  • 8/18/2019 1. IAD local participation presentation Final.pdf

    1/30

    QATAR RAIL

    DOHA METRO PROJECTBUSINESS OPPORTUNITIES FOR LOCAL MARKET

    Daniel Leckel

    Chief Program Officer

    7 May, 2015

  • 8/18/2019 1. IAD local participation presentation Final.pdf

    2/30

    AGENDA

    2

    I. PROJECT OVERVIEWII. OVERVIEW OF POTENTIAL BUSINESS OPPORTUNITIES FOR LOCAL

    MARKET:

    A. CIVIL WORKS

    B. MEPC. ARCHITECTURAL

    D. RAIL SYSTEMS

    E. MAINTENANCE

    F. OTHER SERVICES

    III. PROGRAM OVERVIEW

  • 8/18/2019 1. IAD local participation presentation Final.pdf

    3/30

    I. PROJECT OVERVIEW

  • 8/18/2019 1. IAD local participation presentation Final.pdf

    4/30

    4

    Metro Network 2022 Metro Network 2026

  • 8/18/2019 1. IAD local participation presentation Final.pdf

    5/30

    AWARDED CONTRACTS

    5

    Contract

    NumberContract Title

    Award

    DateContractors

    RTC/075/2013Manufacture, Supply and Install (MSI) - Metro Phase 1 Systems,

    Rolling Stock, Trackwork and Depot 20/02/2015

    Mitsubishi Heavy Industries, Ltd - Mitsubishi Corporation - Hitachi, Ltd -

    Kinki Sharyo Co., Ltd - Thales Canada Inc. Consortium

    RTC/075/2013Systems Maintenance (SM) - Metro Phase 1 Systems, Rolling

    Stock, Trackwork and Maintenance20/02/2015

    Mitsubishi Heavy Indistries, Ltd - Mitsubishi Corporation - Hitachi, Ltd -

    Kinki Sharyo Co., Ltd - Thales Canada Inc. Consortium MSI

    RTC/081/2013Design and Build Package - Red Line North Elevated and At-

    Grade30/11/2014

    Rizzani De Eccher S.p.A. - Lotte Engineering and Construction Co., Ltd. -

    Redco International Trading and Contracting WLL Joint Venture (RLR JV)

    RTC/082/2013 Design and Build Package - Green Line Elevated and At-Grade 23/07/2014Saudi Binladin Group Company Ltd. - PORR Bau GmbH - Hamad Bin Khalid

    Contracting Co. W.L.L. Joint Venture (SPH JV)

    RTC/074/2013 Design and Build Package - Red Line South Elevated & At-Grade 26/02/2014FCC Construccion, S.A. - Yüksel İnşaat, A.S. - Archirodon Construction(Overseas) Company, S.A. - Petroserv Limited JV

    RTC/040/2012 Design and Build Package - Gold Line Underground 20/02/2014Aktor S.A.-Larsen & Tourbo Limited-Yapi Merkezi Insaat V.E. - Sezai Turkes

    Feyzi Akkaya Marine Construction - Al Jaber Engineering LLC JV

    RTC/042/2012Design and Build Package - Major Stations – Musheireb andEducation City Stations

    23/05/2013Samsung C&T Corporation, Obrascon Huarte Lain S.A (OHL) & Qatar

    Building Company

    RTC/038/2012 Design and Build Package - Red Line North Underground 16/05/2013Impregilo SpA - SK Engineering & Construction Co. Ltd. - Galfar AI Misnad

    Engineering & Contracting W.L.L. JV

    RTC/039/2012 Design and Build Package - Red Line South Underground 16/05/2013QDVC - GS Engineering & Construction Corp. - AI-Darwish Engineering

    W.L.L. JV

    RTC/041/2012 Design and Build Package - Green Line Underground 16/05/2013PORR Bau GmbH - Saudi Binladin Group Company Ltd - Hamad Bin Khalid

    Contracting Co. W.L.L. JV

  • 8/18/2019 1. IAD local participation presentation Final.pdf

    6/30

    DOHA METRO STATIONS

    Design & Build 

    • Design Life - 120 Years • Earth Work

    • Temporary Work

    • All Civil Structures 

    • Underground Work 

    • MEP Works 

    • Architectural Finishes • Above Ground Works 

    STATION TYPICAL LONGITUDINAL SECTION

    STATION TYPICAL CROSS SECTION

  • 8/18/2019 1. IAD local participation presentation Final.pdf

    7/30

    II. OVERVIEW OF POTENTIAL

    BUSINESS OPPORTUNITIESLOCAL MARKET

  • 8/18/2019 1. IAD local participation presentation Final.pdf

    8/30

    A. BUSINESS OPPORTUNITIES

    CIVIL WORKS

  • 8/18/2019 1. IAD local participation presentation Final.pdf

    9/30

    FUTURE CONTRACTS FOR LOCAL SUPPLIERS AND

    CONTRACTORS

    ConcreteWorks

    Block Works FormworkWater

    Proofing

    CurtainWalling

    Grouting ScreedingSite SignBoards

    ConstructionChemicals

    9

    CIVIL WORKS

  • 8/18/2019 1. IAD local participation presentation Final.pdf

    10/30

    B. BUSINESS OPPORTUNITIES

    MEP

  • 8/18/2019 1. IAD local participation presentation Final.pdf

    11/30

    11

    1. MECHANICAL SYSTEM

    2. ELECTRICAL SYSTEM

    3. PLUMBING SYSTEM 

    FROM EARTH MATS UNDER STATIONS BASE

    SLABS

    …TO VERTICAL TRANSPORTATION SYSTEMS

    MEP WORKS 

  • 8/18/2019 1. IAD local participation presentation Final.pdf

    12/30

    12

    The ELECTRICAL SYSTEM includes thefollowing sub-systems:

    1. Earthing System - Earthing & Bonding

    2. Low Voltage Power Supply Distribution System

    • Low Voltage Distribution

    • Wires

    • Raceways

    • Cable Trays and Boxes

    Emergency Power• Switchboard – DBs

    3. Lighting System - Lighting & Emergency Lighting

    4. Lightning Protection System

    5. Elevator, Escalator, Moving Walk System

    6. Building Management System

  • 8/18/2019 1. IAD local participation presentation Final.pdf

    13/30

    13

    The MECHANICAL & PLUMBING SYSTEM includes the followingsub-systems:1. Air Conditioning System

    • Chiller

    • AHU

    • CRAC• FCU

    • Air Curtain

    • Chilled Water Pump

    2. Ventilation System - General & Special Ventilation

    • Exhaust Fan

    • Smoke Extract Fan

    3. Plumbing System

    • Domestic Water

    • Sanitary and Rain Water Drainage

    • Irrigation Water

    • Tunnel Drainage

    • Fuel Oil (Domestic Pump, Sump Pump)

    4. Fire Fighting System• Gas Suppression

    • Special Ventilation

    • Standpipe & Sprinkler

    • Smoke & Fire Detection - Fire Pump

  • 8/18/2019 1. IAD local participation presentation Final.pdf

    14/30

    FUTURE CONTRACTS RELATING TO MEP 

    FOR LOCAL SUPPLIERS AND CONTRACTORS

    • BACS (Building Automation & Control System)

    • Clean Agent Suppression System

    • Fire Alarm & Detection

    • Earthing & Lightning Protection

    • Lighting Control System

    • Indoor Air Quality & Monitoring System

    • Energy Measurement & Monitoring System

    • Rainwater Reuse System & Grey Water Treatment System

    • Etc.

    14

    MEP –

     SERVICES

  • 8/18/2019 1. IAD local participation presentation Final.pdf

    15/30

    FUTURE CONTRACTS RELATING TO MEP 

    FOR LOCAL SUPPLIERS AND CONTRACTORS

    MEP –

     SUPPLY AND MANUFACTURING

    15

    Mechanical Systems

    • Air Handling Units

    • Fan Coil Units

    • Fans & Blowers

    • Pumps• Air Conditioners

    • Heat Exchangers

    • Water Tanks

    • Sanitary Fixture & Accessories

    Pipe & Fitting• Air Ductworks

    • Insulation

    • Etc.

    Electrical Systems

    • Medium Voltage Panels

    • Sub Main Distribution Boards

    • Motor Control Centres• Distribution Boards

    • Cables

    • Lighting Fixtures (BOH Only)

    • Cable Tray & Trunking

    • Etc.

  • 8/18/2019 1. IAD local participation presentation Final.pdf

    16/30

    C. BUSINESS OPPORTUNITIES

    ARCHITECTURAL

  • 8/18/2019 1. IAD local participation presentation Final.pdf

    17/30

    ARCHITECTURAL FINISHES

    17

    • A/G SHELTERS

    • LANDSCAPING

    • CEILINGS

    • WALLS

    • FLOORS

    • EQUIPMENT FITOUTS

    • GLAZING

    • WAYFINDING

    • FURNITURES

  • 8/18/2019 1. IAD local participation presentation Final.pdf

    18/30

    FUTURE CONTRACTS RELATING TO ARCHITECTURAL

    WORKS FOR LOCAL SUPPLIERS AND CONTRACTORS

     – Stainless Steel Wall Panel

     – GFRC Ceiling Panels

     – Aluminum Ceiling Panels

     – Stone Cladding

     – Steel Mesh

     – Ceramic Tiles

     – Terrazzo

     – Metal Doors

     – Wooden Doors

     – Steel Fire Doors

     – Aluminum Glass Doors

     – Wall Cladding

     – Ceilings

     – Signage

     – Aluminum Profiles

     – Steel Profiles

     – Gypsum Board

     – Painting

     – Etc.

    18

    • Supply and Installation for Branding Materials:

    • Subcontracting for Architectural Works

  • 8/18/2019 1. IAD local participation presentation Final.pdf

    19/30

    D. BUSINESS OPPORTUNITIES

    RAIL SYSTEMS

  • 8/18/2019 1. IAD local participation presentation Final.pdf

    20/30

    SCOPE OF WORKS• Rolling Stock

    • Trackwork

    • Energy

    • Tunnel Ventilation

    • Platform Screen Doors

    • Signalling

    • Telecommunications

    • Depot Equipment

    • Depot & Stabling Yard Construction

    • 20 Years Maintenance

    Procurement of Mechanical and Electrical equipment/supplies forsystems such as Trackwork, Depot, Energy, Singaling,Telecommunication, Tunnel Ventilation and etc.

    20

  • 8/18/2019 1. IAD local participation presentation Final.pdf

    21/30

    FUTURE CONTRACTS RELATING TO RAIL SYSTEMS

    FOR LOCAL SUPPLIERS AND CONTRACTORS

    Potentially local procured products in Qatar, incl.:

    21

    • Turnout - Assembly

    • Turnout - Manganese

    Crossing

    • Switchgear

    • 33kV Switchgear

    • DC Switchgear

    • Transformer

    • Rectifier Transformer

    • Auxiliary Transformer

    • Ceiling (Various)

    • Wall Materials (Various)

    • Ready Mixed Concrete

    • Reinforced Bar

    • Platform Screen Door

    • Tunnel Ventilation System

    • Cables (Various Power

    Cables)

    • Signs and Markers

    • Construction Equipment

    • Electrical Equipment

    • Rectifier

    • Distribution Board (LV

    Switch Board)

    • Battery & Charger

    • Uninterruptable Power

    Supply (UPS)

    • Blue Light Station

    • Cable Tray

    • Steel Structure

    • Floor, Roof Ceiling and

    Wall Materials

    • Floor Materials (Various)

    • Roof Materials (Various)

  • 8/18/2019 1. IAD local participation presentation Final.pdf

    22/30

    E. BUSINESS OPPORTUNITIES

    MAINTENANCE

  • 8/18/2019 1. IAD local participation presentation Final.pdf

    23/30

    FUTURE CONTRACTS RELATING TO OPERATION &

    FACILITY MANAGEMENT FOR LOCAL SUPPLIERS AND

    ONTRACTORS

    • Tenders for Railway Operation and Facility Management (FM) of

    the DOHA METRO and LUSAIL TRAM will be issued in 2016and the Contractors will be appointed in early 2017.

    • The respective scope of work of the Operation and Facility

    Management Contractors will include services that will be

    opportunities for local businesses.

    • When the results of prequalification are announced, by Q4-2015,

    prequalified companies will seek local sub-contractors to perform

    these services.

    23

  • 8/18/2019 1. IAD local participation presentation Final.pdf

    24/30

    SERVICES THAT THE FUTURE METRO OPERATOR AND

    TRAM OPERATOR ARE LIKELY TO SUBCONTRACT

    • MEP Maintenance

    • Depot Cleaning

    • Depot Security

    Building Maintenance• Catering in Depot

    • Waste Management

    • Pest Control

    • Staff Transportation

    24

  • 8/18/2019 1. IAD local participation presentation Final.pdf

    25/30

    SERVICES THAT THE FUTURE METRO FM CONTRACTORS

    AND TRAM FM CONTRACTORS ARE LIKELY TO

    SUBCONTRACT

    • MEP Maintenance

    • Stations Cleaning

    • Stations Area Landscaping

    • Stations Security

    • Station Building Maintenance

    • Parking Attendant

    • Waste Management

    • Pest Control

    • Staff Transportation

    • Staff Accommodation

    25

  • 8/18/2019 1. IAD local participation presentation Final.pdf

    26/30

    F. BUSINESS OPPORTUNITIES

    OTHER SERVICES

  • 8/18/2019 1. IAD local participation presentation Final.pdf

    27/30

    FUTURE CONTRACTS RELATING TO OTHER SERVICES 

    FOR LOCAL SUPPLIERS AND CONTRACTORS

    • Specialist Services

    • Manpower Providers

    • Construction Equipment Providers (cranes, trucks, generators, etc.)

    Financial Services• Banking and Insurance Services

    • Legal Consultancy

    • Etc.

    27

  • 8/18/2019 1. IAD local participation presentation Final.pdf

    28/30

    III. PROGRAM OVERVIEW

  • 8/18/2019 1. IAD local participation presentation Final.pdf

    29/30

    29

    TIMESCALES

  • 8/18/2019 1. IAD local participation presentation Final.pdf

    30/30

    Thank you