1 Dot Hill Confidential 3Y PSU Weekly KPI week 06 Presented by:XX Date: 20 Nov. 2011

Upload: gordon-mclaughlin

Post on 05-Jan-2016

229 views

Category:

Documents


1 download

TRANSCRIPT

Page 1: 1 Dot Hill Confidential 3Y PSU Weekly KPI week 06 Presented by:XX Date: 20 Nov. 2011

1Dot Hill Confidential

3Y PSU Weekly KPIweek 06

Presented by:XX

Date: 20 Nov. 2011

Page 2: 1 Dot Hill Confidential 3Y PSU Weekly KPI week 06 Presented by:XX Date: 20 Nov. 2011

2Dot Hill Confidential 2

Measurement

Shortage & Build Plan (CTB)Process YieldRMAECR/ECO& Rev Change ListORT&HASA

PSU Weekly KPI

Page 3: 1 Dot Hill Confidential 3Y PSU Weekly KPI week 06 Presented by:XX Date: 20 Nov. 2011

3Dot Hill Confidential 3

The Gray is shipped

The Green is planned to build and ship

The pink is assumed to build, quantity need further confirmation.

PSU Weekly KPIShortage & Build Plan (CTB)

Shortage and build plan

Page 4: 1 Dot Hill Confidential 3Y PSU Weekly KPI week 06 Presented by:XX Date: 20 Nov. 2011

SMT

Page 5: 1 Dot Hill Confidential 3Y PSU Weekly KPI week 06 Presented by:XX Date: 20 Nov. 2011

23/4/20July 24, 2007

Dot Hill Confidential 5

SMT yield Trend

Trend chart – AOI and FQA

Unavailable

Next production schedule March

Page 6: 1 Dot Hill Confidential 3Y PSU Weekly KPI week 06 Presented by:XX Date: 20 Nov. 2011

23/4/20July 24, 2007

Dot Hill Confidential 6

SMT Process Top Failure FACA

FACA – AOI and FQA

Unavailable

Next production schedule March

Page 7: 1 Dot Hill Confidential 3Y PSU Weekly KPI week 06 Presented by:XX Date: 20 Nov. 2011

23/4/20July 24, 2007

Dot Hill Confidential 7

Assembly – front end yield Trend Until before pre-test

Page 8: 1 Dot Hill Confidential 3Y PSU Weekly KPI week 06 Presented by:XX Date: 20 Nov. 2011

23/4/20July 24, 2007

Dot Hill Confidential 8

Assembly front end -- Process Top Failure FACA

Wave solder DPPM trend chart

5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27

total solder points焊錫點 293540

defective count不良數 255

DPPM焊錫不良 869

component qty零件數

defective count 不良數

DPPM作業不良 #DIV/0! ##### ##### ##### ##### ##### ##### ##### ##### ##### ##### ##### ##### ##### ##### ##### ##### ##### ##### ##### ##### ##### #####

TOTAL 869 ##### ##### ##### ##### ##### ##### ##### ##### ##### ##### ##### ##### ##### ##### ##### ##### ##### ##### ##### ##### ##### #####

Target目標 950 950 950 950 950 950 950 950 950 950 950 950 950 950 950 950 950 950 950 950 950 950 950

類別

焊錫不良solder defect

作業不良workmanship

869 869

0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0

200

400

600

800

1000

5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27

焊錫不良DPPM

作業不良DPPM

TOTAL

目標Target

YM-3591AAR

Page 9: 1 Dot Hill Confidential 3Y PSU Weekly KPI week 06 Presented by:XX Date: 20 Nov. 2011

23/4/20July 24, 2007

Dot Hill Confidential 9

week周別 type類別不良數量qtydef

完成時間due

責任人

responsible

5W sol der defect 30i mmediatel y

胡鑫

5W sol der defect 26i mmediatel y

胡鑫

corrective改善措施action

rootcause analysis原因分析主要不良位置description及現象

no sol dersol der contract t i me notenough

adj ust sol der t i me

sol der bri dgesol der contract t i me notenough

adj ust sol der t i me

Wave solder FA Analysis

Page 10: 1 Dot Hill Confidential 3Y PSU Weekly KPI week 06 Presented by:XX Date: 20 Nov. 2011

Assembly – back end yield Trend

Page 11: 1 Dot Hill Confidential 3Y PSU Weekly KPI week 06 Presented by:XX Date: 20 Nov. 2011

Assembly Backend – Test yield trend chart

FPY Trend chat

97.90%

98.00%

98.10%

98.20%

98.30%

98.40%

98.50%

98.60%

98.70%

Target

Yield

Target 98.17% 98.17% 98.17% 98.17% 98.17% 98.17% 98.17% 98.17%

Yield 98.61%

05 06 07 08 09 10 11 12

31

63 2 1 1 1

68.89%

82.22%88.89%

93.33% 95.56% 97.78% 100.00%

0

5

10

15

20

25

30

35

0.00%

10.00%

20.00%

30.00%

40.00%

50.00%

60.00%

70.00%

80.00%

90.00%

100.00%

Q'ty 31 6 3 2 1 1 1

Rate 68.89% 82.22% 88.89% 93.33% 95.56% 97.78% 100.00%

材料不良 空焊 元件損壞 錯件 貼反 漏件 誤判

Defect Pareto

Page 12: 1 Dot Hill Confidential 3Y PSU Weekly KPI week 06 Presented by:XX Date: 20 Nov. 2011

Defect corrective action

Defect item Q'ty Root cause Corrective action Status

材料不良materialdefect

31主要為T901*4pcs來料線反導致開機測試無輸出Major is T901*4pcs. Wire reverse,fail to boot

針對此不良,反饋廠商100%測試改善,料號8LM0249703GP,廠商益宏Feedback to vendor, 100% screen lot8LM0249703GP, vendor HongYi

closed

空焊insufficentsolder

6主要為SMD零件U107,U106,R227,R286空焊,Major U107, U106, R227 ,R286

反饋產線,領班,員工和IPQC進行檢查SMD零件Yield is above set target.inform line leader/operator/IPQC tocheck to monitor solder printing

closed

元件損壞damage

3 零件損壞為於轉運中受損 damage duringtransfer

反饋產線,領班,員工和IPQC進行檢查,落實於流水線中用托盤進行轉運,避免碰傷零件inform lineleader/operator/IPQC to ensure usageof PCBA tray

closed

Final test raw data

Page 13: 1 Dot Hill Confidential 3Y PSU Weekly KPI week 06 Presented by:XX Date: 20 Nov. 2011

OBA

23/4/20July 24, 2007

Dot Hill Confidential 13

Page 14: 1 Dot Hill Confidential 3Y PSU Weekly KPI week 06 Presented by:XX Date: 20 Nov. 2011

23/4/20July 24, 2007

Dot Hill Confidential 14

DPPM Trend chart OBA

30300 0 0 0 0 0 0 0 0 0 0 0 0780 780 780 780 780 780 700 700 700 700 700 700 700 700 7000

12000

2400036000

480006000072000

8400096000

108000120000

03000

60009000

120001500018000

2100024000

2700030000

總抽驗數 總不良率(DPPM) GOAL DPPM

Page 15: 1 Dot Hill Confidential 3Y PSU Weekly KPI week 06 Presented by:XX Date: 20 Nov. 2011

23/4/20July 24, 2007

Dot Hill Confidential 15

Assembly – Final test yield Trend

OBA failure tracking

日期date

機型model

批量qty

抽樣數s

不良數def

不良描述 descr

不良原因 Failure analysis

改善措施action

責任單位dept

2012/1/5

GP.YM-3591AAR

440 50 1

均流測試燈不滅Test current LED on

將 U405 IC 加錫後機台橙色燈恢復正常橙燈不滅是由於 IC U405 假焊導致,屬SMD 異常U405 cold solder

1. 已將不良反饋各測試站作員要求後續 100% 檢查燈不的不良現象,各測試站均需查此項避免不良再次流出 2. 此批返工檢查Feedback to front endWork order 100% screenSMD prevention action --

TBD

SMD

Page 16: 1 Dot Hill Confidential 3Y PSU Weekly KPI week 06 Presented by:XX Date: 20 Nov. 2011

23/4/20July 24, 2007

Dot Hill Confidential 16

RMA

Page 17: 1 Dot Hill Confidential 3Y PSU Weekly KPI week 06 Presented by:XX Date: 20 Nov. 2011

RMA trend DPPM and failure analysis –DC PSU

0200400600800

10001200140016001800

2011

.7~12

W 12

01

W 12

02

W 12

03

W 12

04

W 12

05

W 12

06

W 12

07

W 12

08

W 12

09

W 12

10

W 12

11

W 12

12To

tal

Manu month 2011.7~12 W 1201 W 1202 W 1203 W 1204 W 1205 W 1206 W 1207 W 1208 W 1209 W 1210 W 1211 W 1212 Total

Shipment 3206 300 0 0 0 0 3506

total Returned 5 0 0 0 0 0 5

MTHLY kPPM 1560 0 #DIV/0! #DIV/0! #DIV/0! #DIV/0! #DIV/0! #DIV/0! #DIV/0! #DIV/0! #DIV/0! #DIV/0! #DIV/0! 1426

Page 18: 1 Dot Hill Confidential 3Y PSU Weekly KPI week 06 Presented by:XX Date: 20 Nov. 2011

RMA defect analysis – DC PSU

No. RMA#ReceiveDate(接收日期)

Original 3Y SN(原始 3Y 標籤序號)

3YRev.(3Y版本)

DateCode(周期)

Q'ty

Customerreported((FieldSymptom)(顧客不良描述)

Key ComponentLocation(關鍵失效元件

位置)備註

1 R111102001 11/02/11 SA000E161132MY01FQ A 1132 1 Amber LED NDF2 R111102001 11/02/11 SA000E161132MY0177 A 1132 1 IIC fail re-test IIC3 R111102001 11/02/11 SA000E161132MY015L A 1132 1 CASE distortion chassis CASE4 R111102001 11/02/11 SA000E161132MY019V A 1132 1 Amber LED +5VIC 不良5 R111227001 12/23/11 SA000E161141MY02X7 A 1125 1 IIC fail re-test IIC

YM-3571AAR RMA Returned Record

2011.7~12

Remark : Randcmn defect no action required

RMA DC PSU raw data

Page 19: 1 Dot Hill Confidential 3Y PSU Weekly KPI week 06 Presented by:XX Date: 20 Nov. 2011

RMA trend DPPM and failure analysis -- AC PSU

Week 2011.7~12 W 1201 W 1202 W 1203 W 1204 W 1205 W 1206 W 1207 W 1208 W 1209 W 1210 W 1211 W 1212 Total

Shipment 4900 800 0 0 0 0 5700

total Returned 143 0 6 0 8 7 164

MTHLY kPPM 29184 0 #DIV/0! #DIV/0! #DIV/0! #DIV/0! #DIV/0! #DIV/0! #DIV/0! #DIV/0! #DIV/0! #DIV/0! #DIV/0! 28772

YM-3591AAR RMA Returned Data

0

5000

10000

15000

20000

25000

30000

35000

數列1

Page 20: 1 Dot Hill Confidential 3Y PSU Weekly KPI week 06 Presented by:XX Date: 20 Nov. 2011

RMA defect analysis –AC PSUPROBLEM 2011.7~12 W 1201 W 1202 W 1203 W 1204 W 1205 W 1206 W 1207 W 1208 W 1209 W 1210 W 1211 W 1212 Total %

F101,Q120 22 0 2 0 2 4 30 18%NDF 22 0 0 0 1 1 24 15%R441 17 0 1 0 1 0 19 12%Q111 10 0 0 0 3 1 14 9%F401 7 0 0 0 0 0 7 4%Q104 5 0 0 0 0 0 5 3%R278 4 0 0 0 0 0 4 2%F101,Q121 3 0 0 0 0 0 3 2%U109 3 0 0 0 0 0 3 2%Re-test IIC 2 0 0 0 0 0 2 1%other 48 0 3 0 1 1 53 32%

共: 164

F101,Q120, 18%

NDF, 15%

R441, 12%

Q111, 9%F401, 4%Q104, 3%

R278, 2%F101,Q121, 2%

U109, 2%Re-test IIC, 1%

other, 32%

F101,Q120

NDF

R441

Q111

F401

Q104

R278

F101,Q121

U109

Re-test IIC

other

AC PSU RMA raw data

Page 21: 1 Dot Hill Confidential 3Y PSU Weekly KPI week 06 Presented by:XX Date: 20 Nov. 2011

23/4/20July 24, 2007

Dot Hill Confidential 21

NO. PROBLEM fail Q'ty Root Cause Corrective Action Remark

1 F101,Q120 303YU Q120 ,RD .Q120有送不良的 回台灣做分析 正在處理中defect part under analysis by RD

2 NDF 24 N/A

1. -- visual ok檢查電源外觀 沒有發現問題2. -- .no short檢查錫面和零件面 沒有發現短路和相碰現象or part touch adjacent part

3.B/I 24H , .B/I24 hrs . PSU function後電源有正常輸出normal

4. (H/P,ATE ) PASS. Retest H/P, ATE按正常流程測試 等 都是passes

5. . Return back to customer退還給客戶

3 R441 19

R441 ,因 零件上點有白膠而點白膠治具易與零件相, .R441 epoxy application process碰造成零件受損

nozzle contact R441 and casue damage

, MOI .Update生產時此位置不能點白膠並在 上特別定義MOI to not allow epoxy

RMA Top Failure FACA

Page 22: 1 Dot Hill Confidential 3Y PSU Weekly KPI week 06 Presented by:XX Date: 20 Nov. 2011

22

Dothill PN:81-00000052 Emerson Mfg PN:7001540-J000

Week Issue Description: Root Cause Corrective Actions Owner Due Date Status(RYG)

WW26 … … … ongoing

RMA Issue Action Tracking List

PSU Weekly KPI

Page 23: 1 Dot Hill Confidential 3Y PSU Weekly KPI week 06 Presented by:XX Date: 20 Nov. 2011

23/4/20July 24, 2007

Dot Hill Confidential 23

Production DFM

Page 24: 1 Dot Hill Confidential 3Y PSU Weekly KPI week 06 Presented by:XX Date: 20 Nov. 2011

Production DFM review

3Y production optimisation data collection review

序號sn

發文日期Date

文件編號EC ref no

發文者issue by 機種名稱

model 研發單位RD team

責任人responsible 問題描述description 臨時對策containment

plan 永久對策 Longterm action

預計完成日期 target

completiondate

實際完成日期

compeltiondate

異常級別class grade 結案狀況

1 2010/5/20 胡紹文 YM-2751AAR RD1 范文鵬

初測站測試SB12V電壓低6.6V,范圍為(6.8V-7.1V),Initital test SB12V below6.6V , spec 6.8V-7.1V. In-process detection

N.A.請產線針對12V Shunt 吃錫量減少,使等效阻抗變大 ,間接讓OP的電壓提升。Reduce shuntlength increase Voltage.

2010/5/30 2010/28/30 一般minor Close

Page 25: 1 Dot Hill Confidential 3Y PSU Weekly KPI week 06 Presented by:XX Date: 20 Nov. 2011

25

PSU Weekly KPIECO monitoring

Update on: Updated By:

Item: DH PN: Mfg PN: ECR/ECO No#: Content: Phase in Date: FAI SN: Updated Rev: Status:

Remark: For the newest update in this week, please use blue font, or else, mark the font in black.

EC & Rev Control Table2012/2/8 XX

Remark : No EC as of year 2012

Page 26: 1 Dot Hill Confidential 3Y PSU Weekly KPI week 06 Presented by:XX Date: 20 Nov. 2011

262626

ORT – DH procedure still pend 3Y commitCurrent data is 3Y curretn test data for year 2012

Dot Hill Confidential

PSU Weekly KPI

Page 27: 1 Dot Hill Confidential 3Y PSU Weekly KPI week 06 Presented by:XX Date: 20 Nov. 2011

23/4/20July 24, 2007

Dot Hill Confidential 27

3Y improvement projects trackerProduct partnumber :1.81-00000047-00-01 / CP-1401R22. 81-00000063 / YM-3591-AAR

Projects :1.Assembly front end a)AOI to replace manual inspection – target eval completion by end Febb) Eliminate lead trimming Phase ! – component lead list , done 10th JanPhase II – end Feb pend AOI evalc)ORT computer monitoring –end Aprild)Production DFM review –on-goinge)Vibration test – pend Taiwan RD for spec finalisation – TBD, pend Roger HuangPhase 1– sampling , need define sampling plan – 1st Mar