    Our customers the specialists in construction

    All around the world, living and working spaces, infrastructure and industrial buildings as well as cultural sites are being created which improve the quality of life along with adding value. For their realization and maintenance, workers on the construction sites are often exposed to the most difficult conditions. At the same time, they bear a huge responsibility for the reliability, quality and safety during the exe-cution.

    It is thanks to their experience and hard work that projects are realized under considerable time and cost pressures in accordance with the requirements of the clients. We at PERI support them on the construction site globally and individually.

  • 2 3

    Your benefit is our aspirationYou can count on it

    The Management Board of PERI GmbH: Alexander Schwrer, Christian Schwrer and Dr.-Ing. Ekkehard Gericke

    Dear Readers,

    The world of business is moving faster and faster all the time with both decision and execution times becoming even shorter, resulting in more complex requirements from our customers. We take this into account: for example, through the founding of new companies in numerous countries for even more proximity to the customer, with modernized and expanded production facilities for the best technology or investment in efficiently run rental parks in order to ensure good material availability at short notice.

    These organizational aspects and constantly changing requirements of our customers drive us for-ward, to continuously develop new systems or system enhancements as well as relevant services with the aim of further optimizing all of our formwork and scaffolding processes. In the process, we always strive to provide the best solution that gives real added value for our customers - with PERI you can rely on this at all times.

    A PERI solution is always the result of three factors combined: product, concept and execution. We use our experience gained from successful global projects with diverse requirements to support our customers from the development of the technical solution, with the most suitable system equip-ment through cost-effective and safe execution, to the final return of materials.

    Examples of our product and service portfolio, as well as a number of outstanding reference projects, can be found in this handbook. Naturally, we are not able to show everything. You may be curious to learn even more about our competence in terms of solutions. Your personal PERI Sales Engineer is on hand at any time to provide you with expert advice. He will familiarize you with our company and services, and will collaborate with you with great commitment and energy on your projects and on a long-term, reliable partnership.

    We look forward to having you on board, to your questions and suggestions. Anywhere and at any time: at trade fairs, at one of our branch offices near you or at the company headquarters in Weissenhorn you are always welcome!

    We wish you every success for the future.

    Alexander Schwrer Christian Schwrer Dr.-Ing. Ekkehard Gericke

  • 4 5

    Content

    6 Our services for your projects

    8 PERI in Weissenhorn

    10 Continuous further development since the founding of the company

    12 PERI today

    14 Our goal: performance leadership

    16 Products and systems

    18 System equipment plus engineering

    20 Responsibility for results

    22 Quality is our promise

    24 Sustainability as a main principle

    26 Training and specialist exchange of views and information

    28 Competence with perspective

    160 Housing & Multi-Storey Projects 162 Residential and Office Building,

    Vienna, Austria 164 Detached House in Dulingen, Germany 166 Banco Ciudad Administration Building,

    Buenos Aires, Argentina 168 Los Portones de Linares Housing

    Development, Chile 170 Secondary School Technology Centre, Falkenberg, Sweden 172 Ocean Plaza Business Centre, Kiev,

    Ukraine 174 Jaber Al Ahmad Al Sabah Clinic,

    Kuwait City, Kuwait 176 Prosta Tower, Warsaw, Poland

    178 Skyscrapers and Towers 180 De Rotterdam, Rotterdam, Netherlands 182 Bosco Verticale, Milan, Italy 184 The Bow, Calgary, Canada 186 Central Bank of Nigeria Administration

    Building, Lagos, Nigeria 188 Donau City Tower 1, Vienna, Austria 190 300 Front Street Condos, Toronto,

    Canada 192 Evolution Tower, Moscow, Russia 194 3 World Trade Center, New York, USA 196 Torre Isla Cartuja, Seville, Spain 198 Vila Olimpia Administration Building

    (VIOL), So Paulo, Brazil 200 Meier-on-Rothschild Apartment

    Building, Tel Aviv, Israel 202 Asia Square Tower 2, Singapore 204 Administration Centre Da Nang, Vietnam

    206 Cultural Buildings 208 2012 European Championships

    Football Stadiums, Poland / Ukraine 210 Parco della Musica e della Cultura, Florence, Italy 212 Desert Learning Centre, Al Ain, United Arab Emirates 214 Centro Civico del Bicentenario, Cordoba, Argentina 216 The Artic Ring, Copenhagen Zoo,

    Denmark 218 John Paul II Church Centre, Krakow, Poland 220 Haute-Garonne Media Library, Toulouse Labge, France 222 Caixa Forum, Saragossa, Spain 224 Prez Art Museum Miami, USA 226 Aquatics Centre, London, Great Britain

    228 Transport Engineering 230 Waldschlsschen Bridge, Dresden,

    Germany 232 Puente Baluarte, Mexico 234 Lekki Ikoyi Bridge, Lagos, Nigeria 236 Motorway Bridge T4 Paradisia-Tsakona, Greece 238 Vistula Bridge, Kwidzyn, Poland 240 Puente Ejrcito, Lima, Peru 242 Chachenka Bridge, Moscow, Russia 244 Bridge over the Danube near Beka,

    Serbia 246 Bridge over the Golden Horn, Istanbul, Turkey248 Trans-Rhumel Bridge, Constantine, Algeria 250 Motorway Bridge V12 over the

    Rio Sordo, Vila Real, Portugal252 Bridge over the Dunajec, Tarnow,

    Poland 254 Dalsfjord Bridge, Norway 256 Pfnder Tunnel, Bregenz, Austria 258 Hallandsas Tunnel, Sweden 260 Hongkong-Zhuhai-Macao Bridge

    (HZMB), China 262 Strasswalchen West Ring Road,

    Salzburg, Austria 264 Wild Animal Underpass RN 88 near

    Albi/Rodez, France 266 Wankdorfkreisel, Bern, Switzerland Addresses

    302 PERI International

    268 Water Retaining Structures 270 Panama Canal Lock Installations,

    Panama 272 PPL Holtwood Hydroelectric Station,

    Holtwood, USA 274 Vianden Pumped Storage Power Plant, Luxembourg 276 Cooling Water Tank, Gas-Fired Power

    Station, Putrajaya, Malaysia

    278 Industrial Structures 280 Westfalen Power Plant, Hamm, Germany 282 Biocel Pulp Mill, Paskov, Czech Republic 284 Waste Incineration Plant, Klaipeda,

    Lithuania 286 Grain Silo near Parma, Italy 288 Refuse Derived Heating and Power

    Station, Spremberg, Germany 290 Building Redevelopment 292 Tallinn Oceanographic Museum,

    Estonia 294 Modernization of Motorway

    Underpass, Gstrow, Germany 296 Main Station Roof Renovation, Wiesbaden, Germany 298 Eaton Centre, Toronto, Canada 300 Restoration of St. Vitus Cathedral,

    Prague, Czech Republic

    32 Wall Formwork 34 MAXIMO Panel Formwork 36 TRIO Panel Formwork 38 DOMINO Panel Formwork 40 LIWA Panel Formwork 41 HANDSET Panel Formwork 42 VARIO GT 24 Wall Formwork 44 RUNDFLEX Circular Wall Formwork 46 RUNDFLEX Plus Circular Formwork 47 GRV Articulated Waler Circular

    Formwork 48 SB Brace Frame 49 RS Push-Pull Props, PERI Tie Technology

    50 Column Formwork 52 QUATTRO Column Formwork 53 RAPID Column Formwork 54 LICO Column Formwork 55 VARIO GT 24 Column Formwork VARIO QUATTRO Column Formwork 56 TRIO Column Formwork 57 SRS Circular Column Formwork

    58 Slab Formwork 60 SKYDECK Aluminium Panelized

    Slab Formwork 62 GRIDFLEX Grid Element Slab Formwork 64 MULTIFLEX Girder Slab Formwork 66 VARIODECK Steel Waler Slab Table 67 Table Module VT Slab Table 68 SKYTABLE Slab Table 69 Accessories for Slab Tables

    70 Shoring Systems 72 PEP / PEP Ergo Slab Props 73 MULTIPROP Slab Props 74 ST 100 Stacking Tower 75 PD 8 Slab Table, Shoring and Stair Tower 76 PERI UP Rosett Flex Shoring 78 HD 200 Heavy-Duty Props 79 VARIOKIT Heavy-Duty Shoring Tower

    80 Working Scaffold 82 PERI UP T 72 / T 104 Frame Scaffolding 84 PERI UP Rosett R 72 / R 104

    Modular Scaffolding 86 PERI UP Rosett Scaffold Units 88 PERI UP Rosett Flex Modular

    Scaffolding

    90 Access 92 PERI UP Rosett Staircase Alu 64 94 PERI UP Rosett Flex Staircase Alu 75 96 PERI UP Rosett Flex Staircase

    Steel 100 / 125 98 PERI UP Stairs Public

    100 Safety Scaffold 102 PERI UP Rosett Flex LGS Weather

    Protection Roof 104 Project-Specific Safety Scaffold

    106 Climbing Systems 108 FB 180 Folding Platform System 109 ASG 70-100 Bracket Platform 110 CB 240 / CB 160 Climbing Systems 111 BR Shaft Platform 112 SCS Single-Sided Climbing System 114 LPS Screen 116 RCS Rail Climbing System 118 ACS Self-Climbing System

    120 Civil Engineering Technology 122 VARIOKIT Concept 123 VARIOKIT Framework Constructions 124 VARIOKIT for Tunnel Construction 126 VARIOKIT for Bridge Construction

    128 Special Formwork 130 UNO - for the monolithic construction

    method132 3D Formwork Units

    134 System-Independent Accessories 136 GT 24 Formwork Girder 137 VT 20 Formwork Girder 138 PROKIT Safety Systems 140 FTF Facade Formwork 141 Pallets and Crate Pallets 142 Construction Site Equipment 144 Plywood Formlining, Release Agent

    146 Services 148 Technical Processing 150 PERI ELPOS151 PERI CAD 152 3D Planning153 Field Service 154 Rental Parks and Distribution155 myPERI Online Portal 156 Formwork Assembly157 Cleaning and Repairs

    PERI - The Company PERI - Systems and Services PERI - Reference Projects

  • 6 7

    Our services for your projectsFormwork, scaffolding and engineering from one source

    For every concrete structure and compo-nent, PERI provides the most suitable formwork system. The portfolio fully meets the global requirements of differ-ent construction methods and boundary conditions.

    As is still the case, formwork operations are a decisive cost factor in the realiza-tion of the buildings shell. Therefore, the PERI engineers and experts make every effort in order to further streamline working procedures as well as increasing user safety. The versatile application possibilities and the high quality of the system components make PERI form-work systems so intrinsically valuable.

    PERI scaffolding can be used for a very wide range of applications. Regardless whether it is frame or modular scaffold, the great flexibility leads to a high level of material utilization.

    All PERI developments, including those in the scaffolding sector, take into account the greatest possible safety standards not only for the scaffolder himself but also the users. Dangerous situations, usually at great heights, are eliminated due to design-related safety details. And last but not least, it must be noted that safe working conditions are more efficient and also save time.

    For PERI, engineering not only means product development and technical plan-ning. In particular, PERI engineering stands for the detailed examination and optimization of integral processes in the areas of formwork and scaffolding.

    PERI customers are therefore continu-ously supported throughout the entire course of the project, in particular with versatile and valuable services for sup-porting all work processes. In addition, along with continually improving the solutions, PERI carries out basic research, e.g. for new production processes of new materials.

    Formwork gives the fresh concrete its shape up to the time it has hardened thus forming the negative of the concrete struc-ture and also characterizes, in many instanc-es, the subsequent visibly remaining surfac-es of a building.

    Scaffolds are temporarily-used, reusable constructions which are utilized as working platforms, shoring for formwork or assem-bly work, access means as well as safety scaffold.

    Engineering, on the one hand, is focused on basic research and, on the other, is also applied science. The greatest added value lies in the practical use of the knowledge for the realization of technical products or procedures.

  • 8 9

    PERI in WeissenhornHeadquarters, development and production site since 1969

    In Weissenhorn, located in the German state of Bavaria, we are continually investing in efficient production facilities and bundling our development activities.

  • 93 94 95 96 97 98 99 00 01 02 03 04 05 06 07 08 09 10 11 12

    93 94 95 96 97 98 99 00 01 02 03 04 05 06 07 08 09 10 11 12

    10 11

    PERI continuous development since the founding of the companyInnovation. Internationalization. A very successful story.

    PERI can now look back on more than 40years of experience in the industry. The great innovative force of the company and early internationalization are the corner-stones of our global success and continu-ous growth.

    The high level of customer orientation, superior quality systems and great exper-tise have created the trust that has made the company a leading global brand.

    All of this would not have been possible without the performance of the many PERI

    Artur Schwrer, 1933 - 2009PERI GmbH company founder (1969)

    Working together successfully: the experience as well as the different approaches and ideas of our engineers result in cost-effective solutions for our customers.

    employees around the world who are char-acterized by a high level of motivation and team spirit.

    Dealing with each other is managed through a Compliance Management Sys-tem. This defines the principles of good cor-porate governance in all relevant areas such as anti-trust legislation, protection of busi-ness secrets and innovation, product safety, occupational safety, export control, data protection and much more. This applies to the company headquarters as well as all the PERI subsidiaries.

    International

    Year

    Year

    PERI in Weissenhorn in 1973, four years after the com-pany was founded.

    The Polish subsidiary was established in 1993. Today, there are more than 350 employees available for our local customers.

    Stockyard at PERI Cape Town, South Africa. The acquisi-tion of Wiehahn at the end of 2011 led PERI to directly becoming the leading provider in a number of African countries.

    Openness and trust in our dealings with one another, rec-ognizing the benefits to our customers as the potential for success, being bold and courageous in facing transformation and change we at PERI live the content of our guiding principles on a daily basis.

    1,0001,5002,0002,5003,0003,5004,0004,500

    5,000

    5,5006,0006,500

    1,350 1,5001,650 1,700

    1,9002,150

    2,5002,950

    3,345 3,5003,600

    3,8504,200

    4,700

    5,4005,800

    5,3855,500 5,700

    6,500

    1,1001,000

    1,200

    206 246252 252 276

    299353

    430496 526 535

    615

    760

    920

    1,110

    873 825

    1,220

    9771,052

    100200300400500600700800900

    500

  • 12 13

    PERIs international management team stands for vast experience and expertise in formwork and scaffolding technology. With detailed knowledge of local requirements, suitable systems for every construction project are developed while always taking into account the amount of material and labour costs required.

    PERI todayFamily-run. In the second generation. On-site worldwide.

    With over 50 subsidiaries, we are present on all continents with locally-based experts. From these international activities with widely differing require-ments of our customers regard-ing construction methods, materials and equipment utiliza-tion as well as labour costs, we generate our performance lead-ership.

    This profound knowledge in all areas and all markets is bundled together in product develop-ment processes which then benefit local users again eve-rywhere. With the aim: rationali-zation, simplification, quality, safety. Turning local insights into global knowledge.

    1969 - 1979 1997 - 19991980 - 1990 2000 - 20021991 - 1992 2003 - 20051993 2006 - 20071994 - 1995 2008 - 20111996 2012 - 2013

    Germany, 1969PERI GmbH

    USA, 1982PERI FormworkSystems Inc.

    Malaysia, 1991PERI FormworkMalaysia Sdn. Bhd.

    Sweden, 1993PERIform Sverige AB

    Korea, 1994PERI Korea Ltd.

    Brazil, 1996PERI Formas eExcoramentos Ltda.

    Australia, 1997PERI Australia Pty. Ltd.

    Ukraine, 2000PERI Ukraina

    Mexico, 2003PERI Cimbras y Andamios S.A. de C.V.

    Russia, 2006OOO PERI Russia

    Panama, 2008PERI Panam Inc.

    Colombia, 2012PERI S.A.S.

    France, 1974PERI S.A.S.

    Italy, 1983PERI S.p.A.

    Singapore, 1991PERI ASIA Pte. Ltd.

    Norway, 1993PERI Norge AS

    Portugal, 1994PERIcofragens, Lda.

    Argentina, 1996PERI S.A.

    United Arab Emirates 1997PERI (L.L.C.)

    Bulgaria, 2000PERI Bulgaria EOOD

    Latvia, 2003PERI SIA

    India, 2007PERI (India) Pvt. Ltd.

    Peru, 2008PERI Peruana S.A.C.

    Algeria, 2012SARL PERI

    Switzerland, 1974PERI AG

    United Kingdom, 1989PERI Ltd.

    Austria, 1992PERI Ges. mbH

    Poland, 1993PERI Polska Sp. z o.o.

    Canada, 1995PERI FormworkSystems Inc.

    Chile, 1996PERI Chile Ltda.

    Israel, 1999PERI Formwork andEngineering Ltd.

    Estonia, 2002PERI AS

    Serbia-Montenegro,2003PERI Oplate d.o.o.

    Kazakhstan, 2007TOO PERI Kazakhstan

    Albania, 2010PERI Formwork andScaffolding Sh. p. k.

    Saudi Arabia, 2013PERI Saudi ArabiaCompany Ltd.

    Spain, 1975PERI S.A.U.

    Turkey, 1990PERI Kalip ve IskeleleriSanayi ve Ticaret Ltd.

    Czech Republic, 1992PERI spol. s r.o.

    Denmark, 1993PERI Danmark A/S

    Romania, 1996PERI Romnia SRL

    Greece, 1999PERI Hellas SolelyOwned Ltd.

    Lithuania, 2002PERI UAB

    Croatia, 2004PERI Oplate i skele d.o.o.

    Qatar, 2007PERI Qatar LLC

    South Africa, 2011PERI (Pty) Ltd.

    Kuwait, 2013PERI KuwaitCompany Ltd.

    Belgium, 1979PERI S.A.

    Netherlands, 1979PERI Holding B.V.

    Hungary, 1990PERI Kft.

    Japan, 2005PERI Japan K.K.

    Belorussia, 2007IOOO PERI Belarus

    Finland, 1993PERI Suomi Ltd. Oy

    Slovakia, 1996PERI spol. s r.o.

  • 14 15

    Our goal: performance leadershipBest products. Best concepts. Best realization.

    The consistent orientation to the needs of our customers lies at the heart of our entire business operations. We successfully meet time and cost-saving requirements through the development of innovative products and continuous development of the PERI systems. Worldwide, around 900 PERI engineers develop solutions on a daily basis with project-specific analysis and customized accordingly. For optimal implementation of the planning, we provide the very best tech-nical, commercial and logistic range of ser-vices starting long before breaking ground and continuing well beyond the completion

    Project completion

    Customer support through the sales engineerMaterial on the jobsite of the customer

    Project initiation Project duration

    Our participation and provision of servic-es begins long before the actual ground-breaking ceremony and goes far beyond the project completion.

    of the project. The personal exchange of information along with the close proximity to our customers this is especially impor-tant to us.

    PERI not only develops practi-cal products and system equipment. Our services are very much focused on the development of project-specific concepts with formwork and scaffolding from a single source which provide our customers with a competitive edge.

  • 16 17

    PERI Products and SystemsWell thought-out in every detail. Efficient. Proven.

    We develop new products for applications with which we see rationalization potential with a real future. In this way, efficient system equipment with convincing and practical details is developed which maintain a strong position in the market over many years.

    T 70VWooden Lattice Girder

    KG 240Climbing Scaffold

    STERAPanel Formwork

    GRV Articulated Walerfor Circular Structures

    KGF 240 Climbing and Travelling Formwork

    PD 8Shoring Tower

    STERA PLUSPanel Formwork

    VARIO GT 24Wall Formwork

    AKF Tie-LessClimbing Formwork

    MODUL Aluminium Slab Formwork

    RAPID Aluminium Column Formwork

    GT 24Wooden Lattice Girder

    SKS Single-Sided Climbing Formwork

    TRIOPanel Formwork

    RUNDFLEXGirder Circular Formwork

    CBClimbing Scaffold

    ACSSelf-Climbing System

    SKYDECK Aluminium Slab Formwork

    MULTIPROPSystem

    ELPOSPlanning Software

    HD 200Heavy-Duty Props

    DK / SKTie Technology

    DOMINOPanel Formwork

    TRIOHousing

    VTTable Module

    FB 180Folding Platform

    PEPTubular Steel Slab Prop

    TRIOShaft Element

    VARIO QUATTROColumn Formwork

    TRIOPlatform

    SKYTABLESlab Table

    PERI CADPlanning Software

    PERI UP Frame and Modular Scaffolding

    UNO Monolithic Housing Formwork

    MAXIMO MXPPlatform

    VARIODECKSlab Table

    VARIOKITParapet Track

    VARIOKIT Heavy-Duty Shoring Tower

    PEP ErgoTubular Steel Slab Props

    MAXIMO MXSEShaft Element

    MPB 24Aluminium Beam

    RUNDFLEXPlus

    RCSClimbing System

    MAXIMOPanel Formwork

    VARIOKIT Engineering Construction Kit

    GRIDFLEXSlab Formwork

    PERI UP Rosett FlexIndustrial Scaffolding

    MAXIMOBracket

    MAXIMOMX 18 Tie Technology

    SKYDECKHandrail Unit

    PEP Ergo Slab PropFor use up to Load Class E

    LPSScreen

    SCS Single-SidedClimbing System

    VARIOKIT Balance Cantilever Equipment

    VARIOKITHeavy-Duty Truss Girder

    Brackets for LGSWeather Protection Roof

    ULS FlexLattice Girder

    1969 - 1979 1995 - 20041980 - 1994 2010 - 2012 2005 - 2009 2013

    The innovative MX tie technology, with ties installed at one side, significantly reduces the time and expense for the forming of walls. In addition, lost parts such as spacer tubes are no longer required.

    Our engineers take into consideration the total cost of materials and working hours in every product development - we call this the performance price. Result: the great-est possible reduction in effort and working time.

    PERI products are characterized through their innovative design, intelligent mechani-cal features and practical details manufac-tured with high quality standards and thus ideally suited for dealing with the tough everyday use on the construction site. Easy handling, maximum flexibility and, at the same time, safe application prove convinc-ing in the long-term.

    A clear indicator of this is that we have always been able to set standards in the industry with numerous innovations, and that the vast majority of PERI systems have firmly established themselves in the market.

  • 18 19

    Our engineers are confronted with a very wide range of tasks on a daily basis from all around the world and with different tech-nical and execution-relevant requirements. The challenge of finding technically and cost-effectively optimized solutions togeth-er with our customers is something that the PERI experts are very pleased to accept. And the continuous exchange among colleagues around the world ensures that the experience gained through this benefits all of our customers as well as every project regardless of the size.

    Our engineers plan and design optimized formwork and scaffolding solutions both from the technical as well as economic point of view, and frequently during the ten-dering phase. For the execution, we provide an extensive range of technical documenta-tion from construction drawings through to verifiable static calculations.

    PERI software provides easily understandable planning while automati-cally generated parts lists contain accurate quantities for all system components and facilitates easier material planning.

    PERI system equipment plus engineeringOptimized planning. For all requirements. Worldwide.

    The engineers at PERI use their know-how in order to support building contractors in the realization of their individual projects by means of the best possible solutions. In so doing, they always keep a careful eye on the processes and costs as well as safety for con-struction site personnel.

    Three-dimensional planning solutions lead to a better understanding of complex projects and their realization. The schematic representation of the structure of this form-work solution for an intake structure of a hydropower plant is a clear illustration of this.

  • 20 21

    PERI responsible for resultsExpert and qualified support. Services with added value. Efficient execution.

    Also for the implementation of the plan-ning, we provide the very best support: from the start of construction right through to the last return delivery. Our close-knit network of logistics sites ensures fast avail-ability of materials for every project. In many markets, our system equipment is also available to rent as a cost-effective option for peak demands or less frequent tasks. And our sales engineers and supervi-sors provide active on-site support thus enabling users to efficiently utilize PERI system equipment right from the start.

    With a combination of purchase and rental material models, project-specific require-ments and demand peaks, for example, can be fulfilled economically. PERI rental parks minimize the utilization risk for our custom-ers. Well-maintained equipment featuring state-of-the-art technology also provides a high level of safety during the execution.

    myPERI is an example of how PERI further optimizes formwork and scaffolding processes. The online portal simplifies construction work procedures, e.g. with illus-trated return delivery notes.

    The sales engineer is the first contact person also if there are questions regarding the use of the equipment on the jobsite.

    Our customers can expect reliability from us for all deliv-eries. If required, large quantities of material are also available just-in-time to the respective construction site.

    But we also think of the business manage-ment responsibility of our customers and support their controlling processes with performance-related invoicing and high transparency often online and around the clock. For large projects, project managers help to match the quantities of material to the actual requirements, and thus further optimize on-site material requirements and costs.

    Peak demands

    Material requirements

    System equipment for special applications

    Basic requirements

    TimeMaterials requirements on the construction site during the course of the project

    The service we provide simply does not end with the delivery. With PERI services, in particu-lar, we accompany and support our clients throughout the entire project and thus make a decisive contribution in ensuring an effective, safe and cost-effective realization.

  • 22 23

    PERI quality is a promise to our customersDurable. Proven. A worthwhile investment.

    The high quality of the PERI systems guar-antees a worthwhile investment. It is the basis for long product life cycles with high utilization rates. At PERI, quality begins with the careful selection of materials. Products are manufactured using real craftsmanship by our highly trained work-force who are supported by the availability of the most modern production facilities: Quality made by PERI.

    The entire process is subject to continuous quality assurance which is clearly defined and has been repeatedly certified, from pur-chase through to delivery. Fully galvanized components and powder coating for com-prehensive corrosion protection are exam-ples of how we guarantee the long service life of our formwork and scaffolding sys-tems. As a result, PERI systems can stand up to the tough everyday operations on the jobsite frequently over decades.

    PERI quality assurance already begins in the incoming goods operations. At this point, it is ensured that the raw materials correspond to the predefined PERI requirements.

    In the girder production, the timber strength is tested by means of an X-ray scanner. The non-destructive testing method leads to reliable conclusions about the quality of the sawn timber.

    The PERI systems are thoroughly tested through individ-ual test setups regarding their suitability for use in tough jobsite conditions, e.g. the MAXIMO tie point.

  • chafaudages

    DIN EN ISO 9001

    Reg.Nr. QM 950015

    zertifiziertes Qualittsmanagement

    syste

    m

    chafaudages

    DIN EN ISO 9001

    Reg.Nr. QM 950015

    zertifiziertes Qualittsmanagement

    syste

    m

    chafaudages

    DIN EN ISO 9001

    Reg.Nr. QM 950015

    zertifiziertes Qualittsmanagement

    syste

    m

    chafaudages

    DIN EN ISO 9001

    Reg.Nr. QM 950015

    zertifiziertes Qualittsmanagement

    syste

    m

    24 25

    The issue of sustainability has a firm place in our business processes. Product devel-opment is already focused on the best utili-zation of materials and thus the most eco-nomical use. Raw material selection and procurement is carried out in terms of eco-logical sustainability with timber, for exam-ple, coming mainly from certified growing regions.

    Sustainability as a basic principle: from the development to transportationResource-saving. Environmentally sound. Long-term ecological viability.

    Future viability as well as ecological and economic sustaina-bility have a high priority for all PERI business activities.

    New technologies and efficient production processes ensure the best quality and long service life of PERI system equipment which, in turn, has a positive effect on the consumption of resources. Delivery and construction site logistics are also opti-mized regarding shipping volumes and transportation routes. Strategically-posi-tioned sites guarantee short delivery dis-tances whereby transportation is also con-tinuously optimized through an intelligent logistics network.

    PERI systems have been designed to ensure a long ser-vice life. With panel formwork for example, even badly damaged elements can be used again for countless other applications after repairs have been carried out and with new formlining.

    The T 70 formwork girder is a good example of the lon-gevity of PERI Products. These girders were still being used in many rental parks long after the GT 24 had been launched as a further development.

    The design of the MULTIPROP prop serves as an exam-ple for optimized material utilization. The carefully thought-out form provides the prop with a high load-bearing capacity and offers the best connection possibil-ities for accessories. Closed circuits: the biomass power station at the

    Weissenhorn production site is a symbol for sustain-able action at PERI. From wood shavings a waste product from the girder production power and heat are generated in the power plant which contributes a significant part of the used energy mix at the pro-duction facilities.

  • 26 27

    PERI training and regular specialist exchangesInformative. Practice-oriented. Valuable.

    Technical innovation thrives on the know-how of the user. As part of the PERI Acade-my activities, we therefore help our cus-tomers to become familiar with the optimal use of our system equipment and latest technologies. In concrete terms this means: we organize seminars, workshops and prod-uct training courses in which we pass on specialist knowledge and provide practice-oriented training. In so doing, we support the users to efficiently implement PERI solutions on the construction site even when under time pressure.

    The programme is specially tailored to the individual tasks of the specialized personnel and managers in work preparation, site management, calculations and costings as well as the foremen, scaffolders and other craftsmen. Thereby, PERI specialists along with external experts explain current regula-tions, standards and current industry issues in great detail.

    This is our contribution regarding the exchange of important knowledge and experience for all those parties interested in formwork and scaffolding technology. And it corresponds to our understanding of real added value for our customers.

    PERI experts know every detail about the products and, in many training centres around the world, we are always extremely pleased to pass on this know-how to our customers. At our events, we also offer practical knowledge concerning regulations, standards and other current industry issues.

  • 28 29

    PERI competence with perspectiveKnow-how. Creativity. Foresight.

    The PERI experience is as diverse as the international world of construction and the maintenance. For high-rise buildings with complex shapes, for challenging bridge and tunnel structures, for the implementation of the highest architectural concrete require-ments as well as for ambitious scaffolding tasks we promise to provide you with the fullest possible support and the best solu-tions also in the future.

    To this end, we concern ourselves with innovations in a range of different areas: with new materials for our systems, mod-ern concrete technology as well as with the very latest manufacturing processes and raw materials for our production. Or with 5D planning or very special requirements, e.g. the shaping of gravity foundations for offshore installations. We will therefore continue providing you with the best solu-tions in the future.

    The construction of bridges and tunnels combines high demands on the supporting structure design and the shaping. PERI provides formwork and scaffolding tech-nology from a single source for infrastructure projects of any type.

    PERI specialists are valuable consultants and planners of climbing formwork solutions for high-rise buildings. With their experience and knowledge, they can find the most cost-effective solutions for a wide range of con-struction tasks.

    With the experience gained from countless global scaf-folding projects, our scaffold experts enable our custom-ers to realize projects with PERI UP scaffolding con-structions both economically and safely.

    Architectural concrete is an extremely popular design element. We pro-vide practical help for the realization of architectural concrete structures tai-lored to fully conform to the architectural specifica-tions.

    Trump Tower,Chicago, USA415 m

    World One Tower,Mumbai, India442 m

    Puente Baluarte,Mexico168 m

    Viaduc de Millau,France245 m

    Sea Towers,Gdynia, Poland138 m

    Turning Torso,Malm, Sweden190 m

    Dubai Tower,Dubai, UAE440 m

    Kao Ping Hsi Bridge,Taipei, Taiwan184 m

    Al Hamra Tower,Kuwait City, Kuwait412 m

    Plot 12,Moscow, Russia345 m

  • 30 31

    32

    50

    58

    70

    80

    90

    100

    106

    120

    128

    134

    146

    Wall Formwork

    Column Formwork

    Slab Formwork

    Shoring Systems

    Working Scaffold

    Access

    Safety Scaffold

    Climbing Systems

    Civil Engineering Technology

    Special Formwork

    System-Independent Accessories

    Services

    Systems and Services

  • 32 33

    Selection criteria for wall formwork systems

    Dimensions of the vertical structural elements to be shuttered

    Necessary adjustments in order to match ground plans

    Available crane capacityApplied fresh concrete pressureConcrete surface and tie position

    arrangement requirementsRequired construction time

    Originally, timbered wall formwork was comprised of boards and squared timbers. This has resulted in modular systems for a range of different requirements. Based on the respective construction, a distinc-tion is made between girder wall form-work and panel formwork.

    The girder wall formwork consists of timber and/or steel girders connected to each other that form the support surface for the formlining. The optimization of individual elements and the development of a wide range of accessories for connections and attachments still makes girder wall formwork cost-effective in spite of the relatively high number of components. A major advantage is the flexibility in order to be able to adapt to complex shapes and high loads. In partic-ular, architectural concrete structures with special requirements for surfaces and anchor patterns can often only be efficiently realized with girder wall formwork.

    The further reduction of the individual com-ponents resulted in wall formwork with welded frames made of steel or aluminium. Fixed panel sizes including formlining, sys-tem components for connections and wall connections, as well as other site-compliant detailed solutions, facilitate fast forming of large areas.

    With the afore-mentioned systems, not only can walls, beams and columns be realized. They are also used for vertical structures in civil engineering as well as, with appropriate support structures, for single-sided constructions.

    Wall Formwork

  • 34 35

    MAXIMO Panel FormworkTime-saving forming with MX tie technology as well as the best concrete finishes

    FasterTies installed from one side without spacer tubesEfficientSystemized, reduced number of tie pointsClean finishImproved concrete finish, neat joint and tie arrangement

    In spite of lower site personnel require-ments, MAXIMO is much faster than con-ventional panel formwork. The one-sided tie installation by only one person reduces the time required and, in addition, opens up new possibilities for realizing visibly remain-ing concrete surfaces with panel formwork.

    The special MX tie is installed from one side only and is used without spacer tubes and cones. As a result, both material requirements and costs are reduced as well as saving time.

    The MX shaft corner allows complete sets of shaft formwork to be moved quickly. Attaching and releasing is easily done from a safe position on the working level.

    The BFD coupler provides a flush, aligned and tight connection in one simple operation. For standard panel joints, filler timber compensations up to 10 cm, extensions, external and internal corners as well as articulated corners.

    MX 15 and MX 18 Wingnut

    The defined arrangement of individual MAXIMO panels allows the visually appealing design of concrete surfac-es with a clean concrete finish without any impressions due to unused tie holes or the occurance of concrete bleeding through non-sealed tie points.

    Depending on the fresh concrete pressure or wall thickness, the MX 15 or MX 18 tie is used whilst a removable sealing allows quick adaptation to accommodate the two tie sizes.

    With MX tie technology featuring ties installed from one side for wall thick-nesses from 15 cm to 60 cm, thicker walls with DW ties

    Minimum use of filler timbers with 6 panel heights from 30 cm to 3.00 m as well as 5 panel widths

    Maximum permissible fresh concrete pressure 80 kN/m

    Neat and tidy joint and tie arrangement with reduced number of anchor com-ponents

    Centrally-arranged tie points ensure an attractive concrete finish

    Each tie point must be used, closing of unused anchor positions is not required

    One-sided tie operations with wall thickness adjustment

    System components for wall connec-tions, T-junctions and corners

    Brackets and platforms available for ensuring safe working conditions

    Reliable closing technology

    Fully compatible to TRIO panel form-work

    Can be used with the MX and DW tie systems

    Powder-coating of the elements pre-vents concrete adhesion and makes cleaning easier

    Wall Formwork

  • 36 37

    TRIO Panel FormworkFast forming operations due to large-sized elements with only one connecting part

    TRIO is a universal formwork system which places the highest emphasis on uncompli-cated forming operations and the reduction of shuttering times. With the BFD coupler for all connections and many other system solutions, TRIO has successfully proven itself in the 25 years since it was intro-duced to the market.

    Wall heights up to 3.30 m can be formed with TRIO 330 without any height extensions and with only two tie positions. The 3.30 m high panel can also be combined with the 2.70 m version.

    The TRIO aluminium is the lightweight version with yellow powder coating. It is compatible with the steel variant and can be used with the same accessories.

    The TRIO shaft element for quickly moving complete sets of shaft internal formwork: by pulling the shaft corners, this results in a striking clearance of 30 mm, and the unit can be moved in one crane lift.

    Few different components and, in particular, the univer-sal BFD alignment coupler which can be operated with one hand, ensure quick and easy forming operations with TRIO.

    Equipped with platform systems, TRIO provides maxi-mum safety for the construction team. Complete large-area moveable units with working platforms, access ladders and guardrails are moved from cycle to cycle.

    TRIO 270

    6 panel heights from 0.30 m to 2.70 m and 5 panel widths minimize filler timber requirements

    Maximum permissible fresh concrete pressure 80 kN/m

    Can be used with DW 15 and DW 20 tie systems

    Panels can be used both horizontally and vertically

    System components available for wall connections, T-junctions and corners

    Brackets and platforms available for ensuring safe working conditions

    Powder-coating of elements makes clean-ing easier

    TRIO Variants

    TRIO 330Concreting up to a height of 3.30 m with only 2 tie positionsBest level of evenness with very high permissible fresh concrete pressure

    TRIO AluminiumVery lightweight formwork with yellow powder coating for crane-independent working

    TRIO HousingConically-shaped ties installed from one side on the groundElement with securely mounted working platforms and push-pull propsFormlining screwed on at the rear

    TRIO StructureTRIO panels with free choice of formlining for special concrete

    surface requirements supplied already pre-assembled

    Wall Formwork

    Easy and simpleOnly one connecting part the BFD alignment couplerGenerously-dimensioned2.40 m x 2.70 m panelsCleverMinimum of panel sizes, well thought-out range of accessories for flexible use

  • 38 39

    Wall FormworkDOMINO Panel FormworkLightweight panel formwork for building construction and civil engineering

    DOMINO is the lightweight panel formwork for use in building construction and civil engineering, and for every ground plan. Guaranteed efficient use even without a crane. With only 4 panel widths and inset tie points, foundations are also extremely easy to realize.

    LightweightLow dead weight and only 4 panel widthsPractical1 component for all connections the DRS alignment couplerSimpleInset tie points, extensive range of accessories

    Lightweight aluminium panel formwork (yellow), can also be moved by handAccessories such as corner and stopend panels as well as compensations are availablePanels can be used horizontally and vertically due to inset tie pointsMaximum permissible fresh concrete pressure 60 kN/mEasy cleaning due to powder-coated elementsDRS alignment coupler for standard joints, external and internal corners, obtuse and acute-angled corners,

    stopend formwork, timber compensations and extensionsUsed with DW 15 tie systemAlternatively, the DKS wedge connector is used for standard panel connections with lower load-bearing

    requirements (e.g. for foundations)

    DOMINO elements are also highly suitable for forming foundations.In particular, the 1.25 m high panels complete with inset tie points are an advantage here, as they can be used very flexibly.

    DOMINO panels are extremely light but nevertheless still have a high load-bearing capacity.The aluminium 250 x 100 panel only weighs 59 kg.

    The small-sized, easy to handle panels from PERI DOMINO in use for a low sub-basement.

    1.25

    m

    0.75 m

  • 40 41

    Wall FormworkLIWA Panel FormworkLightweight wall formwork with cleverly designed corner solution

    HANDSET Panel FormworkVariable foundation formwork with a minimum of panels

    Where previously timber, boards and nails dominated shuttering operations, in extreme cases only one man works by hand but nevertheless with system. In particular, small surfaces can be realized in an extremely effective way.

    SystemizedA minimum of panel widths ensure a high level of utilizationCleverOnly one connecting part is used for all panel connections the HANDSET clip FunctionalContinuous adaptability of the panels through the Nonius grid pattern

    LIWA is the lightweight panel formwork with only few panel widths and a very sim-ple corner design: at the same time, each standard panel is also a multi-purpose panel with a perforated strip. In the process, the low number of different-sized panels accel-erates the material planning and ensures easy storage in the stockyard and on the construction site.

    With the LIWA multi panels, columns from 15 x 15 cm up to 55 x 55 cm can be formed in 5 cm increments. The columns are anchored with corner connectors and standard DW 15.

    The brackets allow fast installation of concreting scaffold and provide a very high level of safety for the user.

    VersatileLow weight, with only 4 system heights and 5 panel widthsSpecial featureEach standard panel is, at the same time, a multi-purpose panel with a perforated stripSimpleInset tie points, extensive range of accessories

    Forming by hand due to the low weightCan also be used for columns through multi-purpose panels without requiring any

    special panelsStandard panel joints with wedge connector, compensations up to 5 cm with the

    wedge clamp compensation and length compensation up to 25 cm with compen-sation waler are executable

    Internal corners and T-junctions with corner panelsScaffold brackets, push-pull prop connections, crane suspension and wall thickness

    compensator are availableMaximum permissible fresh concrete pressure 50 kN/mUsed with the DW 5 tie systemPowder coating of the elements ensures easy cleaning

    Forming by hand thanks to the low weightThe clip creates flush connections and closes very tightlyExtensions in 30 cm incrementsNo drilling of additional tie holes required due to the pactical tie point arrangements

    in the panelsMaximum permissible fresh concrete pressure 40 kN/mHigh utilization rate due to few panel sizesPush-pull prop connections and scaffold brackets are available

  • 42 43

    VARIO GT 24 Wall FormworkFlexible girder wall formwork, also for high-grade architectural concrete surfaces

    VARIO GT 24 standard panels are available already pre-assembled in various sizes. The inexpensive standard panels are designed for a permissible fresh concrete pressure of 60 kN/m and concrete surfaces without requirements. The technical characteristics correspond to those of the VARIO GT 24 girder wall formwork.When using the VARIO GT 24 girder wall formwork for project-specific, optimally-sized large elements, the following points are freely selectable:

    Girder length and spacingWaler position, profile and lengthType and size of the formliningFormlining fixingsPanel widths and heights, position of a possible extension or panel removalPermissible fresh concrete pressureHorizontal and vertical tie arrangement

    The project-specific constructed 14 m high VARIO elements were designed for a fresh concrete pressure of 150 kN/m and fitted with large-sized Fin-Ply Maxi formlining sheets.

    The VARIO GT 24 formwork with defined formlining joint formation and tie positioning was specially-designed to meet the project requirements and resulted in an excellent architectural concrete finish.

    In addition to walls in building construction, VARIO GT 24 elements find many applications in civil engineering, e.g. for a bridge pier as shown here.

    With the continuously adjustable panel con-nections, VARIO GT 24 allows the forming of all designs and applications. It can be used as formwork project for industrial and residential construction, bridge abutments or retaining walls, for each ground plan and all heights. Formlining, girder spacing as well as tie positions are freely selectable.

    Cost-effectiveVariable arrangement of formwork girders and walersAdaptableTie positioning and joint pattern design according to planning requirementsWell thought-outElongated hole in walers and couplings allow continuous compensation; the panel connection is flush, aligned and tight

    Flexible panel widths according to the length of the SRZ / SRU steel walersFlexibility regarding the height of the panels which is determined by the

    GT 24 girder length (standard lengths 0.90 m to 6.00 m in 30 cm increments; special lengths up to 17.80 m)

    Project-related planning and mounted with regard to the required fresh concrete pressure

    Use of the rigid GT 24 formwork girder leads to a minimization of the number of waler lines and tie points

    Elongated holes in the steel walers and panel couplings allow 100 % tension and compression-proof panel connections resulting in tight panel joints

    Tie positions can be adjusted according to project requirements

    Wall Formwork

  • 44 45

    RUNDFLEX Circular Wall FormworkContinuously adjustable circular formwork for radii greater than 1.00m without panel alterations

    RUNDFLEX functions with pre-assembled standard panels which can be quickly adjusted to match all required radii. Particularly effective in structures with con-tinuously changing radii, such as sewage treatment plants.

    Uncomplicated3 different panel widths and 1 connection partReliableContinuous radii adjustment of all panelsVariableFlexibly adjustable for wall internal radii of 1.00 m and more

    Pre-assembled panelsMaximum permissible fresh concrete pressure 60 kN/m5 panel heights (0.60 m / 1.20 m / 1.80 m / 2.40 m / 3.00 m / 3.60 m) and 3 panel widths (external: 2.50 m / 1.28 m / 0.85 m)Radii can be quickly adjusted by means of spindles and a templatePanel connections and compensations up to 10 cm with the BFD alignment couplerPre-determined tie pointsHorizontal extensions up to 7.80 m panel heightsComponents available for working and concreting scaffold as well as for providing support

    3.60 m high RUNDFLEX formwork for construction of a sewage treatment plant with a radius of 13.76 m.

    Spindles are adjusted using the combi ratchet spanner SW24.

    A radius template is used to check that the curvature is as specified.

    With RUNDFLEX, more complicated geometries with variable radii can also be cost-effectively realized.

    Wall Formwork

  • 46 47

    GRV Articulated Waler Circular FormworkEconomical forming without ties,for all radii, also with special formwork

    RUNDFLEX Plus Circular FormworkEasy to use and quick adjustment of all radii with diameters greater than 2.50 m

    GRV realizes both large and small radii via a closed formwork ring without any tie points and thus facilitates significant savings even with special formwork, e.g. for vaults or arched bridges.

    Cost-effectiveClosed formwork ring without tiesContinuously adjustableCan be adjusted for minimum inside concrete radii of 0,90 mVersatileCan be used for all possible arched structures

    4 different articulated walers allow a range of inside concrete radii from 0.90 m to 2.10 m

    Cost-effective alternative without ties for watertight tanksCan also be used for arched bridge constructionSimple and fast adjustment of the GRV articulated walerTensile ring forces up to 300 kN can be accomodated

    With its adjustable standard panels, RUNDFLEX Plus avoids cost-intensive reassembly or special formwork modifica-tions. The result, even for large radii: perfectly formed curvatures without any additional measures.

    User-friendlyLow number of ties: only 0.54 per m wallVery efficientLow number of spindles, easy radii adjust-mentCost-effectiveAnchoring above the top edge of the panel saves one tie installation in the concrete

    Maximum permissible fresh concrete pressure 60 kN/m5 panel heights (1.20 m / 1.80 m / 2.40 m / 3.00 m / 3.60 m) and 2 panel widths (external: 2.50 m / 1.25m)Can be adapted to suit changing radii from 2.50 m onwards without any panel alterationsSupplied already pre-assembled ready to useFormlining is screwed on at the rearEasy and simple radii adjustment by means of spindles and a templatePanel connections and compensations with the BFD couplerSpecified tie points and push-pull prop connectionsWorking and concreting scaffold as well as components for extensions and support are available

    The working platforms can be securely mounted to the horizontally-positioned panels. The pre-assembled platforms suit all radii.

    PERI GRV articulated waler is frequently used in combi-nation with GT 24 lattice girders for a wide range of bridges and arched formwork.

    A complete working and concreting scaffold programme with platforms, guardrails and access ladders ensure safe working conditions with the RUNDFLEX Plus.

    For the GRV circular formwork, there are four different articulated walers that allow the realization of different arc radii down to a minimum of 0.90 m for the articu-lated waler with a length of 300 mm.

    The GRV circular formwork is used for the construction of circular structures without the use of ties. The exter-nal as well as internal tensile ring forces are accommo-dated via the closed ring of walers.

    With RUNDFLEX Plus, the formlining is screwed on at the rear. This results in high-quality concrete surfaces without any screw or rivet impressions.

    Wall Formwork

  • 48 49

    Wall FormworkSB Brace FrameReliable concreting of single-sided walls up to 8.75 m high

    RS Push-Pull PropsA complete programme, can be telescoped to reach a length of 14.00 m

    PERI Tie Technology For all wall formwork

    PERI push-pull props have been designed in particular regarding a long service life, low maintenance costs and easy handling. All work is carried out safely from the ground and without ladders, working scaffold or lifting platform.

    Extremely quickRough adjustment in 10 cm increments within seconds, fine adjustment with just a few turnsDurableGalvanized to ensure a very long service lifeSafeAll length extensions are carried out safely on the installation areaVariablePush-pull prop adapter and quick connector head allow safe assembly also on prefabri-cated concrete elements

    SB brace frames transfer the fresh concrete pressure into the sub-structure and founda-tions during single-sided concreting of com-ponents. This is a big advantage when using both vertical formwork as well as horizontal platforms.

    CompatibleCan be combined with MAXIMO, VARIO, TRIO, DOMINO, RUNDFLEX and RUNDFLEX PlusFastAll required connection parts are already mounted on the brace frameMobileAll individual components have been designed for ideal truck and container loading

    The DK sealing cone system is:waterproofgas impermeablefire-resistantsoundproofsuitable for architectural concrete

    The SK tie cone system is:waterproofgas impermeablefire-resistantsoundproofsuitable for strongrooms and architectural

    concrete

    The DK and SK tie systems serve to ensure subsequent, reliable sealing of tie points. The tie points are sealed with concrete cones using a specially-developed sealing compound.

    Guaranteed leak-proofWaterproof and gas impermeable, fire-resistant, soundproof and diffusion-proof as well as approved for drinking waterAppropriate availabilityCones and spacer tubes for a range of tie diameters are available

    Used for attractively designed visible concrete surfaces.

    The choice of the most suitable anchoring system is determined by the ten-sile force applied on the brace frame.

    Against pressing water, for walls with a soundproofing function as well as walls with Fire Resistance Class F90.

  • 50 51

    Column Formwork

    Key criteria when selecting a column formwork

    Dimensions and cross-section of the column to be formed

    Resulting fresh concrete pressureRequirements on the concrete surfaceRequired construction timeAvailable crane capacities

    Fast concreting with comparatively small column cross-sections leads to a high fresh concrete pressure on the formwork. Therefore, the joints in particular are to be formed very carefully in order to avoid leakage problems.

    Column formwork is comprised of panel formwork elements or based on individual formwork girders. In addition, for particularly high demands on the pouring rate, even-ness and concrete surfaces, steel formwork is also available.

    The quick and easy adjustment of the cross-section and height with the least possible number of system components is an important criterion for the versatility of a column formwork. Furthermore, high demands are often placed on the concrete surface. As conventional fixing of the form-work results in impressions of screws and nails being left in the concrete, systems were also developed that allow flawless surfaces to be realized.

  • 52 53

    Column FormworkRAPID Column FormworkPerfect concrete surfaces for highly demanding requirements without any nail or screw impressions

    PERI RAPID for continuous column cross-sections up to 60 cm x 60 cm, square-shaped or rectangular. Through the unique patented clamping principle, the formlining is simply clamped to the frame.

    Fast3 frame heights provide ideal height adjustments, the plywood is cut-to-size and clamped in positionCrane-independentBasic assembly by hand with site-compliant, lightweight aluminium elementsNeat and tidyFreely-selectable formlining for the highest architectural concrete requirements without any imprints of nails or screws, neat joint and tie arrangement

    Lightweight column frame made of aluminiumContinuous square-shaped or rectangular cross-sections up to 60 cm edge length

    (58 cm for sharp edges), oversized cross-sections from 85 cm to 135 cm with an additional anchor

    Cut-to-size formlining sheets for architectural concrete results, for extensions above the joints

    Maximum permissible fresh concrete pressure 120 kN/mFor sharp edges or broken edges with chamfer stripPowder-coated frame makes cleaning easier

    QUATTRO Column FormworkThe column formwork which can be moved as a complete unit

    For contractors, PERI QUATTRO means enormous time-savings when using the crane because the complete column including the push-pull props and concret-ing platform is moved in only one crane lift. With PERI transportation wheels if necessary even by hand.

    Time-savingMoveable as a complete unit, can be opened and closed with the minimum of effortVariableRegardless whether square or rectangular, cross-sections from 20 cm x 20 cm to 60 cm x 60 cm, in 5 cm incrementsSafeConcreting platform with integrated access ladder and ladder safety cage

    For square or rectangular cross-sections in 5 cm increments with edge lengths ranging from 20 cm to 60 cm

    4 different element heights (0.50 m / 1.25 m / 2.75 m / 3.50 m)Height adjustments in 25 cm increments up to 4.50 mMaximum permissible fresh concrete pressure 80 kN/mAlso moveable by hand using transportation wheelsFor architectural concrete surfaces thanks to the formlining being screwed

    on at the rearAccess ladder and concreting platforms availablePowder-coated frame makes cleaning easier

  • Kapitel

    54 55

    Column FormworkVARIO GT 24 Column FormworkAll heights, all cross-sections, regardless whether square or rectangular-shaped

    LICO Column FormworkLightweight column formwork for cost-effective forming by hand

    With its low individual element weights, PERI LICO is ideal for assembling and dismantling by hand, and ensures that crane non-availability is not a problem at all.

    Practice-orientedPractical details simplify the use and reduce shuttering timesFlexibleOnly 3 different element heights cover all required concreting heightsCombinableCross-sections in 5 cm increments up to 60 cm x 60 cm, square or rectangular-shaped

    The LICO column tie bolts and nuts are permanently attached to all panels and cannot be lost.

    With additional centrally-arranged ties, cross-sections of up to 60 cm x 130 cm can be formed.

    Lightweight column formwork for forming without a craneFor square and rectangular column cross-sections in 5 cm increments

    from 20 cm x 20 cm to 60 cm x 60 cm; over 60 cm with additional tiesHeight increments of 50 cm with 3 different element heights

    (0.50 cm / 1.00 m / 3.00 m)Can be extended up to 4.50 m Maximum permissible fresh concrete pressure 80 kN/mEye bolts on all elements serve as load-bearing points for moving with

    the crane as well as for element connections when extendingChamfer strip is simply mounted on the panelPowder-coated frame makes cleaning easy

    Complete formwork unit, foldable, connected to one another

    Rectangular or square cross-sections in 5 cm increments from 20 cm x 20 cm to 120 cm x 120 cm

    Permissible fresh concrete pressure 100 kN/m

    Excellent concrete surface quality thanks to high-grade formlining

    PERI VARIO QUATTRO is extremely cost-effective as it can be moved as a complete unit in one crane lift and provides excellent architectural concrete finishes with sharp or chamfered edges.

    User-friendlyClosed in a few simple steps and re-opened after concreting has taken placeVariableCross-sections in 5 cm increments up to 120 cm x 120 cm, square or rectangular-shapedSafe and reliableConcreting platform and access ladder with ladder safety cage

    Rectangular and square cross-sections, continuously adjustable up to 80 cm x 120 cm

    Permissible fresh concrete pressure 100 kN/m

    Construction with VARIO standard components as well as wedges and tie yokes

    Free choice of formlining

    VARIO QUATTRO Column FormworkFor large cross-sections and architectural concrete surfaces

    With the PERI VARIO GT 24 column form-work, a very wide range of cross-section dimensions and concreting heights can be shuttered without any time-consuming adjustment work.

    Continuously variableColumn cross-sections up to 80 x 120 cmStandardizedOnly 2 ties per waler position from the VARIO programmeRobustDesigned for fresh concrete pressure 100 kN/m, adaptable to suit higher concrete pressures

  • 56 57

    Column FormworkSRS Circular Column FormworkHigh production quality for ensuring perfect concrete surfaces

    PERI SRS as formwork for circular columns prevents the freshly-poured concrete from escaping thanks to the special design of the panel joints which results in the realization of perfect concrete surfaces.

    VariableColumn diameters in 5 cm increments from 25 cm to 70 cm, also special dimensionsTwo-pieceFast assembly with only two column halves and integrated spannerExtendable4 panel heights allow height adjustments in 30 cm increments

    With the captive bolt, the telescopic supporting struts of the concreting platform can be adjusted very quickly to suit all column diameters.

    Thanks to the special design of the panel joints, the freshly-poured concrete is prevented from escaping. This results in the best quality surfaces.

    Crane-independent steel circular column formworkStandard diameters from 25 cm to 70 cm in 5 cm increments; special sizes

    up to 120 cm diameters availablePanel heights up to 8.40 m dependent on diameter, extendable in 30 cm

    incrementsMaximum permissible fresh concrete pressure 150 kN/mEasy and simple closing of the two formwork halvesConnecting possibilities for push-pull props and concreting platformsTie yoke with self-cleaning hexagonal thread, permanently attached to the panelPowder-coated frames keep the cleaning process to a minimum

    TRIO Column FormworkElements for walls and columns, cross-sections up to 75 cm x 75 cm

    The PERI TRIO column formwork complements the TRIO wall form-work system, panels with 90 cm widths can also be used in the wall formwork. Height increments in this case are 30 cm.

    VersatileCross-sections up to 75 cm x 75 cm in 5 cm increments, square or rectangular-shapedCleverNo nailing of chamfer strips thanks to the specially-designed PERI chamfer strip and clamping mechanismUsefulConcreting platform is continuously adjustable, integrated ladder for safe access

    The chamfer strip is simply inserted on the panel. Cham-fered edges can be realized without any time-consuming and labour-intesive nailing of chamfer strips.

    For square or rectangular cross-sections in 5 cm increments with edge lengths from 20 cm to 75 cm

    3 different panel heights (0.60 m / 1.20 m / 2.70 m)Height adjustments in 30 cm increments up to 8.10 m with the BFD alignment

    couplerMaximum permissible fresh concrete pressure 100 kN/mColumn panels can also be used as 90 cm wide wall panelsSharp edges or chamfered edges with the chamfer strip can be realizedThrough the use of special nuts, the formwork panels can easily be connected

    using one handPowder-coated frames keep the cleaning process to a minimum

  • 58 59

    Slab Formwork

    Selection criteria for a slab formwork system

    Geometry such as the spatial dimensions (narrow, spacious), lateral limitations (open, closed) and the form of the slab surface (rectangular, polygonal, curved)

    Required slab thickness and floor heightRequirements on the slab soffitCrane capacity and possibilities for

    strikingRequired cycle timeRequired adjustments, e.g. to beams,

    offsets, cantilever slabs, infill areas or building supports

    Essential elements for slab formwork are the horizontal load-bearing structure and the support system. The horizontal con-struction supports the formlining and safely transfers the forces into the shor-ing which in turn carries the loads into the ground or components that have already been completed. Scaffolding and platforms form working levels and protect the user against falling or from falling objects.

    Crosswise-mounted individual wooden or aluminium girders used as slab formwork have proven their worth over many years now. This construction with main and sec-ondary beams allows the use of any form-lining and also provides a high degree of flexibility regarding geometric adjustments that have to be carried out. Through the continuous optimization of the individual parts, girder formwork is still cost-effective today in spite of the high number of compo-nents involved.

    Slab tables are also produced based on the same design principle, which includes the provision of a load-bearing system available in standard sizes or a project-related approach is taken with customized ele-ments. However, slab tables are only used in a larger-scale, open design form of con-struction as they have to be moved to a cra-neable position after being used underneath the slab.

    Furthermore, various system formwork was developed featuring panels or girder grids. The recurring assembly sequence facilitates extremely fast shuttering times whilst the aluminium and steel materials used ensure a long service life for the system compo-nents.

  • geprfteSicherheit

    BG-PR

    FZERT

    Bau98051

    60 61

    SKYDECK Aluminium Panelized Slab FormworkThe lightweight and proven aluminium panelized slab formwork with the short forming times

    Slab Formwork

    SKYDECK is easy and safe to install. The panels clip onto the outward projecting teeth and are immovably fixed in position. Handling is quickly mastered, even by personnel unfamiliar with this system.

    With SKYDECK edge beams (75 cm and 150 cm lengths), shuttering of columns is a simple procedure. The infill areas are closed by means of 21 mm thick formlining.

    Safety also at slab edges: the SKYDECK platform serves as working and safety scaffold, and saves the installation of additional safety platforms or netting.

    Working with SKYDECK is easy and non-tir-ing resulting in fast, safe forming operations with a systematic assembly sequence. The well thought-out design with drophead allows early striking and reduces on-site material requirements. The small prop requirements simplifies the horizontal transportation of formwork materials.

    FastDepending on the slab thickness and strength of the concrete, early striking is possible after only one dayLightweightAll components are made of aluminium; panels and main beams weigh less than 16 kgEfficientWith a systematic assembly sequence and fewer slab props

    Panel slab formwork for slab thicknesses up to 42 cm in standard application, as well as up to 109 cm with 150 cm main beam and 75 cm panel width

    Lightweight and easy-to-handle individual componentsSystematic assembly sequence and high degree of safetyFewer prop requirements in a standard area with only 0.29 props per m

    (with 225 cm main beams)Early striking with the drophead systemMinimum cleaning effort due to powder coating of the main beams, and self-draining

    edges on the panels and main beamsAccessories for fast longitudinal and width compensations, and closing of residual

    gaps such as shuttering of columnsHigh level of safety at slab edges with cantilevered girders and platformsQuick and simple change of direction of the panels

    Shuttered: the panels and cover strips form the soffit of the concrete.

    Drophead lowered: the cover strips and dropheads remain in position while the panels and beams are struck.

    60 m

    m

  • 07044

    62 63

    GRIDFLEX Grid Element Slab FormworkThe flexible, cost-effective slab formwork with simple assembly and a high level of working safety

    Slab Formwork

    For slabs up to 67 cm thickOnly 2 system components required for placing the girder grid in a standard field:

    prop head and a GRIDFLEX standard elementSimple assembly with systematic installation sequence from the slab belowErgonomic assembly with lightweight individual components: the standard element

    weighs only 20 kgFree choice of formliningThrough the change in the forming direction, filler areas are reduced to a minimumAs the compensation elements are telescopic, all filler areas can be closed using

    only two filler elementsFor the slab edges, the guardrail is pre-mounted on the ground and then pushed

    upwards together with the elementFixing to the building by means of the wall holder; alternatively, with bracing

    GRIDFLEX allows the forming of spatula and wallpaper-suitable slabs up to 67 cm thick. The system features a low number of individual components with forming operations safely taking place from below, and thus ensures very short shuttering times and maximum work safety.

    SafeAbsolutely safe installation in all assembly phasesUncomplicatedFew system components: prop head, one standard and two filler elementsVariableFast adaptation to any structural formCompatibleFree choice of formlining corresponding to customers request and project requirements

    With GRIDFLEX, the elements are hooked in from below and pushed upwards into position.

    All parts are moved by hand and have a particularly lightweight design.

    After the complete assembly process has taken place from below, the closed element grid can be safely accessed for installing the formlining.

    GRIDFLEX is GS-approved and has received several awards as an innovative and very safe system.

    The red transverse infill and the yellow longitudinal infill ensure a high level of flexibility.

  • 64 65

    MULTIFLEX Girder Slab FormworkThe universal girder slab formwork system for any ground plan and all floor heights

    Slab Formwork

    Can be optimized for realizing all slab thicknesses and shapes through the selection of girder and girder combination

    Cost-effective due to inexpensive and reusable componentsFree choice of formlining Infill areas are easily shuttered through the use of girders

    With MULTIFLEX, every slab thickness, any ground plan and all floor heights can be formed. The system allows large spans which thus reduces the number of parts to be moved. As a result, MULTIFLEX stands for economical working operations for all requirements.

    Load-bearingLarge spans result in a reduction in the number of componentsUtilization benefitsFewer girders and props (depending on slab thickness)AdaptableCan be adapted to suit every ground plan due to overlapping of the girdersFreely selectableChoice of formlining according to needs and requirements

    The choice of girder is based on project-specific requirements: the GT 24 lattice girder allows large spans and thus reduces the number of parts to be moved. The VT 20K girder is the cost-effective solution for smaller slab thicknesses.

    MULTIFLEX can be adapted to suit all ground plans. The telescoping of the slab girders or the change in the direction of the main beams ensure maximum flexibility.

    The use of GT 24 girders as main and cross beams ensure that large spans are possible.

    The use of the load-bearing GT 24 girder as a twin main beam, in connection with PERI UP Rosett Flex shoring, facilitates the transfer of heavy loads over great heights.

    With the flexclip, MULTIFLEX is even safer as it prevents the cross beam from tilting. The anti-tilt device is available in three versions for different girder combinations.

  • 66 67

    VARIODECK Steel Waler Slab TableThe consistent further development for large formwork areas and heavy pre-fabricated parts

    Table Module VT Slab TableThe completely pre-assembled, immediately ready-for-use standard table for a low number of re-uses

    Slab Formwork

    Pre-assembled slab tables with lengths of 4.00 m and 6.00 m along with 2.15 m or 2.65 m widthsUp to 50 cm slab thicknesses with only 4 slab props through the use of the high load-bearing MULTIPROP props, thicker slabs

    possible with additional propsCan also be used with the MULTIPROP system or PERI UP Rosett Flex shoringSimple width compensation of up to 50 cmFast moving from storey to storey with the table lifting forkEasy horizontal transportation throughout the storey by means of the table trolley, table lift or transportation wheel on the shoring

    Pre-assembled slab table with lengths of 4.00 m and 5.00 m, with widths of 2.15 m or 2.65 mUp to 50 cm slab thicknesses using only 4 props with thicker slabs possible with additional supportCan be used for floor heights of up to 5.00 mWith bracing can also be used as cantilevered edge tableFast moving from storey to storey in a horizontal position with the table lifting forkEasy moving procedure using the table trolley, table lift or transportation wheel on the shoringCan be used with the swivel head or alternatively with the more inexpensive, immovable TK table head

    VARIODECK moves large formwork areas with one crane lift extremely quickly, and can be used for slabs up to 50 cm thick with only 4 slab props for table sizes of around 16 m. If required, thicker slabs can also be concreted with the addition of more support.

    Ready for useTables are supplied already pre-asembledStrongFor large cantilevers and heavy pre-fabricated parts such as parapetsSafeWorking platforms are integrated in the systemCompactCan be moved easily and quickly with props folded up

    Table modules have been specially designed for projects with a low number of re-uses. They are completely pre-assembled and are ready-to-use when delivered to the construction site. Four standard sizes are available with guardrails being securely mounted for cantilevered modules.

    CompleteCompletely pre-assembled in 4 standard sizesCan be extendedThe 5 m table with integrated table swivel head for use as cantilevered edge tablePracticalFoldable slab props for moving under beams

    One VARIODECK table provides a formwork area of up to 15.90 m. The longitudinal steel walers (U 120 pro-files) allow large cantilevers as well as accommodating higher loads.

    The lifting fork moves the table in one lift onto the next floor. The slab props can be folded and easily mounted and dismantled thanks to the table swivel head.

    Being able to divide the table swivel head has several advantages: the head can also be used with another top part for radial girder arrangements whilst the lower part can be pre-mounted on the slab prop.

    Push-pull props or bracing can be mounted on the table swivel head.

    The TK table head is the inexpensive alternative. It securely connects props and slab table to each other.

  • 68 69

    SKYTABLE Slab Table150 m slab table moved quickly and safely with one crane lift

    Accessories for slab tablesEquipment for ensuring safe moving procedures

    Slab Formwork

    For slab thicknesses up to 40 cmProject-related adjustment of the table size up to 24.40 m x 6.10 mLoad transfer via MULTIPROP post shores which are mounted to the truss girders

    by means of quick release devicesCan also be used for larger slab heights by connecting the MULTIPROP post shores

    with framesEasy moving throughout the storey by means of a transportation trolleyTransport into the next storey using the radio remote-controlled lifting mechanism

    and crane

    SKYTABLE facilitates the forming of large areas. With only 2 truss girders, up to 150 m can be safely moved in a single crane pick workers are not required to stand on the table at any time during the moving procedure.

    Fast150 m with only one crane lift, easy lower-ing without effort and a large lowering rangeSafeRemote-controlled moving procedure with personnel always working from a safe and secure position at the slab edgeAdaptableDifferent floor heights, large heights with shoring towers

    The table lift is a flexible, reliable and easy-to-steer lifting mechanism complete with electric drive and allows fast moving even in tight spaces.The cost-effective table trolley is used for the horizontal transportation and alignment of the slab tables, and the adjustable chassis also allows the passage through small openings. For moving tables into the next storey, transportation forks are used.

    With an electric drive and hydraulic lifting device, the PERI table lift provides an effortless and convenient way of moving slab tables.

    The transportation forks are always in a horizontal posi-tion when not in use and when transporting a slab table.

    The table is flown out of the building by crane with help of the lifting mechanism and the single roller. The mov-ing procedure is very safe as workers are not required to stand on the slab table at any time.

    The truss girders can be connected to one another resulting in tables up to 24.40 m long. With a width of 6.10 m, almost 150 m can be formed with one table.

  • 70 71

    Selection criteria for the creation of shoring systems

    Required height of the shoringLoads to be transferredBoundary conditions such as the contact

    area and other spatial conditions for the assembly

    Possibilities for assembly and disman-tling, e.g. use of crane and accessibility

    Required working and storage areas as well as access possibilities

    Shoring consists of temporary structural elements that can be set up and disman-tled at their point of use. They support the formwork for concrete support struc-tures until sufficient hardening has taken place or transfer loads from components and equipment during the construction, maintenance or demolition of structural works. Load-bearing elements are props, shoring towers or modular scaffolding.

    Apart from tubular steel props, aluminium props are used which can be connected by means of frames and also utilized as a shoring tower or formwork table. Shoring towers can also be realized using frame supports by means of connectors. For very high loads, e.g. in bridge construction, heavy-duty props are frequently used.

    Enormous flexibility is offered through the use of modular scaffolding, ranging from a simple shoring tower through to complex spatial shoring, and can be adapted to suit virtually any geometry as well as different loads.

    Shoring Systems

  • 72 73

    Shoring SystemsPEP/PEP Ergo Slab PropsMade of galvanized steel with high load-bearing capacity and low weight

    MULTIPROP Post ShoresUsed as a cost-saving lightweight individual prop and cost-effective shoring tower

    PEP props / PEP Ergo props fully comply with Load Class B, D, E of DIN EN 1065

    Available in lengths of 1.50 m, 2.50 m, 3.00 m, 3.50 m, 4.00 m and 5.00 m

    Generous 12 cm adjustment rangeAnti-crush device with a safety

    clearance of 10 cm provides pro-tection against injury

    Long service life through complete galvanization

    Tripods or frames available as instal-lation aids

    MULTIPROP post shores fully comply with Load Classes T 25, R 35, D 45 and D 60 according to DIN EN 1065

    Leg loads up to 91 kg in accordance with the type test

    Available in lengths of 1.20 m, 2.50 m, 3.50 m, 4.80 m and 6,25 m

    Building authority approvedProvides 36 mm of adjustment with

    every turnThe powder coating makes the prop

    insensitive to concrete depositsContinuously adjustable, i.e. without

    any re-positioning of pinsCan be erected as square or rectan-

    gular towers through the use of frames

    Galvanized tubular steel props with numer-ous practical features for fast and safe handling. The complete galvanization of all surfaces guarantees a long service life. The low weight whilst maintaining a high load-bearing capacity makes it extremely cost-effective.

    RobustPEP props can carry up up to 50 kNTrend-settingAdjusting nut with lowering nib and captive handgripWell thought-outProp heads can be mounted on the inner and outer tubes

    MULTIPROP post shores are made of alu-minium which means they are very light, e.g. the MP 350 weighs only 19.40 kg and has an extension length of up to 3.50 m. Ingeniously designed details ensure a long service life.

    High load-bearingUp to 91 kN in accordance with the type testWell thought-outSelf-cleaning thread and robust, free-run-ning collarPracticalThe integrated measuring tape on the inner tube shows the complete length of the propExpandableWith MULTIPROP frames, can also be used as a shoring tower

    The integrated measuring tape allows exact prop adjustment without any time-consuming measuring and unnecessary lengthy re-adjustments.

    The shape of the lowering nut shows the direction for lowering when under load and allows damage-free and gentle lowering of materials.

    19.50 m high MULTIPROP towers as shoring with SKYDECK slab formwork for a cantilevered slab.

    In addition to the tripod, the PRK frame can be used as an assembly aid.

    For erection of a tower, MULTIPROP frames are mounted using the captive wedge. Frames can be attached to both the outer and inner tubes without requiring changes to be made to the ground plan.

  • 74 75

    Shoring SystemsPD 8 Slab Table, Shoring and Stair TowerThe proven shoring system for large loads

    ST 100 Stacking TowerThe efficient shoring system consisting of framed supports with few system components

    For use in shoring assemblies, free-standing or restrained at the topAssembled for all permissible heights with only one stacking frame type,

    horizontally or verticallyAssembly height in accordance with type test up to 22.29 m, square ground

    plan of 1.00 m x 1.00 m Completely galvanized and thus maintenance-free

    Modular system for the erection of scaffolding structures as slab tables, shoring towers or stair towers

    With just two frame sizes and two spindles along with large spindling lengths, covers all heights from 1.55 m onwards

    As shoring tower up to 21.30 m high and for loads up to 62 kN

    Can be erected as stair tower up to 100 m high with units pre-assem-bled on the ground

    Flexibly adapted using few system components as slab table

    Fast assemblyBy simply fitting the components together with no pins and connectorsQuickly plannedEvery working height is simple to plan without the need of combination tablesQuickly explainedOnly 5 system components for any height

    Depending on the load-bearing requirements and assembly height, work can also be carried out without diagonals and thus with only 4 parts.

    The ST 100 also safely and reliably transfers loads from great heights.

    The stacking frame weighs less than 7 kg which facilitates ergonomic and fast assembly.

    Through the installation of the horizontal additional ledg-ers, horizontal loads in the system can be transferred.

    PERI ST 100 has been designed for fast assembly and dismantling. The individual components are simply fitted together without tools and make utilization also at low heights very cost-effective.

    PERI PD 8 stands for the solution with large units and high clearances. With the help of flexibly used system components, the application as shoring or stair tower as well as slab table is very economical. SimpleStandard connecting parts, same frame HugeUsed as slab table for high clearances and in large movable unitsHigh load-bearing capacityAs shoring tower for heights over 20 m and loads more than 60 kNHighAs stair tower up to 100 m high

    A trolley and winch unit facilitates fast moving of the PD 8 scaffold constructions.

  • 76 77

    Shoring SystemsPERI UP Rosett Flex ShoringThe maximum level of flexibility in shoring solutions

    As free-standing tower in accord-ance with the type test up to 8.39 m, restrained at the top up to a height of 21.89 m (22.34 m with spindle extension)

    As shoring tower with additional frames or framework unit for high vertical and/or horizontal loads

    Project-specific planning as spatial load-bearing structure for virtually all geometries and loads

    PERI UP Rosett Flex is the universal modu-lar scaffolding for a wide range of tasks. It makes shoring assemblies with lightweight scaffold materials extremely cost-effective. The system grid dimensions of 25 cm and 50 cm allows optimum adaptation to differ-ent geometries and loads.

    VariableFrom shoring towers to complex spatial load-bearing structures, adaptable to suit almost all geometries and loadsModularExtremely flexible in all three dimensions through the uniform grid size

    In areas of load concentrations, standards are bundled together with short 25 cm ledgers.

    Thanks to the modular design, the scaffold can be optimally adapted to suit all loads.

    Due to the low number of different individual compo-nents, PERI UP shoring towers can be quickly assem-bled. Decking levels can be integrated as needed.

    PERI UP shoring towers have been type-tested for heights of up to 21.89 m; up to two additional frames can be attached. A third assembly variant is the framework unit; these are based on shoring towers which are connected in one direction and thus configured as one segment.

    Dimensionally stableCan be moved in large units due to the high rigidity of the ledger connectionsCompatibleCoordinated with PERI formwork systems for optimized transfer of loads

  • 78 79

    Shoring SystemsHD 200 Heavy-Duty PropThe lightweight prop for loads up to 200 kN

    VARIOKIT Heavy-Duty TowerHeavy-duty shoring for civil engineering projects

    PERI HD 200 is the solution for higher loads. The low weight and easy handling of the prop facilitates fast assembly. The props are very flexible in their application from structural renovation through to bridge construction. The individual props can be connected to form main beam areas.

    UncomplicatedTool-free assembly of the individual sections with captive connectionsVery lightThe large aluminium section only weighs 29 kg and can be mounted by handExtremely practicalEven loads of 20 t can be lowered in a controlled manner a simple procedure with a cordless screwdriverVery tight connectionsCan be coupled with system main beams for longer structures

    An HD 200 main beam tract carries the slab formwork, and s