1 dangat industrial estate, s.no.81/2, shivane, nda road, pune :- 411 023, ph.no. 020-25291999, 020-...
DESCRIPTION
S.N.Description 1 Line patrolling 2 Thermographic scanning 3 Coronography. 4 Live Line detection of faulty Insulators Hot line maintenance (PID) 5 Live Line Contact Resistance measurement. 6 Capacitance & tan delta measurement. 7 Hot Stick Method and Bare Hand technique for Hot Line Maintenance including Insulator string replacement upto 400 kV. 8 Hot line washing. 9 Cold line washing kV string replacement by cold line method. 11 Strengthening of tower stub 12 Providing & fixing RPL Compression type power connectors. 13 Hardwares and connectors for HTLS High Ampacity conductor 14 Test Lab 23 January Slide Index Of “Ramelex Pvt. Ltd.” Activity Demonstration.TRANSCRIPT
1
DANGAT INDUSTRIAL ESTATE,S.No.81/2, Shivane, NDA Road,Pune :- 411 023,Ph.No. 020-25291999, 020-25292999,Email:- [email protected]:- www.ramelex.com
ISO 9001:2000 Company
May 3, 2023
We are thankful to authorities for giving us opportunity for giving presentation about our best practices in EHV maintenance applying modern techniques.
“A journey of thousand miles must begin with a single step” ---- Lau Tsu.
Catching the depth of above words M/s. RAMELEX PVT. LTD. has firmed its first foot in the electric world. A growing company in the field of electricity, we have generated electric results in our various projects executed under MSEB and different private sectors.
Established in 1990, we have never looked back since.
We are class ‘A’ registered Electrical contracting company having CRISIL International rating SE-3A.
We are a group of committed, experienced, trained and spiritually motivated 500 Nos of personnel including technical, managerial, financial experts & working technicians along with imported, indigenous sophisticated equipments, modern tools & plants & a fleet of 50 vehicles. For last 24 years, we are shouldering responsibility of planning, investigation, execution, operation & maintenance of various electrical projects in the state.
2 May 3, 2023
Introduction
S.N. Description1 Line patrolling2 Thermographic scanning 3 Coronography.4 Live Line detection of faulty Insulators Hot line maintenance (PID)5 Live Line Contact Resistance measurement.6 Capacitance & tan delta measurement. 7 Hot Stick Method and Bare Hand technique for Hot Line Maintenance inclu
ding Insulator string replacement upto 400 kV. 8 Hot line washing.9 Cold line washing.
10 400 kV string replacement by cold line method.11 Strengthening of tower stub12 Providing & fixing RPL Compression type power connectors.13 Hardwares and connectors for HTLS High Ampacity conductor 14 Test Lab
May 3, 20233
ANY QUERIES PLEASE???
May 3, 2023
THANK YOU FOR KIND ATTENTION
To Index4