1002147 FOR THIS MEETING: QUESTIONS REGARDING

6

Existing v-block: modifications required

Remove material

(view from below) Increase clearance

Add supports/barriers

Page 7: 1 Jigs drawing now online and ready for review: TCP: D1002140D1002140 ERM: D1002201D1002201 BS/FM: D1002147D1002147 FOR THIS MEETING: QUESTIONS REGARDING

7

Existing v-block: support surfaces

Increase surface contact