1 itu-r liaison group report - session #72 opening plenary ieee 802.16 presentation submission...
TRANSCRIPT
1
ITU-R Liaison Group Report - Session #72 Opening Plenary
IEEE 802.16 Presentation Submission Template (Rev. 9) Document Number:IEEE L802.16-11/0006Date Submitted:2011-03-13Source:Reza Arefi Voice: +1 503 830 5485Intel Corporation E-mail: [email protected]
Venue:IEEE 802.16 Session #72, WG Opening PlenaryBase Contribution:None.Purpose:ITU-R Liaison Group presentation to Opening Plenary of the WG, containing plan for the weekNotice:This document does not represent the agreed views of the IEEE 802.16 Working Group or any of its subgroups. It represents only the views of the participants listed in the “Source(s)” field above. It is offered as a basis for discussion. It is not binding on the contributor(s), who reserve(s) the right to add, amend or withdraw material contained herein.
Release:The contributor grants a free, irrevocable license to the IEEE to incorporate material contained in this contribution, and any modifications thereof, in the creation of an IEEE Standards publication; to copyright in the IEEE’s name any IEEE Standards publication even though it may include portions of this contribution; and at the IEEE’s sole discretion to permit others to reproduce in whole or in part the resulting IEEE Standards publication. The contributor also acknowledges and accepts that this
contribution may be made public by IEEE 802.16.
Patent Policy:The contributor is familiar with the IEEE-SA Patent Policy and Procedures:<http://standards.ieee.org/guides/bylaws/sect6-7.html#6> and <http://standards.ieee.org/guides/opman/sect6.html#6.3>.Further information is located at <http://standards.ieee.org/board/pat/pat-material.html> and <http://standards.ieee.org/board/pat >.
ITU-R Liaison Group Report - Session #72 Opening Plenary
Reza Arefi
802.16’s ITU-R Liaison Official
IEEE 802.16 Session #72Singapore, 14-17 March 2011
Relevant Documents from Previous Sessions
• IEEE L802.16-10/0017r6IEEE 802.16 ITU-R Liaison Group Workplan
• IEEE L802.16-11/0130Agenda for the first meeting of the WirelessMAN-Advanced
Transposing Organizations (WATO), to be held on 15 March 2011
• IEEE L802.16-10/0134r1ITU-R Liaison Group Report to Closing Plenary of Session #70
========== Also ===========• IEEE L802.16-08/079IEEE 802.18 IMT-Advanced review process (IEEE 802.18-08-0058/r6)
Input Documents for Session #72
Liaisons• L80216-11_0004 – Draft ARIB STD-T103, Version 1.0:
200 MHz-Band Broadband Wireless Communication Systems between Portable BS and MSs (2011-03-13 )
• L80216-11_0003 – Coordination on P1900.7 draft PAR – P1900.7
Contributions• IEEE L802.16itu-10/0005 - Comments on the Overview
section of the draft IEEE
Proposed Objectives for Session #72
per Workplan• Prepare M.1457-11 meeting X contribution, review with 802.18, and approve at the EC
• Finalize contribution for IMT.RSPEC (Overview in B.1 & titles and synopses of the GCS in B.2)
• Further develop contribution to WP 5D on M.1224 (to provide Abbreviations) , Ref: IEEE L802.16-10/0132d1
• Send LS to ARIB, TTA and the WiMAX Forum on the status of preparations for submission towards IMT.RSPEC
• Develop contributions to WP 5A on topics such as M2M,CRS, etc.
beyond Workplan• Review input contributions and take appropriate action
• Review input liaison statements and prepare responses as appropriate, review with 802.18, and approve at the EC
• Update ITU LG workplan as appropriate
Proposed Agenda for the Week
1) Introduction, approval of the agenda
2) Review and follow workplan of IEEE L802.16-10/0017r6
3) Review input contributions and liaisons and prepare responses and any other output documents to external organizations as necessary
4) Update workplan5) Approve all outgoing documents6) Other business
Proposed schedule for the Week(Room: 4506)
Monday Tuesday Wednesday Thursday
AM08:30 to 12:00
WATO Meeting
08:30 to 12:30Location: 4506
3) Review input contributions and liaisons and prepare responses and any other output documents to external organizations as necessary
4) Update Workplan
5) Approve all outgoing documents
3) Review input contributions and liaisons and prepare responses and any other output documents to external organizations as necessary
PM13:30 to 17:00(Mon. 4:00-6:00 PM)
1) Introduction, approval of the agenda
2) Review and follow workplan of IEEE L802.16-10/0017
6) Other business
UPDATE ON ITU-RIMT-ADVANCED DEVELOPMENT
Steps in radio interface development process:
Step1 and 2
No.1 No.2 No.3 No.4 No.5 No.6 No.7 No.8 No.9
Step 3(0)
(1)
(20 months)
Step 4
(8 months)
(16 months) (2)Steps 5,6 and 7
(3)Steps 8
(4)(12 months)
(20 months)
WP 5D meetings
Step 1: Issuance of the circular letterStep 2: Development of candidate RITs and SRITsStep 3: Submission/Reception of the RIT and SRIT proposals
and acknowledgement of receiptStep 4: Evaluation of candidate RITs and SRITs
by evaluation groups
Step 5: Review and coordination of outside evaluation activitiesStep 6: Review to assess compliance with minimum requirementsStep 7: Consideration of evaluation results, consensus building
and decision Step 8: Development of radio interface Recommendation(s)
Critical milestones in radio interface development process:(0): Issue an invitation to propose RITs March 2008(1): ITU proposed cut off for submission October 2009
of candidate RIT and SRIT proposals
(2): Cut off for evaluation report to ITU June 2010(3): WP 5D decides framework and key October 2010
characteristics of IMT-Advanced RITs and SRITs(4): WP 5D completes development of radio February 2011
interface specification Recommendations
2008 2009 2010No.10
2011
IMT-Advanced A2-01
We are here
IMT-Advanced Development Process
• Evaluation Reports from external evaluation groups were presented and reviewed (see next slide)
• WP 5D developed acknowledgments back to evaluation groups (IMT-ADV documents)
• WP 5D agreed that steps 4 and 5 of the process are COMPLETE
• WP 5D preliminary concluded that step 6 is also complete
– Started filling out of M.2113 compliance templates which contains WP 5D view that both technologies meet the requirements
– To be included in IMT.RADIO to be finalized at 5D#9
Outcome of WP 5D #9
• completed Step 6 and Step 7
– Step 6: Review to assess compliance with minimum requirements
– Step 7: Consideration of evaluation results, consensus building and decision
– Finalized IMT.RADIO
– Announced final decision on IMT-Advanced technologies• WirelessMAN-Advanced
• LTE-Advanced
– Started development of Recommendation M.[IMT.RSPEC] to contain detailed specifications of IMT-Advanced radio interfaces – due for completion in April 2011
Outcome of WP 5D #10
• To complete Step 8
– Finish development of first version of Recommendation M.[IMT.RSPEC] to contain detailed specifications of IMT-Advanced radio interfaces
– Further develop future update process of Recommendation ITU-R M.[IMT.RSPEC]
WP 5D #11
Activity Start Stop ITU-R Action/Deliverable/Milestone
WP 5DMeeting #8 9 Jun. 10 16 June 10
Liaison to External Organizations on the procedural details and detailed timelines for the completion of draft new Rec. ITU‑R M.[IMT.RSPEC].
RIT/SRIT Proponents - Due to ITU-R by 6 Oct. 10 Delivery to ITU-R by RIT/SRIT Proponents of Form A.See Item 4 (Table 3).
WP 5DMeeting #9 13 Oct. 10 20 Oct. 10
WP 5D takes note of the Form A’s in order to determine the structure of draft new Rec. ITU-R M.[IMT.RSPEC].WP 5D provides liaisons to RIT/SRIT Proponents and GCS Proponents.
GCS Proponents - Due to ITU-R by 30 Mar. 11
Delivery to ITU-R by the GCS Proponents of the Overview and either titles and synopsis of the GCS, or the Directly Incorporated Specification when GCS is not utilized . See Item 1(Table 2).Delivery to ITU-R of the Global Core Specifications by the GCS Proponents. Detailed transposition references would not be required at this point. See Item 2 (Table 2).
Delivery to ITU-R of Certification B by GCS Proponents. See Item 5 (Table 3).
WP 5DMeeting #10 6 Apr. 11 13 Apr. 11
WP 5D takes note of the Certification B’s. WP 5D finalizes and preliminarily agrees draft new Rec. ITU-R M.[IMT.RSPEC] (not necessarily including the detailed transposition references).
WP 5D Liaison of the preliminary WP 5D agreed draft new Rec. ITU-R M.[IMT.RSPEC] to the relevant GCS Proponents and authorized Transposing Organizations for their use in developing their inputs of the detailed references.
WP 5DMeeting #11 7 July 11 14 July 11
WP 5D addresses responses from External Organizations on draft new Rec. ITU-R M.[IMT.RSPEC]
Transposing Organizations(in the case of a GCS being utilized) - Due to ITU-R by 21 Sep. 11
Delivery to ITU-R of transposition references by each Transposing Organization for incorporation into the WP 5D preliminary agreed draft new Rec. ITU-R M.[IMT.RSPEC] See Item 3 (Table 2).
Delivery to ITU-R of Certification C by each Transposing Organization. See Item 6 (Table 3).
WP 5DMeeting #12 12 Oct. 11 19 Oct. 11
WP 5D reviews and agrees the completed draft new Rec. ITU-R M.[IMT.RSPEC] (which now includes all transposition references) and forwards to Study Group 5
Radiocommunication Bureau - 14 Nov. 11
Submission by Counsellor for SG 5 of completed draft new Rec. ITU-R M.[IMT.RSPEC] (with all transposition references) to SG 5, based on currently anticipated SG 5 meeting schedule
Study Group 5 21 Nov. 11 22 Nov. 11Study Group 5 considers adoption of the new Rec. ITU-R M.[IMT.RSPEC] for forwarding to the Radiocommunication Assembly for approval.
Radiocommunication Assembly 16 Jan. 12 20 Jan. 12Radiocommunication Assembly considers approval of Rec. ITU-R M.[IMT.RSPEC]
MEETING OF WIRELESSMAN-ADVANCED
TRANSPOSING ORGANIZATIONS(WATO)
15 MARCH 2011
• First meeting of WirelessMAN-Advanced Transposing Organizations (WATO#1) on 15 March 2011
• Participation from IEEE, ARIB, TTA, and WiMAX Forum
• Discussion topics include:– IMT-Advanced documentation development
– Presentations from TOs
– Agreement on transposition and communication plans
– Discussion of M.[IMT.RSPEC] update process
– WATO meeting frequency and schedule
– WATO meeting arrangements and next meeting
WATO#1