1
Integrated Safety Management Peer Review
Corrective Action Plan
Howard K. Hatayama Director
Environmental Health and Safety Division
Presented to the
LBNL Integrated Safety Management Systems Review Team
August 9, 2006
![Page 2: 1 Integrated Safety Management Peer Review Corrective Action Plan Howard K. Hatayama Director Environmental Health and Safety Division Presented to the](https://reader035.vdocuments.us/reader035/viewer/2022081519/56649e4b5503460f94b3f722/html5/thumbnails/2.jpg)
2
“At a minimum, ES&H aspects that require special attention in this (Peer) review are:”
• Adequacy of administrative and engineering controls at the ALS
• Adequacy of the laser safety program
• Quality of Laboratory leadership regarding ES&H
• Effectiveness of PI’s, middle managers, and first line supervisors as safety leaders and mentors
• State of the “safety culture” at the Laboratory
![Page 3: 1 Integrated Safety Management Peer Review Corrective Action Plan Howard K. Hatayama Director Environmental Health and Safety Division Presented to the](https://reader035.vdocuments.us/reader035/viewer/2022081519/56649e4b5503460f94b3f722/html5/thumbnails/3.jpg)
3
LBNL Peer Review Reviewers
• Reviewers – William A. Bookless, Chair ~ LLNL– John Cornuelle ~ SLAC– Dennis Derkacs ~ LANL – Tom Dickinson ~ NSLS – Brookhaven Laboratory– George Goode ~ Brookhaven Laboratory– James Johnson, Jr. ~ Howard University– Jim Smathers ~ UCLA
• Three DOE Observers– W. Earl Carnes ~ DOE Headquarters– Ted Pietrok ~ PNSO– Carol Ingram ~ BSO
![Page 4: 1 Integrated Safety Management Peer Review Corrective Action Plan Howard K. Hatayama Director Environmental Health and Safety Division Presented to the](https://reader035.vdocuments.us/reader035/viewer/2022081519/56649e4b5503460f94b3f722/html5/thumbnails/4.jpg)
4
In summary, the Peer Review found……
•LBNL ISM system is sound with many strengths
•Laboratory staff were very open and frank, not inhibited by DOE observers
•Fear of reporting incidents noted at all levels
•Need to ensure more consistent implementation and communication from top to bottom and across divisions
•Principle Investigators are the most vulnerable link in the line management chain
•Work planning and control should be more comprehensive and consistently implemented
•The LBNL “safety culture” is generally sound
![Page 5: 1 Integrated Safety Management Peer Review Corrective Action Plan Howard K. Hatayama Director Environmental Health and Safety Division Presented to the](https://reader035.vdocuments.us/reader035/viewer/2022081519/56649e4b5503460f94b3f722/html5/thumbnails/5.jpg)
5
Corrective Action Plan Development Process
• CAP Development Team
- Line and support organizations
• Plan development process–Extent of condition/backlook review–Root cause analysis–Corrective actions development
• Interim actions implemented while CAP was developed
![Page 6: 1 Integrated Safety Management Peer Review Corrective Action Plan Howard K. Hatayama Director Environmental Health and Safety Division Presented to the](https://reader035.vdocuments.us/reader035/viewer/2022081519/56649e4b5503460f94b3f722/html5/thumbnails/6.jpg)
6
Extent of Condition/Backlook: Assessments and Reports Reviewed
2006– Report of the RSC Sub-committee to Investigate and Review ALS
Shielding Control Procedures, January– Berkeley Lab FY05 50 OSHA Recordable Cases: Root Causes and
Lessons, January
2005– Crane, Hoist, Rigging & Forklift Safety Program Assessment, October – Causal Analysis of 15 Electrical Incidents that Occurred at Berkeley Lab
from July 2002 to June 2005, October– Building 58 Electrical Near Miss Accident: Status Report on Corrective
Actions, September– LBNL Building 58 Electrical Safety Event, June – LBNL Electrical Safety Self-Assessment, April
2003– Laser Safety Program Review Panel Report, July
![Page 7: 1 Integrated Safety Management Peer Review Corrective Action Plan Howard K. Hatayama Director Environmental Health and Safety Division Presented to the](https://reader035.vdocuments.us/reader035/viewer/2022081519/56649e4b5503460f94b3f722/html5/thumbnails/7.jpg)
7
Root Cause Analysis identified corrective actions needed in 5 general categories
1. Line management (LM) execution of ES&H
2. ES&H assurance mechanisms
3. Educating managers, supervisors and division safety coordinators (SCs)
4. Proactive posture on ES&H
5. Lab-wide work control program
![Page 8: 1 Integrated Safety Management Peer Review Corrective Action Plan Howard K. Hatayama Director Environmental Health and Safety Division Presented to the](https://reader035.vdocuments.us/reader035/viewer/2022081519/56649e4b5503460f94b3f722/html5/thumbnails/8.jpg)
8
Line Management Execution of ES&H
What are we fixing?
• Responsibility for safety is not clearly defined below the principle investigator/staff scientist
• Excessive span of control makes working safely a challenge
How are we fixing it?
• Define safety management responsibilities for lead post-docs and graduate students
• Increase frequency of management walkarounds
• Incorporate changes in Lab policies and procedures
![Page 9: 1 Integrated Safety Management Peer Review Corrective Action Plan Howard K. Hatayama Director Environmental Health and Safety Division Presented to the](https://reader035.vdocuments.us/reader035/viewer/2022081519/56649e4b5503460f94b3f722/html5/thumbnails/9.jpg)
9
Line Management Execution of ES&H
What have we done about it already?• Performed walkarounds of all
spaces • Developed management
walkaround training• Enhanced processes and
training in Divisions
![Page 10: 1 Integrated Safety Management Peer Review Corrective Action Plan Howard K. Hatayama Director Environmental Health and Safety Division Presented to the](https://reader035.vdocuments.us/reader035/viewer/2022081519/56649e4b5503460f94b3f722/html5/thumbnails/10.jpg)
10
ES&H Assurance Mechanisms
What are we fixing?
• Weakened ES&H technical program assurance
• Ability of assurance systems to identify weakness in execution of ES&H
How are we fixing it?
• Establish current baseline of ES&H assurance and re-build
• Review effectiveness of walkarounds, Integrated Functional Appraisal (IFA) and Management ES&H Review (MESH) and revise criteria
• Revise partnership agreement with UCB regarding ES&H
![Page 11: 1 Integrated Safety Management Peer Review Corrective Action Plan Howard K. Hatayama Director Environmental Health and Safety Division Presented to the](https://reader035.vdocuments.us/reader035/viewer/2022081519/56649e4b5503460f94b3f722/html5/thumbnails/11.jpg)
11
ES&H Assurance Mechanisms
What have we done about it already?• Revised FY06 IFA and MESH criteria• Revised division Self Assessment criteria for
2006-07 assessment year
Lawrence Berkeley National Laboratory
2006 Integrated Functional Appraisal
![Page 12: 1 Integrated Safety Management Peer Review Corrective Action Plan Howard K. Hatayama Director Environmental Health and Safety Division Presented to the](https://reader035.vdocuments.us/reader035/viewer/2022081519/56649e4b5503460f94b3f722/html5/thumbnails/12.jpg)
12
Educating Managers, Supervisors, and Coordinators
What are we fixing?• Current safety oversight training for managers,
supervisors, post-docs and graduate students needs to be aligned with roles and responsibilities • Roles, responsibilities, minimum qualifications and
training requirements for Safety Coordinators
How are we fixing it? • Enhance mentoring, safety awareness and training of
post-docs and graduate students • Refine walkaround training based on formal requirements
and feedback from initial roll-out• Evaluate Safety Coordinator program and revise
![Page 13: 1 Integrated Safety Management Peer Review Corrective Action Plan Howard K. Hatayama Director Environmental Health and Safety Division Presented to the](https://reader035.vdocuments.us/reader035/viewer/2022081519/56649e4b5503460f94b3f722/html5/thumbnails/13.jpg)
13
Educating Managers, Supervisors, and Coordinators
What have we done about it already?
• Developed walkaround training
• Established Safety Coordinator review team
![Page 14: 1 Integrated Safety Management Peer Review Corrective Action Plan Howard K. Hatayama Director Environmental Health and Safety Division Presented to the](https://reader035.vdocuments.us/reader035/viewer/2022081519/56649e4b5503460f94b3f722/html5/thumbnails/14.jpg)
14
Proactive Posture on ES&H
What are we fixing?• Cultural attitudes towards risk-taking and ES&H risk
management
• Fear and anxiety related to incident reporting
How are we fixing it?• Develop an enhanced communications strategy
focused on: quality of work and concern for ES&H
• Revise ISM plans, PRDs, and training for line managers to identify and mitigate ES&H risks
• Re-orient response away from blame and towards staff safety, lessons learned and preventative measures
• Communications to encourage incident reporting
![Page 15: 1 Integrated Safety Management Peer Review Corrective Action Plan Howard K. Hatayama Director Environmental Health and Safety Division Presented to the](https://reader035.vdocuments.us/reader035/viewer/2022081519/56649e4b5503460f94b3f722/html5/thumbnails/15.jpg)
15
Proactive Posture on ES&H
What have we done about it already?
• Revisions to incident investigations procedure to make it less onerous• Director’s memo to all
Laboratory staff, 6/9/06
![Page 16: 1 Integrated Safety Management Peer Review Corrective Action Plan Howard K. Hatayama Director Environmental Health and Safety Division Presented to the](https://reader035.vdocuments.us/reader035/viewer/2022081519/56649e4b5503460f94b3f722/html5/thumbnails/16.jpg)
16
![Page 17: 1 Integrated Safety Management Peer Review Corrective Action Plan Howard K. Hatayama Director Environmental Health and Safety Division Presented to the](https://reader035.vdocuments.us/reader035/viewer/2022081519/56649e4b5503460f94b3f722/html5/thumbnails/17.jpg)
17
Lab Wide Work Control Program
What are we fixing?• Managing of changes-people/equipment/scope
• Informality in line management authorized work
How are we fixing it?• Complete transition of AHDs to electronic and review
effectiveness
• Formalize policy and procedures for lesser hazards
• Review/revise hazard identification policies for facilities, sub-contractors, and vendors
• Develop methods to ensure implementation of AHDs
![Page 18: 1 Integrated Safety Management Peer Review Corrective Action Plan Howard K. Hatayama Director Environmental Health and Safety Division Presented to the](https://reader035.vdocuments.us/reader035/viewer/2022081519/56649e4b5503460f94b3f722/html5/thumbnails/18.jpg)
18
Lab Wide Work Control Program
What have we done about it already?
• Focused FY06 IFA on implementation of formal authorizations
![Page 19: 1 Integrated Safety Management Peer Review Corrective Action Plan Howard K. Hatayama Director Environmental Health and Safety Division Presented to the](https://reader035.vdocuments.us/reader035/viewer/2022081519/56649e4b5503460f94b3f722/html5/thumbnails/19.jpg)
19
Current Status and Next Steps
• Interim actions incorporated into CAP
• Teams and Lead for CAP tasks identified
• Establish Change Control Board
• Follow-up on DOE Validation Team recommendations
• Integrate ISM External Review recommendations into CAP
• Implement and close-out corrective actions
• Validation and on-going assurance
![Page 20: 1 Integrated Safety Management Peer Review Corrective Action Plan Howard K. Hatayama Director Environmental Health and Safety Division Presented to the](https://reader035.vdocuments.us/reader035/viewer/2022081519/56649e4b5503460f94b3f722/html5/thumbnails/20.jpg)
Our Goal:
A safer Laboratory through improved execution of Integrated Safety Management
•More active and effective participation of managers, from senior leadership to the mentors in the workplace, as Safety Managers
•More effective training, education and communication
•More formality in line management authorized work