1 CV4902- Construction Methods Dr David Chew

Upload: roderick-lawrence

Post on 02-Jan-2016

212 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: 1 CV4902- Construction Methods Dr David Chew. 2 Construction Considerations Site layout plan Outline of entire construction process Details of temporary

1

CV4902- Construction Methods

Dr David Chew

Page 2: 1 CV4902- Construction Methods Dr David Chew. 2 Construction Considerations Site layout plan Outline of entire construction process Details of temporary

2

Construction Considerations Site layout plan Outline of entire construction process Details of temporary works Choice of construction methods Types of construction machineries & equipment to be

used Potential problems & difficulties during construction Contingency plans for item above Safety precautions & measures Site maintenance & cleanliness Outline of construction cost Outline of construction schedule

Page 3: 1 CV4902- Construction Methods Dr David Chew. 2 Construction Considerations Site layout plan Outline of entire construction process Details of temporary

3

Outline of Construction Procedure Phase 1

* on-site works

- site clearance & mobilization

- erecting hoarding/safety signs

- setting up site-office & facilities

- creating access/excavation works

- piling & excavation

Page 4: 1 CV4902- Construction Methods Dr David Chew. 2 Construction Considerations Site layout plan Outline of entire construction process Details of temporary

4

Phase 1 (Continued)

* off-site works

- fabricate formworks

- fabricate reinforcements

- fabricate precast concrete (or steel)

beams

- fabricate precast concrete (or steel)

staircases

Page 5: 1 CV4902- Construction Methods Dr David Chew. 2 Construction Considerations Site layout plan Outline of entire construction process Details of temporary

5

Phase 2

* Construction of pile-caps

* Construction of concrete piers

* Construction of concrete cross-heads

Phase 3

* launching of precast concrete/steel beams

* launching of precast concrete/steel staircases

* concreting of slab (floor)

Page 6: 1 CV4902- Construction Methods Dr David Chew. 2 Construction Considerations Site layout plan Outline of entire construction process Details of temporary

6

Phase 4 * Erection of steel roof truss * Other building structural works under the

roof * Installation of roof cladding

Page 7: 1 CV4902- Construction Methods Dr David Chew. 2 Construction Considerations Site layout plan Outline of entire construction process Details of temporary

7

Phase 5

* inspection

* testing & commissioning

* permit for occupation/use

* handover

* operation

Page 8: 1 CV4902- Construction Methods Dr David Chew. 2 Construction Considerations Site layout plan Outline of entire construction process Details of temporary

8

Things To Look Out For Underground Services (Check, Double-

Check!) Existing Foundations (Removed?) Safety during Construction/Road Diversion Site Constraints Access for Works Launching of Precast Beams/Columns Launching of Roof Truss

Page 9: 1 CV4902- Construction Methods Dr David Chew. 2 Construction Considerations Site layout plan Outline of entire construction process Details of temporary

9

Site Constraints

Protection of Surrounding Structures/Facilities Types of Heavy Machineries to be Used Noise/Air/Water Pollution Disposal of Spoils and Wastes Limitation of Working Hours Just-In-Time Construction

Page 10: 1 CV4902- Construction Methods Dr David Chew. 2 Construction Considerations Site layout plan Outline of entire construction process Details of temporary

10

Safety Considerations Public Safety Safety Distance of Heavy Construction Machineries

(from Existing Buildings & roadway) Restrictions during Busy Traffic Hours Protection of Existing Facilities Stability of Temporary Supports Procedure for Beam/Column Launching & Securing Stability of Lifting Crane during Launching