1 institutional controls lts “framework” epa post-rod authority state and tribal government...
TRANSCRIPT
![Page 1: 1 Institutional Controls LTS “Framework” EPA Post-ROD Authority State and Tribal Government Working Group March 14, 2002](https://reader036.vdocuments.us/reader036/viewer/2022083007/56649e715503460f94b706be/html5/thumbnails/1.jpg)
1
Institutional ControlsLTS “Framework”
EPA Post-ROD Authority
State and Tribal Government Working Group
March 14, 2002
![Page 2: 1 Institutional Controls LTS “Framework” EPA Post-ROD Authority State and Tribal Government Working Group March 14, 2002](https://reader036.vdocuments.us/reader036/viewer/2022083007/56649e715503460f94b706be/html5/thumbnails/2.jpg)
2
Institutional Controls
Guidance
IC Tracking System
IC Data Collection Pilot
Information Collection Request
Workshops
50-State Study
“One-Call” Pilots
IC Privatization Pilot
![Page 3: 1 Institutional Controls LTS “Framework” EPA Post-ROD Authority State and Tribal Government Working Group March 14, 2002](https://reader036.vdocuments.us/reader036/viewer/2022083007/56649e715503460f94b706be/html5/thumbnails/3.jpg)
3
Institutional Controls:Guidance
“A Site Manager’s Guide to Identifying, Evaluating and Selecting ICs”» Completed: September 2000
“Guide to Implementing, Monitoring and Enforcing ICs”» Second Regional Review: Spring 2002
“ICs and Communities”» Draft: Summer 2002
Developing IC Implementation Plans» Draft: Fall 2002
Developing Full Life-Cycle Cost Estimates for ICs » Draft: Spring 2003
![Page 4: 1 Institutional Controls LTS “Framework” EPA Post-ROD Authority State and Tribal Government Working Group March 14, 2002](https://reader036.vdocuments.us/reader036/viewer/2022083007/56649e715503460f94b706be/html5/thumbnails/4.jpg)
4
Institutional Controls:Tracking System Objectives
EPA developing system to track entire life-cycle of ICs» Selection» Implementation» Monitoring» Reporting » Enforcement
GIS Map based Web-enabled for stakeholder access to information
![Page 5: 1 Institutional Controls LTS “Framework” EPA Post-ROD Authority State and Tribal Government Working Group March 14, 2002](https://reader036.vdocuments.us/reader036/viewer/2022083007/56649e715503460f94b706be/html5/thumbnails/5.jpg)
5
Institutional Controls:Tracking System Objectives (Cont.)
Linked to:
»Other EPA programs
»Other Federal Agencies
»States
»Tribes
»Local Government
![Page 6: 1 Institutional Controls LTS “Framework” EPA Post-ROD Authority State and Tribal Government Working Group March 14, 2002](https://reader036.vdocuments.us/reader036/viewer/2022083007/56649e715503460f94b706be/html5/thumbnails/6.jpg)
6
Institutional Controls:Tracking Research
Nine EPA databases
10 Regions
Other Federal Agencies
» DoD
— Army
— Navy
» DOE
States
California
Illinois
Maryland
Minnesota
New Jersey
Washington
Wisconsin
![Page 7: 1 Institutional Controls LTS “Framework” EPA Post-ROD Authority State and Tribal Government Working Group March 14, 2002](https://reader036.vdocuments.us/reader036/viewer/2022083007/56649e715503460f94b706be/html5/thumbnails/7.jpg)
7
Institutional Controls:Data Collection Form
From research, developed a list of data elements» Basic Site Information» ICs Instrument Selection as Specified in the Decision
Document(s) » ICs Implementation» ICs Monitoring» ICs Enforcement» IC Costs» IC Trends, Additional Information
![Page 8: 1 Institutional Controls LTS “Framework” EPA Post-ROD Authority State and Tribal Government Working Group March 14, 2002](https://reader036.vdocuments.us/reader036/viewer/2022083007/56649e715503460f94b706be/html5/thumbnails/8.jpg)
8
Institutional Controls:Data Collection Pilots
Conducted data collection pilots using data elements form Surveyed 72 sites in Regions 3 and 5 to determine:
— What IC information is actually available— Where we would have to go to get it— What form the data is in— What does it cost to get it — Evaluate feasibility/methods of data gathering— Refine data elements
![Page 9: 1 Institutional Controls LTS “Framework” EPA Post-ROD Authority State and Tribal Government Working Group March 14, 2002](https://reader036.vdocuments.us/reader036/viewer/2022083007/56649e715503460f94b706be/html5/thumbnails/9.jpg)
9
Institutional Controls:Data Collection Pilots (cont.)
Preliminary results:
Data not where we expected
How deed notices are organized varies considerably
Very few “tracking” systems – mostly filing systems
Very little IC information post selection
ICs often assigned to the whole parcel
Imprecise language problematic
Little routine monitoring - based on reported problems
![Page 10: 1 Institutional Controls LTS “Framework” EPA Post-ROD Authority State and Tribal Government Working Group March 14, 2002](https://reader036.vdocuments.us/reader036/viewer/2022083007/56649e715503460f94b706be/html5/thumbnails/10.jpg)
10
Institutional Controls:Workshops/Conferences
Completed IC Workshops
» February 2001 (San Antonio)
— Identify high priority issues for October Conference
» October 2001 (Santa Fe)
— Workgroups worked on Model language, IC Tracking, IC Costs, IC Implementation Plans and ICs and Communities
Planning IC Tracking Meeting – Summer 2002
Planning National IC Conference – Spring 2003
![Page 11: 1 Institutional Controls LTS “Framework” EPA Post-ROD Authority State and Tribal Government Working Group March 14, 2002](https://reader036.vdocuments.us/reader036/viewer/2022083007/56649e715503460f94b706be/html5/thumbnails/11.jpg)
11
50-State Study
ELI updating the 50-State Study
Preliminary Findings regarding ICs
»41 States have stewardship programs
»41 States report using ICs
»24 States report having an IC Tracking System
»20 States make the tracking system information available to the public
![Page 12: 1 Institutional Controls LTS “Framework” EPA Post-ROD Authority State and Tribal Government Working Group March 14, 2002](https://reader036.vdocuments.us/reader036/viewer/2022083007/56649e715503460f94b706be/html5/thumbnails/12.jpg)
12
Institutional Controls:Information Collection
Developed an Information Collection Request Survey»First Federal Register Notice in October 2001»Plan to send to States and Tribes, other
Federal Agencies and 200 local agencies»Gather data on IC Tracking Systems and IC
Costs »Develop interest in a national IC Tracking
Network
![Page 13: 1 Institutional Controls LTS “Framework” EPA Post-ROD Authority State and Tribal Government Working Group March 14, 2002](https://reader036.vdocuments.us/reader036/viewer/2022083007/56649e715503460f94b706be/html5/thumbnails/13.jpg)
13
Institutional Controls:One Call Pilots
Coordinate with IC tracking system»One-Call, Miss Utility, Dig Safe, Blue Stake»Notify excavators of environmental
contamination»Working on Pilots in Region 1, 3, and 5.»EPA cross-program advisory committee
—Superfund, RCRA, UST, OSRE, OGC, Brownfields, Federal Facilities
![Page 14: 1 Institutional Controls LTS “Framework” EPA Post-ROD Authority State and Tribal Government Working Group March 14, 2002](https://reader036.vdocuments.us/reader036/viewer/2022083007/56649e715503460f94b706be/html5/thumbnails/14.jpg)
14
Institutional Controls:Guardian Trust Pilot
EPA HQ, Region 3, State of Pennsylvania and MGP Partners»Research the viability of a “private trust” for
long-term stewardship of ICs»Establish non-profit trust
—Trust inspects/monitors and reports on ICs—Assumes liability for IC breaches—Research conducted over past 4 months
![Page 15: 1 Institutional Controls LTS “Framework” EPA Post-ROD Authority State and Tribal Government Working Group March 14, 2002](https://reader036.vdocuments.us/reader036/viewer/2022083007/56649e715503460f94b706be/html5/thumbnails/15.jpg)
15
LTS “Framework”
EPA began developing draft LTS “framework” guidance last year
Need for such a document unclear
» EPA guidance on O&M, Five-Year Reviews
» DOE, ECOS initiatives
Effort “on hold”
![Page 16: 1 Institutional Controls LTS “Framework” EPA Post-ROD Authority State and Tribal Government Working Group March 14, 2002](https://reader036.vdocuments.us/reader036/viewer/2022083007/56649e715503460f94b706be/html5/thumbnails/16.jpg)
16
Post-ROD Authority
DoD contesting EPA post-ROD authority and role at NPL sites
EPA has directed Regions to approve DoD RODs only if they adequately address monitorng, enforcement, reporting about land use controls
About 25 RODs being held up by dispute
EPA and DoD using Langley AFB ROD to resolve issue
»Dispute resolution process now underway
![Page 17: 1 Institutional Controls LTS “Framework” EPA Post-ROD Authority State and Tribal Government Working Group March 14, 2002](https://reader036.vdocuments.us/reader036/viewer/2022083007/56649e715503460f94b706be/html5/thumbnails/17.jpg)
17
Questions?
Murray Newton
Federal Facilities Restoration
and Reuse Office
M/C 5106
1200 Pennsylvania Avenue, NW
Washington, DC 20460
202/260-2856