1 february 10-11, 2015 revisions to rps calculator (v6.0) workshop

13
1 February 10-11, 2015 Revisions to RPS Calculator (v6.0) Workshop

Upload: julius-trice

Post on 15-Jan-2016

215 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: 1 February 10-11, 2015 Revisions to RPS Calculator (v6.0) Workshop

1

February 10-11, 2015

Revisions to RPS Calculator (v6.0) Workshop

Page 2: 1 February 10-11, 2015 Revisions to RPS Calculator (v6.0) Workshop

2

INTRODUCTION

Page 3: 1 February 10-11, 2015 Revisions to RPS Calculator (v6.0) Workshop

Introduction

• Housekeeping• Workshop purpose and agenda• History of RPS Calculator (versions 1 – 5)• Current use of RPS Calculator in CPUC/CAISO Processes

Page 4: 1 February 10-11, 2015 Revisions to RPS Calculator (v6.0) Workshop

Safety and Emergency Information

• In the event of an emergency, please calmly proceed out the exits.

• We have four exits: Two in the rear and one on either side of the speakers.

• In the event that we do need to evacuate the building:– Our assembly point is Jefferson Square Park on Turk and Gough Streets. – For the Rear Exits - Head out through the courtyard, and down the front

steps. Continue west on McAllister Street. Turn north onto Franklin Street. Turn west onto Turk Street and proceed to Gough Street.

– For the Side Exits - Go out of the exits and you will be on Golden Gate Avenue. Proceed west to Franklin Street. Turn north onto Franklin Street. Turn west onto Turk Street and proceed to Gough Street.

Page 5: 1 February 10-11, 2015 Revisions to RPS Calculator (v6.0) Workshop

Emergency Exit Routes

Page 6: 1 February 10-11, 2015 Revisions to RPS Calculator (v6.0) Workshop

Other Information

WiFi Access• login: guest• password: password

RPS Website• http://www.cpuc.ca.gov/PUC/energy/Renewables/• All presentations are available on the RPS website

RestroomsOut the Auditorium doors and down the far end of the hallway.

Page 7: 1 February 10-11, 2015 Revisions to RPS Calculator (v6.0) Workshop

Call-In Information

Phone• Conference Number: (866) 778-0461• Participant Code: 3664376#

WebEx Day One• https://van.webex.com/van/j.php?MTID=m35d5f7d8db6fc62df0197b3eba8aa6

89• Meeting Number: 746 187 316• Meeting Password: !Energy1

WebEx Day Two• https://

van.webex.com/van/j.php?MTID=m53896a0c1e307eb697b4f1e3149581db• Meeting Number: 748 876 520• Meeting Password: !Energy1

Page 8: 1 February 10-11, 2015 Revisions to RPS Calculator (v6.0) Workshop

Purpose of Workshop

A. Discuss stakeholder comments on RPS Calculator v6.0*B. Identify functionality needed in v6.1 for

1. 2016-2017 Long Term Procurement Proceeding (LTPP) 2. 2016/2017 California Independent System Operator Transmission

Planning Process (CAISO TPP)

C. Discuss and identify areas for further coordination across PUC proceedings and with sister agencies

D. Discuss role of RPS Calculator in facilitating the achievement of State RPS goals

*Additional responses to stakeholder comments available in Technical Notes document on RPS web page

Page 9: 1 February 10-11, 2015 Revisions to RPS Calculator (v6.0) Workshop

Workshop PlanPurpose Agenda Item

A. Discuss stakeholder comments on RPS Calculator v6.0

II. RPS Calculator v6.0 Functionality

DAY ONE

B. Identify functionality needed in v6.1

III. Implications of Energy-Only Procurement

DAY TWOC. Identify areas for

further coordination IV. Intra-CPUC Alignment

D. Discuss role of RPS Calculator

V. >33% Statewide Transmission Planning

Page 10: 1 February 10-11, 2015 Revisions to RPS Calculator (v6.0) Workshop

Agenda Overview

DAY ONE• Calculator Overview• Resource Costs and

Potential• LUNCH (12-1)• Resource Costs and

Potential (cont’d)• BREAK (3:15)• Resource Valuation

DAY TWO• Resource Valuation (cont’d)• Energy-Only Procurement and

Transmission Planning• BREAK (10:45)• CAISO Energy-Only Planning• LUNCH (12-1)• Process Alignment• BREAK (3:15)• Role of RPS Calculator in

Statewide 33% RPS Transmission Planning

Page 11: 1 February 10-11, 2015 Revisions to RPS Calculator (v6.0) Workshop

RPS Calculator Past and Present

• 2009: RPS Calculator created by CPUC RPS staff– Informed 33% RPS Implementation Assessment

• 2010: RPS Calculator integrated into LTPP proceeding– Output used to inform LTPP system and CAISO

transmission planning efforts• 2014 (Jan): RPS Calculator added to RPS Proceeding

– Calculator design & administration is now part of RPS proceeding. RPS now supports LTPP’s planning efforts.

• 2014 (Oct): RPS Calculator v6.0 staff proposal issued• 2015 (Feb): RPS Calculator v6.0 Workshop

Page 12: 1 February 10-11, 2015 Revisions to RPS Calculator (v6.0) Workshop

How RPS Portfolios are Used in Long-Term Planning Studies

RPS

• Vets and adopts RPS Calculator methodologies, inputs and assumptions annually and develops RPS portfolios

• RPS submits portfolios to LTPP for generation planning

LTPP

• Vets and adopts combinations of assumptions (including RPS portfolios) to construct multiple scenarios for use in long term planning analysis

Output

• LTPP scenario analysis informs CPUC procurement authorizations• LTPP scenarios (with associated RPS portfolios) are provided to

CAISO for use in TPP. TPP may approve new transmission infrastructure if needed to serve scenario/case.

Page 13: 1 February 10-11, 2015 Revisions to RPS Calculator (v6.0) Workshop

RPS Calculator Next Steps

• 2015 Q3: Issue draft v6.1 with draft portfolios for comment• 2015 Q4: Finalize and adopt v6.1 and associated portfolios via

ruling (tentative, pending workshop comments)• Additional rulings will be issued later this year seeking

comments on outstanding Calculator-related issues (e.g., environmental scoring) and scheduling additional workshops as needed.