1 ercot pricing and dashboard updates natf sept 30, 2010

12
http://nodal.ercot.com 1 ERCOT Pricing and Dashboard Updates NATF Sept 30, 2010

Upload: lillian-ray

Post on 17-Jan-2018

221 views

Category:

Documents


0 download

DESCRIPTION

Market Update –Nodal MIS is offline Oct 1-12 –Oct 12 th MIS comes back online with data for applicable markets being executed Digital certificate required to access Subset of validated dashboards (more details in later slides) –ERCOT.com will be activated for subset of pricing reports No digital certificate required

TRANSCRIPT

Page 1: 1 ERCOT Pricing and Dashboard Updates NATF Sept 30, 2010

http://nodal.ercot.com 1

ERCOT Pricing and Dashboard Updates

NATF

Sept 30, 2010

Page 2: 1 ERCOT Pricing and Dashboard Updates NATF Sept 30, 2010

• Market Update– ERCOT.com access to nodal pricing data– Prices: ICCP vs WebServices and User Displays

• Dashboards for Go-Live

Page 3: 1 ERCOT Pricing and Dashboard Updates NATF Sept 30, 2010

• Market Update– Nodal MIS is offline Oct 1-12

– Oct 12th MIS comes back online with data for applicable markets being executed

• Digital certificate required to access• Subset of validated dashboards (more details in later slides)

– ERCOT.com will be activated for subset of pricing reports

• No digital certificate required

Page 4: 1 ERCOT Pricing and Dashboard Updates NATF Sept 30, 2010

• Prices: ICCP vs WebServices and User Displays– Concerns recently expressed from Board/PUCT leadership

regarding “level-playing field” for price availability– ERCOT currently evaluating:

• Performance of current dashboard connected to reports/webservices– Measure the timing difference between price delivery

• Considering viability of creating an ICCP – MIS dashboard connection • If ICCP/Web solution incompatible, potential consideration of an NPRR for

removal of prices from ICCP (command/control/dispatch data only)

– Recent issue that all prices still available via ICCP• NPRR169 clarified delivery of LMPs for Reports/Web vs. ICCP• Removed prices from ICCP except for Resource Node QSEs for their

resource• ICCP has not been aligned with this protocol change (will be considered in

context of ICCP price delivery evaluation)

– No current recommendation from ERCOT (in progress)

Page 5: 1 ERCOT Pricing and Dashboard Updates NATF Sept 30, 2010

• MIS Dashboard update– Requirements from TPTF 2008 used to develop (10/13/2008):

System Ancillary Service Capacity Monitor SCED Up/Down Day-Ahead & Real-Time LMPs LMP Contour Map Load Forecast vs. Actual LMP Ticker Frequency DC TiesWeather

• This week ERCOT market staff engaging quality of data and evaluating if there are gaps– Note there were no requirements to transfer Zonal existing zonal displays – under consideration– Re-connecting ticker/graphs to LMPs from Electrical Buses to Load Zones, Resource Nodes, DC Tie

• Reports changed behind display impacting display

– Contour map – evaluating population of points/location, quality of data, price sensitivity in display– Validating data behind load forecast– Evaluating all gaps/defects and then prioritizing for rapid delivery

• Plan for initial deployment Oct 12, and subsequent improvements prior to go-live• Evaluating public deployment of dashboard (accessible via ERCOT.com)• Design issues/concerns can be forwarded to:• [email protected] ; [email protected] ; [email protected]

Page 6: 1 ERCOT Pricing and Dashboard Updates NATF Sept 30, 2010

Appendix of screenshots (work-in-progress)

Appendix of Examples

Page 7: 1 ERCOT Pricing and Dashboard Updates NATF Sept 30, 2010

System Ancillary Service Capacity Monitor SAMPLE screen

Page 8: 1 ERCOT Pricing and Dashboard Updates NATF Sept 30, 2010

SCED up/down SAMPLE screen

Page 9: 1 ERCOT Pricing and Dashboard Updates NATF Sept 30, 2010

Day-Ahead & Real-Time LMPs SAMPLE screen

Page 10: 1 ERCOT Pricing and Dashboard Updates NATF Sept 30, 2010

LMP Contour Map SAMPLE screen

Page 11: 1 ERCOT Pricing and Dashboard Updates NATF Sept 30, 2010

Load Forecast vs. Actual SAMPLE screen

Page 12: 1 ERCOT Pricing and Dashboard Updates NATF Sept 30, 2010

LMP Ticker SAMPLE screen