Professional Engineer Civil Suraj Singh s/o Late Shyam Lal Page 1 of 52 January 23, 2011 P. Eng Suraj Singh Civil Engineer This CV document has been indexed in 6 parts Part 1 General Part 2 Last Assignment Part 3 Previous Career Assignments Part 4 Old Projects Part 5 Activities Immediately Last 5 years giving CPD Part 6 Activities Immediately Further 20 years giving CPD Part 1 Experience Middle East>16 Years, India>12 years http://video.google.com/videoplay?docid=-2836697695720088712#docid=-5924199517411065048 http://video.google.com/videoplay?docid=-2836697695720088712 http://www.orkut.co.in/Main#AlbumList.aspx?rl=ls&uid=14001158920184443671 http://www.facebook.com/people/P-Eng-Suraj-Singh/100000185425294 Many Engineering / Construction Videos for public view to my credit on net Many postings on Structural Engineers forum of India Curriculum Vitae Suraj Singh PE 700066-4/MIE 046231/9 Indian- born 30.1.1955 (55), Permanent Add: 430, Sector 21B, Faridabad, NCR, India 121001, 0091-9810610718, Driving Licenses - Qatar, UAE, KSA, India, [email protected] ,

Upload: p-eng-suraj-singh

Post on 02-Apr-2015

160 views

Category:

Documents


2 download

TRANSCRIPT

Professional Engineer Civil Suraj Singh s/o Late Shyam Lal Page 1 of 37 January 23, 2011

P. Eng Suraj Singh Civil EngineerThis CV document has been indexed in 6 partsPart 1 GeneralPart 2 Last AssignmentPart 3 Previous Career AssignmentsPart 4 Old ProjectsPart 5 Activities Immediately Last 5 years giving CPDPart 6 Activities Immediately Further 20 years giving CPD

Part 1Experience Middle East>16 Years, India>12 years

http://video.google.com/videoplay?docid=-2836697695720088712#docid=-5924199517411065048 http://video.google.com/videoplay?docid=-2836697695720088712http://www.orkut.co.in/Main#AlbumList.aspx?rl=ls&uid=14001158920184443671http://www.facebook.com/people/P-Eng-Suraj-Singh/100000185425294

Many Engineering / Construction Videos for public view to my credit on netMany postings on Structural Engineers forum of India

Curriculum Vitae Suraj Singh PE 700066-4/MIE 046231/9

For Project Management In Construction (Knowledge Areas Integration)

Indian- born 30.1.1955 (55), Permanent Add: 430, Sector 21B, Faridabad, NCR, India 121001, 0091-9810610718,Driving Licenses - Qatar, UAE, KSA, India, [email protected],

Professional Engineer Civil Suraj Singh s/o Late Shyam Lal Page 2 of 37 January 23, 2011

(Civil/Buildings/Structures/On Shore)IEI Professional Engineer Since 1995

Engineers Mobility Forum Defines Professional Engineer means, who is Internationally competent.

Objective: Projects Deliveries.What do I Understand by Profession of Project Management? Applications of earned knowledge enriched with advanced skills, organization environmental factors & processes, tools & technique to deliver specific results or services to the client or customer in line with project delivery requirements through the route of Project Management Plan, using leading & organizing potentials, all integrated with Scope, Quality, Time, Cost, Risks, Human Resources, Procurement, Communication plans etc.

Brief about me:P Eng Suraj Singh Civil Engineer RC Buildings/Structures Indian 1 Professional Qualification PE Professional Engineer (India) 1995,2000,2005,2010 2 Professional Qualification CE Chartered Engineer (India) MIE 19863 Educational Qualification BE Bachelor in Engineering Civil 1980 Section A & B, IEI, 1978/80 respectively. S 140642

Computer - MS Office, Networking, AutoCad

Multi Facet Personality In Project Management, Engineering, Designs & Construction, Contracting, Site & Office Engineering with full adoptability with required acumen (professionally dedicated). Experienced having worked under stress to achieve targets /objectives.

Experience: Years 27 + in (Management + Construction + Designs) (17 Years Middle East /10 Years India)

On the Projects of Civil / RC Buildings with multiple services / Structures/Oil (EPC Projects-Construction-Engineering-Designs-Consultancy-Coordination-Estimation Proposals)-Multi Facet Expertise in Engineering.

Iraq 2 Years, Libya 2 Years, Qatar 6 Years, UAE Abu Dhabi 6 Years, Saudi Arabia 0.5 Year.

Indian- born 30.1.1955 (55), Permanent Add: 430, Sector 21B, Faridabad, NCR, India 121001, 0091-9810610718,Driving Licenses - Qatar, UAE, KSA, India, [email protected],

Professional Engineer Civil Suraj Singh s/o Late Shyam Lal Page 3 of 37 January 23, 2011

Intensely, interact with structural engineers on www.sefindia.org as an author suraj

Contributing to professional solutions requested by various civil & structural engineers on line. 1150 postings finished so far.

Part 2Last Assignment

Alawi Tunsi Establishment - Project Manager effective 15.8.2010 to 15.1.2011 For 500 beds North Jeddah Hospital Project Kingdom of Saudi Arabia. Approved by

Consultant /Engineer. 250 Million SRReports to: Project Director & Sponsors/ChairmanDirect Reports: All Project management team & administrative team.Responsibility & Job Description:

1. Fully authorized to ensure that the project is delivered in time. (all disciplines)2. Control over 25 engineers (all disciplines) & senior personnel & 25 foremen. 3. Coordination with Consultants in all contractual & engineering & construction issues. 4. Interface Coordination with all subcontractors.5. Coordination with Vendors for all materials procurement activities.6. Collaboration with Planning head for scheduling discipline.7. Meetings with engineers on daily basis for output & technical coordination.8. Meeting with engineers on weekly basis for weekly progress review & minuting all reports to all & management of

organization.9. Participation with Consultant weekly meeting.10.Payment certification procedures preparation & follow up with Consultants.11. Interaction with head office functional managers for materials & finances issues.12. Interaction with design office & control over designs for submission to consultants.

Indian- born 30.1.1955 (55), Permanent Add: 430, Sector 21B, Faridabad, NCR, India 121001, 0091-9810610718,Driving Licenses - Qatar, UAE, KSA, India, [email protected],

Professional Engineer Civil Suraj Singh s/o Late Shyam Lal Page 4 of 37 January 23, 2011

13.Frequent site visits with Planning head, engineering head, Construction manager for pushing progress & resolution of various issues to keep schedule in line of time milestone targets.

14.Conducting walkthroughs for urgent lost time schedule recovery successfully.15.Applied all efforts to bring back the project from Comma stage to ICU stage & then to ward stage but,

organizational politics did not assist due to the presence of Egyptian managers obstruction all progress & Local KSA owner not supporting professionally.

16.Arabic documents impeded all professional issues. Ministry dealt with in Arabics caused another problem. At last, I had to request management to accept resign due to non cooperation by the Egyptian as well as non financing the project as required. Salaries were delayed for 4 months.

Personal Assignment 2008-2010Built my own house in Faridabad, Delhi NCR India-RCC Structures. 8 Million IR

Responsibility & Job Description:1. Complete Responsibility all disciplines. 650 sqm slab area. Green Building Concept. 2008-2010. Resolved disputed

case of part occupation certificate pending since year 2000.

2. Supervision & procurement of all requirements till Occupation Certification..

Part 3Previous Career Assignments

1 Al Jaber Energy Services 1/5/2005-1/2008

Abu Dhabi UAE- Senior/Lead Project Engineer Estimation/Buildings Proposal Coordinator

Reporting to Tendering Directors/Bids Corporate Manager

Reports to: Estimation Manager & Project Director.Direct Reports: All Quantity Surveyors & relevant DCC.

Indian- born 30.1.1955 (55), Permanent Add: 430, Sector 21B, Faridabad, NCR, India 121001, 0091-9810610718,Driving Licenses - Qatar, UAE, KSA, India, [email protected],

Professional Engineer Civil Suraj Singh s/o Late Shyam Lal Page 5 of 37 January 23, 2011

Responsibility & Job Description:

Pre Bid1. For Charter Decision-Reviews Bids Scope & presentation to Organisation Management for decision making

whether or not to bid. After authorization of Charter document by the Management:2. Understanding All aspects within bid- Charting out Major concerns generally & contractually.3. Preparation for Vendors related documents Requirements4. Invitation of quotes from selected & interested vendors & their follow up.5. Review & analysis of quotes followed by further coordination with vendors. Conduct Meetings with possible

vendors for technical as well as commercial clarifications.6. Comparative statements production based on negotiated quotes to finalise possible competent vendor.7. Correspondence to Clients for technical clarifications & document modifications.8. Coordination to design vendors for clarification of design scopes & fulfilling technical as well as design

requirements.9. Conducting various long meetings with specialist vendors for main contract backup information & to achieve their

quotes.10.Attending pretender meetings with clients for Queries; clarifications & acknowledge their views about bid scopes..11.Providing Commercial & Technical Back Up to Team Leader Estimators.12.Preparation for Bid Submission both Technical & Back Up for Commercial including, Engineering part for EPC bids.13.Writing execution & Method statements to incorporate with the bid documents wherever required.14.Reporting the prepared bid to the Tendering Manager & Director for review & finalization.15.Coordinated with the QA & SHE departments to obtain their feed back documents for the bid compilation.16.Produced proposed Organisation Chart for relevant bids.17.Proposed manpower requirement & equipment requirement schedule with Histograms.18.Coordinated many voluminous tenders independently amounting to 100 millions to 500 millions $

Post Bid1. Management of Post bid clarifications technically as well as contractually.2. Participation for proceedings of post bid negotiations with clients.3. Review & Finalisation of Execution Statements

Indian- born 30.1.1955 (55), Permanent Add: 430, Sector 21B, Faridabad, NCR, India 121001, 0091-9810610718,Driving Licenses - Qatar, UAE, KSA, India, [email protected],

Professional Engineer Civil Suraj Singh s/o Late Shyam Lal Page 6 of 37 January 23, 2011

4. Contract Documents Verifications for final execution of the contract documents.

EPC Tenders up to 1.2 billion USD included from Oil & other companies such as Qatar Petroleum, Bechtel, Technip, Dolphin, Gasco, ADWEA (Ras Lafan Common Cooling Sea Water System Mega project 34 Buildings 75 Km GRP Waterline, Water lines, Gas lines, Civil Works, Process & Non process both), Commercial Price back Up for ADNOC 324 flats 6 story buildings 17 # Ruwais Housing Married Accommodation Ph III, Borouge / Tecnimont PE-PP-Poly Olefins, Tecnicas Reunidas - O & U Buildings 17 buildings etc.

2 AL HUDA Engineering Works 1/3/2004-28/2/2005Qatar Project Manager QP Record Centre Mesaieed –Site Construction Control-Management

Small Project AED 8 Million

Reports to: Project Director & Sponsors/ChairmanDirect Reports: All Project management team & administrative team.Responsibility & Job Description:

1. Fully authorized to ensure that the project is delivered in time. (all disciplines)2. Control over 4 engineers (all disciplines) & senior personnel & 8 foremen .3. Interface Coordination with all subcontractors.4. Coordination with Vendors for all materials procurement activities.5. Collaboration with Planning Engineer for scheduling discipline.6. Meetings with engineers & other staff on daily basis for output & technical coordination.7. Meeting with Client representative engineers on weekly basis for weekly progress review & Minuting all reports to

all including Client QP & management of organization.8. Participation with Consultant for various one to one meeting.9. Materials & drawings submissions procedures & follow up10.Payment certification procedures, preparation & follow up with Consultants.11. Interaction with head office functional managers for materials & finances issues.12. Interaction with head office & control over all issues of procurement etc. 13.Dedicated site stay with Planning head, engineering head, Construction manager for pushing progress & resolution

of various issues to keep schedule in line of time milestone targets.

Indian- born 30.1.1955 (55), Permanent Add: 430, Sector 21B, Faridabad, NCR, India 121001, 0091-9810610718,Driving Licenses - Qatar, UAE, KSA, India, [email protected],

Professional Engineer Civil Suraj Singh s/o Late Shyam Lal Page 7 of 37 January 23, 2011

14.Writing all construction method statements for approval by the client QP.15.All project management activities required under ISO 9001. 16.All project inspections & execution related issues resolution.

3 Al Jaber Energy Services 31/10/1999-31/5/2002

Abu Dhabi UAE- Project Office Engineer/Field Engineering Incharge

Ruwais Industrial Complex Ethylene Plant 600 KTA- Designer Linde UKBorouge Petrochemical Project-Contracted by Alliance Bechtel Linde-Civil works executed by Al Jaber Energy services for 600 KTA Ethylene Cracker Plant

Project Office Engineering Incharge for 600 KTA Ethylene Plant- Joined 31.10.1999 – Project Completed 2/2002- (Worked on project 2.5 Years)

About 100,000 cum of structural concrete in massive, thick and normal structures for Off sites, Pipe rack, Compressors, Boilers, Wash waters, Cracked gas, Sumps, Pumps, Tanks, Substations & other buildings such as Administration, Amenities, Central Control, Ware houses, Pump houses etc. (complete 600 KTA Ethylene Plant)

Project Office Engineering Incharge Reports to Project Director Direct Reports: All Draftsmen, DCC.Responsibility & Job Description:

1. Raising Site Technical Queries for resolutions by Client or JV leader 2. Prepare Method Statements documentation in conjunction with Construction/Supervision staff & submission for

approvals, 3. Ensure IFC drawings are complete having all necessary information for construction.4. Coordination, of all technical matters as reported by field engineers as well as self revealed.5. Initiate Site Technical Queries to ABL the JV lead partner, follow through replies & incorporate the same with

method statement & drawings.

Indian- born 30.1.1955 (55), Permanent Add: 430, Sector 21B, Faridabad, NCR, India 121001, 0091-9810610718,Driving Licenses - Qatar, UAE, KSA, India, [email protected],

Professional Engineer Civil Suraj Singh s/o Late Shyam Lal Page 8 of 37 January 23, 2011

6. Material Approval follow ups after Purchase requisitions submissions, 7. Engineering matters, Attending Engineering meetings & maintaining proper records.8. Attend QC meetings as need arises.9. Supervising designs & drafting works.10.Rebars BBS production as well as fabrication follow up11.Correspondence as required by the team heads.12.Designs proposals as required by project urgency13.Landscape designs for all external works, 14.Red lines etc, all as required by Project Director / Manager.15.Precast chamber designs for approval & productions.16.Laises with Subcontractors such as HVAC, plumbing etc. for preparation of shop drawings in conjunction.

4 Khalsa Contracting & Trading Co 23/12/1996-31/7/1998Abu Dhabi Chief Engineer-Controlled the following RC Buildings Commercial & Educational projects construction

management wise for the following projects:

1 E 41/C61 G+M+4 Typical-Late Butty Abdulla Butty Al Muhairy7 million, 12 months- Consultant Eng Ardent for DSSCB- Sheikh Khalifa Committee

2 E 19/02/C 66 G+M+2 Typical- Mohd shutait Al Khaily4.89 million, 12 months- Consultant Eng Arab Office for Planning & Architecture headed by Dr Mclouf for DSSCB- Sheikh Khalifa Committee

3 E 40/C 13 G+M+4 Typical- Mohd & Hamad Bin Salem H. Harby Al Ameri6 million, 12 months- Consultant Eng Al Kheari & Al Ameri Consultants Engineers for DSSCB- Khalifa Committee

4 Wadi Al Fill-Nahel Town, Al Ain – PWD Kinder Garten Typical (Partly by me)8.59 million, 18 months-Consultant Eng Al Burj Engineering Consultants

5 Villa, Plot #134, W 47, Abu Dhabi –Late Butty Al Muhairi

Indian- born 30.1.1955 (55), Permanent Add: 430, Sector 21B, Faridabad, NCR, India 121001, 0091-9810610718,Driving Licenses - Qatar, UAE, KSA, India, [email protected],

Professional Engineer Civil Suraj Singh s/o Late Shyam Lal Page 9 of 37 January 23, 2011

1 million 12 months- Consultant Eng Ardent for DSSCB- Khalifa Committee

6 E 19/02, C 76/77, G+M+2 Typical- Khalifa Ubaid Al Farisi4.6 million 10 months-Consultant Eng Al Ain Consultants Engineers for DSSCB

7 Other than the control of the aforesaid works, as Chief Engineer coordinated technical, contractual aspects, prepared many tendering bids & acted as an expert adviser to the management.

Reports as Chief Engineer to Project Director & SponsorDirect Reports: All Project Engineers & other administrative staffResponsibility & Job Description:

1. Responsible for all building projects in and around Abu Dhabi varying from 10 million to 28 millions2. Responsible for bid preparations for new proposals3. Responsible for all projects procurements4. Responsible for surveillance on projects in currency of durations5. Responsible for mobilizing resources requirements6. Holding progress review periodical meetings with project engineers7. Visiting sites frequently for assessments & to meet consultant requirements.8. Responsible for proposed materials submissions & other issues.9. Responsible to deal with all departments as required under statutes & contracts.10.Monitoring all projects regularly for budgetary provisions.

5 Mid Mac Contracting 23/9/1995-31/8/1996Qatar – Project Office Engineer

ROS Verifications for civil works for LNG tanks 4 #s, 85000 cum capacity each At Qatar Gas Ras Laffan site assisting Chief Engineer

Complete Engineering & Supervision Control for Beach Villa/Palace Project in 10 hectares

Project RepresentativeReports to Project Director

Indian- born 30.1.1955 (55), Permanent Add: 430, Sector 21B, Faridabad, NCR, India 121001, 0091-9810610718,Driving Licenses - Qatar, UAE, KSA, India, [email protected],

Professional Engineer Civil Suraj Singh s/o Late Shyam Lal Page 10 of 37 January 23, 2011

Direct Reports: All Project Engineers & other staffResponsibility & Job Description:

1. Review survey activities, 2. Issue all technical documents, 3. Coordinating design activities, 4. Shop drawings follow up, Shop drawing preparation, 5. Civil works specification preparation and procedures, 6. Keeping & Analyzing progress record, 7. Coordinating & verifying changes to Engineering schedules according to construction needs, 8. Coordinating the issue of As Built drawings, 9. Making technical evaluation of vendors and subcontractors

6 Al Attiyah Contracting & Trading 23/3/1985-23/2/1989Qatar Contractor’s Site Agent/Project Engineer –Controlled the site constructions of the following projects as

contractor’s representative.

1 Landscaping of 5 schools-Hard landscapes included sports courts surfacing for Tennis, Volley ball, Hand ball, etc Soft landscape included tree pits, grass areas etc. Also included fencing, Screen walls, Foot path & infrastructure works of minor nature such as Plants irrigation, Benches, Kerbs, Water tanks

2 Boys Preparatory School at Umm Salal QR14 million Qatar Consultant Group for AED (Architectural Engineering department)13 Class rooms, 1 Assembly hall 18 m span, Workshops, Lecture room, Library, Physics & Chemistry labs, Darkrooms, Plant rooms, Facilities, Mosque, Guard room, Long boundary wall, External works, Courts surfaces, Pergola

Building comprised RC framed structure and high class finishes, centrally air conditioned using package units, Chillers, Air handling units and the duct system

Indian- born 30.1.1955 (55), Permanent Add: 430, Sector 21B, Faridabad, NCR, India 121001, 0091-9810610718,Driving Licenses - Qatar, UAE, KSA, India, [email protected],

Professional Engineer Civil Suraj Singh s/o Late Shyam Lal Page 11 of 37 January 23, 2011

False ceiling mineral fiber, Metallic aluminum, Electrical system included Fire alarm, Call bell, Auditorium speaker system, External flood lights, Plumbing included CW, HW & CHW, Vulcathene injected PVC gas pipes in laboratory.External included sewerage, Water supply, Fire fighting, Plant irrigation, Electrical, Telephones, Mosque, Sub station,

3 Barzan Army Camp Development Ph II for 2nd Royal Guard (85% completed)27 million QR-Rice Perry Ellis & Partners, 18 months for Army Works Engineering Unit

1 Firing/Shooting Range Indoor & Outdoor, 300 m, 3 shooting position from main administration & office building,2 #s 300m long RCC baffle walls, Bullet Trap Chamber, Target Pits, Over head gantries on structural steel trusses supporting armored plates shielded by WP Hardwood cladding, Main office building ac.Upright walls of the Bullet Trap chamber retained dune sand both sides to protect soil fill to dampen bullet velocity

2 Sports Facilities Building containing 2 # sports halls (Indoor Gymnasium), 4 #s Squash courts. Changing rooms, Lockers room, Spectator’s gallery, Cafeteria, as RC /Structural Steel Composite Structure converted from an existing garage, Swimming Pools 25x13mx3m deep for competition purpose with Balance tank, Filter room for 10 tones, Chlorinators, Acid chambers, Pumps for water recirculation, surface scum out drains, underwater flood lights, Belgium poolside carpet Lano Greenfield, Aluminum cladding cover over the building , Games field, Minor structures, such as Pump house, Nets store, Pitch equipment stores, Kick about area, Stadium enclosures, Football pitch, Pergolas, 12m & 18 m high light poles, Chain link fencing, Lift, Sports surfacing, such as Tennis, Handball, Volley ball, Football pitch

3 Squadron Offices, Officers QuartersRCC structures with all high profile finishes, in many areas epoxy floor, domestic swimming pool 14x7m, all rooms air conditioned

4 Assisted for the Contracts claims, Contractual matters correspondence, Tendering

Indian- born 30.1.1955 (55), Permanent Add: 430, Sector 21B, Faridabad, NCR, India 121001, 0091-9810610718,Driving Licenses - Qatar, UAE, KSA, India, [email protected],

Professional Engineer Civil Suraj Singh s/o Late Shyam Lal Page 12 of 37 January 23, 2011

Reports to: Project Director Direct Reports: All Project management team & administrative team.Responsibility & Job Description:

1. Fully authorized to ensure that the project is delivered in time. (all disciplines)2. Control over 8 engineers (all disciplines) & senior personnel & 10 foremen .3. Interface Coordination with all subcontractors.4. Coordination with Vendors for all materials procurement activities.5. Collaboration with Planning Engineer for scheduling discipline.6. Meetings with engineers & other staff on daily basis for output & technical coordination.7. Meeting with Client representative engineers on weekly basis for weekly progress review & Minuting all reports to

all including Client AED & management of organization.8. Participation with Consultant for various one to one meeting.9. Materials & drawings submissions procedures & follow up10.Payment certification procedures, preparation & follow up with Consultants.11. Interaction with head office functional managers for materials & finances issues.12. Interaction with head office & control over all issues of procurement etc. 13.Dedicated site stay with Planning head, engineering head, funvtional managers for pushing progress & resolution

of various issues to keep schedule in line of time milestone targets.14.Writing all construction method statements for approval by the client AED.15.All project management activities required under. 16.All project inspections & execution related issues resolution.

Part 4 Old Projects

7 Electrical Construction Company Government of Libya 1/6/1983-30/11/1984Libya- Project Engineer/Civil Engineer

Indian- born 30.1.1955 (55), Permanent Add: 430, Sector 21B, Faridabad, NCR, India 121001, 0091-9810610718,Driving Licenses - Qatar, UAE, KSA, India, [email protected],

Professional Engineer Civil Suraj Singh s/o Late Shyam Lal Page 13 of 37 January 23, 2011

Construction of 4x2 KVA Diesel Power Station Standby Unit-Air base project at Al Gordhabia, Sirte Town-Designer SACM France

Alternator cum Generator bases massive RCC foundations, Generator foundation isolated from raft by vibration isolation using Neoprene pads fixed on steel plates connected to RC raft by steel nails, pads surrounded by extruded polystyrene further covered with polythene sheet, over placed a site fabricated steel frame lamina co

The vertical surfaces isolated by covering with polystyrene, neoprene (double course at corners in triangular shape) and polythene. The Generator and Isolator foundations were provided with bolt grooves 16 & 6 #s 1.5 m deep to be grouted post m/c erection. Cable trenches around foundations for HV/MV. The foundations to the structural steel frame were RCC footings of massive/thick element size & grooved in for anchor bolts. Overhead gantries were provided in the building. Fuel oil tanks, sump tanks, radiator foundation etc were also constructed. Area was rock lime sand. Bulldozer with ripper was used for mass excavation for the building area, storage oil tanks. Ready mixed used for concrete with pump66/11.5 KV Sub Stations 16 #s – Foundations in Benghazi

8 Ansals Eurodec Iraq 23/6/1981-31/3/19831 Construction of pump houses at Mehmodia Baghdad-Clayey soil in high water table-used Miller pump ring system

of well points in 3 levels to achieve 9 m deep excavation dry

2 Construction of 20 story Tower portion involving 5000 cum structural frame concrete-Dar Al Thawra Press Complex from 4 th floor terrace to 65 m elevation . Each slab 500 cum poured in 21 days cycle using reciprocating stationary concrete pump and batching plant. Finishing items carried out in sequence on the lower floors-On the facets of the tower fair face concrete –Marine ply used for forms- Day and night work for monthsNational Consulting Bureau –Supervised by Iraq government engineers

3 Construction of Ancillary buildings (Finishing items only)–Staff quarters, Workshops, Weigh bridge foundation, Administration building

9 Consultancy In India (Self) + Technical/Engineering Writings 1/3/1989-1/8/1995, 1/6/2003-31/4/2004

Indian- born 30.1.1955 (55), Permanent Add: 430, Sector 21B, Faridabad, NCR, India 121001, 0091-9810610718,Driving Licenses - Qatar, UAE, KSA, India, [email protected],

Professional Engineer Civil Suraj Singh s/o Late Shyam Lal Page 14 of 37 January 23, 2011

1 On Line publication of a Professional Book entitled ‘Civil Engineering Buildings Practice Plants Facilities Petrochemicals’ in 20062 Working on a Professional Book on Construction Method Statements to be on line published soon.3 Wrote a paper note for the Earthquake preventive measures/ Risks Management in 2009.4 Involved on SEFI (Structural Engineers Forum Of India) for responding various technical postings by engineers worldwide.5 IT (as a part of continued professional development) - 2002 to 2003, Many videos on You tube & google sites.

These URLs pertained to online software information to engineering community http://www.geocities.com/suraj_engineer www.geocities.com/rccbuildings (no more available) RCCBDS2003/4/5 Powered /Engineered by me on MS Excel & MS Words. RCC frames up to 5 bays & 8 stories can be designed using these 40 #s soft solutions linked to 2420 # work sheets in 120 workbooks

6 Civil Engineering Building Practice- Containing 55 # Home Plans With IsometricsIn 4 Directions, 700 Sketches - Manuscript Prepared 1994 Not Published Yet

7 Civil Engineering Building Practice –Containing Project Management, State Of The Arts Contracts, New Site Schemes, Structural Profiles, Swimming Pools, Baths, Engineer In Law With Statutory References Manuscript Preparation 1990 -1994 Published In 1996

8 Prepared Schematic Plans for a proposed Town to accommodate 500,000 inhabitants in National Capital Region of India-estimated cost to 1991 rates USD 1.5 billions- Client-Proprietor Badri Narayan / BM Promoters-2nd floor, 1186, Bhagwati Market, Kucha Mahajani, Chandni Chowk, Delhi 10006

9 Preliminary Schemes on 6000 hectares of land involving high rise RCC buildings as self contained integrated complex, System Designs regarding Structural & Architectural disciplines, Management aspects, dissertations- Due to the unsuccessful funding, the scheme shelved –Area-Prithala to Palwal –6000 acres approx.

10 Delhi Development Authority Statutory Body 1/1/1975-22/6/1981India-Junior Engineer/Consultant

Indian- born 30.1.1955 (55), Permanent Add: 430, Sector 21B, Faridabad, NCR, India 121001, 0091-9810610718,Driving Licenses - Qatar, UAE, KSA, India, [email protected],

Professional Engineer Civil Suraj Singh s/o Late Shyam Lal Page 15 of 37 January 23, 2011

Supervised The Construction Of Shopping Centers, Dwelling Units, Development Works Such As Pavement, Drains, Toilets, Garden Walls, Pipe Lines, In Resettlement Colonies, Survey On The Environmental Improvement Schemes, Estimation And Quantities, Valuation, Planning And Coordination

Part 5Immediate

Last Five Years Activities:2004/2005

Project Manager Qatar / Doha

Al HUDA Engg 12 Months Project Incharge Oil Company Q P Project

Construction Contract

On Shore Projects Record centre to accommodate shelving for electronic records

RCC Building, Concrete Walls, Block walls

Safety First Criteria being Significant

Hot & Cold works permissions

Package construction from commencement to completion

Generally necessary to comply contract conditions / procedures

My activities Job Descriptions Reasons

Contractual & Commercial

Dedicatedly Represent contractor.QP approved CV

Project Controls responsibilities for the contract

Responsible to company management

Mandatory site presence to respond to client

Contract requirement to officially act for contractor

Execution Plan & Resourcing

Scheduling Co charting with planners

Detailed deliberations

Ensuring compliance

Contract provision requirement

Quality Plans Co Author Concept formation

Co Drafting, Detailing

Ensuring compliance

Contract provision requirement

Executive Management

Kick off meeting Necessary to introduce all parties

Contractual issues / matters exchange

Contract commencement

Contract requirement & procedures

Project Commencement

Works mobilization on site. Global Surveys. Visits.

Site establishment

Land Surveys Permits for cold & hot activities

Operations of contract clause

Coordination / Liaison

All discipline works Inter Coordination

Middle Management

Closing activities Operations of contract clause

Management review/Progress Monitoring

Site meetings Progress reviews Problems identification

Sorting out Solutions / resolutions

Operations of contract clause

Indian- born 30.1.1955 (55), Permanent Add: 430, Sector 21B, Faridabad, NCR, India 121001, 0091-9810610718,Driving Licenses - Qatar, UAE, KSA, India, [email protected],

Professional Engineer Civil Suraj Singh s/o Late Shyam Lal Page 16 of 37 January 23, 2011

Management proposals including shop drawings

Technical Solutions Author & originator

Submissions Approvals Implementation Operations of contract clause

Designs Formworks, all elements foundations, columns, beams, slabs, walls

Rebars, all elements

Temporary works, preparatory works designs

Compliance on site

Execution precautions & meeting specs requirement

Technical Writings Construction Method statements

All disciplines Civil methods Author

Submissions & compliance

Execution precautions & meeting requirement for agreements

Safety plans Personally Responsible Coordination Talks /Walks Compliance Safety First Slogan Red Lines records Technical decisions, deviations, works records Dossiers Submissions Special Pouring 4 m columns,

All building & Lift well walls

Pouring columns + slab monolithic (Guard House)

Curing controlHot weather conditions

Backfill controlImported fill from burrow pits

Fast Pace Concrete Pouring 80 cum/hour

2005/2008

My activities Job Descriptions 30 months Lead Project

Engineer UAE, Abu Dhabi

Estimation & Tendering Al Jaber Energy Services

Engineering + Commercial Support

Oil Company Project bids

EPC Contracts

Bid Flows Reasons Contracting Bids Commercial Support Technical

SupportConstructability reviews

Negotiations Contracts Reviews

Bid documents Receipt Report production, presentation

Management Review

Decision making to do or not to do?

If to do, to follow further.

Bid staff appointment announcement by corporate management

Detailed Report production

Bid Analysis Technical & Commercial

Distribution To Relevant appointed personnel

Coordination in all respects

Involved departments

SHE (Safety Health & Environment)

Quality Assurance

Design Subcontractors

Services Sub Contractors

Organisation’s special infrastructural

Indian- born 30.1.1955 (55), Permanent Add: 430, Sector 21B, Faridabad, NCR, India 121001, 0091-9810610718,Driving Licenses - Qatar, UAE, KSA, India, [email protected],

Professional Engineer Civil Suraj Singh s/o Late Shyam Lal Page 17 of 37 January 23, 2011

departmentsAdministration for legal documents

Vendors for materials

Vendors for sub contracts

Overseas co ordinations

Home coordinations

Meetings Frequently

Coordination, FEED review & investigations

Progress update Status of various quotes

Schedules Deadlines

Commercial Submission Package

Quotations Systemising to adopted procedures

Analysis Feed back Comparison

Unit rates formation Balancing cost of item

Profit assessment Item approval feasibility

Delivery feasibility

Vendor’s track record review

Vendor’s consistency / Prequalification

Short listing for particular bids

Negotiation to reduce price

Include in bid

Vendor’s project schedule Vendor’s projected workforce & equipment

Total cost demanded by vendor

Cost justification analysis

Vendor’s estimation criteria

Material Supplies Requirement studies

Quantifications Listings Documents to support

Quotations Analysis Specs compliance Approvals record Negotiations Technical

Submission Package

EPC Prequalification Company records + commercial registration

Chamber of commerce registration

Government registration as contractor

Company’s capabilities

Method Statement for contract execution

Schedule programme

Workforce/ Key personnel CVs

Equipment Cash flow

Camping for site Camping for Establishment

Material requirements

Material Delivery Management support

Designs Coordination

Consulting Vendor selection procedure

Design documents issue

Request requirements

Follow up procedures

Designs reviews

Design hours Design based costing

Design specifications

Design & consultant operation

SHE Coordination Meeting with SHE team & receipt of submission documents

Safety procedures/plans

Safety specific requirements

CVs safety personnel

Submission review

Quality Meeting with QA team & ITPs requirement Other procedures CVs QA Submission review

Indian- born 30.1.1955 (55), Permanent Add: 430, Sector 21B, Faridabad, NCR, India 121001, 0091-9810610718,Driving Licenses - Qatar, UAE, KSA, India, [email protected],

Professional Engineer Civil Suraj Singh s/o Late Shyam Lal Page 18 of 37 January 23, 2011

Assurance/Requirement Department

receipt of submission documents

list to demands personnel

Bid Conditions Contractual

Coordination with Contract Department

Review of General + Special Conditions

Clarification from client representatives

Incorporation of amendments

Cost impacts if any, to be included with bid

Bid Submission Review

Estimation team Corporate Management

Moderation of bid Working out final costing

Confidential entry of price by director

Post Bid Submission

Queries from client Replies Mails submission, Meetings

Negotiations supports

Finalisations of prices

Revision of additions or deletions

Contract Conditions Final review

Conditions scrutiny & finalizations after award.

Site Support whenever required

Foregoing activities required to meet bids requirements

References to the projects related to Bids undertaken:a. EPC Tenders up to 1.2 billion USD included from Oil & other companies such as Qatar Petroleum, Bechtel, Technip, Dolphin, Gasco,

ADWEA (Ras Lafan Common Cooling Sea Water System Mega project 34 Buildings 75 Km GRP Waterline, Water lines, Gas lines, Civil Works, Process & Non process both), Commercial Price back Up for ADNOC 324 flats 6 story buildings 17 # Ruwais Housing Married Accommodation Ph III, Borouge / Tecnimont PE-PP-Poly Olefins, Tecnicas Reunidas - O & U Buildings 17 buildings etc.

b. Reviewed & studied thousands of technological, technical, specifying & commercial documents that enriched my professional knowledge to higher attainment of engineering profession. Got an exclusive opportunity to understand the mega CWSW pipeline bids about 120 Km long. Also, details of PE plants designs were learnt interestingly. Had an opportunity to know the design of Doha Airport & also many soil investigation laboratory reports that refined my soil understanding. Thousands of e mails were involved for coordination purposes.

c. Through these bids, learnt many new materials from various disciplines & also many new performing technologies. Lot many aspects of professional engineering knowledge learnt, have been included within the Books written.

d. Technologies particularly for concrete performance & fire proofing along with advanced buildings & plant service.e. Provided various options to the demanded design issues in all EPC bids. Many were accepted.

f. Checked out an error caused by certain design vendor who had quantified RCC for pipe line more than 400,000 cum while after technical arguments, it was redesigned & quantified to 150,000 cum only.

Consultancy:In NCR-Faridabad, Delhi, Perused HUDA, a statutory body to issue Part Completion for one house constructed in 2000.

Indian- born 30.1.1955 (55), Permanent Add: 430, Sector 21B, Faridabad, NCR, India 121001, 0091-9810610718,Driving Licenses - Qatar, UAE, KSA, India, [email protected],

Professional Engineer Civil Suraj Singh s/o Late Shyam Lal Page 19 of 37 January 23, 2011

Corresponded to the high profile administrative officials / Estate officer etc. to record completion as the file was lost by the body. It tool 8 months following the departments & ultimately, in October 2008, the part completion was issued to us.

Plans were designed & all drawings were submitted for building permit & the construction commenced on 12.11.2009.

2008/2009 18 months

My activities Job Descriptions

Design & Construction

Supervision Execution

My Own House NCR Faridabad Controls HUDA MCF Architectural Plans Elevations Sections Services Landscape Hard & Soft Structural Plans Design & Details Bar Bending

ScheduleAll relevant details

Design relevance Used Frames designs by Kani’s Rotation Contribution Theorem

Used Self developed worksheets

Used Self developed columns & beams worksheets

Successful Implementation on all frames. Skilled persons learnt much.

Cost saving achieved.Marble paint, no wood works, Aluminum doors, Windows

Site Works Labour Rate contracts Self procurement all materials

Execution & supervision self

Plywood & battens used for formworks

Good results

Costing 2008/2009 Structural costing Rs 5380 per sqm 250 cum RCC 22 T rebars Floors Basement Ground Double

HeightGround Normal First Floor Second Floor

Roofing Used Battens + Ply to embed in roof finishes body

Concrete on the wooden body

It is a model structural for residential buildings

Span 11 m Light without clay fill. Cost saving achieved

Soil Improvement for permeability of water

40 mm aggregate 300 mm

10 mm aggregate in voids

Stone dust in voids Compaction Blinding & foundation on it

2010/2011 6 months Execution Control Coordination with All

DepartmentReview of General + Special

Clarification from client representatives

Activities for deliverable or work pakage

Project Management & Knowledge Areas Integration

Indian- born 30.1.1955 (55), Permanent Add: 430, Sector 21B, Faridabad, NCR, India 121001, 0091-9810610718,Driving Licenses - Qatar, UAE, KSA, India, [email protected],

Professional Engineer Civil Suraj Singh s/o Late Shyam Lal Page 20 of 37 January 23, 2011

Conditions production Management

ControlDesigns Supervision Monitoring Reviews Updates

Procurement Control

Requisitions Quotations Decision Making Reviews & Approvals

Deliveries

Communication Control

Meetings, Correspondense, Mails, Talks

All level communication

Preventive measures

Actions Reviews

CPD Continuous Professional Development:

Plants Record Centre

Technical Writings including designs

25 # 500 hours

Meetings 45 #350 hours

Minutes writings included in compliance with the contract conditions & the facts for client reviews & acceptance next meeting time.

Estimations & EPC Tendering

Technical Writings including designs

1500 hours Commercial4000 hours

Negotiation with hundreds of vendors for price control & for compatibility to specifications demands.

Report Writing

250 hours Meetings500 hours

Intensive studies of the bid documents in all aspects from contract award to handover or closing. All aspects covered on 3 to 4 pages.

Professional Books

Revision

Civil Engineering Buildings Practice 1996 with CBS publisher

100 hours Manuscript Submitted September 2009Added safety health & environment.Added latest achieved construction briefs & certain photos.

Facilities Petrochemicals

Civil Engineering Buildings Practice

750 hours On line published on e groups 2007 free of costAlso, published on SEFI 2009 free of costwww.sefindia.org Resource for Engineers.Thousands benefited over globe.

Construction Method statements

Civil Engineering Buildings Practice

500 hours Under final stage of review. Resource for Engineers from all disciplines generally.

SEFI Postings

Username suraj , rccbuildings2

Responses to engineers’ questions >

800 hours Detailed explanationsParticipating debateswww.sefindia.org

Indian- born 30.1.1955 (55), Permanent Add: 430, Sector 21B, Faridabad, NCR, India 121001, 0091-9810610718,Driving Licenses - Qatar, UAE, KSA, India, [email protected],

Professional Engineer Civil Suraj Singh s/o Late Shyam Lal Page 21 of 37 January 23, 2011

500 posts General Discussions

Training Safety Awareness Al Jaber Energy 4 Hours Refreshing course 30.3.2006 Excel

SoftwareIntroduction/ Inter/Advanced Courses

Sponsored By Al Jaber Energy

40 Hours M S Authorised EXCEED I T Services Abu DhabiDuration 26.6. 2006 to 30.6.2006

Videos Engineering Construction

for public view 70 to 80 hours Livewww.video.google.com

Resource Person

Earth Quake Risk Management Traini ng for 6 days, Government of India sponsored

Resource Person for 2 days in 2 sessions 1/1/2010, 2/1/2010& Panel Member Punjab State Resource Institution

Guru Nanak Dev Engineering College Ludhiana

Training Imparted to Government Employed Senior Engineers belonging to PWD & Municipalities.

Documents Preparation hours

Research On contents

120 hours

Presentation lectures/talks

Interactions 6 hours

Jeddah 2010 500 Beds

North Jeddah Hospital

Technical Writings including designs

Meetings 500 hours Internal organization meeting weekly & dailiy for technical as well as production reviews.

500 Beds North Jeddah Hospital

Submittals

Scrutiny 500 hours Materials & Drawings approval submissions.

500 Beds North Jeddah Hospital

Training to personnel

Safety & Quality 200 hours Teaching to all engineering & site staff.

Indian- born 30.1.1955 (55), Permanent Add: 430, Sector 21B, Faridabad, NCR, India 121001, 0091-9810610718,Driving Licenses - Qatar, UAE, KSA, India, [email protected],

Professional Engineer Civil Suraj Singh s/o Late Shyam Lal Page 22 of 37 January 23, 2011

Non Engineering For public activism Videos Non Engineering:

General Public interest

National politics & others review

50 hours Livewww.video.google.com

Columns / Blogs

Around 400 National politics & others review

1200 hours www.hindtoday.com

Mystery Shopping:

Assigned by Onion Insights

Market Research 20 hours http://www.sassieshop.com/2dcs/index.norm.phpto improve marketing quality of service providers

Self Appraisal In A Line- Consider myself attained to requirement in last five years.------------------------------------------------------------------------------------------------------------------------Submitted by me:P Eng Suraj SinghPE 700066-4, MIE 046231/9430, Sector 21BNCR, Faridabad121001January 23, 2011

Part 6Last CPD Details For PE Certificate Renewal Submitted In 2005> 20 Years Past Submissions Records Just For Information & ContinuitySelected for BHARAT JYOTI Indian institutional most coveted, globally prestigious AWARD in 2003 by India International Friendship Society, 16, Babar Road, New Delhi - 110001Practice Details Total 27 Years (14 Years overseas & 13 years in India)Abu Dhabi UAE & presently located in Indiahttp://www.geocities.com/suraj_engineer http://www.geocities,com/rccbuildings http://www.geocities.com/rccbuildings1 http://www.geocities.com/rccbuildings2 http://www.geocities.com/birthnumbers http://groups.yahoo.com/suraj_engineer

Indian- born 30.1.1955 (55), Permanent Add: 430, Sector 21B, Faridabad, NCR, India 121001, 0091-9810610718,Driving Licenses - Qatar, UAE, KSA, India, [email protected],

Professional Engineer Civil Suraj Singh s/o Late Shyam Lal Page 23 of 37 January 23, 2011

http://www.suraj.addr.com (This site of addr.com now discontinued).These web sites have been uploaded with hundreds of RCCBDS2003 application software files & have been accessed more than 3000 times by various levels of engineers globally. One master file provides direct access to all sites conveniently. Cyber café is being used in India to produce & upload these files to the various web sites. The title of the application software is as follows.RCCBDS 2003 Reinforced Cement Concrete Buildings Design Software online Powered/Engineered by me on MS Excel & MS Words using Spreadsheet Cells References Interlinking Relational Formula Power (SCRIRFP) code. A Contribution to Engineering.RCC frames up to 5 bays & 8 stories can be designed using these 40 #s soft solutions/templates linked to 2426 # work sheets in 120 workbooks. Available free of cost on the aforesaid URLs. The quantum of the soft work amounts to 150 MB minimum giving an equivalent 40000 A4 size pages if booked. These worksheets have been linked to each other from various calculation data areas & tabulation. Other than this software, the relevant brief cases carry many other engineering design files including AutoCAD 14 drawings for the community to have an exchange of knowledge from this store. Online work may also be carried out for immediate use in designs.MIDDLE EAST-Abu Dhabi-Qatar-Libya-IraqAbu Dhabi UAE 2.5 yearsAl Jaber Energy Services PO Box 47467, Ruwais Tel 8760011, Fax 8760035, Project Office Engineer for 600 KTA Ethylene Plant Civil Works Joined 31.10.1999 – Project Completed 2/2002- (Worked on project 2.5 Years) Abu Dhabi-UAE 1.5 yearsKhalsa Contracting & Trading Co PO Box 25231Chief Engineer- 26.12.1996 to 5/1999 (1.5 Years)Qatar 1 yearMID MAC Contracting PO Box 1758-DohaProject Office Engineer- 9/95 to 9/96 (1 Year)Qatar 4 yearsAl-Attiyah Contracting & Trading Co PO Box 681-DohaContractor’s Project /Site Agent - 4/1985 to 3/1989 (4 Years)Libya 2 YearsElectrical Construction co-A Joint Venture Governments of India & LibyaCivil Engineer-Project- 4/1983 to 10/1984 (1.5 Years)Iraq 2 yearsAnsals, Eurodec & Associates, Sitac, Junior Project Engineer, Site Engineer, Senior Site Engineer, Project Site Manager6/1981 to 2/1983 (2 Years)WORKS CARRIED OUT DURING CAREERAl Jaber Energy Services PO Box 47467, Ruwais Tel 8760011, Fax 8760035, Bourouge Petrochemicals Project-Contracted by Alliance Bechtel Linde-Civil works executed by Al Jaber Energy services for 600 KTA Ethylene Plant (Mega Project) at Ruwais, Abu Dhabi, UAEProject Office Engineering In charge for 600 KTA Ethylene Plant- Joined 31.10.1999 – Project Completed 2/2002- (Worked on project 2.5 Years)

Indian- born 30.1.1955 (55), Permanent Add: 430, Sector 21B, Faridabad, NCR, India 121001, 0091-9810610718,Driving Licenses - Qatar, UAE, KSA, India, [email protected],

Professional Engineer Civil Suraj Singh s/o Late Shyam Lal Page 24 of 37 January 23, 2011

& prior to joining, assisted HRD Manager by conducting recruitment interviews of 500 candidates for engineers & technical staff for 7 daysAbout 85000 cum of structural reinforced concrete in massive, thick and normal structures including r.c.structural foundations, superstructures & other structures (machine foundations) involving RCC cast in situ, pre cast & structural steel more than 15000 tonnes erection. For off sites, pipe rack, Cracking furnaces, Cracked gas, Ethane & Propane compressors, boilers, wash waters, cracking gas chambers, sumps, pumps, tanks, flares towers, hundreds of machines bases sub stations, pipe racks & other buildings, roads network, etc, Sea water basins, its pump rooms, ethylene export facility etc. (Complete 600 KTA Ethylene Petrochemicals Plant). I was part of the project team a Project Office Engineering In-charge reporting to the project director, concerned with Site Technical Queries, Method Statements 150 #s Management documents (URLs), Co-ordinations, http://geocities.com/birthnumbers/ EngineeringConstructionMethodsGuidelines24.7.2002.doc http://www.geocities.com/birthnumbers/sitetechnicalquerriesrecordsforguidance3.10.2002.docMaterial Approval follow ups, Engineering matters, Re-bars, Correspondence, Designs proposals, landscape, Red lines etc, all as required by Project Director/Manager. All documentations technical & contractual as required were carried out till completion. Contract interpretations.Khalsa Contracting & Trading Co–Corporate sector- Chief EngineerE 41/C61 G+M+4 Typical-Late Butty Abdulla Butty Al Muhairy7 million, 12 months-Eng Ardent for DSSCB- Sheikh Khalifa CommitteeThe building comprised of RCC frames with shear walls, foundations, under ground tank & cast in situ piles. We he main contractor investigated site & proposed pile designs assisted by pile specialist sub contractors. Piles loads tests according to ACI/BS on selected piles as well as ultra sonic tests to ascertain sectional uniformity/ homogenous sectional concrete formation on all piles were conducted. All best modern finishes & buildings services such as plumbing, bathrooms packages, electrical, mechanical (lift), centralized air conditioning, fire fighting, communication system, security system, cradle with best finishes involving aluminum windows, curtain walls etc were involved. Permissions from the municipality & all other statutory departments were required to be obtained during the contract period only & all these management operations were successfully conducted. In this building.Also conducted one full range testing of 8th slab & after 4 months of cube failure, the slab was successfully approved by the Engineer. I was fully involved with technical & contract controls. E 19/02/C 66 G+M+2 Typical- Mohd shutait Al Khaily4.89 million, 12 months-Eng Arab Office for Planning & Architecture headed by Dr Mclouf for DSSCB- Sheikh Khalifa CommitteeThe building comprised of RCC frames with shear walls, foundations, under ground tank & cast in situ piles. We he main contractor investigated site & proposed pile designs assisted by pile specialist sub contractors. Piles loads tests according to ACI/BS on selected piles as well as ultra sonic tests to ascertain sectional uniformity/ homogenous sectional concrete formation on all piles were conducted. All best modern finishes & buildings services such as plumbing, bathrooms packages, electrical, mechanical (lift), centralized air conditioning, fire fighting, communication system, security system, cradle with best finishes involving aluminum windows, curtain walls etc were involved. Permissions from the municipality & all other statutory departments were required to be obtained during the contract period only & all these management operations were successfully conducted. In this building. E 40/C 13 G+M+4 Typical- Mohd & Hamad Bin Salem H. Harby Al Ameri6 million, 12 months-Eng Al Kheari & Al Ameri Consultants Engineers for DSSCBThe building comprised of RCC frames with shear walls, foundations, under ground tank & cast in situ piles. We he main contractor investigated site & proposed pile designs assisted by pile specialist sub contractors. Piles loads tests according to ACI/BS on selected piles as well as ultra

Indian- born 30.1.1955 (55), Permanent Add: 430, Sector 21B, Faridabad, NCR, India 121001, 0091-9810610718,Driving Licenses - Qatar, UAE, KSA, India, [email protected],

Professional Engineer Civil Suraj Singh s/o Late Shyam Lal Page 25 of 37 January 23, 2011

sonic tests to ascertain sectional uniformity/ homogenous sectional concrete formation on all piles were conducted. All best modern finishes & buildings services such as plumbing, bathrooms packages, electrical, mechanical (lift), centralized air conditioning, fire fighting, communication system, security system, cradle with best finishes involving aluminum windows, curtain walls etc were involved. Permissions from the municipality & all other statutory departments were required to be obtained during the contract period only & all these management operations were successfully conducted. In this building. Wadi Al Fill-Nahel Town, Al Ain –PWD Kinder Garten Typical (Partly by me)8.59 million, 18 months-Eng Al Burj Engineering ConsultantsThe building comprised of RCC frames using mechanical connectors for 32 mm dia rebars, combined footings, independent foundations. We the main contractor investigated site & proposed no need of pile designs assisted by pile specialist sub contractors. Combined & isolated foundations & straps were designed & executed. The school comprised of Atrium, workshops, classrooms & all required facilities, car parks, pergolas, courts. All best modern finishes & buildings services such as plumbing, bathrooms packages, electrical, mechanical (lift), centralized air conditioning, fire fighting, communication system, security system. Best finishes involving aluminum windows, curtain walls etc were involved. Permissions from the PWD& all other statutory departments were required to be obtained during the contract period only & all these management operations were successfully conducted. In this building. Villa, Plot #134, W 47, Abu Dhabi –Late Butty Al Muhairi1 million 12 months- Eng Ardent for DSSCB-RCC structure with beam frame foundation as suggested by us the main contractor based on the soil investigation report & the Engineer’s proposal of piles was replaced with municipal approval.E 19/02, C 76/77, G+M+2 Typical- Khalifa Ubaid Al Farisi4.6 million 10 months-Eng Al Ain Consultants Engineers for DSSCBOther than the control of the aforesaid works, as chief engineer coordinated technical, contractual aspects, sub contracts documents construction for all projects prepared many tendering bids & acted as an expert adviser to the management & technical expert for co-ordinations. Conducted recruitment interviews for engineers on management behalf many timesMid Mac Contracting- Corporate sector - Project Office EngineerROS (records of survey) Verifications for civil works for LNG tanks 4 #s, 85000 cum capacity each. These works were conducted according to IS 9000 total quality systemsAt Ras Laffan site assisting Chief Engineer for all specified activities such as design reviews, working drawings, estimates, costs, planning & coordination, site visits for engineering purpose. Complete Engineering Control for Beach Villa/Palace Project in 10 hectaresJob Description-Review survey activities, Issue all technical documents, coordinating design activities, shop drawings follow up, shop drawing preparation, civil works specification preparation and procedures, keeping & analyzing progress record, coordinating & verifying changes to Engineering schedules according to construction needs, coordinating the issue of As Built drawings, making technical evaluation of vendors and subcontractorsAl Attiyah Contracting- Corporate sector-Contractor’s Site AgentLandscaping of 5 schools-Hard landscapes included sports courts surfacing for Tennis, Volley ball, Hand ball, etc Soft landscape included tree pits, grass areas etc. Also included fencing, screen walls, footpath & infrastructure works of minor nature such as plants irrigation, benches, kerbs, and water tanks. These landscapes were decided on sites using actual conditions of lands.

Indian- born 30.1.1955 (55), Permanent Add: 430, Sector 21B, Faridabad, NCR, India 121001, 0091-9810610718,Driving Licenses - Qatar, UAE, KSA, India, [email protected],

Professional Engineer Civil Suraj Singh s/o Late Shyam Lal Page 26 of 37 January 23, 2011

Boys preparatory school at Umm Salal QR14 million –Qatar Consultant Group for AED (Architectural Engineering department)13 class rooms, 1 assembly hall 18 m span, workshops, lecture room, library, physics & chemistry labs, darkrooms, plant rooms, facilities, mosque, guard room, long boundary wall, external works, courts surfaces, pergolaBuilding comprised RC framed structure and high class finishes, centrally air conditioned using package units, chillers, Air handling units and the duct systemFalse ceiling mineral fiber, metallic aluminum, Electrical system included fire alarm, call bell, auditorium speaker system, external flood lights, Plumbing included CW, HW & CHW, Vulcathene injected PVC gas pipes in laboratory. External included sewerage, water supply, fire fighting, plant irrigation, electrical, telephones, mosque, sub station,Barzan Army Camp development Ph II for 2nd Royal Guard (85% completed)27 million QR-Rice Perry Ellis & Partners 18 months for Army Works Engineering UnitFiring/Shooting Range indoor & Outdoor, 300 m, 3 shooting position from main administration & office building, 2 #s 300m long RCC baffle walls, Bullet Trap Chamber, Target Pits, Over head gantries on structural steel trusses supporting armored plates shielded by WP Hardwood cladding, Main office building ac Upright walls of the Bullet Trap chamber retained dune sand both sides to protect soil fill to dampen bullet velocitySports Facilities Building containing 2 # sports halls (Indoor Gymnasium), 4 #s Squash courts. Changing rooms, lockers rooms, Spectators gallery, cafeteria, as RC /Structural Steel composite structure converted from an existing garage, swimming pools 25x13mx3m deep for competition purpose with balance tank, filter room for 10 tones, chlorinators, acid chambers, pumps for water recirculation, surface scum out drains, underwater flood lights, Belgium poolside carpet Lano Greenfield, aluminum cladding cover over the building, games field, minor structures, such as pump house, net stores, pitch equipment stores, kick about area, stadium enclosures, football pitch, pergolas, 12m & 18 m high light poles, chain link fencing, lift, sports surfacing, such as Tennis, handball, volley ball, football pitchSquadron Offices, Officers QuartersRCC structures with all high profile finishes, in many areas epoxy floor, domestic swimming pool 14x7m, all rooms air conditionedAssisted for the contracts claims, contractual matters correspondence, tenderingElectrical Construction Company-A joint venture of Government of India & Libya SPLAJ Tripoli- Project Engineer- A project in remote desertConstruction of 4x2 KVA diesel power station Standby unit-Air base project at Al Gordhabia, Sirte Town-Designer SACM France- Company carried out work without contractor or suppliers. (Departmental status work)-Successfully carried out all woks on independent basis & after completion French Engineer certified the correctness of these works.Alternator cum Generator bases massive RCC foundations, generator foundation isolated from raft by vibration isolation using Neoprene pads fixed on steel plates connected to RC raft by steel nails, pads surrounded by extruded polystyrene further covered with polythene sheet, over placed a site fabricated steel frame lamina coThe vertical surfaces isolated by covering with polystyrene, neoprene (double course at corners in triangular shape) and polythene. The generator and isolator foundations were provided with bolt grooves 16 & 6 #s 1.5 m deep to be grouted post m/c erection. Cable trenches around foundations for HV/MV. The foundations to the structural steel frame were RCC footings of massive/thick element size & grooved in for anchor bolts. Overhead gantries were provided in the building. Fuel oil tanks, sump tanks, radiator foundation etc were also constructed. Area was rock lime sand. Bulldozer with ripper was used for mass excavation for the building area, storage oil tanks. Ready mixed used for concrete with pump

Indian- born 30.1.1955 (55), Permanent Add: 430, Sector 21B, Faridabad, NCR, India 121001, 0091-9810610718,Driving Licenses - Qatar, UAE, KSA, India, [email protected],

Professional Engineer Civil Suraj Singh s/o Late Shyam Lal Page 27 of 37 January 23, 2011

66/11.5 KV Sub Stations 16 #s – Foundations in BenghaziCoordinated & executed the sub station works spread over a wide areaSitac- Senior Site EngineerConstruction of 5 pump houses at Mehmodia Baghdad-Clayey soil in high water table-used Miller pump ring system of well points in 3 levels to achieve 9 m deep excavation dry. The water table rise was a continuous problem & Millers pumps were continuously installed for operation & the foundation area kept dry until the RCC raft laidEurodec & Associates- Project Site Manager-Senior Site EngineerConstruction of building Tower portion involving 5000 cum structural frame concrete-Dar Al Thawra Press Complex from 4th floor terrace to 65 m elevation. Each slab 500 cum poured in 21 days cycle using reciprocating stationary concrete pump and batching plant. Finishing items carried out in sequence on the lower floors-On the facets of the tower fair face concrete –Marine ply used for forms- Day and night work for months. Every week coordination meeting was conducted. Every day planning & coordination meeting was conducted. All columns, beams, slabs were prepared & poured successfully. Directed 20 staff members & reported to the company owner. Coordinated with the Jordanian company management of United Engineers as well as with the client the authorities of the Iraq government engineers. National consulting Bureau –Supervised by Iraq government engineersAnsals-Grain silos –Shirkat-Junior Project EngineerConstruction of ancilliary buildings (Finishing items only) –staff quarters, workshops, weighbridge foundation, administration building, guardhouse, pump house, resident engineer office. All modern finishes were involved. Coordination with the building services was conducted with the main contractor, sub contractors & engineers. Some minor designs were produced & adopted for execution & executed.IndiaHeaded M/S SKY ASSOCIATES-Building Engineering group 5/89 to 95Prepared Schematic Plans for a proposed IndiaTown to accommodate 500,000 inhabitants in National Capital Region of India-estimated cost to 1991 rates IR 60 billions- Client-Proprietor Badri Narayan / BM Promoters-2nd floor, 1186, Bhagwati Market, Kucha Mahajani, Chandni Chowk, Deli 10006. This was a model for the national integration of India giving cultural dimensions to the building, well thought of to create a new district near Delhi & complete conceptual scheme was based on thorough research & innovation by presenting completePreliminary Schemes, System Designs regarding Structural & Architectural disciplines, Management aspects, dissertations- Due to the unsuccessful funding, the scheme shelved –Area-Prithala to Palwal –6000 acres approx to be enhance to 10000 acres in future.A case was initiated vide IPA 18/93 for the fee recovery & after 10 years of proceedings, the Delhi High Court did not allow the case to be continued as indigent person & directed to file the heavy court fee. This scheme involved a national integration concept to give to the buildings a style of letter shape structures & numbers. An approach to design 55 minimum complexes involving 550 structures with an objective to produce self contained complexes consisting of all modern facilities & 80 % green area for environment needs & including shopping malls, police station, community centers, multistory car ports, swimming pools, separate service floors, under ground water reservoirs, over head reservoirs etc allowing individual names to each complex. Delhi Development Authority-Statutory body- Junior EngineerSupervised the construction of shopping centers, dwelling units, development works such as pavement, drains, toilets, garden walls, pipe lines, in resettlement colonies, survey on the environmental improvement schemes, estimation and quantities, valuation, planning and coordination & parliament questions & government reports.The shopping complexes comprised of RCC structures & general public category finishes, Responsible for the supervision over the contractor,

Indian- born 30.1.1955 (55), Permanent Add: 430, Sector 21B, Faridabad, NCR, India 121001, 0091-9810610718,Driving Licenses - Qatar, UAE, KSA, India, [email protected],

Professional Engineer Civil Suraj Singh s/o Late Shyam Lal Page 28 of 37 January 23, 2011

preparation of the running & final valuations & coordinating with the executive & assistant engineers.Supervised other infrastructure development works in Delhi including the surveys & estimations pertaining to the environment works for the slums & katra improvements. Worked in the planning & coordination & responsible for the tender justification of item rates & the tender costs. Construction of MIG Dwelling Units 180 #s at Wazirpur Phase IIIConstruction of CSC shopping center at Wazirpur Phase III 14 shopsConstruction of CSC shopping center at Shakti Nagar Extension 24 shopsWorks of resettlement colonies in Khichripur, Kalyanpuri, Mangolpuri, jahangir puri etc involving construction of drains, streets & road works on emergency level.Also carried out my Section A & B studies during this job.Qualified Accounts examination conducted by CPWD to cross Efficiency bar

Professional Contribution, Research & Development, Education & CPD (under separate table below)S #

Details about personal development. Also refer to Continued Professional Development please. Remarks/Personal responsibility/Achievement

1 Civil Engineering Building Practice –Containing Project Management, State of the Arts Contracts, New Site Schemes, Structural Profiles, swimming Pools, Baths, Engineer in Law with Statutory References www.careerdowell.com/BS/Subcat/Engineering4.htm listedwww.kist.ac.rw/adbreport4/Appendix10.64.htm listedManuscript Preparation 1990 –1994 Published in 1996 CBS Publishers

Manuscript 1990-1992Published 1996IEI reviewed In Technorama

2 Civil Engineering Buildings Practice - Dissertation works on RCC design pertaining to buildings in general using Kani’s Rotation Contribution method for frames resolutions also to be utilized for the projects but publication was jeopardized due to immense volume of pages.Manuscript preparation 1989-1992. These pages have now been incorporated into soft solution forms RCCBDS2003 as given later & the process of incorporation into soft files shall remain continuous. On line 2003 http://www.geocities.com/rccbuildings

Manuscript 1989-1992

3 Civil Engineering Building Practice- Containing 55 # HomePlans with isometrics In 4 directions, 700 sketches - Manuscript Prepared 1994 Not published Yet Immense research was involved to get the required information & orientation & setting in operations. All birds’ eye view along with the detailed plans & elevations & services incorporated

Manuscript 1993-1994Achieved standards plans for general staff & engineering staff

4 Applied Spiritual Numbers 0-9 & Luck Published in 1998, a new concept of number based formations to anticipate the time effect spiritually. Lot of research work on formation of series of equations mathematically using Lotus 1-2-3 formula programming which assisted immensely. A new subject produced for world. SLSM Publisherswww.iitd.ac.in/library/recent/march2000.html listed. Web site also created.

Manuscript 1998Published 1998IEI reviewed TechnoramaInnovation on numbers

Indian- born 30.1.1955 (55), Permanent Add: 430, Sector 21B, Faridabad, NCR, India 121001, 0091-9810610718,Driving Licenses - Qatar, UAE, KSA, India, [email protected],

Professional Engineer Civil Suraj Singh s/o Late Shyam Lal Page 29 of 37 January 23, 2011

5 Execution & Administration of high profile projects –RC Structures. Involved fully personally to get on to all engineering & all other details to execute the projects works in all respects as site agent. Directed the site & the project engineers of various disciplines to let them know the procedure & technical details to carry out the jobs on site & coordinated every activity where technical decision-making was required. Involved on all disciplines to produce the results so that to let me know more & more & learnt & taught a lot.

Achieved successful construction for various project till completion & contributed for overseas fieldDetails in Career

6 Commercial, Educational, Army, Residential, Petrochemicals. Involved fully personally to get on to all engineering & all other details to execute the projects works in all respects as site agent. Directed the site & the project engineers of various disciplines to let them know the procedure & technical details to carry out the jobs on site & coordinated every activity where technical decision-making was required. Involved on all disciplines to produce the results so that to let me know more & more & learnt & taught a lot to site as well as to the project engineers & also the middle level site staff & consultants.

Achieved successful construction for various project till completion & contributed for overseas fieldDetails in Career

7 Planning schemes-Office Engineering-Site EngineeringInvolved fully to produce all details of the technicalities, engineering, shop drawings, approvals, material submittals, drawings submittals, other submittals, technical & coordination meetings, progress review meetings, reports, method statements writing, technical queries, costs, estimates, debates, conferences on site & all activities so required.

Achieved successful construction for various project till completion & contributed for overseas fieldDetails in Career

8 English, Maths, Physics, Chemistry, Engineering Materials, Engineering Drawings & Laboratories, Electrical Engineering, Mechanical Engineering, Strength of Materials, surveying, Hydraulics, Engineering & Mech Drawing, Labour Relation & Civics, Carpentry, Fitting, Heat engines, Electrical & Welding shops, Civil Engineering laboratory, Strength of Material Lab, Hydraulics Lab, Estimation & costing, Applied Mechanics & Strength of Materials, Overseers Duties & Accounts, Details of Construction, Drawings & Detailing (Civil), Public Health Engineering, Irrigation, Road railways & Bridges, Surveying, Tours, Viva Voce all subjects including Erection & Construction Plans

EngineeringDiploma

9 Math I, Math II, Applied Mechanics & Strength of Materials, Modern Physics, Applied Thermodynamics, Elements of Electrical Engineering, Drawings, Material Science Processes, Social Science. Period of one session for the clearance from the Referee to join section BTheory of Structures, Construction & Foundation Engineering, Fluid Mechanics, Surveying, Structural Designs, Water resources, Applied Geology, RailwaysSelf continuing educationTown Planning & Architecture, Multi Storied RC Frames, Dissertations on Building Frames, dissertation on new style of structural & Architectural Designs, new concept on RCC foundations for various levels of buildingsComputer Literate in Dos, Lotus 123, MS Words, MS Excel, Power Point, MS Project, Auto CAD-14, MS Front page, Internet

EngineeringDegree

Grade IE

Self continuing education

Information technology

Continued Professional DevelopmentS #

Year Description of activity Hours Personal Responsibility

Indian- born 30.1.1955 (55), Permanent Add: 430, Sector 21B, Faridabad, NCR, India 121001, 0091-9810610718,Driving Licenses - Qatar, UAE, KSA, India, [email protected],

Professional Engineer Civil Suraj Singh s/o Late Shyam Lal Page 30 of 37 January 23, 2011

1 1982 Eurodec & associates (Large Project)Coordination meetings/weekly progress meetingsConducted interviews for workers recruitment

200 Yes for all operations

2 1983-84 Electrical Construction Company Libya JV, GOI & SPLAJ Planning CPM, coordination, Inquiry commission for Sabha sub station site (Large Project) Conducted interviews for workers

1800 Yes for all operations

3 1985 Visited Institution of Structural Engineers London 6 Personal visit4 1986-89 Al Attiyah contracting Doha/Qatar (Large Project)

Technical Policymaking, Coordination & progress review meetings, preperation base records for the contractual & arbitration purposes,Training to learn sports courts surfacing & epoxy flooring demonstration by the propriety suppliers, training imparted to site engineers

600 Yes for all operations

Training given & Received also

5 1986-89 Associated with Tendering system of the Al Attiyah contracting Doha/Qatar 600 Learn lot of tendering 6 1986 Attended corrosion resistance lecture by UK engineers 3 Learning & information

exchange7 1989 Attended lecture on ISO 9000 by Indian Standard Institution at IEI Delhi center. 3 Learning & information

exchange8 1990-

1994Attended many memorial & Engineers day lectures at IEI Delhi Center 12 Learning & information

exchange9 1990 Designs for client Ranbir & Madhu saini 400 Yes for all operations10 1990-94

1990-941993-03

Designs for K.K.Jaitly. Many structures were designed according to IS 456 Schematic Designs for the Township Project for BM Promoters & its complete legal follow up

500

8000300

Yes for all operations

11 1991 Various bare Indian Acts study for awareness 400 Learning12 1992 Load Test of Jubilee Cinema balcony Delhi 100 Certification13 1992 Seminar on NCR by PHD Chambers Delhi

This was 1-day seminar conducted by corporate sector & Government of Delhi. Presented paper on integrated complex development INDIA TOWN

8 Learning & information exchangePublication

14 1990-95 Building practice management book (Large Project) 4000 Yes for all operations15 1993 Building Practice home Plans Standards 55 cases

(Large Project). All details were included.3000 Yes for all operations

16 1993 Lecture by ICE president at Delhi Center about management in engineering. Also he presented ICE activities & various slides of ICE.

3 Learning & information exchange

17 1993 Lecture by IEE member delegation about engineers & institution in UK & about chartered engineer designation & its legal representation.

3 Learning & information exchange

18 1993 Lecture on aeronautical structures at IEI Delhi Center. A discussion on the plane structural engineering though not in civil but of interest.

3 Learning & information exchange

19 1994 8 th Indian engineering Congress at Vigyan Bhawan. Held for 3 days continuously inaugurated by Mr Balram jakhar hon’ble minister.

24 Learning & information exchange

Indian- born 30.1.1955 (55), Permanent Add: 430, Sector 21B, Faridabad, NCR, India 121001, 0091-9810610718,Driving Licenses - Qatar, UAE, KSA, India, [email protected],

Professional Engineer Civil Suraj Singh s/o Late Shyam Lal Page 31 of 37 January 23, 2011

20 1995-96 Safety Training in TBMM-MIDMAC by CHIYODA CorporationSafety awareness training module 1 for construction safetySupervising safety/Causes of accidentsWorking at heights/Site safety inspectionHouse keeping/ Personal Protective Equipment

24 Learning At Qatar Gas LNG ProjectQatar Ras LafanComplete Engineering of beach villa

21 1995 Study of ACI 318, BS & QNBS 200 Learning22 1996 Lecture by FOSROC Chemicals at Doha Qatar.

Demonstrated all its products & multimedia show at Hotel Ramadan6 Learning & information

exchange 23 1996 IEI Chapter Doha / Qatar, Ramadan Hotel, Lecture by Qatar National Gas Corporation

Mechanical Engineer at Doha Qatar about pipelines6 Learning

24 1997 8th slab testing to clear the rejected slab Abu Dhabi& Contractual proceeding to obtain the delay extensions & preparation for the bases for the arbitration award (Large Project). All technical & contractual matters handled by me to resolve the slab & ultimately successfully achieved results.A technical paper written & with IEI

300 Yes for all operationsLearning, teaching & information exchange

25 1998 Joining computer training in Delhi for Computer applications, MS Office, Lotus, AutoCAD, MS Project & composed my book pages.

1200 Learning

26 1992-1998

Applied spiritual numbers 0 to 9 & luck manuscript (For the survival & sustainable development of society as a whole, soul system is extremely important to be understood, which understanding enhances the working & thinking capacities(Large Project). IEI reviewed in Technorama.

1200 Yes for all operationsTeaching the subject about Theurgy

27 1998-2002

Safety training in AJES-General & fire fighting exercises/ drills (Large Project) 24 Learning & information exchange

28 1998 Oracle 8 & Developer 2000 softwareSoftware Solutions Integrated workshop in Delhi Lajpat Nagar about RDBMS

8 Learning

29 2000 Lecture in AJES about QA systems 3 Learning & review30 2001 General conditions of Contracts Qatar

Study of the clauses, interpretation & review with comments for my record to be published later with further additions. It is still in study stage & publication shall take time.

200 Learning & review for further writing to explain to the professional engineers

31 2001 AJES Designs. The details included in the design section of this record. 3500 Yes for all operations32 2000-

2002Computer awareness about Excel & AutoCAD to many engineers & staff members in AJES 200 Training given

33 2002 Attended Disaster mitigation forum IEI Delhi Center 3 Learning34 2003 Professional Engineer licensing E conference at SEFI on internet. This conference continued

for 3 days & various legal & other aspects were conferred by members all over globe20 Yes for all operations

Teaching35 2003 Professionalization of Engineers National Seminar in New Delhi Indian Habitat Center

Organized by Engineering Council of India April, 30 & May 112 Learning & information

exchange36 2003 Structural softwares e conference SEFI on inter net. RCCBDS 2003 was suggested for

review of the members8 Learning & information

exchange37 2003 Indian codes SEFI e conference on inter net. A long discussion about codes published by 8 Learning & information

Indian- born 30.1.1955 (55), Permanent Add: 430, Sector 21B, Faridabad, NCR, India 121001, 0091-9810610718,Driving Licenses - Qatar, UAE, KSA, India, [email protected],

Professional Engineer Civil Suraj Singh s/o Late Shyam Lal Page 32 of 37 January 23, 2011

BSI & their reliability exchange38 2003 Discussion forum of SEFI on inter net discussion [email protected] 100 Learning & information

exchange39 2001-

2003

1989-1992

RCCBDS 2003 application software also available on line (Very Large Project) Accessed> 3000 timesThe URL given above. Contains more than 150 MB/ 40000 A4 size pages. This software is a conversion of the manual work on design dissertations done in 1989/91 not published then due to huge volume. Also created web site for spiritual numbers forming mathematical sequences for mind entertainment.

4000

3000

Yes for all operations

40 2003 Written discussion 500 words on Ethics in contract performance by Member R Ramakrishana in Vol 84 May 2003Tried to explain various contract Acts implications

10 Yes for all operationsInformation exchange

41 2003 Technical Paper sent to IEI8th slab of a RCC building ultimately survivedGives the testing history of rejected slabIEI AcknowledgementRS/T-177/CV/SE-86/JULY 23, 2003

50 Yes for all operationsTeaching & Information exchange

42 2003 Technical Paper sent to IEIMethod statements on Industrial Construction ProjectsGives an outline how to formulate statementsIEI AcknowledgementRS/T-177/CV/CPM-18/JULY 24, 2003

50 Yes for all operationsTeaching & Information exchange

43 2003 Technical Paper sent to IEIRCCBDS 2003 Structural frames soft SolutionsIEI AcknowledgementGives outline how the software has been producedRS/T-177/CV/SE-87/JULY 24, 2003

50 Yes for all operationsTeaching & Information exchange

44 2002/2003

Association with E groupshttp://groups.yahoo.com/suraj_engineer/birthnumbers, rccbuildings, AlMohandis, DabMeador, design-answers, earthquakeengineering, eflash-ieindia, Engineering jobsUK, hvac-rp, ieindia, ieiplc, indianengineers2000, Lighthousebeach, mechanicalengineers, mobile4arabs, My-india, naturalmineralwatergroup, pcetx, peoplesoft, peoplesoft users, petro-amu, PETROSPECTION, structural-world, structuralengineering, structure, thestarswarsfansclub, mechanicalengineering, institutionofarchitects, sefindia, PlantEngineers, mineralwater,

800

Enabled me to interact with about 8000 engineers globally. Technical & engineer’s cause discussions have been held.Conferences on inter net held

Design Projects # Year Description of project of personal responsibility Client Remarks1 1988 Plans for an existing house 3604 Darya Ganj showing property partitions Owner Dakho

DeviFor court purpose

2 1989- Structural dissertation on designs for RCC building frames regarding foundations, For publication Research

Indian- born 30.1.1955 (55), Permanent Add: 430, Sector 21B, Faridabad, NCR, India 121001, 0091-9810610718,Driving Licenses - Qatar, UAE, KSA, India, [email protected],

Professional Engineer Civil Suraj Singh s/o Late Shyam Lal Page 33 of 37 January 23, 2011

1993 combined footings, rafts, frames analysisAbout 1200 pages

& StandardsFormationWork

3 1990 House design plan for Faridabad 430/1A, Sector 21 BArchitecural, Structural, Services, BBS, Building permit follow up etc

Owner Sumitra

Complete packageDesign

4 1990-95

Planning, Architectural, Structural & Schematic design for India Town a proposed Satellite Township near Delhi in NCR National capital Region for an accommodation of 500,000 inhabitants. Concept, scheme, development, structural preliminary formationAlso participated with the proposed revision of Unified bye laws as ordered by HC Delhi by filing suggestions regarding technicalities & engineers competencies

Very Large ProjectM/S B M Promoters

Public interest workFor Buildings

Office design works only

Social awareness

5 1992 Conducted load tests of Jubilee cinema balcony in Delhi @ 500 Kg/SM jointly with Eng Dr Jain to statutory requirement for evolution of the remaining life of the existing & restored structure

Jubilee cinema

Certified safety

6 1992 Architectural & structural details proposal for reformation of an existing plotted house Krishna Nagar Delhi

Owner Sharma

Preliminary design

7 1992 Complete package details for a plotted house A 8 Krishna Nagar, Delhi Mr Ranbir Saini

Complete design

8 1992-94

Work on a book of Home Plans desired by one publisher CBS containing 55 well planned houses details in about 1000 pages

Not published due to large size

Reseach work

9 1993 Usha temple extension in West DelhiDetails of the temple dome also included.The architect was not able to carry on the project further & contacted me to inspect & design the extension structure. I studied the problem & resolved using combined footings & structural beams. The building was successfully extended.

Architect K.K.Jaitly

Structural design of foundation & superstructure using combined footings

10 1993 Building plan for an existing building Delhi Gate New Delhi. The plan was required for the legal purpose & complete survey was conducted of the irregular shape & details noted & reproduced.

Owner Kishori lal & Laxmi Narayan

For court requirement

11 1993 Valuation for bank loan for many proposed houses based on the drawings provided by the owners

Many clients Certificates issued

12 1993 Building plan for an existing building Laxmi Nagar New Delhi Swami Records13 1994 Structural survey conducted for an old building to reform into new proposal Delhi Nai

Sarak. Coordinated with the Architect & ownerArchitect K.K.Jaitly

Design calculations & plans

Indian- born 30.1.1955 (55), Permanent Add: 430, Sector 21B, Faridabad, NCR, India 121001, 0091-9810610718,Driving Licenses - Qatar, UAE, KSA, India, [email protected],

Professional Engineer Civil Suraj Singh s/o Late Shyam Lal Page 34 of 37 January 23, 2011

14 1994 Architectural & structural details proposal for a plotted house Sanik colony Delhi Owner O P Dhalla

Preliminary design

15 1994 Architectural & structural details proposal for a plotted house Rajasthan. Architectural, structural, services, BBS, directory statements,

Owner Kartar Singh

Complete packageDesign

16 1994 Architectural & structural details proposal for a temple Maharastra. Provided all structural details & concept.

Architect K.K.Jaitly

Consultancy& Design

17 1992-96

Worked on a book Civil Engineering Buildings Practice giving site management, contracts, designs, swimming pools, construction operations, sketches, engineer in law & statutory references

CBS Publishers Published 1996

Researchwork

18 1998 Worked on a book Applied spiritual numbers a research work using programming on Lotus 1-2-3 software

Published by SLSM 1998

Researchwork

19 2000 House design plan for Faridabad 500 sq m plot. Prepared & approved all structural & architectural details

Owner Sumitra

Complete packagedesign

20 2000 House design plan for Pakistan client (colleague).Prepared & approved all structural & architectural details with services & other directions, landscape

Owner Suhail Complete packagedesign

21 2001 House design plan for Kerala client (colleague).Prepared & approved all structural & architectural details

Owner Vargheese

Complete packagedesign

22 2001-2003

Ethylene plant 600 KTA capacity, Civil works working drawings, shop drawings, landscape drawings, road layout & designs connected with it. Thousands of personnel worked.Landscape Administration building areaLandscape Central control Building areaAdministrative building investigation for erroneous construction by project site engineerWorking drawings for 400 manholes chambers duly researched, coordinated, prepared & after approval issued to project site engineers/superintendent for pre cast fabrication of RCC structures.Culvert designs for 6 locations with complete details including BBS to BS 4466 & structural calculations.Pump room designs 2 locations/calculations Design coordination for warehouse. Review.Site technical queries 1500 #s to resolve technical issues for the project site engineers implementation approved by client office & recorded for red lines.Method statements 150 #s all pertaining to civil & structural engineering activities after approval issue to project site for implementation imparting working direction to the site

Very Large ProjectAJES/ABL/Borougeat Ruwais Abu DhabiRCC comprised 85000 cum in light & heavy structuresMajor achievement. Roads network on 3 km x 2 km site area

Package WorksTo UK office approval

Imparted training to many site engineers & foreman through these documents& designs to be used

Discussed technicalities with the engineers to let them understand the technical parts to implement smoothly.Many engineers benefited after getting

Indian- born 30.1.1955 (55), Permanent Add: 430, Sector 21B, Faridabad, NCR, India 121001, 0091-9810610718,Driving Licenses - Qatar, UAE, KSA, India, [email protected],

Professional Engineer Civil Suraj Singh s/o Late Shyam Lal Page 35 of 37 January 23, 2011

staff. A technical paper on method statements written & with IEI.These were issued after complete documentary research & studies. All red lines documents prepared to be issued to the ABL for recording into their formation of record drawings for maintenance purpose according to contractual requirements. Involved with the Quality Control & engineering meeting & coordinated accordinglyResolved hundreds of site technical issues with the client Supervised the AutoCAD draftsmenIn charge of the Project Site Engineering Section

Pipe racks all over site

Prepared my roads diversion schemes for the smooth traffic flow according to international conventions.

technical information provided.

23 2000-2003

RCCBDS 2003 An application software Reinforced Cement Concrete Buildings Frames Design software available on line based on super macro formation using MS Excel & MS Word packages, using Kani's Rotation Contribution Method for moments resolution on frames. This software sizes up to 150 MB & more giving about 40000 A4 size soft solutions & also other management documents details. Reference web sites URLs. A technical paper already submitted to IEIhttp://www.geocities.com/rccbuildingshttp://www.geocities.com/rccbuildings1http://www.geocities.com/rccbuildings2http://www.geocities.com/birthnumbershttp://www.geocities.com/suraj_engineerhttp://www.groups.yahoo.com/suraj_engineer [email protected] web sites have been requested from Yahoo for free professional service to the civil engineering community

Very Large ProjectJust feed the central line dimensions & possible sectional sizes of members & loads, concrete grade & the results shall be ready for use or for research purpose.

Professional Information exchange & training

This is very useful tool for the students as well as for the practitioner.It saves lot of time of minute calculationsPresently meant for 1 bay up to 8 storeies to 5 bays

24 2002 Complete home design package for a house in Krishan Nagar Delhi. Used RCC beams frame for the foundation.Supervised complete frame.All details pertaining to all disciplines were included.

Sainis Complete design & supervisionBudget controls Package

Specific Comments about my professional achievements

The above designs were carried out by me exclusively making considerable contribution to the cause of engineering advancement & promotion.

Indian- born 30.1.1955 (55), Permanent Add: 430, Sector 21B, Faridabad, NCR, India 121001, 0091-9810610718,Driving Licenses - Qatar, UAE, KSA, India, [email protected],

Professional Engineer Civil Suraj Singh s/o Late Shyam Lal Page 36 of 37 January 23, 2011

Also made a lot of contribution to the field colleagues all these years consequently, many senior & middle level engineers & other staff learnt a lot of engineering ideas from me during these working sessions benefiting them in the field. I conducted immense interaction with all categories of colleagues with whom had a chance so to do & wish to continue these efforts.

Writing work of buildings practice made a difference in the R C C buildings practical field as the field personnel started getting tutorials by the experienced & not exclusively confined to the university professor written books.

Construction Method statements that I produced imparted high level benefits to all levels in the field & in designs supported by the site technical queries resolutions along with hundreds of design solutions in sketch & drawings form giving all working details.

Production of design shop & working drawings resolutions impacted in the field all levels to make fast implementation of the execution, wherever it was technically so required.

Publishing inter net application software RCCBDS 2003 on MS Office packages have encouraged young engineers all over to involve more into the Online system of design use & learning. These software solutions have been created without any formal aid by any computer trainer but by trial & error & self-learning initiative inculcated by the formal education obtained during education study & career. Initially small package has been presented which may later be expanded further depending on the engineers’ response to its practicality. This effort has resulted into very faster automation of designs if used properly in any field.

My teaching of computer has made many engineers, quantity surveyors & students enable form super macros conveniently & successfully & I hope to train more & more people particularly my juniors who may be keen to learn for a better future.

Representing Engineers’ Cause1 1992 Conducted many interviews with the engineering students as well as with the engineers about awareness of chartered

engineers designations. Voluntary workRepresentations to the Municipal corporation of Delhi the Government of India pertaining to this subject of engineers registration in 1992 to review the unified building bye laws consequent upon the Delhi high court orderAlso communicated with the IEI but all in vain

Awareness To theGovernment authorities& PublicAbout theEngineers problems

2 1995 Included in my book a chapter on engineers & professional legal problems. Civil Engineering Building Practice Voluntary work

Published

3 2001 After Gujarat earth quake responded to the ministry of urban development & poverty alleviation about the engineering registration issues. Also copied to IEI & PM/Ministries.In response to Public notice K-12016/5/79/DDIA/VA/1B by Mr. RC Nayak under secretary, Nirman Bhawan, New Delhi in HT 10.2.2001 The response included the Engineers Registration issues in details & various references about the laws & IEI status & suggestions about competencies of professionals & technicalities. Voluntary work. Also submitted representation to HUDA

Awareness To theGovernment authoritiesAbout theEngineers problems

4 2003 Forwarded a petition to Rajya Sabha under matter of general public interest for the Making it mandatory for the Indian institutions, municipalities etc to accept IEI Chartered Engineers/Professional Engineers certifications etc. Voluntary workIt is prayed upon the august House of Parliament, the council of states that the Government of India notify to refresh all the relevant authorities of the Indian Institutions, Courts, Government of India, local bodies, municipalities, private & in

Rights of antiquity to petition parliament by a citizen for the safeguard of professional & fundamental rights under

Indian- born 30.1.1955 (55), Permanent Add: 430, Sector 21B, Faridabad, NCR, India 121001, 0091-9810610718,Driving Licenses - Qatar, UAE, KSA, India, [email protected],

Professional Engineer Civil Suraj Singh s/o Late Shyam Lal Page 37 of 37 January 23, 2011

general public & others accept as legal document Chartered Engineers Certification/ Professional Engineers Certification wherever it is statutorily required such as for the submission/approval of the building plans, systems designs, engineering plans, engineering designs, calculations, construction drawings, all contract documents, construction methodology statements, quality assurance documents, safety & environment controls, technical controls, valuation, product total quality, process, supervision , stability, completion, estimates, project reports, services, investigation reports etc. but not limited to these. All these operational provisions to be conducted are enshrined within IEI Charter Scheme effective 1935 & still in force. http://www.geocities.com/suraj_engineer/Petitionparliament.docThe petition has been attended & update is available on this URL. There has been some favorable response & the IEI have to submits its official details about its working, responsibilities & authority Refer RS.2. (6)/2003 dated July 23, 2003. Letter communicated to IEI.IEI responded vide Ref: Memb/SDG/CE/PE-106 August 04/, 2003 supporting the Chartered / Professional Engineer Certification.The matter shall be taken up by one of the standing committee on petitions Rajya Sabha after whose recommendations in the form of a report, it shall be circulated to the Rajya Sabha & then shall be referred to Government of India for recommended actionAlso searched the inter net to explore the charters meaning available in the British chapters. Studied many charters & forwarded to thousand of engineers though internet e groupshttp://www.geocities.com/suraj_engineer/CharterMeaning.docThe government of India issued many circulars & notifications about the validity of chartered engineers certifications available on this URL & copied to engineers & the Petition Committee.http://www.geocities.com/slsmpublishers/CharteredEngineers.doc

the rules of Rajya Sabha Where there is no solution in the Acts or byelaws or Government rules.A fight for Engineers Status & Authority

Submitted for PE Certification renewalAttached with PE Renewal application formAll pages # 1 to 28 in this document undertaken to be true to best of my knowledge.

Submitted by me:P Eng Suraj SinghPE 700066-4, MIE 046231/9430, Sector 21BNCR, Faridabad121001

October 24, 2010

Indian- born 30.1.1955 (55), Permanent Add: 430, Sector 21B, Faridabad, NCR, India 121001, 0091-9810610718,Driving Licenses - Qatar, UAE, KSA, India, [email protected],