Arkansas Statewide Transportation Improvement Program (STIP) Presented by the Arkansas State Highway Commission in compliance with Title 23—United States Code—Section 135 April 12, 2010 Fiscal Years 2010-2013 (April 6, 2010 ~ September 30, 2013)

Upload: others

Post on 28-Sep-2020

3 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: 1 - Cover Page STIP 2010-2013 Web Version.pdf · iii TUTS - Texarkana Urban Transportation Study (Miller County) CEO of Texarkana, Texas Dr. Larry Sullivan P. O. Box 1967 Texarkana,

Arkansas Statewide Transportation

Improvement Program (STIP)

Presented by the

Arkansas State Highway Commission

in compliance with

Title 23—United States Code—Section 135

April 12, 2010

Fisc

al Y

ears

201

0-20

13

(Apr

il 6

, 201

0 ~

Sep

tem

ber 3

0, 2

013

)

Page 2: 1 - Cover Page STIP 2010-2013 Web Version.pdf · iii TUTS - Texarkana Urban Transportation Study (Miller County) CEO of Texarkana, Texas Dr. Larry Sullivan P. O. Box 1967 Texarkana,

AHTD STIP

Arkansas State Highway and Transportation Department Statewide Transportation Improvement Program

For Federal Fiscal Years 2010 - 2013

www.arkansashighways.com

Page 3: 1 - Cover Page STIP 2010-2013 Web Version.pdf · iii TUTS - Texarkana Urban Transportation Study (Miller County) CEO of Texarkana, Texas Dr. Larry Sullivan P. O. Box 1967 Texarkana,

TABLE OF CONTENTS

Introduction........................................................................................................... i

Financial Summary Report Federal Highway Administration Funds ............................................ v

Federal Transit Administration Funds............................................... vi

Glossary of Terms / Abbreviations / Acronyms ............................ vii

Information on Grouped Categories ................................................... viii

Projects State Projects Sorted by Route............................................................ 1

Local Projects Areas > 200,000 Population

Central Arkansas Regional Transportation Study Area............................... 22

West Memphis-Marion Area Transportation Study .................................... 27

Areas < 200,000 Population..................................................................... 29

Statewide Generic Projects FFY 2010.................................................................................................. 33

FFY 2011.................................................................................................. 35

FFY 2012.................................................................................................. 37

FFY 2013.................................................................................................. 39

Transit Projects FFY 2010.................................................................................................. 41

FFY 2011.................................................................................................. 47

FFY 2012.................................................................................................. 53

FFY 2013.................................................................................................. 59

Eastern Federal Lands Highway Division ...................................... 65

State and Local Projects Sorted by Job Number.......................... 66

State and Local Projects Sorted by County.................................... 91

Page 4: 1 - Cover Page STIP 2010-2013 Web Version.pdf · iii TUTS - Texarkana Urban Transportation Study (Miller County) CEO of Texarkana, Texas Dr. Larry Sullivan P. O. Box 1967 Texarkana,

i

INTRODUCTION This Statewide Transportation Improvement Program (STIP) for federal fiscal years 2010 through 2013 has been prepared by the Arkansas State Highway Commission in response to 23 U.S.C. 135 - Statewide Planning, as amended by the Safe, Accountable, Flexible, Efficient Transportation Equity Act: A Legacy for Users. Authorization for the listed projects may be requested for any phase of development (i.e., preliminary engineering, right of way, utilities, or construction) during F.Y. 2010-2013. Authorization for pre-construction phases may be requested in advance of the year a project is scheduled for construction to assure the project can be advertised and let to contract as scheduled in this STIP. With respect to urban areas greater than 50,000 in population, projects listed in the Transportation Improvement Programs (TIPs) that have been developed by the various Metropolitan Planning Organizations (MPO) are hereby included as part of the overall Federal-aid highway construction program. For additional information on projects located within a TIP Area, consult the following TIPs or contact the appropriate MPO.

Bi-State - Bi-State Transportation Study (Crawford & Sebastian Counties) Bi-State MPO Mr. John Guthrie, Executive Director P. O. Box 2067 Fort Smith, AR 72901 Telephone: 479-785-2651

CARTS - Central Arkansas Regional Transportation Study

(Pulaski, Saline, Faulkner, & Lonoke Counties)

Metroplan Mr. Jim McKenzie, Executive Director 501 West Markham, Suite B Little Rock, AR 72201 Telephone: 501-372-3300

Page 5: 1 - Cover Page STIP 2010-2013 Web Version.pdf · iii TUTS - Texarkana Urban Transportation Study (Miller County) CEO of Texarkana, Texas Dr. Larry Sullivan P. O. Box 1967 Texarkana,

ii

HSA-MPO - Hot Springs Area Metropolitan Planning Organization (Garland & Hot Spring Counties)

Hot Springs Area Metropolitan Planning Organization Mr. Lance Hudnell, Hot Springs City Manager P. O. Box 700 Hot Springs, AR 71902-0083 Telephone: 501-321-4804

JATS - Jonesboro Area Transportation Study

(Craighead County)

Mayor of Jonesboro The Honorable Harold Perrin P. O. Box 1845 Jonesboro, AR 72403-1845 Telephone: 870-933-4635

NARTS - Northwest Arkansas Regional Transportation Study

(Washington & Benton Counties)

Northwest Arkansas Regional Planning Commission Mr. Jeff Hawkins, Executive Director 1311 A Clayton St. Springdale, AR 72762 Telephone: 479-751-7125

PBATS - Pine Bluff Area Transportation Study

(Jefferson County)

Southeast Arkansas Regional Planning Commission Ms. Jerre George, Director P. O. Box 8398 Pine Bluff, AR 71611 Telephone: 870-534-4247

Page 6: 1 - Cover Page STIP 2010-2013 Web Version.pdf · iii TUTS - Texarkana Urban Transportation Study (Miller County) CEO of Texarkana, Texas Dr. Larry Sullivan P. O. Box 1967 Texarkana,

iii

TUTS - Texarkana Urban Transportation Study

(Miller County)

CEO of Texarkana, Texas Dr. Larry Sullivan P. O. Box 1967 Texarkana, TX 75504-1967 Telephone: 903-798-3927

WMATS - West Memphis-Marion Area Transportation Study (Crittenden County)

Mayor of West Memphis The Honorable William Johnson 205 South Redding West Memphis, AR 72301 Telephone: 870-732-7500

Projects (including Federal Transit Administration Projects) utilizing funds set aside for rural areas were selected in consultation with the appropriate local officials. This program includes both the Federal-aid portion and the 100% State funded portion of the State's overall highway construction program and is financially constrained in accordance with federal regulations set forth in 23 CFR Part 450. The following financial summary demonstrates current and estimated revenues to fund the STIP, while the system as a whole is being adequately operated and maintained. Additional information regarding this program may be obtained by contacting: Scott Bennett Assistant Chief Engineer - Planning Arkansas State Highway and Transportation Department P. O. Box 2261 Little Rock, Arkansas 72203 Telephone: (501) 569-2241

Page 7: 1 - Cover Page STIP 2010-2013 Web Version.pdf · iii TUTS - Texarkana Urban Transportation Study (Miller County) CEO of Texarkana, Texas Dr. Larry Sullivan P. O. Box 1967 Texarkana,

iv

NOTICE OF NONDISCRIMINATION

The Arkansas State Highway and Transportation Department complies with all civil rights provisions of federal statutes and related authorities that prohibited discrimination in programs and activities receiving federal financial assistance. Therefore, the Department does not discriminate on the basis of race, sex, color, age, national origin, religion or disability, in the admission, access to and treatment in Department’s programs and activities, as well as the Department’s hiring or employment practices. Complaints of alleged discrimination and inquiries regarding the Department’s nondiscrimination policies may be directed to James B. Moore, Jr., Section Head - EEO/DBE (ADA/504/Title VI Coordinator), P. O. Box 2261, Little Rock, AR 72203, (501) 569-2298, (Voice/TTY 711), or the following email address: [email protected].

Page 8: 1 - Cover Page STIP 2010-2013 Web Version.pdf · iii TUTS - Texarkana Urban Transportation Study (Miller County) CEO of Texarkana, Texas Dr. Larry Sullivan P. O. Box 1967 Texarkana,

April 6, 2010 (P&C)

REVENUES

EXPENDITURES (1)

STATE FUNDS REMAINING FOR

CONSTRUCTION

FUNDING CATEGORIES: APPORTIONED SCHEDULED APPORTIONED SCHEDULED APPORTIONED SCHEDULED APPORTIONED SCHEDULED APPORTIONED SCHEDULED

INTERSTATE MAINTENANCE 89.0 71.5 92.5 71.5 96.1 71.5 99.9 71.5 377.4 286.0

NATIONAL HIGHWAY SYSTEM 101.4 106.0 105.4 88.9 109.6 170.6 113.9 70.0 430.3 435.5

SURFACE TRANSPORTATION 247.3 203.1 158.4 157.1 164.7 138.4 171.1 197.0 741.5 695.6

CONGESTION MITIGATION AND AIR QUALITY 11.4 0.7 11.9 25.7 12.4 0.7 12.8 0.8 48.5 27.9

HIGHWAY SAFETY 21.4 35.7 22.3 14.0 23.1 13.6 24.0 21.5 90.8 84.8

RAIL-HWY CROSSING 3.9 3.7 4.1 3.8 4.3 4.0 4.4 4.1 16.7 15.5

SAFE ROUTES TO SCHOOL 1.7 1.4 1.8 1.4 1.8 1.5 1.9 1.5 7.2 5.8

BRIDGE REPLACEMENT 73.0 59.5 75.9 78.2 78.8 58.7 81.9 112.9 309.6 309.3

RECREATIONAL TRAILS 1.5 0.8 1.5 0.8 1.6 0.8 1.6 0.8 6.2 3.2

SUB-TOTAL 550.6 482.4 473.7 441.5 492.3 459.7 511.6 480.1 2,028.2 1,863.6

EARMARKED FUNDS 148.2 148.2 162.3 162.3 4.6 4.6 8.6 8.6 323.6 323.6

FEDERAL LANDS HIGHWAY PROGRAM 2.0 2.0 10.2 10.2 0.04 0.04 0.1 0.1 12.4 12.4

STATE MATCH 98.2 98.2 103.6 103.6 88.0 88.0 86.1 86.1 375.9 375.9

IRP DEBT SERVICE 17.0 17.0 18.5 18.5 18.5 18.5 19.0 19.0 73.0 73.0

OTHER MATCH(2) 76.6 76.6 70.7 70.7 52.5 52.5 26.8 26.8 226.6 226.6

TOTAL 892.6 824.4 839.0 806.8 655.9 623.3 652.2 620.7 3,039.7 2,875.1

FUNDING CATEGORIES: APPORTIONED SCHEDULED APPORTIONED SCHEDULED APPORTIONED SCHEDULED APPORTIONED SCHEDULED APPORTIONED SCHEDULED

402-SAFETY 21.3 18.5 10.0 5.0 10.4 9.1 10.8 9.8 52.6 42.4

100% STATE 57.3 33.8 29.4 52.5 19.0 14.0 21.0 23.0 126.8 123.3

TOTAL 78.6 52.3 39.5 57.5 29.4 23.1 31.9 32.8 179.3 165.7

GRAND TOTAL 971.2 876.7 878.5 864.2 685.3 646.4 684.0 653.5 3,219.0 3,040.8

NOTE: TOTAL MAY NOT BE ADDITIVE DUE TO ROUNDING

2013 TOTAL

2010 2011 2012 2013 TOTAL

(2) LOCAL, STATE AID, RAILROAD

2012

160.3 163.1 162.4 647.1

442.6

(266.7) (273.7) (1,081.3)

1,728.4429.8

OTHER AVAILABLE FUNDING ANALYSIS

436.1

161.4

FHWA FEDERAL FUNDING ANALYSIS

2010 2011

(259.7)

STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM (STIP)

FINANCIAL SUMMARY REPORT FOR FEDERAL FISCAL YEARS 2010-2013(x $1 million)

(281.2)

2013

ESTIMATED STATE REVENUE ANALYSIS

2011

420.0

(1) INCLUDES FUNDS TO BE USED FOR MAINTENANCE AND OPERATIONS OF EXISTING SYSTEM

TOTAL2010 2012

v

Page 9: 1 - Cover Page STIP 2010-2013 Web Version.pdf · iii TUTS - Texarkana Urban Transportation Study (Miller County) CEO of Texarkana, Texas Dr. Larry Sullivan P. O. Box 1967 Texarkana,

 February 25, 2010 (P&R)

FUNDING CATEGORIES: APPORTIONED SCHEDULED APPORTIONED SCHEDULED APPORTIONED SCHEDULED APPORTIONED SCHEDULED APPORTIONED SCHEDULED

FTA 5307 - URBANIZED AREAS $9,779 $9,779 $10,017 $10,017 $10,357 $10,357 $10,711 $10,711 $40,864 $40,864

FTA 5309 - BUS & BUS FACILITIES $950 $950 $3,000 $3,000 $3,000 $3,000 $3,000 $3,000 $9,950 $9,950

FTA 5310 - ELDERLY & DISABLED $1,414 $1,414 $1,414 $1,414 $1,463 $1,463 $1,514 $1,514 $5,805 $5,805

FTA 5311 - NONURBANIZED AREAS $10,206 $10,206 $10,206 $10,206 $10,564 $10,564 $10,933 $10,933 $41,909 $41,909

FTA 5316 - JOB ACCESS & REVERSE COMMUTE $1,693 $1,693 $1,693 $1,693 $1,752 $1,752 $1,814 $1,814 $6,952 $6,952

FTA 5317 - NEW FREEDOM $855 $855 $855 $855 $885 $885 $917 $917 $3,512 $3,512

FTA 5337 - JOB ACCESS DISCRETIONARY $350 $350 $350 $350

EARMARKED FUNDS $570 $570 $570 $570

SUB-TOTAL $25,817 $25,817 $27,185 $27,185 $28,021 $28,021 $28,889 $28,889 $109,912 $109,912

LOCAL MATCH $11,328 $11,328 $11,377 $11,377 $11,816 $11,816 $12,197 $12,197 $46,718 $46,718

GRAND TOTAL $37,145 $37,145 $38,562 $38,562 $39,837 $39,837 $41,086 $41,086 $156,630 $156,630

vi

STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM (STIP)

FY 2010 FY 2011 FY 2012 FY 2013 TOTAL

FTA FEDERAL FUNDING ANALYSIS

(x $1 thousand)

FINANCIAL SUMMARY FOR FEDERAL FISCAL YEARS 2010-2013

Page 10: 1 - Cover Page STIP 2010-2013 Web Version.pdf · iii TUTS - Texarkana Urban Transportation Study (Miller County) CEO of Texarkana, Texas Dr. Larry Sullivan P. O. Box 1967 Texarkana,

GLOSSARY OF TERMS / ABBREVIATIONS / ACRONYMS

402-Safety Funds set aside for safety improvements due to the lack of a state open container law.

JETS Jonesboro Economical Transit System

4-R Resurfacing, Restoration, Rehabilitation and Reconstruction LUZA Local Urbanized Area

BI-STATE Bi-State Transportation Study MPO Metropolitan Planning Organization

BR Bridge Replacement Funds NARTS Northwest Arkansas Regional Transportation Study

Bs. & Surf. Base and Surfacing NHS National Highway System Funds

CARTS Central Arkansas Regional Transportation Study PBATS Pine Bluff Area Transportation Study

CATA Central Arkansas Transit Authority P.E. Preliminary Engineering

CMAQ AQ Congestion Mitigation and Air Quality Funds – Air Quality Use Rec Trails Recreational Trail Funds

CMAQ FLEX Congestion Mitigation and Air Quality Funds – Flexible Use RR Railroad

CR County Road RRP Railway-Highway Crossing Program Funds

CS City Street RUZA Regional Urbanized Area

Earmark Various Earmarked Funds in Previous Highway Acts SRTS Safe Routes to School Funds

EFLHD Eastern Federal Lands Highway Division of the Federal Highway Administration

STP Surface Transportation Program Funds

Eng. Engineering STP > 200,000 Surface Transportation Program funds for areas greater than 200,000 population

ENH Enhancement Funds STP < 200,000 Surface Transportation Program funds for areas less than 200,000 population

FTA Federal Transit Administration Funds Str. & Apprs. Structure and Approaches

Gr. & Strs. Grading and Structures TIP Transportation Improvement Program

HSA-MPO Hot Springs Area Metropolitan Planning Organization TDOT Tennessee Department of Transportation

HSIP Highway Safety Improvement Program Funds TUTS Texarkana Urban Transportation Study

IM Interstate Maintenance Funds U of A University of Arkansas

IRP Interstate Rehabilitation Program WMATS West Memphis-Marion Area Transportation Study

vii

JATS Jonesboro Area Transportation Study

Page 11: 1 - Cover Page STIP 2010-2013 Web Version.pdf · iii TUTS - Texarkana Urban Transportation Study (Miller County) CEO of Texarkana, Texas Dr. Larry Sullivan P. O. Box 1967 Texarkana,

viii

ARKANSAS’ STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM FEDERAL FISCAL YEARS 2010-2013

INFORMATION ON GROUPED CATEGORIES

INTERSTATE MAINTENANCE

VARIOUS RESURFACING / RESTORATION / REHABILITATION / RECONSTRUCTION – Projects in this category include improvements to the existing pavement condition of the Interstate System. The purpose of these improvements would be to improve the ride quality, to extend the life of pavements, or to improve traffic service on the Interstate System. Improvements could include interchange reconstruction and increasing lanes widths and/or shoulder widths to current standards, but do not include adding capacity.

RIGHT-OF-WAY / UTILITIES / CONSTRUCTION ENGINEERING – Funding for project activities that include right-of-way acquisition, relocating utilities and providing construction engineering.

NATIONAL HIGHWAY SYSTEM

VARIOUS RESURFACING / RESTORATION / REHABILITATION / RECONSTRUCTION – Projects in this category include improvements to the existing pavement condition of routes on the National Highway System. The purpose of these improvements would be to improve the ride quality or to extend the life of pavements on the National Highway System. Although projects may increase lane widths and/or shoulder widths to current standards, projects to add capacity are not included in this category.

RIGHT-OF-WAY / UTILITIES / CONSTRUCTION ENGINEERING – Funding for project activities that include right-of-way acquisition, relocating utilities and providing construction engineering.

SURFACE TRANSPORTATION PROGRAM

VARIOUS RESURFACING / RESTORATION / REHABILITATION / RECONSTRUCTION – Projects in this category include improvements to the existing pavement condition of routes functionally classified above rural minor collector. The purpose of these improvements would be to improve the ride quality or to extend the life of pavements. Although projects may increase lane widths and/or shoulder widths to current standards, projects to add capacity are not included in this category.

RIGHT-OF-WAY / UTILITIES / CONSTRUCTION ENGINEERING – Funding for project activities that include right-of-way acquisition, relocating utilities and providing construction engineering.

VARIOUS RESURFACING / RESTORATION / REHABITATION / RECONSTRUCTION / BRIDGE REPLACEMENT / BRIDGE REHABILITATION ON COUNTY ROADS– Eligible projects would include resurfacing, restoration, rehabilitation, reconstruction, signalization, increasing lanes widths and/or shoulder widths to current standards, intersection improvements such as the addition of turn lanes, pedestrian and bicycle improvements, bridge rehabilitation or replacement, and railroad crossing improvements. Projects to add capacity are not included in this category.

Page 12: 1 - Cover Page STIP 2010-2013 Web Version.pdf · iii TUTS - Texarkana Urban Transportation Study (Miller County) CEO of Texarkana, Texas Dr. Larry Sullivan P. O. Box 1967 Texarkana,

ix

SURFACE TRANSPORTATION PROGRAM – URBAN PROJECTS IN AREAS > 200,000

LUZA/RUZA NON-CAPACITY PROJECTS – Projects in this category include improvements to maintain the system of eligible routes in Transportation Management Areas. Eligible projects would include resurfacing, restoration, rehabilitation, reconstruction, signalization, increasing lanes widths and/or shoulder widths to current standards, intersection improvements such as the addition of turn lanes, pedestrian and bicycle improvements, bridge rehabilitation or replacement, and railroad crossing improvements. Projects to add capacity are not included in this category.

SURFACE TRANSPORTATION PROGRAM – URBAN PROJECTS IN AREAS < 200,000

SIGNALIZATION / INTERSECTION IMPROVEMENTS – Projects in this category include signalization, signal upgrades, signal coordination, and the addition of turn lanes to improve the flow of traffic through intersections.

SURFACE TRANSPORTATION PROGRAM – ENHANCEMENT

VARIOUS ENHANCEMENT TYPE PROJECTS – Projects in this category include those eligible under the Federal Transportation Enhancement Program as listed in 23 USC 101(a)(35). These include: Provision of facilities for pedestrians and bicycles. Provision of safety and educational activities for pedestrians and bicyclists. Acquisition of scenic easements and scenic or historic sites (including historic battlefields). Scenic or historic highway programs (including the provision of tourist and welcome center

facilities). Landscaping and other scenic beautification. Historic preservation. Rehabilitation and operation of historic transportation buildings, structures, or facilities

(including historic railroad facilities and canals). Preservation of abandoned railway corridors (including the conversion and use of the

corridors for pedestrian or bicycle trails). Inventory, control, and removal of outdoor advertising. Archaeological planning and research. Environmental mitigation--

(i) to address water pollution due to highway runoff; or (ii) reduce vehicle-caused wildlife mortality while maintaining habitat connectivity. Establishment of transportation museums.

RIGHT-OF-WAY / UTILITIES / CONSTRUCTION ENGINEERING – Funding for project activities that include right-of-way acquisition, relocating utilities and providing construction engineering.

BRIDGE REPLACEMENT

VARIOUS BRIDGE REHABILITATION / REPLACEMENT – Projects in this category include the replacement or rehabilitation of eligible bridges. While improvements may include increasing lane widths and/or shoulder widths to current standards, projects to add capacity are not included in this category.

RIGHT-OF-WAY / UTILITIES / CONSTRUCTION ENGINEERING – Funding for project activities that include right-of-way acquisition, relocating utilities and providing construction engineering.

Page 13: 1 - Cover Page STIP 2010-2013 Web Version.pdf · iii TUTS - Texarkana Urban Transportation Study (Miller County) CEO of Texarkana, Texas Dr. Larry Sullivan P. O. Box 1967 Texarkana,

x

BRIDGE PAINTING / GUARD RAIL / SCOUR CONTROL / INSPECTION – Projects in this category include the routine inspection of bridges, painting structural steel, adding or replacing guard rail at bridge ends, and improvements to columns to control scour.

VARIOUS BRIDGE REHABILITATION / REPLACEMENT ON COUNTY ROADS – Projects in this category include the replacement or rehabilitation of eligible bridges. While improvements may include increasing lane widths and/or shoulder widths to current standards, projects to add capacity are not included in this category.

HIGHWAY SAFETY IMPROVEMENT PROGRAM

VARIOUS SAFETY TYPE IMPROVEMENTS – Highway safety improvement project means a project consistent with the State strategic highway safety plan (SHSP) that corrects or improves a hazardous road location or feature, or addresses a highway safety problem. Projects include, but are not limited to, the following: An intersection safety improvement. Pavement and shoulder widening (including addition of a passing lane to remedy an unsafe

condition). Installation of rumble strips or other warning devices, if the rumble strips or other warning

devices do not adversely affect the safety or mobility of bicyclists, pedestrians and persons with disabilities.

Installation of a skid-resistant surface at an intersection or other location with a high frequency of crashes.

An improvement for pedestrian or bicyclist safety or for the safety of persons with disabilities.

Construction of any project for the elimination of hazards at a railway-highway crossing that is eligible for funding under 23 U.S.C. 130, including the separation or protection of grades at railway-highway crossings.

Construction of a railway-highway crossing safety feature, including installation of highway-rail grade crossing protective devices.

The conduct of an effective traffic enforcement activity at a railway-highway crossing. Construction of a traffic calming feature. Elimination of a roadside obstacle or roadside hazard. Improvement of highway signage and pavement markings. Installation of a priority control system for emergency vehicles at signalized intersections. Installation of a traffic control or other warning device at a location with high crash potential. Transportation safety planning. Improvement in the collection and analysis of safety data. Planning integrated interoperable emergency communications equipment, operational

activities, or traffic enforcement activities (including law enforcement assistance) relating to work zone safety.

Installation of guardrails, barriers (including barriers between construction work zones and traffic lanes for the safety of road users and workers), and crash attenuators.

The addition or retrofitting of structures or other measures to eliminate or reduce crashes involving vehicles and wildlife.

Installation and maintenance of signs (including fluorescent yellow-green signs) at pedestrian-bicycle crossings and in school zones.

Construction and operational improvements on high risk rural roads. Conducting road safety audits.

Page 14: 1 - Cover Page STIP 2010-2013 Web Version.pdf · iii TUTS - Texarkana Urban Transportation Study (Miller County) CEO of Texarkana, Texas Dr. Larry Sullivan P. O. Box 1967 Texarkana,

xi

. RIGHT-OF-WAY / UTILITIES / CONSTRUCTION ENGINEERING – Funding for project activities

that include right-of-way acquisition, relocating utilities and providing construction engineering.

RAILWAY-HIGHWAY CROSSING

RAILROAD CROSSING PROTECTIVE DEVICES / SURFACING / HAZARD ELIMINATION – Projects in this category include adding or upgrading flashing lights and gates, crossbucks or surfaces at railroad crossings, and the construction of railroad overpasses.

CONGESTION MITIGATION AND AIR QUALITY

NON-ATTAINMENT PROJECT – Projects in this category have been selected by the Metropolitan Planning Organization in an area designated by the Environmental Protection Agency as a non-attainment area for the National Ambient Air Quality Standards and have been documented to decrease vehicular emissions.

RECREATIONAL TRAILS

VARIOUS TRAIL PROJECTS – Projects in this category will be approved through the solicitation of applications. Eligible projects include motorized and non-motorized trails and trail facilities.

SAFE ROUTES TO SCHOOL

VARIOUS SAFE ROUTES TO SCHOOL PROJECTS – Projects in this category will be approved through the solicitation of applications. Eligible projects include infrastructure and non-infrastructure projects, as well as administration of a Safe Routes to School Program that benefits elementary and middle school children in grades K-8. Infrastructure-related projects include the planning, design, and construction of projects within public right of way that will substantially improve the ability of students to walk and bicycle to school. These include: Sidewalk improvements, Traffic calming and speed reduction improvements, Pedestrian and bicycle crossing improvements, On-street bicycle facilities, Off-street bicycle and pedestrian facilities, Secure bicycle parking facilities, and Traffic diversion improvements in the vicinity of schools. Non-infrastructure-related activities include activities that will encourage walking and

bicycling to school, including: Public awareness campaigns and outreach, Traffic education and enforcement in the vicinity of schools, Student sessions on bicycle and pedestrian safety, health, and environment, and Funding for training, volunteers, and managers of SRTS Programs.

NATIONAL SCENIC BYWAYS

SCENIC BYWAYS PROJECTS – Eligible projects in this category include: An activity related to the planning, design, or development of a State or Indian tribe scenic

byway program;

Page 15: 1 - Cover Page STIP 2010-2013 Web Version.pdf · iii TUTS - Texarkana Urban Transportation Study (Miller County) CEO of Texarkana, Texas Dr. Larry Sullivan P. O. Box 1967 Texarkana,

xii

Development and implementation of a byway corridor management plan; Safety improvements to accommodate increased traffic; improvements that enhance

access; protection of resources adjacent to the byway; Development and implementation of a marketing program; Development and provision of tourist implementation; and construction of bicycle and

pedestrian facilities, interpretive facilities, overlooks and other enhancements for byway travelers.

Page 16: 1 - Cover Page STIP 2010-2013 Web Version.pdf · iii TUTS - Texarkana Urban Transportation Study (Miller County) CEO of Texarkana, Texas Dr. Larry Sullivan P. O. Box 1967 Texarkana,

State Highway Projects Sorted by Route

Page 17: 1 - Cover Page STIP 2010-2013 Web Version.pdf · iii TUTS - Texarkana Urban Transportation Study (Miller County) CEO of Texarkana, Texas Dr. Larry Sullivan P. O. Box 1967 Texarkana,

JOB / ITEM

NUMBER COUNTY RTE TERMINI TYPE WORK LENGTH

ESTIMATED COSTLET

YEAR

PROVIDING MATCHING

FUNDS

CARRYINGOUT THE PROJECT TIP AREA

AGENCY RESPONSIBLE FOR:

Funding Breakdown

(x $1,000)

4/14/2010 9:46:18 AM

110502 Lee 001 Cypress Corner-North (S) Widening 4.70 2012State State30,500

24,400 - NHS

6,100 - State Match

- TOTAL

110228 Lee 001 So. Marianna-South (S) Widening 1.80 2010State State9,500

7,600 - NHS

1,900 - State Match

- TOTAL

061259 Garland 005 Hwy. 7-Hot Springs Village (Safety Impvts) (S) Safety Improvements 1.08 2012State State HSA-MPO3,500

3,150 - HSIP

350 - State Match

- TOTAL

061228 Saline 005 Hwy. 5 Drainage Structure (Bryant) (S) Str. & Apprs. 2011State State CARTS1,000

800 - STP

200 - State Match

- TOTAL

061202 Pulaski 005 Saline Co Line-Otter Creek Rd. (L.R.) (S) Widening 1.26 2010State State CARTS12,000

9,600 - STP

2,400 - State Match

- TOTAL

060352 Pulaski 005 McHenry Creek & Relief Strs. & Apprs. (S) Str. & Apprs. 2011State State CARTS2,200

1,760 - BR

440 - State Match

- TOTAL

R50116 Stone 005 Little Raccoon Creek-Cove Prong Creek (S) Reconst/Climb Lanes 4.00 2011State State11,500

5,000 - STP

1,250 - State Match

- TOTAL

5,250 - 100% State

090281 Baxter 005 North Fork River Str. & Apprs. (Norfork) (S) Str. & Apprs. 2011State State3,000

2,400 - BR

600 - State Match

- TOTAL

Page 1 of 115

An (S) or (F) following the termini indicates federal or state oversight.

STATE PROJECTS SORTED BY ROUTE

Page 18: 1 - Cover Page STIP 2010-2013 Web Version.pdf · iii TUTS - Texarkana Urban Transportation Study (Miller County) CEO of Texarkana, Texas Dr. Larry Sullivan P. O. Box 1967 Texarkana,

JOB / ITEM

NUMBER COUNTY RTE TERMINI TYPE WORK LENGTH

ESTIMATED COSTLET

YEAR

PROVIDING MATCHING

FUNDS

CARRYINGOUT THE PROJECT TIP AREA

AGENCY RESPONSIBLE FOR:

Funding Breakdown

(x $1,000)

4/14/2010 9:46:18 AM

080385 Yell 007 Little Rock & Western RR Str. & Apprs. (Ola) (S) Str. & Apprs. 2012State State1,250

1,000 - BR

250 - State Match

- TOTAL

080377 Yell 007 Centerville-Dardanelle (Passing Lanes) (S) Passing Lanes 1.00 2013State State2,000

1,600 - STP

400 - State Match

- TOTAL

080164 Pope 007 Hwy. 7 Improvements (Dover) (S) New Location 1.30 2013State State6,250

5,000 - STP

1,250 - State Match

- TOTAL

080392 Pope 007 Newton Co. Line-South (Passing Lanes) (S) Passing Lanes 2.30 2012State State5,000

4,000 - STP

1,000 - State Match

- TOTAL

090169 Newton 007 Jasper-Co. Rd. 46 (Passing Lanes) (S) Passing Lanes 1.00 2010State State3,000

2,400 - STP

600 - State Match

- TOTAL

090213 Newton 007 Co. Rd. 46-Buffalo River (Safety Impvts.) (S) Reconstruction 0.60 2010State State8,600

7,740 - HSIP

860 - State Match

- TOTAL

009784 Newton 007 Buffalo River Br. & Apprs. (Pruitt) (S) Str. & Apprs. 2010State State2,600

2,080 - BR

520 - State Match

- TOTAL

090221 Newton 007 Mill Cr.-Hwy. 7S Safety Impvts. (Marble Falls) (S) Reconstruction 0.83 2010State State5,700

5,130 - HSIP

570 - State Match

- TOTAL

Page 2 of 115

An (S) or (F) following the termini indicates federal or state oversight.

STATE PROJECTS SORTED BY ROUTE

Page 19: 1 - Cover Page STIP 2010-2013 Web Version.pdf · iii TUTS - Texarkana Urban Transportation Study (Miller County) CEO of Texarkana, Texas Dr. Larry Sullivan P. O. Box 1967 Texarkana,

JOB / ITEM

NUMBER COUNTY RTE TERMINI TYPE WORK LENGTH

ESTIMATED COSTLET

YEAR

PROVIDING MATCHING

FUNDS

CARRYINGOUT THE PROJECT TIP AREA

AGENCY RESPONSIBLE FOR:

Funding Breakdown

(x $1,000)

4/14/2010 9:46:18 AM

080378 Montgomery 008 Lick Creek Str. & Apprs. (Norman) (S) Str. & Apprs. 2011State State1,200

960 - BR

240 - State Match

- TOTAL

050012 Izard 009 Fulton Co. Line-South Strs. & Apprs.(Oxford) (S) Str. & Apprs. 2011State State3,300

2,640 - BR

660 - State Match

- TOTAL

061194 Pulaski 010 Mississippi Ave.-Perryville Rd. (Hwy. 10) (Little Rock) (S) Safety Improvements 0.65 2013Local State CARTS9,000

8,100 - HSIP

900 - Local

- TOTAL

061218 Pulaski 010 Union Pacific R.R. Viaduct Safety Impvts. (L.R) (S) Safety Improvements 0.20 2012State State CARTS1,700

1,530 - HSIP

170 - State Match

- TOTAL

020506 Lincoln 011 Cane Creek Str. & Apprs. (S) Str. & Apprs. 2011State State1,000

800 - BR

200 - State Match

- TOTAL

090251 Benton 012 Hwy. 71B-Shell Rd. (Hwy. 12) (Bentonville) (S) Capacity Imprvmnts 2.70 2012Local State NARTS20,400

10,400 - Local

- TOTAL

10,000 - 100% State

061215 Lonoke 013 I-40-South (Carlisle) (S) Rehabilitation 0.46 2012State State2,500

2,000 - STP

500 - State Match

- TOTAL

050189 White 013 Hwy. 13 Extension (Searcy) (Phase I) (S) New Location 4.60 2011State State10,000

8,000 - STP

2,000 - State Match

- TOTAL

Page 3 of 115

An (S) or (F) following the termini indicates federal or state oversight.

STATE PROJECTS SORTED BY ROUTE

Page 20: 1 - Cover Page STIP 2010-2013 Web Version.pdf · iii TUTS - Texarkana Urban Transportation Study (Miller County) CEO of Texarkana, Texas Dr. Larry Sullivan P. O. Box 1967 Texarkana,

JOB / ITEM

NUMBER COUNTY RTE TERMINI TYPE WORK LENGTH

ESTIMATED COSTLET

YEAR

PROVIDING MATCHING

FUNDS

CARRYINGOUT THE PROJECT TIP AREA

AGENCY RESPONSIBLE FOR:

Funding Breakdown

(x $1,000)

4/14/2010 9:46:18 AM

050212 White 013 Hwy. 13 Extension (Searcy) (Phase II) (S) New Location 4.60 2013State State14,000

11,200 - STP

2,800 - State Match

- TOTAL

070273 Union 015 Hwy 335-Hwy 82 Strs & Apprs (S) Str. & Apprs. 2011State State2,650

2,120 - BR

530 - State Match

- TOTAL

090282 Benton 016 Illinois River Str. & Apprs. (S) Str. & Apprs. 2012State State NARTS5,000

4,000 - BR

1,000 - State Match

- TOTAL

040486 Washington 016 College Ave.-Stone Bridge Rd. (Fayetteville) (S) Widening 2.68 2011Local State NARTS10,000

5,000 - STP

5,000 - Local

- TOTAL

040569 Washington 016 West & Middle Forks of White River Strs. & Apprs. (Fayetteville) (S)

Str. & Apprs. 2012State State NARTS11,500

9,200 - BR

2,300 - State Match

- TOTAL

100308 Craighead 018 St. Francis River-North of Black Oak (S) Widening 5.60 2010State State33,000

26,400 - STP

6,600 - State Match

- TOTAL

100567 Craighead 018 North of Black Oak-Monette Bypass (S) Widening 1.40 2013State State11,600

9,280 - STP

2,320 - State Match

- TOTAL

100653 Craig/Miss 018 Monette Bypass-Manila (S) Widening 6.00 2012State State41,700

33,360 - STP

8,340 - State Match

- TOTAL

Page 4 of 115

An (S) or (F) following the termini indicates federal or state oversight.

STATE PROJECTS SORTED BY ROUTE

Page 21: 1 - Cover Page STIP 2010-2013 Web Version.pdf · iii TUTS - Texarkana Urban Transportation Study (Miller County) CEO of Texarkana, Texas Dr. Larry Sullivan P. O. Box 1967 Texarkana,

JOB / ITEM

NUMBER COUNTY RTE TERMINI TYPE WORK LENGTH

ESTIMATED COSTLET

YEAR

PROVIDING MATCHING

FUNDS

CARRYINGOUT THE PROJECT TIP AREA

AGENCY RESPONSIBLE FOR:

Funding Breakdown

(x $1,000)

4/14/2010 9:46:18 AM

100307 Mississippi 018 Hwy. 181-West (S) Widening 2.74 2010State State17,000

12,400

1,200

- STP

- BR

3,400 - State Match

- TOTAL

100663 Mississippi 018 Hwy. 18 Improvements (Blytheville) (S) Safety Improvements 2011State State15,876

6,000

500

2,588

- STP

- Earmarks

- HSIP

1,788 - State Match

- TOTAL

5,000 - 402-Safety

090283 Carroll 021 Indian Creek Str. & Apprs. (S) Str. & Apprs. 2012State State1,000

800 - BR

200 - State Match

- TOTAL

040438 Franklin 023 Arkansas River Bridge Painting (Ozark) (S) Str. & Apprs. 2011State State870

696 - BR

174 - State Match

- TOTAL

080X01 Faulkner 025 Hwy. 25 Relocation (S) New Location 1.70 2013Local State CARTS9,000

4,500 - STP

3,621 - Local

- STP > 200,000

- TOTAL

879

Also shown in the LOCAL PROJECTS AREAS > 200,000 POPULATION Section

050166 Cleburne 025 Faulkner Co. Line-Hwy. 107 (Passing Lanes) (S) Passing Lanes 2.20 2012State State6,500

5,200 - STP

1,300 - State Match

- TOTAL

080379 Montgomery 027 Ouachita River Str. & Apprs. (S) Str. & Apprs. 2012State State2,500

2,000 - BR

500 - State Match

- TOTAL

Page 5 of 115

An (S) or (F) following the termini indicates federal or state oversight.

STATE PROJECTS SORTED BY ROUTE

Page 22: 1 - Cover Page STIP 2010-2013 Web Version.pdf · iii TUTS - Texarkana Urban Transportation Study (Miller County) CEO of Texarkana, Texas Dr. Larry Sullivan P. O. Box 1967 Texarkana,

JOB / ITEM

NUMBER COUNTY RTE TERMINI TYPE WORK LENGTH

ESTIMATED COSTLET

YEAR

PROVIDING MATCHING

FUNDS

CARRYINGOUT THE PROJECT TIP AREA

AGENCY RESPONSIBLE FOR:

Funding Breakdown

(x $1,000)

4/14/2010 9:46:18 AM

061256 Saline 030 Hwy. 70-Sevier St. Cable Median Barrier (S) Safety Improvements 5.21 2012State CARTS1,700 - TOTAL

1,700 - 402-Safety

061201 Pulaski 030 I-30: South Terminal Interchange-I-630 (L.R.) (P.E.) (F) Safety & Traffic Eng. 1.40 2010State State CARTS1,350

1,080 - Earmarks

270 - State Match

- TOTAL

030386 Nevada 032 Little Bodcaw Creek & Relief Strs. & Apprs.(S) Str. & Apprs. 2011State State2,800

2,240 - BR

560 - State Match

- TOTAL

100722 Greene 034 Lafe-Marmaduke Strs. & Apprs. (S) Str. & Apprs. 2011State State2,500

2,000 - BR

500 - State Match

- TOTAL

080339 Faulkner 036 Hwys. 36/107 Inters. Impvts. (S. of Enola) (S) Safety 2011State State900

720 - STP

180 - State Match

- TOTAL

061280 Prairie 038 White River Bridge Rehab. (Des Arc) (S) Str. & Apprs. 2010State State1,600

1,280 - BR

320 - State Match

- TOTAL

110541 Woodruff 038 Bayou Deview Str. & Apprs. (S) Str. & Apprs. 2011State State1,750

1,400 - BR

350 - State Match

- TOTAL

080388 Faulkner 040 Conway-Pulaski Co. Line (Widening) (Phase I) (F) Widening 2012State State CARTS36,000

28,800 - NHS

7,200 - State Match

- TOTAL

061190 Pulaski 040 I-40 Interchange (Maumelle) (F) Interchange 2010Local Local CARTS696

557 - Earmarks

139 - Local

- TOTAL

Page 6 of 115

An (S) or (F) following the termini indicates federal or state oversight.

STATE PROJECTS SORTED BY ROUTE

Page 23: 1 - Cover Page STIP 2010-2013 Web Version.pdf · iii TUTS - Texarkana Urban Transportation Study (Miller County) CEO of Texarkana, Texas Dr. Larry Sullivan P. O. Box 1967 Texarkana,

JOB / ITEM

NUMBER COUNTY RTE TERMINI TYPE WORK LENGTH

ESTIMATED COSTLET

YEAR

PROVIDING MATCHING

FUNDS

CARRYINGOUT THE PROJECT TIP AREA

AGENCY RESPONSIBLE FOR:

Funding Breakdown

(x $1,000)

4/14/2010 9:46:18 AM

060897 Lonoke 040 I-40/Hwy. 89 Intchg. (Lonoke) (Project Development) (F) Interchange 2010Local Local5,352

4,282 - Earmarks

1,070 - Local

- TOTAL

110473 Crittenden 040 I-40 Miss. River Bridge Seismic Retrofit (Phase VII) (S) Str. & Apprs. 2010State TDOT WMATS11,040

8,832 - BR

2,208 - State Match

- TOTAL

110542 Crittenden 040 I-40 Miss. Rv. Br. Seismic Retrofit (Phase VIII) (S) Str. & Apprs. 2011State TDOT WMATS26,000

20,800 - BR

5,200 - State Match

- TOTAL

040238 Sebastian 045 Hwy. 255-Phoenix Ave. (Widening) (Ft. Smith) (S) Widening 1.10 2010Local State BI-STATE9,400

4,700 - STP

4,700 - Local

- TOTAL

110478 Monroe 049 Hwy. 17-I-40 (Brinkley) (S) Widening 1.03 2010State State5,000

4,000 - STP

1,000 - State Match

- TOTAL

070240 Clark 051 Ouachita River Str. & Apprs. (Arkadelphia) (S) Str. & Apprs. 2012State State3,000

2,400 - BR

600 - State Match

- TOTAL

020451 Desha 054 Waterman St.-West (Dumas) (S) Reconstruction 0.81 2010State State3,300 - TOTAL

3,300 - 100% State

020508 Jefferson 054 Steep Bank Creek Str. & Apprs. (S) Str. & Apprs. 2011State State PBATS600

480 - BR

120 - State Match

- TOTAL

020507 Jefferson 054 Big Creek Str. & Apprs. (S) Str. & Apprs. 2011State State PBATS800

640 - BR

160 - State Match

- TOTAL

Page 7 of 115

An (S) or (F) following the termini indicates federal or state oversight.

STATE PROJECTS SORTED BY ROUTE

Page 24: 1 - Cover Page STIP 2010-2013 Web Version.pdf · iii TUTS - Texarkana Urban Transportation Study (Miller County) CEO of Texarkana, Texas Dr. Larry Sullivan P. O. Box 1967 Texarkana,

JOB / ITEM

NUMBER COUNTY RTE TERMINI TYPE WORK LENGTH

ESTIMATED COSTLET

YEAR

PROVIDING MATCHING

FUNDS

CARRYINGOUT THE PROJECT TIP AREA

AGENCY RESPONSIBLE FOR:

Funding Breakdown

(x $1,000)

4/14/2010 9:46:18 AM

040524 Washington 062 Hwy. 62 Bypass (Gr. & Strs.) (Prairie Grove) (S) New Location 4.20 2010State State NARTS15,000

12,000 - STP

3,000 - State Match

- TOTAL

090065 Benton 062 Avoca-North Garfield (S) Widening 6.43 2012State State NARTS28,000

22,400 - NHS

5,600 - State Match

- TOTAL

009901 Carroll 062 Hwy. 143-Berryville (S) Widening 2.80 2010State State13,300

10,640 - STP

2,660 - State Match

- TOTAL

009702 Carroll 062 Hwy. 62 Improvements (Green Forest) (Phase I) (S) Widening 2.00 2013State State9,000

4,800 - STP

1,200 - State Match

- TOTAL

3,000 - 100% State

R90097 Marion 062 Flippin Bypass-Hwy. 62B (S) Widening 0.65 2010State State5,300 - TOTAL

5,300 - 100% State

050230 Fulton 063 Hwy. 9-Hwy. 342 Strs. & Apprs. (Mammoth Spring) (S) Str. & Apprs. 2012State State7,000

5,600 - BR

1,400 - State Match

- TOTAL

100686 Lawrence 063 Black Rock-Portia (Phase I) (F) Widening 3.50 2013State State15,900

12,720 - STP

3,180 - State Match

- TOTAL

100687 Lawrence 063 Black River & Relief Strs. & Apprs. (F) Str. & Apprs. 2013State State33,000

26,400 - BR

6,600 - State Match

- TOTAL

Page 8 of 115

An (S) or (F) following the termini indicates federal or state oversight.

STATE PROJECTS SORTED BY ROUTE

Page 25: 1 - Cover Page STIP 2010-2013 Web Version.pdf · iii TUTS - Texarkana Urban Transportation Study (Miller County) CEO of Texarkana, Texas Dr. Larry Sullivan P. O. Box 1967 Texarkana,

JOB / ITEM

NUMBER COUNTY RTE TERMINI TYPE WORK LENGTH

ESTIMATED COSTLET

YEAR

PROVIDING MATCHING

FUNDS

CARRYINGOUT THE PROJECT TIP AREA

AGENCY RESPONSIBLE FOR:

Funding Breakdown

(x $1,000)

4/14/2010 9:46:18 AM

100682 Poinsett 063 Future I-555 Access Roads (S) Project Development 2011State State2,946

2,357 - Earmarks

589 - State Match

- TOTAL

080380 Pope 064 Galla Creek Str. & Apprs. (Pottsville) (S) Str. & Apprs. 2011State State2,500

2,000 - BR

500 - State Match

- TOTAL

110504 Cross 064 Hwy. 1 North-West (Wynne) (S) Widening 0.65 2010State State6,400

5,120 - STP

1,280 - State Match

- TOTAL

090280 Searcy 065 Cove Creek Str. & Apprs. (S) Str. & Apprs. 2011State State2,000

1,600 - BR

400 - State Match

- TOTAL

080390 Van Buren 065 Hwy. 16 East-Hwy. 65B South (Clinton) (S) Widening 1.41 2013State State15,000

12,000 - NHS

3,000 - State Match

- TOTAL

080391 Van Buren 065 Hwy. 336 West-Co. Rd. 28 (Phase I) (S) Widening 9.30 2012State State15,000

12,000 - NHS

3,000 - State Match

- TOTAL

080363 Van Buren 065 Hwys. 65/92 Signal & Inters. Impvts. (Bee Branch) (S) Inters Impvts 2011State State2,000

1,600 - STP

400 - State Match

- TOTAL

080273 Faulkner 065B Hwy 266-Hwy. 64 (Conway) (S) Widening 0.51 2010State State CARTS2,250

2,025 - HSIP

225 - State Match

- TOTAL

Page 9 of 115

An (S) or (F) following the termini indicates federal or state oversight.

STATE PROJECTS SORTED BY ROUTE

Page 26: 1 - Cover Page STIP 2010-2013 Web Version.pdf · iii TUTS - Texarkana Urban Transportation Study (Miller County) CEO of Texarkana, Texas Dr. Larry Sullivan P. O. Box 1967 Texarkana,

JOB / ITEM

NUMBER COUNTY RTE TERMINI TYPE WORK LENGTH

ESTIMATED COSTLET

YEAR

PROVIDING MATCHING

FUNDS

CARRYINGOUT THE PROJECT TIP AREA

AGENCY RESPONSIBLE FOR:

Funding Breakdown

(x $1,000)

4/14/2010 9:46:18 AM

050231 Stone 066 Mt. View-West (Passing Lanes) (S) Passing Lanes 3.00 2013State State9,500

7,600 - STP

1,900 - State Match

- TOTAL

070344 Clark 067 Gurdon-Oak Grove Strs. & Apprs. (S) Str. & Apprs. 2013State State5,000

4,000 - BR

1,000 - State Match

- TOTAL

061278 Pulaski 067 Redmond Rd. Strs. & Apprs. (Jacksonville) (F) Str. & Apprs. 2012State State CARTS6,500

5,200 - BR

1,300 - State Match

- TOTAL

061276 Pulaski 067 Main Street Strs. & Apprs. (Jacksonville) (F) Str. & Apprs. 2013State State CARTS4,000

3,200 - BR

800 - State Match

- TOTAL

061219 Lonoke/Pul 067 Hwy. 67 Cable Median Barrier (Jacksonville-Cabot) (S) Safety Improvements 4.80 2012State State CARTS1,500

1,350 - HSIP

150 - State Match

- TOTAL

050207 Independence 069 Hwy. 69/Hwy. 122 Inters. Impvts. (S. of Newark) (S) Safety Improvements 2011State State130

117 - HSIP

13 - State Match

- TOTAL

020316 Desha 069 I-69 Corridor (Hwy. 65-Miss. Rt. 1) (GRB) (Ph I) (F) Phase I 2010State State10,346

8,666 - Earmarks

1,680 - State Match

- TOTAL

020462 Drew 069 Monticello Bypass (Phase I) (F) New Location 8.60 2010State State88,107

70,486 - Earmarks

17,621 - State Match

- TOTAL

Page 10 of 115

An (S) or (F) following the termini indicates federal or state oversight.

STATE PROJECTS SORTED BY ROUTE

Page 27: 1 - Cover Page STIP 2010-2013 Web Version.pdf · iii TUTS - Texarkana Urban Transportation Study (Miller County) CEO of Texarkana, Texas Dr. Larry Sullivan P. O. Box 1967 Texarkana,

JOB / ITEM

NUMBER COUNTY RTE TERMINI TYPE WORK LENGTH

ESTIMATED COSTLET

YEAR

PROVIDING MATCHING

FUNDS

CARRYINGOUT THE PROJECT TIP AREA

AGENCY RESPONSIBLE FOR:

Funding Breakdown

(x $1,000)

4/14/2010 9:46:18 AM

061277 Pulaski 070 Union Pacific RR Str. & Apprs. (Roosevelt Rd.) (LR) (S) Str. & Apprs. 2013State State CARTS6,500

5,200 - BR

1,300 - State Match

- TOTAL

061275 Pulaski 070 Arkansas River Str. & Apprs. (Broadway) (LR/NLR) (F) Str. & Apprs. 2013State State CARTS45,000

36,000 - BR

9,000 - State Match

- TOTAL

110544 Monroe 070 Hwy. 17-St. Francis Co. Line Strs. & Apprs. (S) Str. & Apprs. 2013State State4,000

3,200 - BR

800 - State Match

- TOTAL

030X01 Miller 071 LA Line-Doddridge (Phase III) (F) New Location 2.18 2012State State23,505

15,200

3,800

- NHS

- Earmarks

4,505 - State Match

- TOTAL

030388 Miller 071 Broad St. Str. & Apprs. (Texarkana) (S) Str. & Apprs. 2012State State TUTS6,500

5,200 - BR

1,300 - State Match

- TOTAL

030326 Miller 071 I-30-Hwy. 71 (Bs. & Surf.) (F) New Location 4.44 2010State State TUTS33,600

6,720 - NHS

1,680 - State Match

- TOTAL

25,200 - 100% State

030325 Miller 071 Arkansas Blvd.-I-30 (Bs. & Surf.) (F) New Location 2.43 2010State State TUTS14,800

11,840 - NHS

2,960 - State Match

- TOTAL

040373 Sebastian 071 Jenny Lind-I-40 (Phase II) (F) New Location 6.04 2011State State BI-STATE29,900

17,600

6,300

- NHS

- Earmarks

6,000 - State Match

- TOTAL

Page 11 of 115

An (S) or (F) following the termini indicates federal or state oversight.

STATE PROJECTS SORTED BY ROUTE

Page 28: 1 - Cover Page STIP 2010-2013 Web Version.pdf · iii TUTS - Texarkana Urban Transportation Study (Miller County) CEO of Texarkana, Texas Dr. Larry Sullivan P. O. Box 1967 Texarkana,

JOB / ITEM

NUMBER COUNTY RTE TERMINI TYPE WORK LENGTH

ESTIMATED COSTLET

YEAR

PROVIDING MATCHING

FUNDS

CARRYINGOUT THE PROJECT TIP AREA

AGENCY RESPONSIBLE FOR:

Funding Breakdown

(x $1,000)

4/14/2010 9:46:18 AM

090224 Benton 071 Bella Vista Bypass (Phase I) (F) New Location 14.60 2011State State NARTS33,584

12,000

15,032

- STP

- Earmarks

6,552 - State Match

- TOTAL

040024 Washington 074 White River Bridge Str. & Apprs. (Elkins) (S) Str. & Apprs. 2011State State NARTS2,500

2,000 - BR

500 - State Match

- TOTAL

070301 Columbia 079 Magnolia-Ouachita Co. Line (Passing Lanes) (S) Passing Lanes 2.50 2010State State6,200

5,580 - HSIP

620 - State Match

- TOTAL

020070 Jefferson 079 Hwy. 65B-North (S) Widening 1.60 2010State State PBATS8,900

4,240

2,880

- STP

- Earmarks

1,780 - State Match

- TOTAL

110394 Monroe 079 White River Str. & Apprs. (Clarendon) (Ph. II) (F) Str. & Apprs. 1.14 2010State State38,200

30,560 - BR

7,640 - State Match

- TOTAL

020509 Ashley 082 Hwy. 165 Str. & Apprs. (Montrose) (S) Str. & Apprs. 2012State State2,200

1,760 - BR

440 - State Match

- TOTAL

R20098 Chicot 082 Fairview-Mississippi River Br. (S) Widening 4.10 2011State State25,250

800

1,800

- STP

- Earmarks

650 - State Match

- TOTAL

22,000 - 100% State

Page 12 of 115

An (S) or (F) following the termini indicates federal or state oversight.

STATE PROJECTS SORTED BY ROUTE

Page 29: 1 - Cover Page STIP 2010-2013 Web Version.pdf · iii TUTS - Texarkana Urban Transportation Study (Miller County) CEO of Texarkana, Texas Dr. Larry Sullivan P. O. Box 1967 Texarkana,

JOB / ITEM

NUMBER COUNTY RTE TERMINI TYPE WORK LENGTH

ESTIMATED COSTLET

YEAR

PROVIDING MATCHING

FUNDS

CARRYINGOUT THE PROJECT TIP AREA

AGENCY RESPONSIBLE FOR:

Funding Breakdown

(x $1,000)

4/14/2010 9:46:18 AM

061113 Garland 088 Hwy. 270-Printers Place (Higdon Ferry Rd.) (Hot Springs) (S) Widening 0.46 2010State State HSA-MPO3,000

2,400 - STP

600 - State Match

- TOTAL

061214 Garland 088 Printers Place-Hwy 7 North (Higdon Ferry Rd)(Hot Sprs) (S) Widening 0.36 2013State/Local State HSA-MPO5,686

4,000

549

- STP

- Earmarks

1,000 - State Match

137 - Local

- TOTAL

080381 Van Buren 092 Scroggins Creek Str. & Apprs. (S) Str. & Apprs. 2011State State1,000

800 - BR

200 - State Match

- TOTAL

080387 Conway 095 Overcup Creek-North & South Grade Impvts. (S) Reconstruction 1.20 2012State State4,000

3,200 - STP

800 - State Match

- TOTAL

080386 Conway 095 East Fork Point Remove Creek-North & South Grade Impvts (S)

Reconstruction 0.80 2012State State6,000

4,800 - STP

1,200 - State Match

- TOTAL

090174 Benton 102 Hwy. 102B-Greenhouse Rd. (Centerton) (S) Widening 1.79 2010Local State NARTS12,000

10,000 - STP

2,000 - Local

- TOTAL

080340 Johnson 103 Market St.-I-40 WB Ramps (Clarksville) (S) Capacity Imprvmnts 0.40 2013State State7,500

6,000 - STP

1,500 - State Match

- TOTAL

040489 Washington 112 Hwy. 112 Spur-North (Fayetteville) (S) Widening 0.75 2010Local State NARTS3,000

1,500 - STP

1,500 - Local

- TOTAL

Page 13 of 115

An (S) or (F) following the termini indicates federal or state oversight.

STATE PROJECTS SORTED BY ROUTE

Page 30: 1 - Cover Page STIP 2010-2013 Web Version.pdf · iii TUTS - Texarkana Urban Transportation Study (Miller County) CEO of Texarkana, Texas Dr. Larry Sullivan P. O. Box 1967 Texarkana,

JOB / ITEM

NUMBER COUNTY RTE TERMINI TYPE WORK LENGTH

ESTIMATED COSTLET

YEAR

PROVIDING MATCHING

FUNDS

CARRYINGOUT THE PROJECT TIP AREA

AGENCY RESPONSIBLE FOR:

Funding Breakdown

(x $1,000)

4/14/2010 9:46:18 AM

080383 Conway 124 Point Remove Creek Str. & Apprs. (S) Str. & Apprs. 2011State State1,500

1,200 - BR

300 - State Match

- TOTAL

080382 Conway 124 Cove Creek Str. & Apprs. (S) Str. & Apprs. 2011State State1,500

1,200 - BR

300 - State Match

- TOTAL

100675 Greene 135 Cache River & Relief Strs. & Apprs. (S) Str. & Apprs. 2011State State6,120

4,896 - BR

1,224 - State Match

- TOTAL

100723 Mississippi 148 Clear Lake Str. & Apprs. (S) Str. & Apprs. 2011State State900

720 - BR

180 - State Match

- TOTAL

070289 Cleve/Dallas 167 Hwy. 273-Peters Rd. (CR 24) (Phase I) (S) Widening 5.30 2013State State38,364

29,600

1,364

- STP

- Earmarks

7,400 - State Match

- TOTAL

070290 Cleveland 167 Peters Rd. (CR 24)-North (S) Widening 5.10 2011State State32,500

26,000 - NHS

6,500 - State Match

- TOTAL

070291 Cleve/Dallas 167 Saline River-South (S) Widening 5.50 2012State State54,500

43,600 - NHS

10,900 - State Match

- TOTAL

020464 Grant 167 Hwy. 167 Bypass (Sheridan) (Bs. & Surf.) (S) New Location 8.63 2010State State43,000

34,400 - NHS

8,600 - State Match

- TOTAL

Page 14 of 115

An (S) or (F) following the termini indicates federal or state oversight.

STATE PROJECTS SORTED BY ROUTE

Page 31: 1 - Cover Page STIP 2010-2013 Web Version.pdf · iii TUTS - Texarkana Urban Transportation Study (Miller County) CEO of Texarkana, Texas Dr. Larry Sullivan P. O. Box 1967 Texarkana,

JOB / ITEM

NUMBER COUNTY RTE TERMINI TYPE WORK LENGTH

ESTIMATED COSTLET

YEAR

PROVIDING MATCHING

FUNDS

CARRYINGOUT THE PROJECT TIP AREA

AGENCY RESPONSIBLE FOR:

Funding Breakdown

(x $1,000)

4/14/2010 9:46:18 AM

050186 Independence 167 Hwy. 69-Hwy. 394 (Batesville) (S) Widening 2.70 2010State State12,400

9,920 - STP

2,480 - State Match

- TOTAL

050213 Independence 167 Hwy. 394-North (S) Widening 5.11 2013State State18,000

14,400 - STP

3,600 - State Match

- TOTAL

050187 Sharp 167 Hwy. 354-Hwy. 62/412 (Ash Flat) (S) Widening 1.00 2010State State6,000

4,800 - STP

1,200 - State Match

- TOTAL

040570 Washington 170 Branch of Illinois River Str. & Apprs. (S) Str. & Apprs. 2012State State NARTS750

600 - BR

150 - State Match

- TOTAL

090223 Baxter 177 Hwy. 5-Izard Co. Line (Passing Lanes) (S) Passing Lanes 2.50 2010State State6,400

5,760 - HSIP

640 - State Match

- TOTAL

050228 Cleburne 225 Midway Branch Str. & Apprs. (S) Str. & Apprs. 2011State State3,500

2,800 - BR

700 - State Match

- TOTAL

100412 Craighead 226 Hwy. 67-Hwy. 49 (Phase II) (F) Widening 12.45 2011State State JATS49,717

22,160

19,092

- STP

- Earmarks

8,465 - State Match

- TOTAL

080345 Pope 247 I-40 South (Russellville Bypass) (Bs. & Surf.) (S) New Location 2.43 2012State State16,600

13,280 - STP

3,320 - State Match

- TOTAL

Page 15 of 115

An (S) or (F) following the termini indicates federal or state oversight.

STATE PROJECTS SORTED BY ROUTE

Page 32: 1 - Cover Page STIP 2010-2013 Web Version.pdf · iii TUTS - Texarkana Urban Transportation Study (Miller County) CEO of Texarkana, Texas Dr. Larry Sullivan P. O. Box 1967 Texarkana,

JOB / ITEM

NUMBER COUNTY RTE TERMINI TYPE WORK LENGTH

ESTIMATED COSTLET

YEAR

PROVIDING MATCHING

FUNDS

CARRYINGOUT THE PROJECT TIP AREA

AGENCY RESPONSIBLE FOR:

Funding Breakdown

(x $1,000)

4/14/2010 9:46:18 AM

040443 Sebastian 252 Branch of Washburn Creek Str. & Apprs. (So. of Hwy. 10) (S) Str. & Apprs. 2011State State500

400 - BR

100 - State Match

- TOTAL

110543 St. Francis 261 Hwys. 261, 38 & 149 Strs. & Apprs. (S) Str. & Apprs. 2012State State4,800

3,840 - BR

960 - State Match

- TOTAL

090284 Benton 264 Hwy. 71B-Hwy. 265 (Springdale) (S) Widening 1.40 2013State State NARTS11,000

8,800 - STP

2,200 - State Match

- TOTAL

040517 Washington 265 Hwy. 45-E. Joyce Blvd. (Fayetteville) (S) Widening 2.19 2010Local State NARTS15,400

7,700 - STP

7,700 - Local

- TOTAL

040518 Washington 265 E. Joyce Blvd.-City Limits (Fayetteville) (S) Widening 2.04 2012State State NARTS15,000

12,000 - STP

3,000 - State Match

- TOTAL

040490 Washington 265 South City Limits-Hwy. 412 (Springdale) (S) Widening 1.25 2010Local State NARTS4,700

2,350 - STP

2,350 - Local

- TOTAL

012007 Benton/Wash 265 Randall Wobbe Lane-Hwy. 264 (Springdale) (S) Widening 1.55 2011Local State NARTS5,000

2,500 - STP

2,500 - Local

- TOTAL

080310 Montgomery 270 Hwy. 270 Realignment (Blowout Mountain) (S) Reconstruction 1.35 2010State State4,360

3,924 - HSIP

436 - State Match

- TOTAL

061059 Garland 270 Hot Springs-West (Passing Lanes) (S) Passing Lanes 4.55 2010State HSA-MPO12,800 - TOTAL

12,800 - 402-Safety

Page 16 of 115

An (S) or (F) following the termini indicates federal or state oversight.

STATE PROJECTS SORTED BY ROUTE

Page 33: 1 - Cover Page STIP 2010-2013 Web Version.pdf · iii TUTS - Texarkana Urban Transportation Study (Miller County) CEO of Texarkana, Texas Dr. Larry Sullivan P. O. Box 1967 Texarkana,

JOB / ITEM

NUMBER COUNTY RTE TERMINI TYPE WORK LENGTH

ESTIMATED COSTLET

YEAR

PROVIDING MATCHING

FUNDS

CARRYINGOUT THE PROJECT TIP AREA

AGENCY RESPONSIBLE FOR:

Funding Breakdown

(x $1,000)

4/14/2010 9:46:18 AM

020445 Jefferson 270 Grant Co. Line-White Hall (Passing Lanes) (S) Passing Lanes 2.20 2010State PBATS5,700 - TOTAL

5,700 - 402-Safety

070345 Calhoun 274 Ditch at L.M. 1.8 Str. & Apprs. (S) Str. & Apprs. 2011State State1,000

800 - BR

200 - State Match

- TOTAL

080384 Faulkner 287 Branch of Cadron Creek Str. & Apprs. (Holland) (S) Str. & Apprs. 2011State State600

480 - BR

120 - State Match

- TOTAL

050229 White 305 Brier Creek Str. & Apprs. (S) Str. & Apprs. 2011State State700

560 - BR

140 - State Match

- TOTAL

100724 Mississippi 312 Ditch No. 6 Str. & Apprs. (Blytheville) (S) Str. & Apprs. 2011State State800

640 - BR

160 - State Match

- TOTAL

080389 Pope 326 Hob Nob Rd.-Hwy. 124 (S) Widening 0.45 2013Local State6,000

3,000 - STP

3,000 - Local

- TOTAL

060395 Pulaski 367 Union Pacific RR Overpass (Arch St.) (LR) (S) Str. & Apprs. 2012State State CARTS6,200

4,960 - BR

1,240 - State Match

- TOTAL

005836 Jackson 367 White River Str. & Apprs. (Newport) (S) Str. & Apprs. 2013State State20,000

16,000 - BR

4,000 - State Match

- TOTAL

030387 Hempstead 371 Ozan Creek & Relief Strs. & Apprs. (S) Str. & Apprs. 2011State State2,000

1,600 - BR

400 - State Match

- TOTAL

Page 17 of 115

An (S) or (F) following the termini indicates federal or state oversight.

STATE PROJECTS SORTED BY ROUTE

Page 34: 1 - Cover Page STIP 2010-2013 Web Version.pdf · iii TUTS - Texarkana Urban Transportation Study (Miller County) CEO of Texarkana, Texas Dr. Larry Sullivan P. O. Box 1967 Texarkana,

JOB / ITEM

NUMBER COUNTY RTE TERMINI TYPE WORK LENGTH

ESTIMATED COSTLET

YEAR

PROVIDING MATCHING

FUNDS

CARRYINGOUT THE PROJECT TIP AREA

AGENCY RESPONSIBLE FOR:

Funding Breakdown

(x $1,000)

4/14/2010 9:46:18 AM

001966 Benton/Wash 412 Springdale Northern Bypass (Phase I) (F) New Location 20.60 2011State State NARTS11,521

8,000

1,217

- NHS

- Earmarks

2,304 - State Match

- TOTAL

090272 Madison 412 Hwy. 412/Hwy. 45 Inters. Impvts. (N. of Hindsville) (S) Safety Improvements 2011State State650

585 - HSIP

65 - State Match

- TOTAL

009951 Madison 412 Hindsville-Huntsville Bypass (F) Widening 4.92 2010State State18,000

14,400 - NHS

3,600 - State Match

- TOTAL

090235 Carroll 412 Dryfork-Hwy. 103 (Passing Lane) (S) Passing Lanes 1.30 2012State State4,000 - TOTAL

4,000 - 100% State

100445 Greene 412 Hwy. 412 Improvements (Paragould) (Phase I) (F) New Location 9.90 2011State State28,625

3,400 - Earmarks

- TOTAL

25,225 - 100% State

100X01 Greene 412 Hwy. 412 Improvements (Paragould) (Phase II) (F) New Location 10.43 2013State State14,800

11,840 - NHS

2,960 - State Match

- TOTAL

061244 Pulaski 430 I-430/I-630 Interchange Modifications (Phase III) (F) Interchange 2011State State CARTS80,069

30,600

9,825

- STP

- Earmarks

14,644 - State Match

25,000 - CMAQ FLEX

- TOTAL

020354 Jefferson 530 I-530-Co. Rd. 35 (Bs. & Surf.) (F) New Location 4.60 2011State State PBATS26,900

21,520 - Earmarks

5,380 - State Match

- TOTAL

Page 18 of 115

An (S) or (F) following the termini indicates federal or state oversight.

STATE PROJECTS SORTED BY ROUTE

Page 35: 1 - Cover Page STIP 2010-2013 Web Version.pdf · iii TUTS - Texarkana Urban Transportation Study (Miller County) CEO of Texarkana, Texas Dr. Larry Sullivan P. O. Box 1967 Texarkana,

JOB / ITEM

NUMBER COUNTY RTE TERMINI TYPE WORK LENGTH

ESTIMATED COSTLET

YEAR

PROVIDING MATCHING

FUNDS

CARRYINGOUT THE PROJECT TIP AREA

AGENCY RESPONSIBLE FOR:

Funding Breakdown

(x $1,000)

4/14/2010 9:46:18 AM

012060 Clev/Jeff/Linc 530 Co. Rd. 35-Hwy. 212 (Bs. & Surf.) (F) New Location 11.14 2011State State39,300

31,440 - Earmarks

7,860 - State Match

- TOTAL

020356 Lincoln 530 Hwy. 212-Hwys. 11/425 Connector (Bs. & Surf) (Phase I) (F) New Location 7.40 2013State State7,131

5,855 - Earmarks

1,276 - State Match

- TOTAL

040561 Washington 540 Bobby Hopper Tunnel-Winslow (S) Safety Improvements 3.50 2012State NARTS900 - TOTAL

900 - 402-Safety

012X01 Benton/Wash 540 Major Widening and/or Interchange Improvements (F) Capacity Imprvmnts 2011State State NARTS15,890

8,000

5,335

- NHS

- Earmarks

2,555 - State Match

- TOTAL

012X02 Benton/Wash 540 Major Widening and/or Interchange Improvements (F) Capacity Imprvmnts 2013State State NARTS20,000

16,000 - NHS

4,000 - State Match

- TOTAL

012111 Benton/Wash 540 Hwy. 112/265-Hwy. 62/102 Cable Median Barrier (F) Safety Improvements 24.45 2012State NARTS6,500 - TOTAL

6,500 - 402-Safety

040485 Washington 540 I-540/Hwy. 62/180 Interchg Interim Impvts. (Fayetteville) (F) Interchange 2010State State NARTS5,000

4,000 - NHS

1,000 - State Match

- TOTAL

090236 Benton 540 I-540/Hwy. 62/102 Interch Interim Impvts. (Bentonvl) (F) Interchange 2010State/Local State NARTS6,598

4,000

1,278

- NHS

- Earmarks

320 - State Match

1,000 - Local

- TOTAL

Page 19 of 115

An (S) or (F) following the termini indicates federal or state oversight.

STATE PROJECTS SORTED BY ROUTE

Page 36: 1 - Cover Page STIP 2010-2013 Web Version.pdf · iii TUTS - Texarkana Urban Transportation Study (Miller County) CEO of Texarkana, Texas Dr. Larry Sullivan P. O. Box 1967 Texarkana,

JOB / ITEM

NUMBER COUNTY RTE TERMINI TYPE WORK LENGTH

ESTIMATED COSTLET

YEAR

PROVIDING MATCHING

FUNDS

CARRYINGOUT THE PROJECT TIP AREA

AGENCY RESPONSIBLE FOR:

Funding Breakdown

(x $1,000)

4/14/2010 9:46:18 AM

050198 White NEW North Searcy Connector (Phase I) (S) New Location 2013Local State12,000

6,000 - STP

6,000 - Local

- TOTAL

R60016 Garland NEW East-West Arterial (Hot Springs) (P.E.) Project Development 2011State State HSA-MPO7,234

5,787 - Earmarks

1,447 - State Match

- TOTAL

Note: Contingent upon approval from National Parks Service

080X03 Faulkner NEW Conway South Interchange-Hwy. 365 (Gr. & Strs.) (F) New Location 2011Local State CARTS12,000

5,589

1,836

- NHS

- Earmarks

41 - State Match

4,534 - Local

- TOTAL

Also shown in the LOCAL PROJECTS AREAS > 200,000 POPULATION Section

080X04 Faulkner NEW Conway South Interchange-Hwy. 365 (Bs. & Surf.) (F) New Location 2013Local State CARTS11,000

5,500 - NHS

4,329 - Local

- STP > 200,000

- TOTAL

1,171

Also shown in the LOCAL PROJECTS AREAS > 200,000 POPULATION Section

110547 Crittenden VAR District 1 Bridge Painting (S) Str. & Apprs. 2010State State WMATS2,040

1,632 - BR

408 - State Match

- TOTAL

030236A Various VAR District 3 Bridge Painting (Phase II) (S) Str. & Apprs. 2011State State TUTS995

797 - BR

198 - State Match

- TOTAL

030236B Various VAR District 3 Bridge Painting (Phase II) (S) Str. & Apprs. 2012State State TUTS980

784 - BR

196 - State Match

- TOTAL

Page 20 of 115

An (S) or (F) following the termini indicates federal or state oversight.

STATE PROJECTS SORTED BY ROUTE

Page 37: 1 - Cover Page STIP 2010-2013 Web Version.pdf · iii TUTS - Texarkana Urban Transportation Study (Miller County) CEO of Texarkana, Texas Dr. Larry Sullivan P. O. Box 1967 Texarkana,

JOB / ITEM

NUMBER COUNTY RTE TERMINI TYPE WORK LENGTH

ESTIMATED COSTLET

YEAR

PROVIDING MATCHING

FUNDS

CARRYINGOUT THE PROJECT TIP AREA

AGENCY RESPONSIBLE FOR:

Funding Breakdown

(x $1,000)

4/14/2010 9:46:18 AM

050X04 Various VAR Districts 5 & 8 Highway Improvements Various 2013State State CARTS20,000 - TOTAL

20,000 - 100% State

090X03 Benton VAR District 9 Improvements TBD 2013State State NARTS5,000

4,000 - STP

1,000 - State Match

- TOTAL

323.53 1,840,632TOTAL

Page 21 of 115

An (S) or (F) following the termini indicates federal or state oversight.

STATE PROJECTS SORTED BY ROUTE

Page 38: 1 - Cover Page STIP 2010-2013 Web Version.pdf · iii TUTS - Texarkana Urban Transportation Study (Miller County) CEO of Texarkana, Texas Dr. Larry Sullivan P. O. Box 1967 Texarkana,

Local Projects in Areas > 200,000 Population

Sorted by MPO Area and Job Number

Page 39: 1 - Cover Page STIP 2010-2013 Web Version.pdf · iii TUTS - Texarkana Urban Transportation Study (Miller County) CEO of Texarkana, Texas Dr. Larry Sullivan P. O. Box 1967 Texarkana,

JOB / ITEM

NUMBER COUNTY RTE TERMINI TYPE WORK LENGTH

ESTIMATED COSTLET

YEAR

PROVIDING MATCHING

FUNDS

CARRYINGOUT THE PROJECT TIP AREA

AGENCY RESPONSIBLE FOR:

Funding Breakdown

(x $1,000)

4/14/2010 9:46:18 AM

060907 Pulaski CS Geyer Springs R.R. Grade Separation (L.R.) (PE) (S) RR Xing 2010Local Local CARTS734

587 - Earmarks

147 - Local

- TOTAL

061026A Pulaski CS Oak St.-Loop Rd. (Graham Rd.) (Jacksonville) (S) Utilities 2010Local State/Local CARTS2,026

405 - Local

- STP > 200,000

- TOTAL

1,621

061026B Pulaski CS Oak St.-Loop Rd. (Graham Rd.) (Jacksonville) (S) Widening 2011Local State/Local CARTS7,996

1,599 - Local

- STP > 200,000

- TOTAL

6,397

061080 Pulaski CS South Loop Bypass (Mabelvale Rd-Alexander Rd) (LR) (S) New Location 1.00 2010Local Local CARTS5,365

3,060 - Earmarks

1,073 - Local

- STP > 200,000

- TOTAL

1,232

061094A Pulaski CS Baseline Rd.-J.E. Davis Dr. (Scott Hamilton Dr.) (L.R.) (S) ROW/Utilities 1.00 2010Local State/Local CARTS470

94 - Local

- STP > 200,000

- TOTAL

376

061094B Pulaski CS Baseline Rd.-J.E. Davis Dr. (Scott Hamilton Dr.) (L.R.) (S) Widening 0.50 2010Local Local CARTS2,521

504 - Local

- STP > 200,000

- TOTAL

2,017

061229 Lonoke 067 Hwy 67/Hwy 5 Interchange Ramp Modifications (Cabot) (S) Interchange 2010Local State CARTS860

172 - Local

- STP > 200,000

- TOTAL

688

061232 Saline CS Benton Downtown Streetscape (S) Enhancement 2010Local State/Local CARTS619

160 - Local

- STP > 200,000

- TOTAL

459

Page 22 of 115

An (S) or (F) following the termini indicates federal or state oversight.

CENTRAL ARKANSAS REGIONAL TRANSPORTATION STUDY AREA

Page 40: 1 - Cover Page STIP 2010-2013 Web Version.pdf · iii TUTS - Texarkana Urban Transportation Study (Miller County) CEO of Texarkana, Texas Dr. Larry Sullivan P. O. Box 1967 Texarkana,

JOB / ITEM

NUMBER COUNTY RTE TERMINI TYPE WORK LENGTH

ESTIMATED COSTLET

YEAR

PROVIDING MATCHING

FUNDS

CARRYINGOUT THE PROJECT TIP AREA

AGENCY RESPONSIBLE FOR:

Funding Breakdown

(x $1,000)

4/14/2010 9:46:18 AM

061257 Saline CS Congo Rd.-I-30 (Military Rd.) (Benton) (S) Widening 2010Local State/Local CARTS8,250

1,650 - Local

- STP > 200,000

- TOTAL

6,600

061260 Pulaski 630 I-630 Corridor Fixed Guideway Alignment Study Planning 2010Local Metroplan CARTS188

38 - Local

- STP > 200,000

- TOTAL

150

061267A Pulaski CS W Main St/Harris Rd/Jacksonville Cutoff Inters Impvts (Jacksonville) (S)

PE 2010Local State/Local CARTS138

28 - Local

- STP > 200,000

- TOTAL

110

061267B Pulaski CS W Main St/Harris Rd/Jacksonville Cutoff Inters Impvts (Jacksonville) (S)

Safety & Traffic Eng. 2011Local State/Local CARTS439

88 - Local

- STP > 200,000

- TOTAL

351

061268 Lonoke 038 Hwy 367/Locust Signal (Cabot) (S) Safety & Traffic Eng. 2010Local State/Local CARTS130

26 - Local

- STP > 200,000

- TOTAL

104

061X01 Lonoke CS Cabot High School Roundabout (S) Reconstruction 2010Local State/Local CARTS211

43 - Local

- STP > 200,000

- TOTAL

168

061269 Lonoke CS Cabot Jr. High School North Sidewalks (Cabot) (S) Enhancement 2010Local State/Local CARTS60

12 - Local

- STP > 200,000

- TOTAL

48

061X03A Pulaski CS McCain Rail Grade Separation PE 2011Local State/Local CARTS1,338

268 - Local

- STP > 200,000

- TOTAL

1,070

Page 23 of 115

An (S) or (F) following the termini indicates federal or state oversight.

CENTRAL ARKANSAS REGIONAL TRANSPORTATION STUDY AREA

Page 41: 1 - Cover Page STIP 2010-2013 Web Version.pdf · iii TUTS - Texarkana Urban Transportation Study (Miller County) CEO of Texarkana, Texas Dr. Larry Sullivan P. O. Box 1967 Texarkana,

JOB / ITEM

NUMBER COUNTY RTE TERMINI TYPE WORK LENGTH

ESTIMATED COSTLET

YEAR

PROVIDING MATCHING

FUNDS

CARRYINGOUT THE PROJECT TIP AREA

AGENCY RESPONSIBLE FOR:

Funding Breakdown

(x $1,000)

4/14/2010 9:46:18 AM

061X03B Pulaski CS McCain Rail Grade Separation ROW/Utilities 2012Local State/Local CARTS4,294

859 - Local

- STP > 200,000

- TOTAL

3,435

061X03C Pulaski CS McCain Rail Grade Separation Str. & Apprs. 2013Local State/Local CARTS11,185

2,227 - Local

- STP > 200,000

- TOTAL

8,958

061X04A Pulaski CS Maryland Road Extension (Sherwood) PE 2011Local State/Local CARTS106

21 - Local

- STP > 200,000

- TOTAL

85

061X04B Pulaski CS Maryland Road Extension (Sherwood) New Location 2012Local State/Local CARTS960

192 - Local

- STP > 200,000

- TOTAL

768

061X05 Pulaski Levy UPRR Spur Bikeway (North Little Rock) ROW 2012Local State/Local CARTS1,803

361 - Local

- STP > 200,000

- TOTAL

1,442

061X06A Saline CS Alcoa Road: I-30 to Sidell Road (Saline County) PE 2010Local State CARTS900

180 - Local

- STP > 200,000

- TOTAL

720

061X06B Saline CS Alcoa Road: I-30 to Sidell Road (Saline County) Widening 2011Local State/Local CARTS1,047

209 - Local

- STP > 200,000

- TOTAL

838

061X07 Pulaski Maumelle Pedestrian/Bicycle Facilities (Phase II) Enhancement 2010Local State/Local CARTS536

107 - Local

- STP > 200,000

- TOTAL

429

Page 24 of 115

An (S) or (F) following the termini indicates federal or state oversight.

CENTRAL ARKANSAS REGIONAL TRANSPORTATION STUDY AREA

Page 42: 1 - Cover Page STIP 2010-2013 Web Version.pdf · iii TUTS - Texarkana Urban Transportation Study (Miller County) CEO of Texarkana, Texas Dr. Larry Sullivan P. O. Box 1967 Texarkana,

JOB / ITEM

NUMBER COUNTY RTE TERMINI TYPE WORK LENGTH

ESTIMATED COSTLET

YEAR

PROVIDING MATCHING

FUNDS

CARRYINGOUT THE PROJECT TIP AREA

AGENCY RESPONSIBLE FOR:

Funding Breakdown

(x $1,000)

4/14/2010 9:46:18 AM

080329 Faulkner Vilonia Middle SRTS I (2007) (Supplemental Funds) Enhancement 2010Local State/Local CARTS106

21 - Local

- STP > 200,000

- TOTAL

85

080X01 Faulkner 025 Hwy. 25 Relocation (S) New Location 1.70 2013Local State CARTS9,000

4,500 - STP

3,621 - Local

- STP > 200,000

- TOTAL

879

Also shown in the STATE PROJECTS SORTED BY ROUTE Section

080X03 Faulkner NEW Conway South Interchange-Hwy. 365 (Gr. & Strs.) (F) New Location 2011Local State CARTS12,000

5,589

1,836

- NHS

- Earmarks

41 - State Match

4,534 - Local

- TOTAL

Also shown in the STATE PROJECTS SORTED BY ROUTE Section

080X04 Faulkner NEW Conway South Interchange-Hwy. 365 (Bs. & Surf.) (F) New Location 2013Local State CARTS11,000

5,500 - NHS

4,329 - Local

- STP > 200,000

- TOTAL

1,171

Also shown in the STATE PROJECTS SORTED BY ROUTE Section

080X12 Faulkner NEW Hwy. 365-Sturgis Road (Phase I) (S) New Location 2012Local State CARTS5,437

5,437 - Local

- TOTAL

XX2010-19 Various CARTS Planning Planning 2010Local Metroplan CARTS215

43 - Local

- STP > 200,000

- TOTAL

172

XX2010-20 Various LUZA Non-Capacity Projects TBD 2010Local State/Local CARTS919

184 - Local

- STP > 200,000

- TOTAL

735

Page 25 of 115

An (S) or (F) following the termini indicates federal or state oversight.

CENTRAL ARKANSAS REGIONAL TRANSPORTATION STUDY AREA

Page 43: 1 - Cover Page STIP 2010-2013 Web Version.pdf · iii TUTS - Texarkana Urban Transportation Study (Miller County) CEO of Texarkana, Texas Dr. Larry Sullivan P. O. Box 1967 Texarkana,

JOB / ITEM

NUMBER COUNTY RTE TERMINI TYPE WORK LENGTH

ESTIMATED COSTLET

YEAR

PROVIDING MATCHING

FUNDS

CARRYINGOUT THE PROJECT TIP AREA

AGENCY RESPONSIBLE FOR:

Funding Breakdown

(x $1,000)

4/14/2010 9:46:18 AM

XX2010-21 Various RUZA Non-Capacity Projects TBD 2010Local State/Local CARTS795

159 - Local

- STP > 200,000

- TOTAL

636

XX2011-19 Various CARTS Planning Planning 2011Local Metroplan CARTS225

45 - Local

- STP > 200,000

- TOTAL

180

XX2011-20 Various LUZA Non-Capacity Projects TBD 2011Local State/Local CARTS225

46 - Local

- STP > 200,000

- TOTAL

179

XX2012-19 Various CARTS Planning Planning 2012Local Metroplan CARTS225

45 - Local

- STP > 200,000

- TOTAL

180

XX2012-20 Various LUZA Non-Capacity Projects TBD 2012Local State/Local CARTS303

61 - Local

- STP > 200,000

- TOTAL

242

XX2012-21 Various RUZA Non-Capacity Projects TBD 2012Local State/Local CARTS2,424

485 - Local

- STP > 200,000

- TOTAL

1,939

XX2013-19 Various CARTS Planning Planning 2013Local Metroplan CARTS225

45 - Local

- STP > 200,000

- TOTAL

180

4.20 95,275TOTAL

Page 26 of 115

An (S) or (F) following the termini indicates federal or state oversight.

CENTRAL ARKANSAS REGIONAL TRANSPORTATION STUDY AREA

Page 44: 1 - Cover Page STIP 2010-2013 Web Version.pdf · iii TUTS - Texarkana Urban Transportation Study (Miller County) CEO of Texarkana, Texas Dr. Larry Sullivan P. O. Box 1967 Texarkana,

JOB / ITEM

NUMBER COUNTY RTE TERMINI TYPE WORK LENGTH

ESTIMATED COSTLET

YEAR

PROVIDING MATCHING

FUNDS

CARRYINGOUT THE PROJECT TIP AREA

AGENCY RESPONSIBLE FOR:

Funding Breakdown

(x $1,000)

4/14/2010 9:46:18 AM

110509 Crittenden CS BNSF Railroad Overpass (Marion) (S) Str. & Apprs. 2010Local Local WMATS6,061

5,206 - Earmarks

855 - Local

- TOTAL

110530 Crittenden CS Southland Dr.-MLK, Jr. Dr.-West (S) Rehabilitation 0.42 2010Local Local WMATS1,300

260 - Local

- STP > 200,000

- TOTAL

1,040

110X01 Crittenden CS Southland Dr., Ingram Blvd.-East (S) Miscellaneous 0.83 2013Local Local WMATS2,695

539 - Local

- STP > 200,000

- TOTAL

2,156

XX2010-15 Crittenden VAR MPO Planning Planning 2010Local Local WMATS272

55 - Local

- STP > 200,000

138 - CMAQ FLEX

- TOTAL

79

XX2011-15 Crittenden VAR MPO Planning Planning 2011Local Local WMATS272

55 - Local

- STP > 200,000

138 - CMAQ FLEX

- TOTAL

79

XX2012-15 Crittenden VAR MPO Planning Planning 2012Local Local WMATS272

55 - Local

- STP > 200,000

138 - CMAQ FLEX

- TOTAL

79

XX2013-15 Crittenden VAR MPO Planning Planning 2013Local Local WMATS272

55 - Local

- STP > 200,000

138 - CMAQ FLEX

- TOTAL

79

Page 27 of 115

An (S) or (F) following the termini indicates federal or state oversight.

WEST MEMPHIS-MARION AREA TRANSPORTATION STUDY

Page 45: 1 - Cover Page STIP 2010-2013 Web Version.pdf · iii TUTS - Texarkana Urban Transportation Study (Miller County) CEO of Texarkana, Texas Dr. Larry Sullivan P. O. Box 1967 Texarkana,

JOB / ITEM

NUMBER COUNTY RTE TERMINI TYPE WORK LENGTH

ESTIMATED COSTLET

YEAR

PROVIDING MATCHING

FUNDS

CARRYINGOUT THE PROJECT TIP AREA

AGENCY RESPONSIBLE FOR:

Funding Breakdown

(x $1,000)

4/14/2010 9:46:18 AM

XX2010-16 Crittenden VAR CMAQ Non-Attainment Project Improve Air Quality 2010Local Local WMATS721

144 - Local

577 - CMAQ - AQ

- TOTAL

XX2011-16 Crittenden VAR CMAQ Non-Attainment Project Improve Air Quality 2011Local Local WMATS738

148 - Local

590 - CMAQ - AQ

- TOTAL

XX2012-16 Crittenden VAR CMAQ Non-Attainment Project Improve Air Quality 2012Local Local WMATS756

151 - Local

605 - CMAQ - AQ

- TOTAL

XX2013-16 Crittenden VAR CMAQ Non-Attainment Project Improve Air Quality 2013Local Local WMATS774

155 - Local

619 - CMAQ - AQ

- TOTAL

1.25 14,133TOTAL

Page 28 of 115

An (S) or (F) following the termini indicates federal or state oversight.

WEST MEMPHIS-MARION AREA TRANSPORTATION STUDY

Page 46: 1 - Cover Page STIP 2010-2013 Web Version.pdf · iii TUTS - Texarkana Urban Transportation Study (Miller County) CEO of Texarkana, Texas Dr. Larry Sullivan P. O. Box 1967 Texarkana,

Local Projects in Areas < 200,000 Population

Sorted by Job Number

Page 47: 1 - Cover Page STIP 2010-2013 Web Version.pdf · iii TUTS - Texarkana Urban Transportation Study (Miller County) CEO of Texarkana, Texas Dr. Larry Sullivan P. O. Box 1967 Texarkana,

JOB / ITEM

NUMBER COUNTY RTE TERMINI TYPE WORK LENGTH

ESTIMATED COSTLET

YEAR

PROVIDING MATCHING

FUNDS

CARRYINGOUT THE PROJECT TIP AREA

AGENCY RESPONSIBLE FOR:

Funding Breakdown

(x $1,000)

4/14/2010 9:46:18 AM

020480 Drew Southeast Arkansas Intermodal Facility (Wilmar) (S) Roadside Appurt 2010Local Local1,752

1,401 - Earmarks

351 - Local

- TOTAL

020505 Jefferson CS Nevins Creek Str. & Apprs. (Nevins Rd.) (Pine Bluff) (S) Str. & Apprs. 2012Local State PBATS350

280 - BR

70 - Local

- TOTAL

030100 Miller CS Jefferson Ave-Mount Olive Dr(McDonald Ln)(Texarkana)(S) New Location 0.25 2010Local Local TUTS1,913

913 - Local

- STP < 200,000

- TOTAL

1,000

040272 Washington CS Johnson Road Reconst. (Springdale) P.E. Widening 2.20 2010Local Local NARTS14,586

10,669 - Earmarks

2,917 - Local

- STP < 200,000

- TOTAL

1,000

040345 Crawford CS Hwy. 59-West (Rena Road) (Van Buren) (S) Widening 1.10 2010Local State BI-STATE5,400

3,240

80

- Earmarks

- BR

1,080 - Local

- STP < 200,000

- TOTAL

1,000

040418 Washington 112 Hwy. 180-Garland Ave. (Hwy. 112) (Fayetteville) (S) Widening 1.17 2012Local State NARTS1,250

250 - Local

- STP < 200,000

- TOTAL

1,000

040464 Crawford CS West of Ham Town Rd.-East (Wire Rd.) (Mulberry) (S) Reconstruction 0.94 2012Local State2,350

1,350 - Local

- STP < 200,000

- TOTAL

1,000

040471 Sebastian CS Jenny Lind Rd. & Ingersoll Rd. Widening (Fort Smith) (S) Widening 3.00 2010Local Local BI-STATE8,980

7,360 - Earmarks

1,620 - Local

- TOTAL

Page 29 of 115

An (S) or (F) following the termini indicates federal or state oversight.

LOCAL PROJECTS AREAS < 200,000 POPULATION

Page 48: 1 - Cover Page STIP 2010-2013 Web Version.pdf · iii TUTS - Texarkana Urban Transportation Study (Miller County) CEO of Texarkana, Texas Dr. Larry Sullivan P. O. Box 1967 Texarkana,

JOB / ITEM

NUMBER COUNTY RTE TERMINI TYPE WORK LENGTH

ESTIMATED COSTLET

YEAR

PROVIDING MATCHING

FUNDS

CARRYINGOUT THE PROJECT TIP AREA

AGENCY RESPONSIBLE FOR:

Funding Breakdown

(x $1,000)

4/14/2010 9:46:18 AM

040493 Franklin CS Hillbilly Lane-Hwy. 23 (Ozark) (S) New Location 0.90 2011Local State1,935

935 - Local

- STP < 200,000

- TOTAL

1,000

040496 Washington CS Hwy. 112-Hwy. 71B (Cato Springs Rd.) (Fayetteville) (S) Reconstruction 1.00 2010Local Local NARTS3,596

2,877 - Earmarks

719 - Local

- TOTAL

040506 Franklin CS Gar Creek Str. & Apprs. (2nd Street) (Ozark) (S) Str. & Apprs. 2010Local State425

340 - BR

85 - Local

- TOTAL

040527 Washington 540 I-540/Don Tyson Pkwy. Intchng. (Springdale) (F) Interchange 2012Local Local NARTS26,951

26,951 - Local

- TOTAL

040535 Washington CS Fulbright Expwy./Hwy. 71B Flyover (Fayetteville) (S) Str. & Apprs. 2011Local Local NARTS6,452

5,162 - Earmarks

1,290 - Local

- TOTAL

040536 Washington CS Fulbright Expwy./Futrall Dr. Roundabout (Fayetteville) (S) Inters Impvts 2010Local Local NARTS2,966

2,373 - Earmarks

593 - Local

- TOTAL

040545 Sebastian CS 9th St.-13th St. (Garrison Ave.) (Ft. Smith) (S) Enhancement 2010Local Local BI-STATE2,438

950 - Earmarks

488 - Local

- STP < 200,000

- TOTAL

1,000

070304 Columbia CS Frederick St.-Hwy. 82 (E. North St.) (Magnolia) (S) Widening 0.70 2011Local State2,840

1,840 - Local

- STP < 200,000

- TOTAL

1,000

Page 30 of 115

An (S) or (F) following the termini indicates federal or state oversight.

LOCAL PROJECTS AREAS < 200,000 POPULATION

Page 49: 1 - Cover Page STIP 2010-2013 Web Version.pdf · iii TUTS - Texarkana Urban Transportation Study (Miller County) CEO of Texarkana, Texas Dr. Larry Sullivan P. O. Box 1967 Texarkana,

JOB / ITEM

NUMBER COUNTY RTE TERMINI TYPE WORK LENGTH

ESTIMATED COSTLET

YEAR

PROVIDING MATCHING

FUNDS

CARRYINGOUT THE PROJECT TIP AREA

AGENCY RESPONSIBLE FOR:

Funding Breakdown

(x $1,000)

4/14/2010 9:46:18 AM

080157 Pope Intermodal Complex (Russellville) (F) Miscellaneous 2010Local Local3,488

2,790 - Earmarks

698 - Local

- TOTAL

080295 Pope CS W Main Pl-Honeysuckle Ln (Inglewood St) (Russellville)(S) Reconstruction 0.80 2010Local State2,850

1,850 - Local

- STP < 200,000

- TOTAL

1,000

080314 Johnson CS Hwy. 123-Hwy. 21 (Clarksville) (S) Project Development 0.50 2011Local Local1,100

100 - Local

- STP < 200,000

- TOTAL

1,000

090069 Benton NEW Northwest Arkansas Regional Airport Access (F) New Location 2010Local Local NARTS35,000

10,651 - Earmarks

24,349 - Local

- TOTAL

090218 Benton CS 8th Street Improvements (Bentonville) (S) Widening 2011Local Local NARTS38,586

30,869 - Earmarks

7,717 - Local

- TOTAL

090228 Benton CR War Eagle Bridge Rehab. (Benton Co.) (S) New Location 2010Local State NARTS494

395 - Earmarks

99 - Local

- TOTAL

090232 Benton CS East Monroe Ave. Extension (Sel. Secs.) (Lowell) (S) New Location 0.32 2010Local State NARTS2,100

1,100 - Local

- STP < 200,000

- TOTAL

1,000

090254 Benton CS Shell Road Str. & Apprs. (Bentonville) (S) Str. & Apprs. 2010Local State NARTS1,404

1,000 - BR

404 - Local

- TOTAL

090260 Benton 071 Hwy. 71/NE J St. Intchng. (Bentonville) (F) Interchange 2011Local Local NARTS37,676

37,676 - Local

- TOTAL

Page 31 of 115

An (S) or (F) following the termini indicates federal or state oversight.

LOCAL PROJECTS AREAS < 200,000 POPULATION

Page 50: 1 - Cover Page STIP 2010-2013 Web Version.pdf · iii TUTS - Texarkana Urban Transportation Study (Miller County) CEO of Texarkana, Texas Dr. Larry Sullivan P. O. Box 1967 Texarkana,

JOB / ITEM

NUMBER COUNTY RTE TERMINI TYPE WORK LENGTH

ESTIMATED COSTLET

YEAR

PROVIDING MATCHING

FUNDS

CARRYINGOUT THE PROJECT TIP AREA

AGENCY RESPONSIBLE FOR:

Funding Breakdown

(x $1,000)

4/14/2010 9:46:18 AM

100639 Craighead CS Mt. Carmel Rd-S Culberhouse Rd (Lawson Rd)(Jonesboro)(S) Widening 1.20 2010Local State JATS4,900

3,900 - Local

- STP < 200,000

- TOTAL

1,000

100662 Craighead CS Caraway Rd. Safety Enhancement (Jonesboro) (Ph. II) (S) New Location 2010Local Local JATS9,185

5,848 - Earmarks

1,837 - Local

1,500 - RRP

- TOTAL

XX2010-17 Various VAR Various Signals and Intersection Improvements Safety & Traffic Eng. 2010State/Local State All MPOs except WMATS

2,500

500 - State or Local

- STP < 200,000

- TOTAL

2,000

XX2011-17 Various VAR Various Signals and Intersection Improvements Safety & Traffic Eng. 2011State/Local State All MPOs except WMATS

2,500

500 - State or Local

- STP < 200,000

- TOTAL

2,000

XX2012-17 Various VAR Various Signals and Intersection Improvements Safety & Traffic Eng. 2012State/Local State All MPOs except WMATS

2,500

500 - State or Local

- STP < 200,000

- TOTAL

2,000

XX2013-17 Statewide VAR Various Signals and Intersection Improvements Safety & Traffic Eng. 2013State/Local State All MPOs except WMATS

2,500

500 - State or Local

- STP < 200,000

- TOTAL

2,000

14.08 230,967TOTAL

Page 32 of 115

An (S) or (F) following the termini indicates federal or state oversight.

LOCAL PROJECTS AREAS < 200,000 POPULATION

Page 51: 1 - Cover Page STIP 2010-2013 Web Version.pdf · iii TUTS - Texarkana Urban Transportation Study (Miller County) CEO of Texarkana, Texas Dr. Larry Sullivan P. O. Box 1967 Texarkana,

Statewide Generic Projects

Page 52: 1 - Cover Page STIP 2010-2013 Web Version.pdf · iii TUTS - Texarkana Urban Transportation Study (Miller County) CEO of Texarkana, Texas Dr. Larry Sullivan P. O. Box 1967 Texarkana,

JOB / ITEM

NUMBER COUNTY RTE TERMINI TYPE WORK LENGTH

ESTIMATED COSTLET

YEAR

PROVIDING MATCHING

FUNDS

CARRYINGOUT THE PROJECT TIP AREA

AGENCY RESPONSIBLE FOR:

Funding Breakdown

(x $1,000)

4/14/2010 9:46:18 AM

XX2010-01 Statewide VAR IRP Debt Service Various 2010State State58,000

58,000 - IM

- TOTAL

XX2010-02 Statewide VAR Various Resurf / Restoration / Rehab / Reconst 4-R 2010State State All MPOs16,000

1,600

1,600

10,800

- NHS

- STP

- IM

2,000 - State Match

- TOTAL

XX2010-03 Statewide VAR Various Bridge Rehab / Replacement Str. & Apprs. 2010State/Local State/Local All MPOs2,000

1,600 - BR

400 - State or Local

- TOTAL

XX2010-04 Statewide VAR Bridge Painting / Guard Rail / Scour Control / Inspection Miscellaneous 2010State/Local State All MPOs2,000

1,600 - BR

400 - State or Local

- TOTAL

XX2010-05 Statewide VAR Various Safety Type Improvements Safety 2010State State All MPOs1,000

900 - HSIP

100 - State Match

- TOTAL

XX2010-06 Statewide VAR RR Xing Protect Devices / Surfacing / Hazard Elim Safety 2010State/RR State/RR All MPOs2,400

240 - State Match

2,160 - RRP

- TOTAL

XX2010-07 Statewide VAR Various Enhancement Type Projects Enhancement 2010State/Local State/Local All MPOs10,000

2,000 - State or Local

- TOTAL

8,000 - ENH

XX2010-08 Statewide VAR Various Safe Routes to School Projects Enhancement 2010N/A State/Local All MPOs1,400 - TOTAL

1,400 - SRTS

Page 33 of 115

An (S) or (F) following the termini indicates federal or state oversight.

STATEWIDE GENERIC PROJECTS FFY 2010

Page 53: 1 - Cover Page STIP 2010-2013 Web Version.pdf · iii TUTS - Texarkana Urban Transportation Study (Miller County) CEO of Texarkana, Texas Dr. Larry Sullivan P. O. Box 1967 Texarkana,

JOB / ITEM

NUMBER COUNTY RTE TERMINI TYPE WORK LENGTH

ESTIMATED COSTLET

YEAR

PROVIDING MATCHING

FUNDS

CARRYINGOUT THE PROJECT TIP AREA

AGENCY RESPONSIBLE FOR:

Funding Breakdown

(x $1,000)

4/14/2010 9:46:18 AM

XX2010-09 Statewide VAR Scenic Byways Projects Miscellaneous 2010State/Local State/Local WMATS / JATS / HSA-MPO

1,000

800 - Earmarks

200 - State or Local

- TOTAL

XX2010-10 Statewide VAR Various Trail Projects Enhancement 2010Local Local All MPOs1,000

200 - Local

800 - Rec Trails

- TOTAL

XX2010-11 Statewide CR Var Resurf / Restore / Rehab / Reconst / BR Repl / BR Rehab on County Roads

4-R / Strs. & Apprs. 2010State/Local State All MPOs7,459

5,967 - STP

1,492 - State or Local

- TOTAL

XX2010-12 Statewide CR Various Bridge Rehab / Replacement on County Roads Str. & Apprs. 2010Local State All MPOs5,525

720

3,700

- Earmarks

- BR

1,105 - Local

- TOTAL

XX2010-13 Statewide VAR Right-of-Way / Utilities / CENG Various 2010State/Local State All MPOs80,600

21,440

28,880

2,700

5,600

4,680

- NHS

- STP

- IM

- BR

- HSIP

14,800 - State Match

500 - State or Local

- TOTAL

2,000 - ENH

188,384TOTAL

Page 34 of 115

An (S) or (F) following the termini indicates federal or state oversight.

STATEWIDE GENERIC PROJECTS FFY 2010

Page 54: 1 - Cover Page STIP 2010-2013 Web Version.pdf · iii TUTS - Texarkana Urban Transportation Study (Miller County) CEO of Texarkana, Texas Dr. Larry Sullivan P. O. Box 1967 Texarkana,

JOB / ITEM

NUMBER COUNTY RTE TERMINI TYPE WORK LENGTH

ESTIMATED COSTLET

YEAR

PROVIDING MATCHING

FUNDS

CARRYINGOUT THE PROJECT TIP AREA

AGENCY RESPONSIBLE FOR:

Funding Breakdown

(x $1,000)

4/14/2010 9:46:18 AM

XX2011-01 Statewide VAR IRP Debt Service Various 2011State State58,000

58,000 - IM

- TOTAL

XX2011-02 Statewide VAR Various Resurf / Restoration / Rehab / Reconstruction 4-R 2011State State All MPOs16,000

1,600

1,600

10,800

- NHS

- STP

- IM

2,000 - State Match

- TOTAL

XX2011-03 Statewide VAR Various Bridge Rehab / Replacement Str. & Apprs. 2011State/Local State/Local All MPOs2,000

1,600 - BR

400 - State or Local

- TOTAL

XX2011-04 Statewide VAR Bridge Painting / Guard Rail / Scour Control / Inspection Miscellaneous 2011State/Local State All MPOs2,000

1,600 - BR

400 - State or Local

- TOTAL

XX2011-05 Statewide VAR Various Safety Type Improvements Safety 2011State State All MPOs6,556

5,900 - HSIP

656 - State Match

- TOTAL

XX2011-06 Statewide VAR RR Xing Protect Devices / Surfacing / Hazard Elim Safety 2011State/RR State/RR All MPOs4,222

422 - State Match

3,800 - RRP

- TOTAL

XX2011-07 Statewide VAR Various Enhancement Type Projects Enhancement 2011State/Local State/Local All MPOs10,000

2,000 - State or Local

- TOTAL

8,000 - ENH

XX2011-08 Statewide VAR Various Safe Routes to School Projects Enhancement 2011N/A State/Local All MPOs1,400 - TOTAL

1,400 - SRTS

Page 35 of 115

An (S) or (F) following the termini indicates federal or state oversight.

STATEWIDE GENERIC PROJECTS FFY 2011

Page 55: 1 - Cover Page STIP 2010-2013 Web Version.pdf · iii TUTS - Texarkana Urban Transportation Study (Miller County) CEO of Texarkana, Texas Dr. Larry Sullivan P. O. Box 1967 Texarkana,

JOB / ITEM

NUMBER COUNTY RTE TERMINI TYPE WORK LENGTH

ESTIMATED COSTLET

YEAR

PROVIDING MATCHING

FUNDS

CARRYINGOUT THE PROJECT TIP AREA

AGENCY RESPONSIBLE FOR:

Funding Breakdown

(x $1,000)

4/14/2010 9:46:18 AM

XX2011-09 Statewide VAR Scenic Byways Projects Miscellaneous 2011State/Local State/Local WMATS / JATS / HSA-MPO

1,000

800 - Earmarks

200 - State or Local

- TOTAL

XX2011-10 Statewide VAR Various Trail Projects Enhancement 2011Local Local All MPOs1,000

200 - Local

800 - Rec Trails

- TOTAL

XX2011-11 Statewide CR Var Resurf / Restore / Rehab / Reconst / BR Repl / BR Rehab on County Roads

4-R / Strs. & Apprs. 2011State/Local State All MPOs7,459

5,967 - STP

1,492 - State or Local

- TOTAL

XX2011-12 Statewide CR Various Bridge Rehab / Replacement on County Roads Str. & Apprs. 2011Local State All MPOs4,625

3,700 - BR

925 - Local

- TOTAL

XX2011-13 Statewide VAR Right-of-Way / Utilities / CENG Various 2011State/Local State All MPOs83,400

22,160

29,920

2,700

6,000

4,770

- NHS

- STP

- IM

- BR

- HSIP

15,350 - State Match

500 - State or Local

- TOTAL

2,000 - ENH

XX2011-18 Statewide NA Motor Fuel Tracking System Miscellaneous 2011N/A State300

300 - STP

- TOTAL

197,962TOTAL

Page 36 of 115

An (S) or (F) following the termini indicates federal or state oversight.

STATEWIDE GENERIC PROJECTS FFY 2011

Page 56: 1 - Cover Page STIP 2010-2013 Web Version.pdf · iii TUTS - Texarkana Urban Transportation Study (Miller County) CEO of Texarkana, Texas Dr. Larry Sullivan P. O. Box 1967 Texarkana,

JOB / ITEM

NUMBER COUNTY RTE TERMINI TYPE WORK LENGTH

ESTIMATED COSTLET

YEAR

PROVIDING MATCHING

FUNDS

CARRYINGOUT THE PROJECT TIP AREA

AGENCY RESPONSIBLE FOR:

Funding Breakdown

(x $1,000)

4/14/2010 9:46:18 AM

XX2012-01 Statewide VAR IRP Debt Service Various 2012State State58,000

58,000 - IM

- TOTAL

XX2012-02 Statewide VAR Various Resurf / Restoration / Rehab / Reconstruction 4-R 2012State State All MPOs16,000

1,600

1,600

10,800

- NHS

- STP

- IM

2,000 - State Match

- TOTAL

XX2012-03 Statewide VAR Various Bridge Rehab / Replacement Str. & Apprs. 2012State/Local State/Local All MPOs2,000

1,600 - BR

400 - State Match

- TOTAL

XX2012-04 Statewide VAR Bridge Painting / Guard Rail / Scour Control / Inspection Miscellaneous 2012State/Local State All MPOs2,000

1,600 - BR

400 - State Match

- TOTAL

XX2012-05 Statewide VAR Various Safety Type Improvements Safety 2012State State All MPOs3,000

2,700 - HSIP

300 - State Match

- TOTAL

XX2012-06 Statewide VAR RR Xing Protect Devices / Surfacing / Hazard Elim Safety 2012State/RR State/RR All MPOs4,389

439 - State Match

3,950 - RRP

- TOTAL

XX2012-07 Statewide VAR Various Enhancement Type Projects Enhancement 2012State/Local State/Local All MPOs10,000

2,000 - State or Local

- TOTAL

8,000 - ENH

XX2012-08 Statewide VAR Various Safe Routes to School Projects Enhancement 2012N/A State/Local All MPOs1,500 - TOTAL

1,500 - SRTS

Page 37 of 115

An (S) or (F) following the termini indicates federal or state oversight.

STATEWIDE GENERIC PROJECTS FFY 2012

Page 57: 1 - Cover Page STIP 2010-2013 Web Version.pdf · iii TUTS - Texarkana Urban Transportation Study (Miller County) CEO of Texarkana, Texas Dr. Larry Sullivan P. O. Box 1967 Texarkana,

JOB / ITEM

NUMBER COUNTY RTE TERMINI TYPE WORK LENGTH

ESTIMATED COSTLET

YEAR

PROVIDING MATCHING

FUNDS

CARRYINGOUT THE PROJECT TIP AREA

AGENCY RESPONSIBLE FOR:

Funding Breakdown

(x $1,000)

4/14/2010 9:46:18 AM

XX2012-09 Statewide VAR Scenic Byways Projects Miscellaneous 2012State/Local State/Local WMATS / JATS / HSA-MPO

1,000

800 - Earmarks

200 - State or Local

- TOTAL

XX2012-10 Statewide VAR Various Trail Projects Enhancement 2012Local Local All MPOs1,000

200 - Local

800 - Rec Trails

- TOTAL

XX2012-11 Statewide CR Var Resurf / Restore / Rehab / Reconst / BR Repl / BR Rehab on County Roads

4-R / Strs. & Apprs. 2012State/Local State All MPOs7,459

5,967 - STP

1,492 - State or Local

- TOTAL

XX2012-12 Statewide CR Various Bridge Rehab / Replacement on County Roads Str. & Apprs. 2012Local State All MPOs4,625

3,700 - BR

925 - Local

- TOTAL

XX2012-13 Statewide VAR Right-of-Way / Utilities / CENG Various 2012State/Local State All MPOs87,300

22,560

30,560

2,700

8,000

4,860

- NHS

- STP

- IM

- BR

- HSIP

16,120 - State Match

500 - State or Local

- TOTAL

2,000 - ENH

XX2012-18 Statewide NA Motor Fuel Tracking System Miscellaneous 2012N/A State300

300 - STP

- TOTAL

198,573TOTAL

Page 38 of 115

An (S) or (F) following the termini indicates federal or state oversight.

STATEWIDE GENERIC PROJECTS FFY 2012

Page 58: 1 - Cover Page STIP 2010-2013 Web Version.pdf · iii TUTS - Texarkana Urban Transportation Study (Miller County) CEO of Texarkana, Texas Dr. Larry Sullivan P. O. Box 1967 Texarkana,

JOB / ITEM

NUMBER COUNTY RTE TERMINI TYPE WORK LENGTH

ESTIMATED COSTLET

YEAR

PROVIDING MATCHING

FUNDS

CARRYINGOUT THE PROJECT TIP AREA

AGENCY RESPONSIBLE FOR:

Funding Breakdown

(x $1,000)

4/14/2010 9:46:18 AM

XX2013-01 Statewide VAR IRP Debt Service Various 2013State State58,000

58,000 - IM

- TOTAL

XX2013-02 Statewide VAR Various Resurf / Restoration / Rehab / Reconstruction 4-R 2013State/Local State All MPOs16,050

1,600

1,600

10,800

- NHS

- STP

- IM

2,000 - State Match

10 - Local

- STP < 200,000

- TOTAL

40

XX2013-03 Statewide VAR Various Bridge Rehab / Replacement Str. & Apprs. 2013State/Local State/Local All MPOs2,000

1,600 - BR

400 - State Match

- TOTAL

XX2013-04 Statewide VAR Bridge Painting / Guard Rail / Scour Control / Inspection Miscellaneous 2013State/Local State All MPOs2,000

1,600 - BR

400 - State Match

- TOTAL

XX2013-05 Statewide VAR Various Safety Type Improvements Safety 2013State State All MPOs19,120

8,388 - HSIP

932 - State Match

- TOTAL

9,800 - 402-Safety

XX2013-06 Statewide VAR RR Xing Protect Devices / Surfacing / Hazard Elim Safety 2013State/RR State/RR All MPOs4,567

457 - State Match

4,110 - RRP

- TOTAL

XX2013-07 Statewide VAR Various Enhancement Type Projects Enhancement 2013State/Local State/Local All MPOs10,000

2,000 - State or Local

- TOTAL

8,000 - ENH

XX2013-08 Statewide VAR Various Safe Routes to School Projects Enhancement 2013N/A State/Local All MPOs1,500 - TOTAL

1,500 - SRTS

Page 39 of 115

An (S) or (F) following the termini indicates federal or state oversight.

STATEWIDE GENERIC PROJECTS FFY 2013

Page 59: 1 - Cover Page STIP 2010-2013 Web Version.pdf · iii TUTS - Texarkana Urban Transportation Study (Miller County) CEO of Texarkana, Texas Dr. Larry Sullivan P. O. Box 1967 Texarkana,

JOB / ITEM

NUMBER COUNTY RTE TERMINI TYPE WORK LENGTH

ESTIMATED COSTLET

YEAR

PROVIDING MATCHING

FUNDS

CARRYINGOUT THE PROJECT TIP AREA

AGENCY RESPONSIBLE FOR:

Funding Breakdown

(x $1,000)

4/14/2010 9:46:19 AM

XX2013-09 Statewide VAR Scenic Byways Projects Miscellaneous 2013State/Local State/Local WMATS / JATS / HSA-MPO

1,000

800 - Earmarks

200 - State or Local

- TOTAL

XX2013-10 Statewide VAR Various Trail Projects Enhancement 2013Local Local All MPOs1,000

200 - Local

800 - Rec Trails

- TOTAL

XX2013-11 Statewide CR Var Resurf / Restore / Rehab / Reconst / BR Repl / BR Rehab on County Roads

4-R / Strs. & Apprs. 2013State/Local State All MPOs7,459

5,967 - STP

1,492 - State or Local

- TOTAL

XX2013-12 Statewide CR Various Bridge Rehab / Replacement on County Roads Str. & Apprs. 2013Local State All MPOs4,625

3,700 - BR

925 - Local

- TOTAL

XX2013-13 Statewide VAR Right-of-Way / Utilities / CENG Various 2013State/Local State All MPOs93,900

23,040

31,200

2,700

12,000

5,040

- NHS

- STP

- IM

- BR

- HSIP

17,420 - State Match

500 - State or Local

- TOTAL

2,000 - ENH

XX2013-18 Statewide NA Motor Fuel Tracking System Miscellaneous 2013N/A State300

300 - STP

- TOTAL

221,521TOTAL

Page 40 of 115

An (S) or (F) following the termini indicates federal or state oversight.

STATEWIDE GENERIC PROJECTS FFY 2013

Page 60: 1 - Cover Page STIP 2010-2013 Web Version.pdf · iii TUTS - Texarkana Urban Transportation Study (Miller County) CEO of Texarkana, Texas Dr. Larry Sullivan P. O. Box 1967 Texarkana,

Transit Projects

Page 61: 1 - Cover Page STIP 2010-2013 Web Version.pdf · iii TUTS - Texarkana Urban Transportation Study (Miller County) CEO of Texarkana, Texas Dr. Larry Sullivan P. O. Box 1967 Texarkana,

JOB / ITEM

NUMBER COUNTY RTE TERMINI TYPE WORK LENGTH

ESTIMATED COSTLET

YEAR

PROVIDING MATCHING

FUNDS

CARRYINGOUT THE PROJECT TIP AREA

AGENCY RESPONSIBLE FOR:

Funding Breakdown

(x $1,000)

4/14/2010 9:46:19 AM

031FTA Miller Operating Assistance Transit 2010Local Local TUTS394

197 - Local

197 - FTA-5307

FFY Transit Appropriation: 2009

- TOTAL

032FTA Miller Capital - Preventive Maintenance Transit 2010Local Local TUTS106

21 - Local

85 - FTA-5307

FFY Transit Appropriation: 2009

- TOTAL

040FTA Wash/Benton Environmental, Security & Bus Upgrades Transit 2010Local - UofA Local - UofA NARTS713

143 - Local

570 - FTA-5309

FFY Transit Appropriation: 2009

E2009-BUSP-043FTA Earmark ID:

- TOTAL

116FTA Statewide Job Access Reverse Commute Urbanized Areas > 200,000 Transit 2010Var Agencies

Var Agencies

CARTS / WMATS

466

233 - Local

233 - FTA-5316

FFY Transit Appropriation: 2009

- TOTAL

117FTA Statewide New Freedom Urbanized Areas >200,000 Transit 2010Var Agencies

Var Agencies

CARTS / WMATS

248

124 - Local

124 - FTA-5317

FFY Transit Appropriation: 2009

- TOTAL

216FTA Statewide Job Access Reverse Commute Urbanized Areas < 200,000 Transit 2010Var Agencies

Var Agencies

BI-STATE / HSA / JATS / NARTS / PBATS / TUTS

1,186

593 - Local

593 - FTA-5316

FFY Transit Appropriation: 2009

- TOTAL

Page 41 of 115

An (S) or (F) following the termini indicates federal or state oversight.

TRANSIT PROJECTS FFY 2010

Page 62: 1 - Cover Page STIP 2010-2013 Web Version.pdf · iii TUTS - Texarkana Urban Transportation Study (Miller County) CEO of Texarkana, Texas Dr. Larry Sullivan P. O. Box 1967 Texarkana,

JOB / ITEM

NUMBER COUNTY RTE TERMINI TYPE WORK LENGTH

ESTIMATED COSTLET

YEAR

PROVIDING MATCHING

FUNDS

CARRYINGOUT THE PROJECT TIP AREA

AGENCY RESPONSIBLE FOR:

Funding Breakdown

(x $1,000)

4/14/2010 9:46:19 AM

217FTA Statewide New Freedom Urbanized Areas <200,000 Transit 2010Var Agencies

Var Agencies

BI-STATE / HSA / JATS / NARTS / PBATS / TUTS

606

303 - Local

303 - FTA-5317

FFY Transit Appropriation: 2009

- TOTAL

309FTA Statewide Bus and Bus Facilities Transit 2010Var Agencies

Var Agencies

All MPOs1,188

238 - Local

950 - FTA-5309

FFY Transit Appropriation: 2009

E2009-BUSP-046FTA Earmark ID:

- TOTAL

310FTA Statewide Elderly and Disabled Persons Transit 2010Var Agencies

Var Agencies

All MPOs1,768

354 - Local

1,414 - FTA-5310

FFY Transit Appropriation: 2009

- TOTAL

311FTA Statewide Non-Urbanized Transit 2010Local Local All MPOs12,758

2,552 - Local

10,206 - FTA-5311

FFY Transit Appropriation: 2009

- TOTAL

316CRI Crittenden Job Access Reverse Commute - Discretionary Transit 2010Local Local WMATS700

350 - Local

350 - FTA-5316

FFY Transit Appropriation: 2009

- TOTAL

316FTA Statewide Job Access Reverse Commute Non-Urbanized Areas Transit 2010Var Agencies

Var Agencies

All MPOs1,734

867 - Local

867 - FTA-5316

FFY Transit Appropriation: 2009

- TOTAL

Page 42 of 115

An (S) or (F) following the termini indicates federal or state oversight.

TRANSIT PROJECTS FFY 2010

Page 63: 1 - Cover Page STIP 2010-2013 Web Version.pdf · iii TUTS - Texarkana Urban Transportation Study (Miller County) CEO of Texarkana, Texas Dr. Larry Sullivan P. O. Box 1967 Texarkana,

JOB / ITEM

NUMBER COUNTY RTE TERMINI TYPE WORK LENGTH

ESTIMATED COSTLET

YEAR

PROVIDING MATCHING

FUNDS

CARRYINGOUT THE PROJECT TIP AREA

AGENCY RESPONSIBLE FOR:

Funding Breakdown

(x $1,000)

4/14/2010 9:46:19 AM

317FTA Statewide New Freedom Non Urbanized Areas Transit 2010Var Agencies

Var Agencies

All MPOs856

428 - Local

428 - FTA-5317

FFY Transit Appropriation: 2009

- TOTAL

CATA01 Pulaski Bus Support Equipment/Facilities Transit 2010Local Local CARTS368

74 - Local

294 - FTA-5307

FFY Transit Appropriation: 2010

- TOTAL

CATA02 Pulaski Transit Enhancements (Bus) Transit 2010Local Local CARTS75

15 - Local

60 - FTA-5307

FFY Transit Appropriation: 2010

- TOTAL

CATA03 Pulaski Other Capital Items (Bus) - Prev Maint / Para Serv Transit 2010Local Local CARTS2,039

408 - Local

1,631 - FTA-5307

FFY Transit Appropriation: 2010

- TOTAL

CATA04 Pulaski Metropolitan Planning Transit 2010Local Local CARTS333

67 - Local

266 - FTA-5307

FFY Transit Appropriation: 2010

- TOTAL

CATA05 Pulaski Training Transit 2010Local Local CARTS19

4 - Local

15 - FTA-5307

FFY Transit Appropriation: 2010

- TOTAL

CATA06 Pulaski Signal & Communication (Bus) Transit 2010Local Local CARTS2,098

420 - Local

1,678 - FTA-5307

FFY Transit Appropriation: 2010

- TOTAL

Page 43 of 115

An (S) or (F) following the termini indicates federal or state oversight.

TRANSIT PROJECTS FFY 2010

Page 64: 1 - Cover Page STIP 2010-2013 Web Version.pdf · iii TUTS - Texarkana Urban Transportation Study (Miller County) CEO of Texarkana, Texas Dr. Larry Sullivan P. O. Box 1967 Texarkana,

JOB / ITEM

NUMBER COUNTY RTE TERMINI TYPE WORK LENGTH

ESTIMATED COSTLET

YEAR

PROVIDING MATCHING

FUNDS

CARRYINGOUT THE PROJECT TIP AREA

AGENCY RESPONSIBLE FOR:

Funding Breakdown

(x $1,000)

4/14/2010 9:46:19 AM

FST001 Sebastian Operating Assistance Transit 2010Local Local BI-STATE1,704

852 - Local

852 - FTA-5307

FFY Transit Appropriation: 2009

- TOTAL

FST002 Sebastian Capital - Preventive Maintenance / Paratransit Service Transit 2010Local Local BI-STATE514

103 - Local

411 - FTA-5307

FFY Transit Appropriation: 2009

- TOTAL

FST003 Sebastian Rolling Stock Transit 2010Local Local BI-STATE186

37 - Local

149 - FTA-5307

FFY Transit Appropriation: 2009

- TOTAL

HSIT01 Garland Operating Assistance Transit 2010Local Local HSA-MPO658

329 - Local

329 - FTA-5307

FFY Transit Appropriation: 2010

- TOTAL

HSIT02 Garland Capital - Preventive Maintenance Transit 2010Local Local HSA-MPO286

57 - Local

229 - FTA-5307

FFY Transit Appropriation: 2010

- TOTAL

JETS01 Craighead Operating Assistance Transit 2010Local Local JATS990

495 - Local

495 - FTA-5307

FFY Transit Appropriation: 2010

- TOTAL

JETS02 Craighead Capital - Paratransit Service Transit 2010Local Local JATS280

56 - Local

224 - FTA-5307

FFY Transit Appropriation: 2010

- TOTAL

Page 44 of 115

An (S) or (F) following the termini indicates federal or state oversight.

TRANSIT PROJECTS FFY 2010

Page 65: 1 - Cover Page STIP 2010-2013 Web Version.pdf · iii TUTS - Texarkana Urban Transportation Study (Miller County) CEO of Texarkana, Texas Dr. Larry Sullivan P. O. Box 1967 Texarkana,

JOB / ITEM

NUMBER COUNTY RTE TERMINI TYPE WORK LENGTH

ESTIMATED COSTLET

YEAR

PROVIDING MATCHING

FUNDS

CARRYINGOUT THE PROJECT TIP AREA

AGENCY RESPONSIBLE FOR:

Funding Breakdown

(x $1,000)

4/14/2010 9:46:19 AM

JETS03 Craighead Tires Transit 2010Local Local JATS28

6 - Local

22 - FTA-5307

FFY Transit Appropriation: 2010

- TOTAL

NART01 Wash/Benton Operating Assistance Transit 2010Local - ORT Local - ORT NARTS1,506

753 - Local

753 - FTA-5307

FFY Transit Appropriation: 2009

- TOTAL

NART02 Wash/Benton Capital - Preventive Maintenance Transit 2010Local - ORT Local - ORT NARTS511

102 - Local

409 - FTA-5307

FFY Transit Appropriation: 2009

- TOTAL

NART03 Wash/Benton Operating Assistance Transit 2010Local - UofA Local - UofA NARTS1,302

651 - Local

651 - FTA-5307

FFY Transit Appropriation: 2009

- TOTAL

NART04 Wash/Benton Capital - Preventive Maintenance Transit 2010Local - UofA Local - UofA NARTS375

75 - Local

300 - FTA-5307

FFY Transit Appropriation: 2009

- TOTAL

PBT001 Jefferson Operating Assistance Transit 2010Local Local PBATS640

320 - Local

320 - FTA-5307

FFY Transit Appropriation: 2009

- TOTAL

PBT002 Jefferson Capital - Preventive Maintenance Transit 2010Local Local PBATS390

78 - Local

312 - FTA-5307

FFY Transit Appropriation: 2009

- TOTAL

Page 45 of 115

An (S) or (F) following the termini indicates federal or state oversight.

TRANSIT PROJECTS FFY 2010

Page 66: 1 - Cover Page STIP 2010-2013 Web Version.pdf · iii TUTS - Texarkana Urban Transportation Study (Miller County) CEO of Texarkana, Texas Dr. Larry Sullivan P. O. Box 1967 Texarkana,

JOB / ITEM

NUMBER COUNTY RTE TERMINI TYPE WORK LENGTH

ESTIMATED COSTLET

YEAR

PROVIDING MATCHING

FUNDS

CARRYINGOUT THE PROJECT TIP AREA

AGENCY RESPONSIBLE FOR:

Funding Breakdown

(x $1,000)

4/14/2010 9:46:19 AM

PBT003 Jefferson Capital - Paratransit Service Transit 2010Local Local PBATS91

18 - Local

73 - FTA-5307

FFY Transit Appropriation: 2009

- TOTAL

PBT004 Jefferson Capital - Planning Transit 2010Local Local PBATS30

6 - Local

24 - FTA-5307

FFY Transit Appropriation: 2009

- TOTAL

37,145TOTAL

Page 46 of 115

An (S) or (F) following the termini indicates federal or state oversight.

TRANSIT PROJECTS FFY 2010

Page 67: 1 - Cover Page STIP 2010-2013 Web Version.pdf · iii TUTS - Texarkana Urban Transportation Study (Miller County) CEO of Texarkana, Texas Dr. Larry Sullivan P. O. Box 1967 Texarkana,

JOB / ITEM

NUMBER COUNTY RTE TERMINI TYPE WORK LENGTH

ESTIMATED COSTLET

YEAR

PROVIDING MATCHING

FUNDS

CARRYINGOUT THE PROJECT TIP AREA

AGENCY RESPONSIBLE FOR:

Funding Breakdown

(x $1,000)

4/14/2010 9:46:19 AM

031FTA Miller Operating Assistance Transit 2011Local Local TUTS394

197 - Local

197 - FTA-5307

FFY Transit Appropriation: 2010

- TOTAL

032FTA Miller Capital - Preventive Maintenance Transit 2011Local Local TUTS106

21 - Local

85 - FTA-5307

FFY Transit Appropriation: 2010

- TOTAL

116FTA Statewide Job Access Reverse Commute Urbanized Areas > 200,000 Transit 2011Var Agencies

Var Agencies

CARTS / WMATS

466

233 - Local

233 - FTA-5316

FFY Transit Appropriation: 2010

- TOTAL

117FTA Statewide New Freedom Urbanized Areas >200,000 Transit 2011Var Agencies

Var Agencies

CARTS / WMATS

248

124 - Local

124 - FTA-5317

FFY Transit Appropriation: 2010

- TOTAL

216FTA Statewide Job Access Reverse Commute Urbanized Areas < 200,000 Transit 2011Var Agencies

Var Agencies

BI-STATE / HSA / JATS / NARTS / PBATS / TUTS

1,186

593 - Local

593 - FTA-5316

FFY Transit Appropriation: 2010

- TOTAL

217FTA Statewide New Freedom Urbanized Areas <200,000 Transit 2011Var Agencies

Var Agencies

BI-STATE / HSA / JATS / NARTS / PBATS / TUTS

606

303 - Local

303 - FTA-5317

FFY Transit Appropriation: 2010

- TOTAL

Page 47 of 115

An (S) or (F) following the termini indicates federal or state oversight.

TRANSIT PROJECTS FFY 2011

Page 68: 1 - Cover Page STIP 2010-2013 Web Version.pdf · iii TUTS - Texarkana Urban Transportation Study (Miller County) CEO of Texarkana, Texas Dr. Larry Sullivan P. O. Box 1967 Texarkana,

JOB / ITEM

NUMBER COUNTY RTE TERMINI TYPE WORK LENGTH

ESTIMATED COSTLET

YEAR

PROVIDING MATCHING

FUNDS

CARRYINGOUT THE PROJECT TIP AREA

AGENCY RESPONSIBLE FOR:

Funding Breakdown

(x $1,000)

4/14/2010 9:46:19 AM

309FTA Statewide Bus and Bus Facilities Transit 2011Local Local All MPOs3,750

750 - Local

3,000 - FTA-5309

FFY Transit Appropriation: 2010

- TOTAL

310FTA Statewide Elderly and Disabled Persons Transit 2011Var Agencies

Var Agencies

All MPOs1,768

354 - Local

1,414 - FTA-5310

FFY Transit Appropriation: 2010

- TOTAL

311FTA Statewide Non-Urbanized Transit 2011Local Local All MPOs12,758

2,552 - Local

10,206 - FTA-5311

FFY Transit Appropriation: 2010

- TOTAL

316FTA Statewide Job Access Reverse Commute Non-Urbanized Areas Transit 2011Var Agencies

Var Agencies

All MPOs1,734

867 - Local

867 - FTA-5316

FFY Transit Appropriation: 2010

- TOTAL

317FTA Statewide New Freedom Non Urbanized Areas Transit 2011Var Agencies

Var Agencies

All MPOs856

428 - Local

428 - FTA-5317

FFY Transit Appropriation: 2010

- TOTAL

CATA01 Pulaski Rolling Stock Transit 2011Local Local CARTS2,170

370 - Local

1,800 - FTA-5307

FFY Transit Appropriation: 2011

- TOTAL

Page 48 of 115

An (S) or (F) following the termini indicates federal or state oversight.

TRANSIT PROJECTS FFY 2011

Page 69: 1 - Cover Page STIP 2010-2013 Web Version.pdf · iii TUTS - Texarkana Urban Transportation Study (Miller County) CEO of Texarkana, Texas Dr. Larry Sullivan P. O. Box 1967 Texarkana,

JOB / ITEM

NUMBER COUNTY RTE TERMINI TYPE WORK LENGTH

ESTIMATED COSTLET

YEAR

PROVIDING MATCHING

FUNDS

CARRYINGOUT THE PROJECT TIP AREA

AGENCY RESPONSIBLE FOR:

Funding Breakdown

(x $1,000)

4/14/2010 9:46:19 AM

CATA02 Pulaski Bus Support Equipment/Facilities Transit 2011Local Local CARTS368

74 - Local

294 - FTA-5307

FFY Transit Appropriation: 2011

- TOTAL

CATA03 Pulaski Transit Enhancements (Bus) Transit 2011Local Local CARTS75

15 - Local

60 - FTA-5307

FFY Transit Appropriation: 2011

- TOTAL

CATA04 Pulaski Other Capital Items (Bus) - Prev Maint / Para Serv Transit 2011Local Local CARTS2,039

408 - Local

1,631 - FTA-5307

FFY Transit Appropriation: 2011

- TOTAL

CATA05 Pulaski Metropolitan Planning Transit 2011Local Local CARTS333

67 - Local

266 - FTA-5307

FFY Transit Appropriation: 2011

- TOTAL

CATA06 Pulaski Training Transit 2011Local Local CARTS19

4 - Local

15 - FTA-5307

FFY Transit Appropriation: 2011

- TOTAL

CATA07 Pulaski Signal & Communication (Bus) Transit 2011Local Local CARTS20

4 - Local

16 - FTA-5307

FFY Transit Appropriation: 2011

- TOTAL

FST001 Sebastian Operating Assistance Transit 2011Local Local BI-STATE1,704

852 - Local

852 - FTA-5307

FFY Transit Appropriation: 2010

- TOTAL

Page 49 of 115

An (S) or (F) following the termini indicates federal or state oversight.

TRANSIT PROJECTS FFY 2011

Page 70: 1 - Cover Page STIP 2010-2013 Web Version.pdf · iii TUTS - Texarkana Urban Transportation Study (Miller County) CEO of Texarkana, Texas Dr. Larry Sullivan P. O. Box 1967 Texarkana,

JOB / ITEM

NUMBER COUNTY RTE TERMINI TYPE WORK LENGTH

ESTIMATED COSTLET

YEAR

PROVIDING MATCHING

FUNDS

CARRYINGOUT THE PROJECT TIP AREA

AGENCY RESPONSIBLE FOR:

Funding Breakdown

(x $1,000)

4/14/2010 9:46:19 AM

FST002 Sebastian Capital - Preventive Maintenance / Paratransit Service Transit 2011Local Local BI-STATE514

103 - Local

411 - FTA-5307

FFY Transit Appropriation: 2010

- TOTAL

FST003 Sebastian Rolling Stock Transit 2011Local Local BI-STATE186

37 - Local

149 - FTA-5307

FFY Transit Appropriation: 2010

- TOTAL

HSIT01 Garland Operating Assistance Transit 2011Local Local HSA-MPO682

341 - Local

341 - FTA-5307

FFY Transit Appropriation: 2011

- TOTAL

HSIT02 Garland Capital - Preventive Maintenance Transit 2011Local Local HSA-MPO296

59 - Local

237 - FTA-5307

FFY Transit Appropriation: 2011

- TOTAL

JETS01 Craighead Operating Assistance Transit 2011Local Local JATS1,000

500 - Local

500 - FTA-5307

FFY Transit Appropriation: 2011

- TOTAL

JETS02 Craighead Capital - Paratransit Service Transit 2011Local Local JATS280

56 - Local

224 - FTA-5307

FFY Transit Appropriation: 2011

- TOTAL

JETS03 Craighead Tires Transit 2011Local Local JATS28

6 - Local

22 - FTA-5307

FFY Transit Appropriation: 2011

- TOTAL

Page 50 of 115

An (S) or (F) following the termini indicates federal or state oversight.

TRANSIT PROJECTS FFY 2011

Page 71: 1 - Cover Page STIP 2010-2013 Web Version.pdf · iii TUTS - Texarkana Urban Transportation Study (Miller County) CEO of Texarkana, Texas Dr. Larry Sullivan P. O. Box 1967 Texarkana,

JOB / ITEM

NUMBER COUNTY RTE TERMINI TYPE WORK LENGTH

ESTIMATED COSTLET

YEAR

PROVIDING MATCHING

FUNDS

CARRYINGOUT THE PROJECT TIP AREA

AGENCY RESPONSIBLE FOR:

Funding Breakdown

(x $1,000)

4/14/2010 9:46:19 AM

JETS04 Craighead Computers (3) Transit 2011Local Local JATS3

1 - Local

2 - FTA-5307

FFY Transit Appropriation: 2011

- TOTAL

NART01 Wash/Benton Operating Assistance Transit 2011Local - ORT Local - ORT NARTS1,558

779 - Local

779 - FTA-5307

FFY Transit Appropriation: 2010

- TOTAL

NART02 Wash/Benton Capital - Preventive Maintenance Transit 2011Local - ORT Local - ORT NARTS529

106 - Local

423 - FTA-5307

FFY Transit Appropriation: 2010

- TOTAL

NART03 Wash/Benton Operating Assistance Transit 2011Local - UofA Local - UofA NARTS1,348

674 - Local

674 - FTA-5307

FFY Transit Appropriation: 2010

- TOTAL

NART04 Wash/Benton Capital - Preventive Maintenance Transit 2011Local - UofA Local - UofA NARTS388

78 - Local

310 - FTA-5307

FFY Transit Appropriation: 2010

- TOTAL

PBT001 Jefferson Operating Assistance Transit 2011Local Local PBATS640

320 - Local

320 - FTA-5307

FFY Transit Appropriation: 2010

- TOTAL

PBT002 Jefferson Capital - Preventive Maintenance Transit 2011Local Local PBATS390

78 - Local

312 - FTA-5307

FFY Transit Appropriation: 2010

- TOTAL

Page 51 of 115

An (S) or (F) following the termini indicates federal or state oversight.

TRANSIT PROJECTS FFY 2011

Page 72: 1 - Cover Page STIP 2010-2013 Web Version.pdf · iii TUTS - Texarkana Urban Transportation Study (Miller County) CEO of Texarkana, Texas Dr. Larry Sullivan P. O. Box 1967 Texarkana,

JOB / ITEM

NUMBER COUNTY RTE TERMINI TYPE WORK LENGTH

ESTIMATED COSTLET

YEAR

PROVIDING MATCHING

FUNDS

CARRYINGOUT THE PROJECT TIP AREA

AGENCY RESPONSIBLE FOR:

Funding Breakdown

(x $1,000)

4/14/2010 9:46:19 AM

PBT003 Jefferson Capital - Paratransit Service Transit 2011Local Local PBATS91

18 - Local

73 - FTA-5307

FFY Transit Appropriation: 2010

- TOTAL

PBT004 Jefferson Capital - Planning Transit 2011Local Local PBATS30

6 - Local

24 - FTA-5307

FFY Transit Appropriation: 2010

- TOTAL

38,562TOTAL

Page 52 of 115

An (S) or (F) following the termini indicates federal or state oversight.

TRANSIT PROJECTS FFY 2011

Page 73: 1 - Cover Page STIP 2010-2013 Web Version.pdf · iii TUTS - Texarkana Urban Transportation Study (Miller County) CEO of Texarkana, Texas Dr. Larry Sullivan P. O. Box 1967 Texarkana,

JOB / ITEM

NUMBER COUNTY RTE TERMINI TYPE WORK LENGTH

ESTIMATED COSTLET

YEAR

PROVIDING MATCHING

FUNDS

CARRYINGOUT THE PROJECT TIP AREA

AGENCY RESPONSIBLE FOR:

Funding Breakdown

(x $1,000)

4/14/2010 9:46:19 AM

031FTA Miller Operating Assistance Transit 2012Local Local TUTS408

204 - Local

204 - FTA-5307

FFY Transit Appropriation: 2011

- TOTAL

032FTA Miller Capital - Preventive Maintenance Transit 2012Local Local TUTS109

22 - Local

87 - FTA-5307

FFY Transit Appropriation: 2011

- TOTAL

116FTA Statewide Job Access Reverse Commute Urbanized Areas > 200,000 Transit 2012Var Agencies

Var Agencies

CARTS / WMATS

482

241 - Local

241 - FTA-5316

FFY Transit Appropriation: 2011

- TOTAL

117FTA Statewide New Freedom Urbanized Areas >200,000 Transit 2012Var Agencies

Var Agencies

CARTS / WMATS

256

128 - Local

128 - FTA-5317

FFY Transit Appropriation: 2011

- TOTAL

216FTA Statewide Job Access Reverse Commute Urbanized Areas < 200,000 Transit 2012Var Agencies

Var Agencies

BI-STATE / HSA / JATS / NARTS / PBATS / TUTS

1,228

614 - Local

614 - FTA-5316

FFY Transit Appropriation: 2011

- TOTAL

217FTA Statewide New Freedom Urbanized Areas <200,000 Transit 2012Var Agencies

Var Agencies

BI-STATE / HSA / JATS / NARTS / PBATS / TUTS

628

314 - Local

314 - FTA-5317

FFY Transit Appropriation: 2011

- TOTAL

Page 53 of 115

An (S) or (F) following the termini indicates federal or state oversight.

TRANSIT PROJECTS FFY 2012

Page 74: 1 - Cover Page STIP 2010-2013 Web Version.pdf · iii TUTS - Texarkana Urban Transportation Study (Miller County) CEO of Texarkana, Texas Dr. Larry Sullivan P. O. Box 1967 Texarkana,

JOB / ITEM

NUMBER COUNTY RTE TERMINI TYPE WORK LENGTH

ESTIMATED COSTLET

YEAR

PROVIDING MATCHING

FUNDS

CARRYINGOUT THE PROJECT TIP AREA

AGENCY RESPONSIBLE FOR:

Funding Breakdown

(x $1,000)

4/14/2010 9:46:19 AM

309FTA Statewide Bus and Bus Facilities Transit 2012Local Local All MPOs3,750

750 - Local

3,000 - FTA-5309

FFY Transit Appropriation: 2011

- TOTAL

310FTA Statewide Elderly and Disabled Persons Transit 2012Var Agencies

Var Agencies

All MPOs1,829

366 - Local

1,463 - FTA-5310

FFY Transit Appropriation: 2011

- TOTAL

311FTA Statewide Non-Urbanized Transit 2012Local Local All MPOs13,205

2,641 - Local

10,564 - FTA-5311

FFY Transit Appropriation: 2011

- TOTAL

316FTA Statewide Job Access Reverse Commute Non-Urbanized Areas Transit 2012Var Agencies

Var Agencies

All MPOs1,794

897 - Local

897 - FTA-5316

FFY Transit Appropriation: 2011

- TOTAL

317FTA Statewide New Freedom Non Urbanized Areas Transit 2012Var Agencies

Var Agencies

All MPOs886

443 - Local

443 - FTA-5317

FFY Transit Appropriation: 2011

- TOTAL

CATA01 Pulaski Rolling Stock Transit 2012Local Local CARTS2,428

486 - Local

1,942 - FTA-5307

FFY Transit Appropriation: 2012

- TOTAL

Page 54 of 115

An (S) or (F) following the termini indicates federal or state oversight.

TRANSIT PROJECTS FFY 2012

Page 75: 1 - Cover Page STIP 2010-2013 Web Version.pdf · iii TUTS - Texarkana Urban Transportation Study (Miller County) CEO of Texarkana, Texas Dr. Larry Sullivan P. O. Box 1967 Texarkana,

JOB / ITEM

NUMBER COUNTY RTE TERMINI TYPE WORK LENGTH

ESTIMATED COSTLET

YEAR

PROVIDING MATCHING

FUNDS

CARRYINGOUT THE PROJECT TIP AREA

AGENCY RESPONSIBLE FOR:

Funding Breakdown

(x $1,000)

4/14/2010 9:46:19 AM

CATA02 Pulaski Bus Support Equipment/Facilities Transit 2012Local Local CARTS368

74 - Local

294 - FTA-5307

FFY Transit Appropriation: 2012

- TOTAL

CATA03 Pulaski Transit Enhancements (Bus) Transit 2012Local Local CARTS75

15 - Local

60 - FTA-5307

FFY Transit Appropriation: 2012

- TOTAL

CATA04 Pulaski Other Capital Items (Bus) - Prev Maint / Para Serv Transit 2012Local Local CARTS2,039

408 - Local

1,631 - FTA-5307

FFY Transit Appropriation: 2012

- TOTAL

CATA05 Pulaski Metropolitan Planning Transit 2012Local Local CARTS333

67 - Local

266 - FTA-5307

FFY Transit Appropriation: 2012

- TOTAL

CATA06 Pulaski Training Transit 2012Local Local CARTS19

4 - Local

15 - FTA-5307

FFY Transit Appropriation: 2012

- TOTAL

CATA07 Pulaski Signal & Communication (Bus) Transit 2012Local Local CARTS20

4 - Local

16 - FTA-5307

FFY Transit Appropriation: 2012

- TOTAL

FST001 Sebastian Operating Assistance Transit 2012Local Local BI-STATE1,762

881 - Local

881 - FTA-5307

FFY Transit Appropriation: 2011

- TOTAL

Page 55 of 115

An (S) or (F) following the termini indicates federal or state oversight.

TRANSIT PROJECTS FFY 2012

Page 76: 1 - Cover Page STIP 2010-2013 Web Version.pdf · iii TUTS - Texarkana Urban Transportation Study (Miller County) CEO of Texarkana, Texas Dr. Larry Sullivan P. O. Box 1967 Texarkana,

JOB / ITEM

NUMBER COUNTY RTE TERMINI TYPE WORK LENGTH

ESTIMATED COSTLET

YEAR

PROVIDING MATCHING

FUNDS

CARRYINGOUT THE PROJECT TIP AREA

AGENCY RESPONSIBLE FOR:

Funding Breakdown

(x $1,000)

4/14/2010 9:46:19 AM

FST002 Sebastian Capital - Preventive Maintenance / Paratransit Service Transit 2012Local Local BI-STATE533

107 - Local

426 - FTA-5307

FFY Transit Appropriation: 2011

- TOTAL

FST003 Sebastian Rolling Stock Transit 2012Local Local BI-STATE200

40 - Local

160 - FTA-5307

FFY Transit Appropriation: 2011

- TOTAL

HSIT01 Garland Operating Assistance Transit 2012Local Local HSA-MPO706

353 - Local

353 - FTA-5307

FFY Transit Appropriation: 2012

- TOTAL

HSIT02 Garland Capital - Preventive Maintenance Transit 2012Local Local HSA-MPO306

61 - Local

245 - FTA-5307

FFY Transit Appropriation: 2012

- TOTAL

JETS01 Craighead Operating Assistance Transit 2012Local Local JATS1,000

500 - Local

500 - FTA-5307

FFY Transit Appropriation: 2012

- TOTAL

JETS02 Craighead Capital - Paratransit Service Transit 2012Local Local JATS290

58 - Local

232 - FTA-5307

FFY Transit Appropriation: 2012

- TOTAL

JETS03 Craighead Tires Transit 2012Local Local JATS30

6 - Local

24 - FTA-5307

FFY Transit Appropriation: 2012

- TOTAL

Page 56 of 115

An (S) or (F) following the termini indicates federal or state oversight.

TRANSIT PROJECTS FFY 2012

Page 77: 1 - Cover Page STIP 2010-2013 Web Version.pdf · iii TUTS - Texarkana Urban Transportation Study (Miller County) CEO of Texarkana, Texas Dr. Larry Sullivan P. O. Box 1967 Texarkana,

JOB / ITEM

NUMBER COUNTY RTE TERMINI TYPE WORK LENGTH

ESTIMATED COSTLET

YEAR

PROVIDING MATCHING

FUNDS

CARRYINGOUT THE PROJECT TIP AREA

AGENCY RESPONSIBLE FOR:

Funding Breakdown

(x $1,000)

4/14/2010 9:46:19 AM

JETS04 Craighead Computers (3) Transit 2012Local Local JATS3

1 - Local

2 - FTA-5307

FFY Transit Appropriation: 2012

- TOTAL

NART01 Wash/Benton Operating Assistance Transit 2012Local - ORT Local - ORT NARTS1,614

807 - Local

807 - FTA-5307

FFY Transit Appropriation: 2011

- TOTAL

NART02 Wash/Benton Capital - Preventive Maintenance Transit 2012Local - ORT Local - ORT NARTS548

110 - Local

438 - FTA-5307

FFY Transit Appropriation: 2011

- TOTAL

NART03 Wash/Benton Operating Assistance Transit 2012Local - UofA Local - UofA NARTS1,394

697 - Local

697 - FTA-5307

FFY Transit Appropriation: 2011

- TOTAL

NART04 Wash/Benton Capital - Preventive Maintenance Transit 2012Local - UofA Local - UofA NARTS402

80 - Local

322 - FTA-5307

FFY Transit Appropriation: 2011

- TOTAL

PBT001 Jefferson Operating Assistance Transit 2012Local Local PBATS664

332 - Local

332 - FTA-5307

FFY Transit Appropriation: 2011

- TOTAL

PBT002 Jefferson Capital - Preventive Maintenance Transit 2012Local Local PBATS405

81 - Local

324 - FTA-5307

FFY Transit Appropriation: 2011

- TOTAL

Page 57 of 115

An (S) or (F) following the termini indicates federal or state oversight.

TRANSIT PROJECTS FFY 2012

Page 78: 1 - Cover Page STIP 2010-2013 Web Version.pdf · iii TUTS - Texarkana Urban Transportation Study (Miller County) CEO of Texarkana, Texas Dr. Larry Sullivan P. O. Box 1967 Texarkana,

JOB / ITEM

NUMBER COUNTY RTE TERMINI TYPE WORK LENGTH

ESTIMATED COSTLET

YEAR

PROVIDING MATCHING

FUNDS

CARRYINGOUT THE PROJECT TIP AREA

AGENCY RESPONSIBLE FOR:

Funding Breakdown

(x $1,000)

4/14/2010 9:46:19 AM

PBT003 Jefferson Capital - Paratransit Service Transit 2012Local Local PBATS94

19 - Local

75 - FTA-5307

FFY Transit Appropriation: 2011

- TOTAL

PBT004 Jefferson Capital - Planning Transit 2012Local Local PBATS30

6 - Local

24 - FTA-5307

FFY Transit Appropriation: 2011

- TOTAL

39,837TOTAL

Page 58 of 115

An (S) or (F) following the termini indicates federal or state oversight.

TRANSIT PROJECTS FFY 2012

Page 79: 1 - Cover Page STIP 2010-2013 Web Version.pdf · iii TUTS - Texarkana Urban Transportation Study (Miller County) CEO of Texarkana, Texas Dr. Larry Sullivan P. O. Box 1967 Texarkana,

JOB / ITEM

NUMBER COUNTY RTE TERMINI TYPE WORK LENGTH

ESTIMATED COSTLET

YEAR

PROVIDING MATCHING

FUNDS

CARRYINGOUT THE PROJECT TIP AREA

AGENCY RESPONSIBLE FOR:

Funding Breakdown

(x $1,000)

4/14/2010 9:46:19 AM

031FTA Miller Operating Assistance Transit 2013Local Local TUTS422

211 - Local

211 - FTA-5307

FFY Transit Appropriation: 2012

- TOTAL

032FTA Miller Capital - Preventive Maintenance Transit 2013Local Local TUTS113

23 - Local

90 - FTA-5307

FFY Transit Appropriation: 2012

- TOTAL

116FTA Statewide Job Access Reverse Commute Urbanized Areas > 200,000 Transit 2013Var Agencies

Var Agencies

CARTS / WMATS

500

250 - Local

250 - FTA-5316

FFY Transit Appropriation: 2012

- TOTAL

117FTA Statewide New Freedom Urbanized Areas >200,000 Transit 2013Var Agencies

Var Agencies

CARTS / WMATS

266

133 - Local

133 - FTA-5317

FFY Transit Appropriation: 2012

- TOTAL

216FTA Statewide Job Access Reverse Commute Urbanized Areas < 200,000 Transit 2013Var Agencies

Var Agencies

BI-STATE / HSA / JATS / NARTS / PBATS / TUTS

1,272

636 - Local

636 - FTA-5316

FFY Transit Appropriation: 2012

- TOTAL

217FTA Statewide New Freedom Urbanized Areas <200,000 Transit 2013Var Agencies

Var Agencies

BI-STATE / HSA / JATS / NARTS / PBATS / TUTS

650

325 - Local

325 - FTA-5317

FFY Transit Appropriation: 2012

- TOTAL

Page 59 of 115

An (S) or (F) following the termini indicates federal or state oversight.

TRANSIT PROJECTS FFY 2013

Page 80: 1 - Cover Page STIP 2010-2013 Web Version.pdf · iii TUTS - Texarkana Urban Transportation Study (Miller County) CEO of Texarkana, Texas Dr. Larry Sullivan P. O. Box 1967 Texarkana,

JOB / ITEM

NUMBER COUNTY RTE TERMINI TYPE WORK LENGTH

ESTIMATED COSTLET

YEAR

PROVIDING MATCHING

FUNDS

CARRYINGOUT THE PROJECT TIP AREA

AGENCY RESPONSIBLE FOR:

Funding Breakdown

(x $1,000)

4/14/2010 9:46:19 AM

309FTA Statewide Bus and Bus Facilities Transit 2013Local Local All MPOs3,750

750 - Local

3,000 - FTA-5309

FFY Transit Appropriation: 2012

- TOTAL

310FTA Statewide Elderly and Disabled Persons Transit 2013Var Agencies

Var Agencies

All MPOs1,893

379 - Local

1,514 - FTA-5310

FFY Transit Appropriation: 2012

- TOTAL

311FTA Statewide Non-Urbanized Transit 2013Local Local All MPOs13,666

2,733 - Local

10,933 - FTA-5311

FFY Transit Appropriation: 2012

- TOTAL

316FTA Statewide Job Access Reverse Commute Non-Urbanized Areas Transit 2013Var Agencies

Var Agencies

All MPOs1,856

928 - Local

928 - FTA-5316

FFY Transit Appropriation: 2012

- TOTAL

317FTA Statewide New Freedom Non Urbanized Areas Transit 2013Var Agencies

Var Agencies

All MPOs918

459 - Local

459 - FTA-5317

FFY Transit Appropriation: 2012

- TOTAL

CATA01 Pulaski Rolling Stock Transit 2013Local Local CARTS2,613

523 - Local

2,090 - FTA-5307

FFY Transit Appropriation: 2013

- TOTAL

Page 60 of 115

An (S) or (F) following the termini indicates federal or state oversight.

TRANSIT PROJECTS FFY 2013

Page 81: 1 - Cover Page STIP 2010-2013 Web Version.pdf · iii TUTS - Texarkana Urban Transportation Study (Miller County) CEO of Texarkana, Texas Dr. Larry Sullivan P. O. Box 1967 Texarkana,

JOB / ITEM

NUMBER COUNTY RTE TERMINI TYPE WORK LENGTH

ESTIMATED COSTLET

YEAR

PROVIDING MATCHING

FUNDS

CARRYINGOUT THE PROJECT TIP AREA

AGENCY RESPONSIBLE FOR:

Funding Breakdown

(x $1,000)

4/14/2010 9:46:19 AM

CATA02 Pulaski Bus Support Equipment/Facilities Transit 2013Local Local CARTS368

74 - Local

294 - FTA-5307

FFY Transit Appropriation: 2013

- TOTAL

CATA03 Pulaski Transit Enhancements (Bus) Transit 2013Local Local CARTS75

15 - Local

60 - FTA-5307

FFY Transit Appropriation: 2013

- TOTAL

CATA04 Pulaski Other Capital Items (Bus) - Prev Maint / Para Serv Transit 2013Local Local CARTS2,039

408 - Local

1,631 - FTA-5307

FFY Transit Appropriation: 2013

- TOTAL

CATA05 Pulaski Metropolitan Planning Transit 2013Local Local CARTS333

67 - Local

266 - FTA-5307

FFY Transit Appropriation: 2013

- TOTAL

CATA06 Pulaski Training Transit 2013Local Local CARTS19

4 - Local

15 - FTA-5307

FFY Transit Appropriation: 2013

- TOTAL

CATA07 Pulaski Signal & Communication (Bus) Transit 2013Local Local CARTS20

4 - Local

16 - FTA-5307

FFY Transit Appropriation: 2013

- TOTAL

FST001 Sebastian Operating Assistance Transit 2013Local Local BI-STATE1,824

912 - Local

912 - FTA-5307

FFY Transit Appropriation: 2012

- TOTAL

Page 61 of 115

An (S) or (F) following the termini indicates federal or state oversight.

TRANSIT PROJECTS FFY 2013

Page 82: 1 - Cover Page STIP 2010-2013 Web Version.pdf · iii TUTS - Texarkana Urban Transportation Study (Miller County) CEO of Texarkana, Texas Dr. Larry Sullivan P. O. Box 1967 Texarkana,

JOB / ITEM

NUMBER COUNTY RTE TERMINI TYPE WORK LENGTH

ESTIMATED COSTLET

YEAR

PROVIDING MATCHING

FUNDS

CARRYINGOUT THE PROJECT TIP AREA

AGENCY RESPONSIBLE FOR:

Funding Breakdown

(x $1,000)

4/14/2010 9:46:19 AM

FST002 Sebastian Capital - Preventive Maintenance / Paratransit Service Transit 2013Local Local BI-STATE551

110 - Local

441 - FTA-5307

FFY Transit Appropriation: 2012

- TOTAL

FST003 Sebastian Rolling Stock Transit 2013Local Local BI-STATE206

41 - Local

165 - FTA-5307

FFY Transit Appropriation: 2012

- TOTAL

HSIT01 Garland Operating Assistance Transit 2013Local Local HSA-MPO730

365 - Local

365 - FTA-5307

FFY Transit Appropriation: 2013

- TOTAL

HSIT02 Garland Capital - Preventive Maintenance Transit 2013Local Local HSA-MPO317

63 - Local

254 - FTA-5307

FFY Transit Appropriation: 2013

- TOTAL

JETS01 Craighead Operating Assistance Transit 2013Local Local JATS1,020

510 - Local

510 - FTA-5307

FFY Transit Appropriation: 2013

- TOTAL

JETS02 Craighead Capital - Paratransit Service Transit 2013Local Local JATS300

60 - Local

240 - FTA-5307

FFY Transit Appropriation: 2013

- TOTAL

JETS03 Craighead Tires Transit 2013Local Local JATS30

6 - Local

24 - FTA-5307

FFY Transit Appropriation: 2013

- TOTAL

Page 62 of 115

An (S) or (F) following the termini indicates federal or state oversight.

TRANSIT PROJECTS FFY 2013

Page 83: 1 - Cover Page STIP 2010-2013 Web Version.pdf · iii TUTS - Texarkana Urban Transportation Study (Miller County) CEO of Texarkana, Texas Dr. Larry Sullivan P. O. Box 1967 Texarkana,

JOB / ITEM

NUMBER COUNTY RTE TERMINI TYPE WORK LENGTH

ESTIMATED COSTLET

YEAR

PROVIDING MATCHING

FUNDS

CARRYINGOUT THE PROJECT TIP AREA

AGENCY RESPONSIBLE FOR:

Funding Breakdown

(x $1,000)

4/14/2010 9:46:19 AM

JETS04 Craighead Computers (3) Transit 2013Local Local JATS3

1 - Local

2 - FTA-5307

FFY Transit Appropriation: 2013

- TOTAL

NART01 Wash/Benton Operating Assistance Transit 2013Local - ORT Local - ORT NARTS1,670

835 - Local

835 - FTA-5307

FFY Transit Appropriation: 2012

- TOTAL

NART02 Wash/Benton Capital - Preventive Maintenance Transit 2013Local - ORT Local - ORT NARTS567

113 - Local

454 - FTA-5307

FFY Transit Appropriation: 2012

- TOTAL

NART03 Wash/Benton Operating Assistance Transit 2013Local - UofA Local - UofA NARTS1,444

722 - Local

722 - FTA-5307

FFY Transit Appropriation: 2012

- TOTAL

NART04 Wash/Benton Capital - Preventive Maintenance Transit 2013Local - UofA Local - UofA NARTS416

83 - Local

333 - FTA-5307

FFY Transit Appropriation: 2012

- TOTAL

PBT001 Jefferson Operating Assistance Transit 2013Local Local PBATS688

344 - Local

344 - FTA-5307

FFY Transit Appropriation: 2012

- TOTAL

PBT002 Jefferson Capital - Preventive Maintenance Transit 2013Local Local PBATS419

84 - Local

335 - FTA-5307

FFY Transit Appropriation: 2012

- TOTAL

Page 63 of 115

An (S) or (F) following the termini indicates federal or state oversight.

TRANSIT PROJECTS FFY 2013

Page 84: 1 - Cover Page STIP 2010-2013 Web Version.pdf · iii TUTS - Texarkana Urban Transportation Study (Miller County) CEO of Texarkana, Texas Dr. Larry Sullivan P. O. Box 1967 Texarkana,

JOB / ITEM

NUMBER COUNTY RTE TERMINI TYPE WORK LENGTH

ESTIMATED COSTLET

YEAR

PROVIDING MATCHING

FUNDS

CARRYINGOUT THE PROJECT TIP AREA

AGENCY RESPONSIBLE FOR:

Funding Breakdown

(x $1,000)

4/14/2010 9:46:19 AM

PBT003 Jefferson Capital - Paratransit Service Transit 2013Local Local PBATS98

20 - Local

78 - FTA-5307

FFY Transit Appropriation: 2012

- TOTAL

PBT004 Jefferson Capital - Planning Transit 2013Local Local PBATS30

6 - Local

24 - FTA-5307

FFY Transit Appropriation: 2012

- TOTAL

41,086TOTAL

Page 64 of 115

An (S) or (F) following the termini indicates federal or state oversight.

TRANSIT PROJECTS FFY 2013

Page 85: 1 - Cover Page STIP 2010-2013 Web Version.pdf · iii TUTS - Texarkana Urban Transportation Study (Miller County) CEO of Texarkana, Texas Dr. Larry Sullivan P. O. Box 1967 Texarkana,

Eastern Federal Lands Highway Division

Page 86: 1 - Cover Page STIP 2010-2013 Web Version.pdf · iii TUTS - Texarkana Urban Transportation Study (Miller County) CEO of Texarkana, Texas Dr. Larry Sullivan P. O. Box 1967 Texarkana,

JOB / ITEM

NUMBER COUNTY RTE TERMINI TYPE WORK LENGTH

ESTIMATED COSTLET

YEAR

PROVIDING MATCHING

FUNDS

CARRYINGOUT THE PROJECT TIP AREA

AGENCY RESPONSIBLE FOR:

Funding Breakdown

(x $1,000)

4/14/2010 9:46:19 AM

EFLHD1 Johnson 215 Rt 215 from Sta. 11+590 to Sta. 14+000 (Schedule B only) 2010EFLHD EFLHD1,075 - TOTAL

Project - AR PFH 65-3(7) Funding Source - ARRA - Public Lands Highway-Forest Highway / Forest Highway

EFLHD2 Searcy Permanent Repairs for Slide at Falling Water Road 2010EFLHD EFLHD670 - TOTAL

Project - AR FSR 400(1) Funding Source - Emergency Repair for Federally Owned Lands

EFLHD3 Ashley / Bradley / Union

Rehabilitate Boar Shoat Road 2010EFLHD EFLHD35 - TOTAL

Project - Felsenthal Funding Source - Refuge Roads

EFLHD4 Arkansas Construct Visitor Center Turn Lanes off Highway 1 and Rehabilitate Belknap Lake Road

2010EFLHD EFLHD250 - TOTAL

Project - White River Funding Source - Refuge Roads

EFLHD5 Howard / Polk CR 25/64 1.2 mi Realignment 2011EFLHD EFLHD4,380 - TOTAL

Project - AR PFH 159-1(2) Funding Source - Public Lands Highway-Forest Highway

EFLHD6 Garland Repair/Rehabilitate West Mountain Drive and West Mountain Summit Drive

2011EFLHD EFLHD1,400 - TOTAL

Project - HOSP 11(2), 101(2) Funding Source - Park Roads and Parkways

EFLHD7 Johnson 215 Rt 215 from Sta. 11+590 to Sta. 14+000 (Remaining Schedules)

2011EFLHD EFLHD4,450 - TOTAL

Project - AR PFH 65-3(7) Funding Source - Public Lands Highway-Forest Highway / Forest Highway

EFLHD8 Various Rehabilitate Howell Unit Access Road 2012EFLHD EFLHD38 - TOTAL

Project - Cache River Funding Source - Refuge Roads

EFLHD9 Crittenden Rehabilitate Nature Drive, Route 011 2013EFLHD EFLHD70 - TOTAL

Project - Wapanocca Funding Source - Refuge Roads

12,368TOTAL

Page 65 of 115

An (S) or (F) following the termini indicates federal or state oversight.

EASTERN FEDERAL LANDS HIGHWAY DIVISION

Page 87: 1 - Cover Page STIP 2010-2013 Web Version.pdf · iii TUTS - Texarkana Urban Transportation Study (Miller County) CEO of Texarkana, Texas Dr. Larry Sullivan P. O. Box 1967 Texarkana,

State and Local Projects Sorted by Job Number

Page 88: 1 - Cover Page STIP 2010-2013 Web Version.pdf · iii TUTS - Texarkana Urban Transportation Study (Miller County) CEO of Texarkana, Texas Dr. Larry Sullivan P. O. Box 1967 Texarkana,

JOB / ITEM

NUMBER COUNTY RTE TERMINI TYPE WORK LENGTH

ESTIMATED COSTLET

YEAR

PROVIDING MATCHING

FUNDS

CARRYINGOUT THE PROJECT TIP AREA

AGENCY RESPONSIBLE FOR:

Funding Breakdown

(x $1,000)

4/14/2010 9:46:42 AM

110228 Lee 001 So. Marianna-South (S) Widening 1.80 2010State State9,500

7,600 - NHS

1,900 - State Match

- TOTAL

110394 Monroe 079 White River Str. & Apprs. (Clarendon) (Ph. II) (F) Str. & Apprs. 1.14 2010State State38,200

30,560 - BR

7,640 - State Match

- TOTAL

110473 Crittenden 040 I-40 Miss. River Bridge Seismic Retrofit (Phase VII) (S) Str. & Apprs. 2010State TDOT WMATS11,040

8,832 - BR

2,208 - State Match

- TOTAL

110478 Monroe 049 Hwy. 17-I-40 (Brinkley) (S) Widening 1.03 2010State State5,000

4,000 - STP

1,000 - State Match

- TOTAL

110502 Lee 001 Cypress Corner-North (S) Widening 4.70 2012State State30,500

24,400 - NHS

6,100 - State Match

- TOTAL

110504 Cross 064 Hwy. 1 North-West (Wynne) (S) Widening 0.65 2010State State6,400

5,120 - STP

1,280 - State Match

- TOTAL

110509 Crittenden CS BNSF Railroad Overpass (Marion) (S) Str. & Apprs. 2010Local Local WMATS6,061

5,206 - Earmarks

855 - Local

- TOTAL

110530 Crittenden CS Southland Dr.-MLK, Jr. Dr.-West (S) Rehabilitation 0.42 2010Local Local WMATS1,300

260 - Local

- STP > 200,000

- TOTAL

1,040

110541 Woodruff 038 Bayou Deview Str. & Apprs. (S) Str. & Apprs. 2011State State1,750

1,400 - BR

350 - State Match

- TOTAL

Page 66 of 115

STATE AND LOCAL PROJECTS SORTED BY JOB NUMBER

An (S) or (F) following the termini indicates federal or state oversight.For those projects located in a Transportation Improvement Plan (TIP) Area, additional information is available. See the Introduction for further details.

Page 89: 1 - Cover Page STIP 2010-2013 Web Version.pdf · iii TUTS - Texarkana Urban Transportation Study (Miller County) CEO of Texarkana, Texas Dr. Larry Sullivan P. O. Box 1967 Texarkana,

JOB / ITEM

NUMBER COUNTY RTE TERMINI TYPE WORK LENGTH

ESTIMATED COSTLET

YEAR

PROVIDING MATCHING

FUNDS

CARRYINGOUT THE PROJECT TIP AREA

AGENCY RESPONSIBLE FOR:

Funding Breakdown

(x $1,000)

4/14/2010 9:46:42 AM

110542 Crittenden 040 I-40 Miss. Rv. Br. Seismic Retrofit (Phase VIII) (S) Str. & Apprs. 2011State TDOT WMATS26,000

20,800 - BR

5,200 - State Match

- TOTAL

110543 St. Francis 261 Hwys. 261, 38 & 149 Strs. & Apprs. (S) Str. & Apprs. 2012State State4,800

3,840 - BR

960 - State Match

- TOTAL

110544 Monroe 070 Hwy. 17-St. Francis Co. Line Strs. & Apprs. (S) Str. & Apprs. 2013State State4,000

3,200 - BR

800 - State Match

- TOTAL

110547 Crittenden VAR District 1 Bridge Painting (S) Str. & Apprs. 2010State State WMATS2,040

1,632 - BR

408 - State Match

- TOTAL

110X01 Crittenden CS Southland Dr., Ingram Blvd.-East (S) Miscellaneous 0.83 2013Local Local WMATS2,695

539 - Local

- STP > 200,000

- TOTAL

2,156

020070 Jefferson 079 Hwy. 65B-North (S) Widening 1.60 2010State State PBATS8,900

4,240

2,880

- STP

- Earmarks

1,780 - State Match

- TOTAL

020316 Desha 069 I-69 Corridor (Hwy. 65-Miss. Rt. 1) (GRB) (Ph I) (F) Phase I 2010State State10,346

8,666 - Earmarks

1,680 - State Match

- TOTAL

020354 Jefferson 530 I-530-Co. Rd. 35 (Bs. & Surf.) (F) New Location 4.60 2011State State PBATS26,900

21,520 - Earmarks

5,380 - State Match

- TOTAL

020356 Lincoln 530 Hwy. 212-Hwys. 11/425 Connector (Bs. & Surf) (Phase I) (F) New Location 7.40 2013State State7,131

5,855 - Earmarks

1,276 - State Match

- TOTAL

Page 67 of 115

STATE AND LOCAL PROJECTS SORTED BY JOB NUMBER

An (S) or (F) following the termini indicates federal or state oversight.For those projects located in a Transportation Improvement Plan (TIP) Area, additional information is available. See the Introduction for further details.

Page 90: 1 - Cover Page STIP 2010-2013 Web Version.pdf · iii TUTS - Texarkana Urban Transportation Study (Miller County) CEO of Texarkana, Texas Dr. Larry Sullivan P. O. Box 1967 Texarkana,

JOB / ITEM

NUMBER COUNTY RTE TERMINI TYPE WORK LENGTH

ESTIMATED COSTLET

YEAR

PROVIDING MATCHING

FUNDS

CARRYINGOUT THE PROJECT TIP AREA

AGENCY RESPONSIBLE FOR:

Funding Breakdown

(x $1,000)

4/14/2010 9:46:42 AM

020445 Jefferson 270 Grant Co. Line-White Hall (Passing Lanes) (S) Passing Lanes 2.20 2010State PBATS5,700 - TOTAL

5,700 - 402-Safety

020451 Desha 054 Waterman St.-West (Dumas) (S) Reconstruction 0.81 2010State State3,300 - TOTAL

3,300 - 100% State

020462 Drew 069 Monticello Bypass (Phase I) (F) New Location 8.60 2010State State88,107

70,486 - Earmarks

17,621 - State Match

- TOTAL

020464 Grant 167 Hwy. 167 Bypass (Sheridan) (Bs. & Surf.) (S) New Location 8.63 2010State State43,000

34,400 - NHS

8,600 - State Match

- TOTAL

020480 Drew Southeast Arkansas Intermodal Facility (Wilmar) (S) Roadside Appurt 2010Local Local1,752

1,401 - Earmarks

351 - Local

- TOTAL

020505 Jefferson CS Nevins Creek Str. & Apprs. (Nevins Rd.) (Pine Bluff) (S) Str. & Apprs. 2012Local State PBATS350

280 - BR

70 - Local

- TOTAL

020506 Lincoln 011 Cane Creek Str. & Apprs. (S) Str. & Apprs. 2011State State1,000

800 - BR

200 - State Match

- TOTAL

020507 Jefferson 054 Big Creek Str. & Apprs. (S) Str. & Apprs. 2011State State PBATS800

640 - BR

160 - State Match

- TOTAL

020508 Jefferson 054 Steep Bank Creek Str. & Apprs. (S) Str. & Apprs. 2011State State PBATS600

480 - BR

120 - State Match

- TOTAL

020509 Ashley 082 Hwy. 165 Str. & Apprs. (Montrose) (S) Str. & Apprs. 2012State State2,200

1,760 - BR

440 - State Match

- TOTAL

Page 68 of 115

STATE AND LOCAL PROJECTS SORTED BY JOB NUMBER

An (S) or (F) following the termini indicates federal or state oversight.For those projects located in a Transportation Improvement Plan (TIP) Area, additional information is available. See the Introduction for further details.

Page 91: 1 - Cover Page STIP 2010-2013 Web Version.pdf · iii TUTS - Texarkana Urban Transportation Study (Miller County) CEO of Texarkana, Texas Dr. Larry Sullivan P. O. Box 1967 Texarkana,

JOB / ITEM

NUMBER COUNTY RTE TERMINI TYPE WORK LENGTH

ESTIMATED COSTLET

YEAR

PROVIDING MATCHING

FUNDS

CARRYINGOUT THE PROJECT TIP AREA

AGENCY RESPONSIBLE FOR:

Funding Breakdown

(x $1,000)

4/14/2010 9:46:42 AM

R20098 Chicot 082 Fairview-Mississippi River Br. (S) Widening 4.10 2011State State25,250

800

1,800

- STP

- Earmarks

650 - State Match

- TOTAL

22,000 - 100% State

030100 Miller CS Jefferson Ave-Mount Olive Dr(McDonald Ln)(Texarkana)(S) New Location 0.25 2010Local Local TUTS1,913

913 - Local

- STP < 200,000

- TOTAL

1,000

030236A Various VAR District 3 Bridge Painting (Phase II) (S) Str. & Apprs. 2011State State TUTS995

797 - BR

198 - State Match

- TOTAL

030236B Various VAR District 3 Bridge Painting (Phase II) (S) Str. & Apprs. 2012State State TUTS980

784 - BR

196 - State Match

- TOTAL

030325 Miller 071 Arkansas Blvd.-I-30 (Bs. & Surf.) (F) New Location 2.43 2010State State TUTS14,800

11,840 - NHS

2,960 - State Match

- TOTAL

030326 Miller 071 I-30-Hwy. 71 (Bs. & Surf.) (F) New Location 4.44 2010State State TUTS33,600

6,720 - NHS

1,680 - State Match

- TOTAL

25,200 - 100% State

030386 Nevada 032 Little Bodcaw Creek & Relief Strs. & Apprs.(S) Str. & Apprs. 2011State State2,800

2,240 - BR

560 - State Match

- TOTAL

030387 Hempstead 371 Ozan Creek & Relief Strs. & Apprs. (S) Str. & Apprs. 2011State State2,000

1,600 - BR

400 - State Match

- TOTAL

030388 Miller 071 Broad St. Str. & Apprs. (Texarkana) (S) Str. & Apprs. 2012State State TUTS6,500

5,200 - BR

1,300 - State Match

- TOTAL

Page 69 of 115

STATE AND LOCAL PROJECTS SORTED BY JOB NUMBER

An (S) or (F) following the termini indicates federal or state oversight.For those projects located in a Transportation Improvement Plan (TIP) Area, additional information is available. See the Introduction for further details.

Page 92: 1 - Cover Page STIP 2010-2013 Web Version.pdf · iii TUTS - Texarkana Urban Transportation Study (Miller County) CEO of Texarkana, Texas Dr. Larry Sullivan P. O. Box 1967 Texarkana,

JOB / ITEM

NUMBER COUNTY RTE TERMINI TYPE WORK LENGTH

ESTIMATED COSTLET

YEAR

PROVIDING MATCHING

FUNDS

CARRYINGOUT THE PROJECT TIP AREA

AGENCY RESPONSIBLE FOR:

Funding Breakdown

(x $1,000)

4/14/2010 9:46:42 AM

030X01 Miller 071 LA Line-Doddridge (Phase III) (F) New Location 2.18 2012State State23,505

15,200

3,800

- NHS

- Earmarks

4,505 - State Match

- TOTAL

040024 Washington 074 White River Bridge Str. & Apprs. (Elkins) (S) Str. & Apprs. 2011State State NARTS2,500

2,000 - BR

500 - State Match

- TOTAL

040238 Sebastian 045 Hwy. 255-Phoenix Ave. (Widening) (Ft. Smith) (S) Widening 1.10 2010Local State BI-STATE9,400

4,700 - STP

4,700 - Local

- TOTAL

040272 Washington CS Johnson Road Reconst. (Springdale) P.E. Widening 2.20 2010Local Local NARTS14,586

10,669 - Earmarks

2,917 - Local

- STP < 200,000

- TOTAL

1,000

040345 Crawford CS Hwy. 59-West (Rena Road) (Van Buren) (S) Widening 1.10 2010Local State BI-STATE5,400

3,240

80

- Earmarks

- BR

1,080 - Local

- STP < 200,000

- TOTAL

1,000

040373 Sebastian 071 Jenny Lind-I-40 (Phase II) (F) New Location 6.04 2011State State BI-STATE29,900

17,600

6,300

- NHS

- Earmarks

6,000 - State Match

- TOTAL

040418 Washington 112 Hwy. 180-Garland Ave. (Hwy. 112) (Fayetteville) (S) Widening 1.17 2012Local State NARTS1,250

250 - Local

- STP < 200,000

- TOTAL

1,000

040438 Franklin 023 Arkansas River Bridge Painting (Ozark) (S) Str. & Apprs. 2011State State870

696 - BR

174 - State Match

- TOTAL

Page 70 of 115

STATE AND LOCAL PROJECTS SORTED BY JOB NUMBER

An (S) or (F) following the termini indicates federal or state oversight.For those projects located in a Transportation Improvement Plan (TIP) Area, additional information is available. See the Introduction for further details.

Page 93: 1 - Cover Page STIP 2010-2013 Web Version.pdf · iii TUTS - Texarkana Urban Transportation Study (Miller County) CEO of Texarkana, Texas Dr. Larry Sullivan P. O. Box 1967 Texarkana,

JOB / ITEM

NUMBER COUNTY RTE TERMINI TYPE WORK LENGTH

ESTIMATED COSTLET

YEAR

PROVIDING MATCHING

FUNDS

CARRYINGOUT THE PROJECT TIP AREA

AGENCY RESPONSIBLE FOR:

Funding Breakdown

(x $1,000)

4/14/2010 9:46:42 AM

040443 Sebastian 252 Branch of Washburn Creek Str. & Apprs. (So. of Hwy. 10) (S) Str. & Apprs. 2011State State500

400 - BR

100 - State Match

- TOTAL

040464 Crawford CS West of Ham Town Rd.-East (Wire Rd.) (Mulberry) (S) Reconstruction 0.94 2012Local State2,350

1,350 - Local

- STP < 200,000

- TOTAL

1,000

040471 Sebastian CS Jenny Lind Rd. & Ingersoll Rd. Widening (Fort Smith) (S) Widening 3.00 2010Local Local BI-STATE8,980

7,360 - Earmarks

1,620 - Local

- TOTAL

040485 Washington 540 I-540/Hwy. 62/180 Interchg Interim Impvts. (Fayetteville) (F) Interchange 2010State State NARTS5,000

4,000 - NHS

1,000 - State Match

- TOTAL

040486 Washington 016 College Ave.-Stone Bridge Rd. (Fayetteville) (S) Widening 2.68 2011Local State NARTS10,000

5,000 - STP

5,000 - Local

- TOTAL

040489 Washington 112 Hwy. 112 Spur-North (Fayetteville) (S) Widening 0.75 2010Local State NARTS3,000

1,500 - STP

1,500 - Local

- TOTAL

040490 Washington 265 South City Limits-Hwy. 412 (Springdale) (S) Widening 1.25 2010Local State NARTS4,700

2,350 - STP

2,350 - Local

- TOTAL

040493 Franklin CS Hillbilly Lane-Hwy. 23 (Ozark) (S) New Location 0.90 2011Local State1,935

935 - Local

- STP < 200,000

- TOTAL

1,000

040496 Washington CS Hwy. 112-Hwy. 71B (Cato Springs Rd.) (Fayetteville) (S) Reconstruction 1.00 2010Local Local NARTS3,596

2,877 - Earmarks

719 - Local

- TOTAL

Page 71 of 115

STATE AND LOCAL PROJECTS SORTED BY JOB NUMBER

An (S) or (F) following the termini indicates federal or state oversight.For those projects located in a Transportation Improvement Plan (TIP) Area, additional information is available. See the Introduction for further details.

Page 94: 1 - Cover Page STIP 2010-2013 Web Version.pdf · iii TUTS - Texarkana Urban Transportation Study (Miller County) CEO of Texarkana, Texas Dr. Larry Sullivan P. O. Box 1967 Texarkana,

JOB / ITEM

NUMBER COUNTY RTE TERMINI TYPE WORK LENGTH

ESTIMATED COSTLET

YEAR

PROVIDING MATCHING

FUNDS

CARRYINGOUT THE PROJECT TIP AREA

AGENCY RESPONSIBLE FOR:

Funding Breakdown

(x $1,000)

4/14/2010 9:46:42 AM

040506 Franklin CS Gar Creek Str. & Apprs. (2nd Street) (Ozark) (S) Str. & Apprs. 2010Local State425

340 - BR

85 - Local

- TOTAL

040517 Washington 265 Hwy. 45-E. Joyce Blvd. (Fayetteville) (S) Widening 2.19 2010Local State NARTS15,400

7,700 - STP

7,700 - Local

- TOTAL

040518 Washington 265 E. Joyce Blvd.-City Limits (Fayetteville) (S) Widening 2.04 2012State State NARTS15,000

12,000 - STP

3,000 - State Match

- TOTAL

040524 Washington 062 Hwy. 62 Bypass (Gr. & Strs.) (Prairie Grove) (S) New Location 4.20 2010State State NARTS15,000

12,000 - STP

3,000 - State Match

- TOTAL

040527 Washington 540 I-540/Don Tyson Pkwy. Intchng. (Springdale) (F) Interchange 2012Local Local NARTS26,951

26,951 - Local

- TOTAL

040535 Washington CS Fulbright Expwy./Hwy. 71B Flyover (Fayetteville) (S) Str. & Apprs. 2011Local Local NARTS6,452

5,162 - Earmarks

1,290 - Local

- TOTAL

040536 Washington CS Fulbright Expwy./Futrall Dr. Roundabout (Fayetteville) (S) Inters Impvts 2010Local Local NARTS2,966

2,373 - Earmarks

593 - Local

- TOTAL

040545 Sebastian CS 9th St.-13th St. (Garrison Ave.) (Ft. Smith) (S) Enhancement 2010Local Local BI-STATE2,438

950 - Earmarks

488 - Local

- STP < 200,000

- TOTAL

1,000

040561 Washington 540 Bobby Hopper Tunnel-Winslow (S) Safety Improvements 3.50 2012State NARTS900 - TOTAL

900 - 402-Safety

Page 72 of 115

STATE AND LOCAL PROJECTS SORTED BY JOB NUMBER

An (S) or (F) following the termini indicates federal or state oversight.For those projects located in a Transportation Improvement Plan (TIP) Area, additional information is available. See the Introduction for further details.

Page 95: 1 - Cover Page STIP 2010-2013 Web Version.pdf · iii TUTS - Texarkana Urban Transportation Study (Miller County) CEO of Texarkana, Texas Dr. Larry Sullivan P. O. Box 1967 Texarkana,

JOB / ITEM

NUMBER COUNTY RTE TERMINI TYPE WORK LENGTH

ESTIMATED COSTLET

YEAR

PROVIDING MATCHING

FUNDS

CARRYINGOUT THE PROJECT TIP AREA

AGENCY RESPONSIBLE FOR:

Funding Breakdown

(x $1,000)

4/14/2010 9:46:42 AM

040569 Washington 016 West & Middle Forks of White River Strs. & Apprs. (Fayetteville) (S)

Str. & Apprs. 2012State State NARTS11,500

9,200 - BR

2,300 - State Match

- TOTAL

040570 Washington 170 Branch of Illinois River Str. & Apprs. (S) Str. & Apprs. 2012State State NARTS750

600 - BR

150 - State Match

- TOTAL

005836 Jackson 367 White River Str. & Apprs. (Newport) (S) Str. & Apprs. 2013State State20,000

16,000 - BR

4,000 - State Match

- TOTAL

050012 Izard 009 Fulton Co. Line-South Strs. & Apprs.(Oxford) (S) Str. & Apprs. 2011State State3,300

2,640 - BR

660 - State Match

- TOTAL

050166 Cleburne 025 Faulkner Co. Line-Hwy. 107 (Passing Lanes) (S) Passing Lanes 2.20 2012State State6,500

5,200 - STP

1,300 - State Match

- TOTAL

050186 Independence 167 Hwy. 69-Hwy. 394 (Batesville) (S) Widening 2.70 2010State State12,400

9,920 - STP

2,480 - State Match

- TOTAL

050187 Sharp 167 Hwy. 354-Hwy. 62/412 (Ash Flat) (S) Widening 1.00 2010State State6,000

4,800 - STP

1,200 - State Match

- TOTAL

050189 White 013 Hwy. 13 Extension (Searcy) (Phase I) (S) New Location 4.60 2011State State10,000

8,000 - STP

2,000 - State Match

- TOTAL

050198 White NEW North Searcy Connector (Phase I) (S) New Location 2013Local State12,000

6,000 - STP

6,000 - Local

- TOTAL

Page 73 of 115

STATE AND LOCAL PROJECTS SORTED BY JOB NUMBER

An (S) or (F) following the termini indicates federal or state oversight.For those projects located in a Transportation Improvement Plan (TIP) Area, additional information is available. See the Introduction for further details.

Page 96: 1 - Cover Page STIP 2010-2013 Web Version.pdf · iii TUTS - Texarkana Urban Transportation Study (Miller County) CEO of Texarkana, Texas Dr. Larry Sullivan P. O. Box 1967 Texarkana,

JOB / ITEM

NUMBER COUNTY RTE TERMINI TYPE WORK LENGTH

ESTIMATED COSTLET

YEAR

PROVIDING MATCHING

FUNDS

CARRYINGOUT THE PROJECT TIP AREA

AGENCY RESPONSIBLE FOR:

Funding Breakdown

(x $1,000)

4/14/2010 9:46:42 AM

050207 Independence 069 Hwy. 69/Hwy. 122 Inters. Impvts. (S. of Newark) (S) Safety Improvements 2011State State130

117 - HSIP

13 - State Match

- TOTAL

050212 White 013 Hwy. 13 Extension (Searcy) (Phase II) (S) New Location 4.60 2013State State14,000

11,200 - STP

2,800 - State Match

- TOTAL

050213 Independence 167 Hwy. 394-North (S) Widening 5.11 2013State State18,000

14,400 - STP

3,600 - State Match

- TOTAL

050228 Cleburne 225 Midway Branch Str. & Apprs. (S) Str. & Apprs. 2011State State3,500

2,800 - BR

700 - State Match

- TOTAL

050229 White 305 Brier Creek Str. & Apprs. (S) Str. & Apprs. 2011State State700

560 - BR

140 - State Match

- TOTAL

050230 Fulton 063 Hwy. 9-Hwy. 342 Strs. & Apprs. (Mammoth Spring) (S) Str. & Apprs. 2012State State7,000

5,600 - BR

1,400 - State Match

- TOTAL

050231 Stone 066 Mt. View-West (Passing Lanes) (S) Passing Lanes 3.00 2013State State9,500

7,600 - STP

1,900 - State Match

- TOTAL

050X04 Various VAR Districts 5 & 8 Highway Improvements Various 2013State State CARTS20,000 - TOTAL

20,000 - 100% State

R50116 Stone 005 Little Raccoon Creek-Cove Prong Creek (S) Reconst/Climb Lanes 4.00 2011State State11,500

5,000 - STP

1,250 - State Match

- TOTAL

5,250 - 100% State

Page 74 of 115

STATE AND LOCAL PROJECTS SORTED BY JOB NUMBER

An (S) or (F) following the termini indicates federal or state oversight.For those projects located in a Transportation Improvement Plan (TIP) Area, additional information is available. See the Introduction for further details.

Page 97: 1 - Cover Page STIP 2010-2013 Web Version.pdf · iii TUTS - Texarkana Urban Transportation Study (Miller County) CEO of Texarkana, Texas Dr. Larry Sullivan P. O. Box 1967 Texarkana,

JOB / ITEM

NUMBER COUNTY RTE TERMINI TYPE WORK LENGTH

ESTIMATED COSTLET

YEAR

PROVIDING MATCHING

FUNDS

CARRYINGOUT THE PROJECT TIP AREA

AGENCY RESPONSIBLE FOR:

Funding Breakdown

(x $1,000)

4/14/2010 9:46:42 AM

060352 Pulaski 005 McHenry Creek & Relief Strs. & Apprs. (S) Str. & Apprs. 2011State State CARTS2,200

1,760 - BR

440 - State Match

- TOTAL

060395 Pulaski 367 Union Pacific RR Overpass (Arch St.) (LR) (S) Str. & Apprs. 2012State State CARTS6,200

4,960 - BR

1,240 - State Match

- TOTAL

060897 Lonoke 040 I-40/Hwy. 89 Intchg. (Lonoke) (Project Development) (F) Interchange 2010Local Local5,352

4,282 - Earmarks

1,070 - Local

- TOTAL

060907 Pulaski CS Geyer Springs R.R. Grade Separation (L.R.) (PE) (S) RR Xing 2010Local Local CARTS734

587 - Earmarks

147 - Local

- TOTAL

061026A Pulaski CS Oak St.-Loop Rd. (Graham Rd.) (Jacksonville) (S) Utilities 2010Local State/Local CARTS2,026

405 - Local

- STP > 200,000

- TOTAL

1,621

061026B Pulaski CS Oak St.-Loop Rd. (Graham Rd.) (Jacksonville) (S) Widening 2011Local State/Local CARTS7,996

1,599 - Local

- STP > 200,000

- TOTAL

6,397

061059 Garland 270 Hot Springs-West (Passing Lanes) (S) Passing Lanes 4.55 2010State HSA-MPO12,800 - TOTAL

12,800 - 402-Safety

061080 Pulaski CS South Loop Bypass (Mabelvale Rd-Alexander Rd) (LR) (S) New Location 1.00 2010Local Local CARTS5,365

3,060 - Earmarks

1,073 - Local

- STP > 200,000

- TOTAL

1,232

061094A Pulaski CS Baseline Rd.-J.E. Davis Dr. (Scott Hamilton Dr.) (L.R.) (S) ROW/Utilities 1.00 2010Local State/Local CARTS470

94 - Local

- STP > 200,000

- TOTAL

376

Page 75 of 115

STATE AND LOCAL PROJECTS SORTED BY JOB NUMBER

An (S) or (F) following the termini indicates federal or state oversight.For those projects located in a Transportation Improvement Plan (TIP) Area, additional information is available. See the Introduction for further details.

Page 98: 1 - Cover Page STIP 2010-2013 Web Version.pdf · iii TUTS - Texarkana Urban Transportation Study (Miller County) CEO of Texarkana, Texas Dr. Larry Sullivan P. O. Box 1967 Texarkana,

JOB / ITEM

NUMBER COUNTY RTE TERMINI TYPE WORK LENGTH

ESTIMATED COSTLET

YEAR

PROVIDING MATCHING

FUNDS

CARRYINGOUT THE PROJECT TIP AREA

AGENCY RESPONSIBLE FOR:

Funding Breakdown

(x $1,000)

4/14/2010 9:46:42 AM

061094B Pulaski CS Baseline Rd.-J.E. Davis Dr. (Scott Hamilton Dr.) (L.R.) (S) Widening 0.50 2010Local Local CARTS2,521

504 - Local

- STP > 200,000

- TOTAL

2,017

061113 Garland 088 Hwy. 270-Printers Place (Higdon Ferry Rd.) (Hot Springs) (S) Widening 0.46 2010State State HSA-MPO3,000

2,400 - STP

600 - State Match

- TOTAL

061190 Pulaski 040 I-40 Interchange (Maumelle) (F) Interchange 2010Local Local CARTS696

557 - Earmarks

139 - Local

- TOTAL

061194 Pulaski 010 Mississippi Ave.-Perryville Rd. (Hwy. 10) (Little Rock) (S) Safety Improvements 0.65 2013Local State CARTS9,000

8,100 - HSIP

900 - Local

- TOTAL

061201 Pulaski 030 I-30: South Terminal Interchange-I-630 (L.R.) (P.E.) (F) Safety & Traffic Eng. 1.40 2010State State CARTS1,350

1,080 - Earmarks

270 - State Match

- TOTAL

061202 Pulaski 005 Saline Co Line-Otter Creek Rd. (L.R.) (S) Widening 1.26 2010State State CARTS12,000

9,600 - STP

2,400 - State Match

- TOTAL

061214 Garland 088 Printers Place-Hwy 7 North (Higdon Ferry Rd)(Hot Sprs) (S) Widening 0.36 2013State/Local State HSA-MPO5,686

4,000

549

- STP

- Earmarks

1,000 - State Match

137 - Local

- TOTAL

061215 Lonoke 013 I-40-South (Carlisle) (S) Rehabilitation 0.46 2012State State2,500

2,000 - STP

500 - State Match

- TOTAL

061218 Pulaski 010 Union Pacific R.R. Viaduct Safety Impvts. (L.R) (S) Safety Improvements 0.20 2012State State CARTS1,700

1,530 - HSIP

170 - State Match

- TOTAL

Page 76 of 115

STATE AND LOCAL PROJECTS SORTED BY JOB NUMBER

An (S) or (F) following the termini indicates federal or state oversight.For those projects located in a Transportation Improvement Plan (TIP) Area, additional information is available. See the Introduction for further details.

Page 99: 1 - Cover Page STIP 2010-2013 Web Version.pdf · iii TUTS - Texarkana Urban Transportation Study (Miller County) CEO of Texarkana, Texas Dr. Larry Sullivan P. O. Box 1967 Texarkana,

JOB / ITEM

NUMBER COUNTY RTE TERMINI TYPE WORK LENGTH

ESTIMATED COSTLET

YEAR

PROVIDING MATCHING

FUNDS

CARRYINGOUT THE PROJECT TIP AREA

AGENCY RESPONSIBLE FOR:

Funding Breakdown

(x $1,000)

4/14/2010 9:46:42 AM

061219 Lonoke/Pul 067 Hwy. 67 Cable Median Barrier (Jacksonville-Cabot) (S) Safety Improvements 4.80 2012State State CARTS1,500

1,350 - HSIP

150 - State Match

- TOTAL

061228 Saline 005 Hwy. 5 Drainage Structure (Bryant) (S) Str. & Apprs. 2011State State CARTS1,000

800 - STP

200 - State Match

- TOTAL

061229 Lonoke 067 Hwy 67/Hwy 5 Interchange Ramp Modifications (Cabot) (S) Interchange 2010Local State CARTS860

172 - Local

- STP > 200,000

- TOTAL

688

061232 Saline CS Benton Downtown Streetscape (S) Enhancement 2010Local State/Local CARTS619

160 - Local

- STP > 200,000

- TOTAL

459

061244 Pulaski 430 I-430/I-630 Interchange Modifications (Phase III) (F) Interchange 2011State State CARTS80,069

30,600

9,825

- STP

- Earmarks

14,644 - State Match

25,000 - CMAQ FLEX

- TOTAL

061256 Saline 030 Hwy. 70-Sevier St. Cable Median Barrier (S) Safety Improvements 5.21 2012State CARTS1,700 - TOTAL

1,700 - 402-Safety

061257 Saline CS Congo Rd.-I-30 (Military Rd.) (Benton) (S) Widening 2010Local State/Local CARTS8,250

1,650 - Local

- STP > 200,000

- TOTAL

6,600

061259 Garland 005 Hwy. 7-Hot Springs Village (Safety Impvts) (S) Safety Improvements 1.08 2012State State HSA-MPO3,500

3,150 - HSIP

350 - State Match

- TOTAL

061260 Pulaski 630 I-630 Corridor Fixed Guideway Alignment Study Planning 2010Local Metroplan CARTS188

38 - Local

- STP > 200,000

- TOTAL

150

Page 77 of 115

STATE AND LOCAL PROJECTS SORTED BY JOB NUMBER

An (S) or (F) following the termini indicates federal or state oversight.For those projects located in a Transportation Improvement Plan (TIP) Area, additional information is available. See the Introduction for further details.

Page 100: 1 - Cover Page STIP 2010-2013 Web Version.pdf · iii TUTS - Texarkana Urban Transportation Study (Miller County) CEO of Texarkana, Texas Dr. Larry Sullivan P. O. Box 1967 Texarkana,

JOB / ITEM

NUMBER COUNTY RTE TERMINI TYPE WORK LENGTH

ESTIMATED COSTLET

YEAR

PROVIDING MATCHING

FUNDS

CARRYINGOUT THE PROJECT TIP AREA

AGENCY RESPONSIBLE FOR:

Funding Breakdown

(x $1,000)

4/14/2010 9:46:42 AM

061267A Pulaski CS W Main St/Harris Rd/Jacksonville Cutoff Inters Impvts (Jacksonville) (S)

PE 2010Local State/Local CARTS138

28 - Local

- STP > 200,000

- TOTAL

110

061267B Pulaski CS W Main St/Harris Rd/Jacksonville Cutoff Inters Impvts (Jacksonville) (S)

Safety & Traffic Eng. 2011Local State/Local CARTS439

88 - Local

- STP > 200,000

- TOTAL

351

061268 Lonoke 038 Hwy 367/Locust Signal (Cabot) (S) Safety & Traffic Eng. 2010Local State/Local CARTS130

26 - Local

- STP > 200,000

- TOTAL

104

061269 Lonoke CS Cabot Jr. High School North Sidewalks (Cabot) (S) Enhancement 2010Local State/Local CARTS60

12 - Local

- STP > 200,000

- TOTAL

48

061275 Pulaski 070 Arkansas River Str. & Apprs. (Broadway) (LR/NLR) (F) Str. & Apprs. 2013State State CARTS45,000

36,000 - BR

9,000 - State Match

- TOTAL

061276 Pulaski 067 Main Street Strs. & Apprs. (Jacksonville) (F) Str. & Apprs. 2013State State CARTS4,000

3,200 - BR

800 - State Match

- TOTAL

061277 Pulaski 070 Union Pacific RR Str. & Apprs. (Roosevelt Rd.) (LR) (S) Str. & Apprs. 2013State State CARTS6,500

5,200 - BR

1,300 - State Match

- TOTAL

061278 Pulaski 067 Redmond Rd. Strs. & Apprs. (Jacksonville) (F) Str. & Apprs. 2012State State CARTS6,500

5,200 - BR

1,300 - State Match

- TOTAL

061280 Prairie 038 White River Bridge Rehab. (Des Arc) (S) Str. & Apprs. 2010State State1,600

1,280 - BR

320 - State Match

- TOTAL

Page 78 of 115

STATE AND LOCAL PROJECTS SORTED BY JOB NUMBER

An (S) or (F) following the termini indicates federal or state oversight.For those projects located in a Transportation Improvement Plan (TIP) Area, additional information is available. See the Introduction for further details.

Page 101: 1 - Cover Page STIP 2010-2013 Web Version.pdf · iii TUTS - Texarkana Urban Transportation Study (Miller County) CEO of Texarkana, Texas Dr. Larry Sullivan P. O. Box 1967 Texarkana,

JOB / ITEM

NUMBER COUNTY RTE TERMINI TYPE WORK LENGTH

ESTIMATED COSTLET

YEAR

PROVIDING MATCHING

FUNDS

CARRYINGOUT THE PROJECT TIP AREA

AGENCY RESPONSIBLE FOR:

Funding Breakdown

(x $1,000)

4/14/2010 9:46:42 AM

061X01 Lonoke CS Cabot High School Roundabout (S) Reconstruction 2010Local State/Local CARTS211

43 - Local

- STP > 200,000

- TOTAL

168

061X03A Pulaski CS McCain Rail Grade Separation PE 2011Local State/Local CARTS1,338

268 - Local

- STP > 200,000

- TOTAL

1,070

061X03B Pulaski CS McCain Rail Grade Separation ROW/Utilities 2012Local State/Local CARTS4,294

859 - Local

- STP > 200,000

- TOTAL

3,435

061X03C Pulaski CS McCain Rail Grade Separation Str. & Apprs. 2013Local State/Local CARTS11,185

2,227 - Local

- STP > 200,000

- TOTAL

8,958

061X04A Pulaski CS Maryland Road Extension (Sherwood) PE 2011Local State/Local CARTS106

21 - Local

- STP > 200,000

- TOTAL

85

061X04B Pulaski CS Maryland Road Extension (Sherwood) New Location 2012Local State/Local CARTS960

192 - Local

- STP > 200,000

- TOTAL

768

061X05 Pulaski Levy UPRR Spur Bikeway (North Little Rock) ROW 2012Local State/Local CARTS1,803

361 - Local

- STP > 200,000

- TOTAL

1,442

061X06A Saline CS Alcoa Road: I-30 to Sidell Road (Saline County) PE 2010Local State CARTS900

180 - Local

- STP > 200,000

- TOTAL

720

061X06B Saline CS Alcoa Road: I-30 to Sidell Road (Saline County) Widening 2011Local State/Local CARTS1,047

209 - Local

- STP > 200,000

- TOTAL

838

Page 79 of 115

STATE AND LOCAL PROJECTS SORTED BY JOB NUMBER

An (S) or (F) following the termini indicates federal or state oversight.For those projects located in a Transportation Improvement Plan (TIP) Area, additional information is available. See the Introduction for further details.

Page 102: 1 - Cover Page STIP 2010-2013 Web Version.pdf · iii TUTS - Texarkana Urban Transportation Study (Miller County) CEO of Texarkana, Texas Dr. Larry Sullivan P. O. Box 1967 Texarkana,

JOB / ITEM

NUMBER COUNTY RTE TERMINI TYPE WORK LENGTH

ESTIMATED COSTLET

YEAR

PROVIDING MATCHING

FUNDS

CARRYINGOUT THE PROJECT TIP AREA

AGENCY RESPONSIBLE FOR:

Funding Breakdown

(x $1,000)

4/14/2010 9:46:42 AM

061X07 Pulaski Maumelle Pedestrian/Bicycle Facilities (Phase II) Enhancement 2010Local State/Local CARTS536

107 - Local

- STP > 200,000

- TOTAL

429

R60016 Garland NEW East-West Arterial (Hot Springs) (P.E.) Project Development 2011State State HSA-MPO7,234

5,787 - Earmarks

1,447 - State Match

- TOTAL

Note: Contingent upon approval from National Parks Service

070240 Clark 051 Ouachita River Str. & Apprs. (Arkadelphia) (S) Str. & Apprs. 2012State State3,000

2,400 - BR

600 - State Match

- TOTAL

070273 Union 015 Hwy 335-Hwy 82 Strs & Apprs (S) Str. & Apprs. 2011State State2,650

2,120 - BR

530 - State Match

- TOTAL

070289 Cleve/Dallas 167 Hwy. 273-Peters Rd. (CR 24) (Phase I) (S) Widening 5.30 2013State State38,364

29,600

1,364

- STP

- Earmarks

7,400 - State Match

- TOTAL

070290 Cleveland 167 Peters Rd. (CR 24)-North (S) Widening 5.10 2011State State32,500

26,000 - NHS

6,500 - State Match

- TOTAL

070291 Cleve/Dallas 167 Saline River-South (S) Widening 5.50 2012State State54,500

43,600 - NHS

10,900 - State Match

- TOTAL

070301 Columbia 079 Magnolia-Ouachita Co. Line (Passing Lanes) (S) Passing Lanes 2.50 2010State State6,200

5,580 - HSIP

620 - State Match

- TOTAL

070304 Columbia CS Frederick St.-Hwy. 82 (E. North St.) (Magnolia) (S) Widening 0.70 2011Local State2,840

1,840 - Local

- STP < 200,000

- TOTAL

1,000

Page 80 of 115

STATE AND LOCAL PROJECTS SORTED BY JOB NUMBER

An (S) or (F) following the termini indicates federal or state oversight.For those projects located in a Transportation Improvement Plan (TIP) Area, additional information is available. See the Introduction for further details.

Page 103: 1 - Cover Page STIP 2010-2013 Web Version.pdf · iii TUTS - Texarkana Urban Transportation Study (Miller County) CEO of Texarkana, Texas Dr. Larry Sullivan P. O. Box 1967 Texarkana,

JOB / ITEM

NUMBER COUNTY RTE TERMINI TYPE WORK LENGTH

ESTIMATED COSTLET

YEAR

PROVIDING MATCHING

FUNDS

CARRYINGOUT THE PROJECT TIP AREA

AGENCY RESPONSIBLE FOR:

Funding Breakdown

(x $1,000)

4/14/2010 9:46:42 AM

070344 Clark 067 Gurdon-Oak Grove Strs. & Apprs. (S) Str. & Apprs. 2013State State5,000

4,000 - BR

1,000 - State Match

- TOTAL

070345 Calhoun 274 Ditch at L.M. 1.8 Str. & Apprs. (S) Str. & Apprs. 2011State State1,000

800 - BR

200 - State Match

- TOTAL

080157 Pope Intermodal Complex (Russellville) (F) Miscellaneous 2010Local Local3,488

2,790 - Earmarks

698 - Local

- TOTAL

080164 Pope 007 Hwy. 7 Improvements (Dover) (S) New Location 1.30 2013State State6,250

5,000 - STP

1,250 - State Match

- TOTAL

080273 Faulkner 065B Hwy 266-Hwy. 64 (Conway) (S) Widening 0.51 2010State State CARTS2,250

2,025 - HSIP

225 - State Match

- TOTAL

080295 Pope CS W Main Pl-Honeysuckle Ln (Inglewood St) (Russellville)(S) Reconstruction 0.80 2010Local State2,850

1,850 - Local

- STP < 200,000

- TOTAL

1,000

080310 Montgomery 270 Hwy. 270 Realignment (Blowout Mountain) (S) Reconstruction 1.35 2010State State4,360

3,924 - HSIP

436 - State Match

- TOTAL

080314 Johnson CS Hwy. 123-Hwy. 21 (Clarksville) (S) Project Development 0.50 2011Local Local1,100

100 - Local

- STP < 200,000

- TOTAL

1,000

080329 Faulkner Vilonia Middle SRTS I (2007) (Supplemental Funds) Enhancement 2010Local State/Local CARTS106

21 - Local

- STP > 200,000

- TOTAL

85

Page 81 of 115

STATE AND LOCAL PROJECTS SORTED BY JOB NUMBER

An (S) or (F) following the termini indicates federal or state oversight.For those projects located in a Transportation Improvement Plan (TIP) Area, additional information is available. See the Introduction for further details.

Page 104: 1 - Cover Page STIP 2010-2013 Web Version.pdf · iii TUTS - Texarkana Urban Transportation Study (Miller County) CEO of Texarkana, Texas Dr. Larry Sullivan P. O. Box 1967 Texarkana,

JOB / ITEM

NUMBER COUNTY RTE TERMINI TYPE WORK LENGTH

ESTIMATED COSTLET

YEAR

PROVIDING MATCHING

FUNDS

CARRYINGOUT THE PROJECT TIP AREA

AGENCY RESPONSIBLE FOR:

Funding Breakdown

(x $1,000)

4/14/2010 9:46:42 AM

080339 Faulkner 036 Hwys. 36/107 Inters. Impvts. (S. of Enola) (S) Safety 2011State State900

720 - STP

180 - State Match

- TOTAL

080340 Johnson 103 Market St.-I-40 WB Ramps (Clarksville) (S) Capacity Imprvmnts 0.40 2013State State7,500

6,000 - STP

1,500 - State Match

- TOTAL

080345 Pope 247 I-40 South (Russellville Bypass) (Bs. & Surf.) (S) New Location 2.43 2012State State16,600

13,280 - STP

3,320 - State Match

- TOTAL

080363 Van Buren 065 Hwys. 65/92 Signal & Inters. Impvts. (Bee Branch) (S) Inters Impvts 2011State State2,000

1,600 - STP

400 - State Match

- TOTAL

080377 Yell 007 Centerville-Dardanelle (Passing Lanes) (S) Passing Lanes 1.00 2013State State2,000

1,600 - STP

400 - State Match

- TOTAL

080378 Montgomery 008 Lick Creek Str. & Apprs. (Norman) (S) Str. & Apprs. 2011State State1,200

960 - BR

240 - State Match

- TOTAL

080379 Montgomery 027 Ouachita River Str. & Apprs. (S) Str. & Apprs. 2012State State2,500

2,000 - BR

500 - State Match

- TOTAL

080380 Pope 064 Galla Creek Str. & Apprs. (Pottsville) (S) Str. & Apprs. 2011State State2,500

2,000 - BR

500 - State Match

- TOTAL

080381 Van Buren 092 Scroggins Creek Str. & Apprs. (S) Str. & Apprs. 2011State State1,000

800 - BR

200 - State Match

- TOTAL

Page 82 of 115

STATE AND LOCAL PROJECTS SORTED BY JOB NUMBER

An (S) or (F) following the termini indicates federal or state oversight.For those projects located in a Transportation Improvement Plan (TIP) Area, additional information is available. See the Introduction for further details.

Page 105: 1 - Cover Page STIP 2010-2013 Web Version.pdf · iii TUTS - Texarkana Urban Transportation Study (Miller County) CEO of Texarkana, Texas Dr. Larry Sullivan P. O. Box 1967 Texarkana,

JOB / ITEM

NUMBER COUNTY RTE TERMINI TYPE WORK LENGTH

ESTIMATED COSTLET

YEAR

PROVIDING MATCHING

FUNDS

CARRYINGOUT THE PROJECT TIP AREA

AGENCY RESPONSIBLE FOR:

Funding Breakdown

(x $1,000)

4/14/2010 9:46:42 AM

080382 Conway 124 Cove Creek Str. & Apprs. (S) Str. & Apprs. 2011State State1,500

1,200 - BR

300 - State Match

- TOTAL

080383 Conway 124 Point Remove Creek Str. & Apprs. (S) Str. & Apprs. 2011State State1,500

1,200 - BR

300 - State Match

- TOTAL

080384 Faulkner 287 Branch of Cadron Creek Str. & Apprs. (Holland) (S) Str. & Apprs. 2011State State600

480 - BR

120 - State Match

- TOTAL

080385 Yell 007 Little Rock & Western RR Str. & Apprs. (Ola) (S) Str. & Apprs. 2012State State1,250

1,000 - BR

250 - State Match

- TOTAL

080386 Conway 095 East Fork Point Remove Creek-North & South Grade Impvts (S)

Reconstruction 0.80 2012State State6,000

4,800 - STP

1,200 - State Match

- TOTAL

080387 Conway 095 Overcup Creek-North & South Grade Impvts. (S) Reconstruction 1.20 2012State State4,000

3,200 - STP

800 - State Match

- TOTAL

080388 Faulkner 040 Conway-Pulaski Co. Line (Widening) (Phase I) (F) Widening 2012State State CARTS36,000

28,800 - NHS

7,200 - State Match

- TOTAL

080389 Pope 326 Hob Nob Rd.-Hwy. 124 (S) Widening 0.45 2013Local State6,000

3,000 - STP

3,000 - Local

- TOTAL

080390 Van Buren 065 Hwy. 16 East-Hwy. 65B South (Clinton) (S) Widening 1.41 2013State State15,000

12,000 - NHS

3,000 - State Match

- TOTAL

Page 83 of 115

STATE AND LOCAL PROJECTS SORTED BY JOB NUMBER

An (S) or (F) following the termini indicates federal or state oversight.For those projects located in a Transportation Improvement Plan (TIP) Area, additional information is available. See the Introduction for further details.

Page 106: 1 - Cover Page STIP 2010-2013 Web Version.pdf · iii TUTS - Texarkana Urban Transportation Study (Miller County) CEO of Texarkana, Texas Dr. Larry Sullivan P. O. Box 1967 Texarkana,

JOB / ITEM

NUMBER COUNTY RTE TERMINI TYPE WORK LENGTH

ESTIMATED COSTLET

YEAR

PROVIDING MATCHING

FUNDS

CARRYINGOUT THE PROJECT TIP AREA

AGENCY RESPONSIBLE FOR:

Funding Breakdown

(x $1,000)

4/14/2010 9:46:42 AM

080391 Van Buren 065 Hwy. 336 West-Co. Rd. 28 (Phase I) (S) Widening 9.30 2012State State15,000

12,000 - NHS

3,000 - State Match

- TOTAL

080392 Pope 007 Newton Co. Line-South (Passing Lanes) (S) Passing Lanes 2.30 2012State State5,000

4,000 - STP

1,000 - State Match

- TOTAL

080X01 Faulkner 025 Hwy. 25 Relocation (S) New Location 1.70 2013Local State CARTS9,000

4,500 - STP

3,621 - Local

- STP > 200,000

- TOTAL

879

080X03 Faulkner NEW Conway South Interchange-Hwy. 365 (Gr. & Strs.) (F) New Location 2011Local State CARTS12,000

5,589

1,836

- NHS

- Earmarks

41 - State Match

4,534 - Local

- TOTAL

080X04 Faulkner NEW Conway South Interchange-Hwy. 365 (Bs. & Surf.) (F) New Location 2013Local State CARTS11,000

5,500 - NHS

4,329 - Local

- STP > 200,000

- TOTAL

1,171

080X12 Faulkner NEW Hwy. 365-Sturgis Road (Phase I) (S) New Location 2012Local State CARTS5,437

5,437 - Local

- TOTAL

009702 Carroll 062 Hwy. 62 Improvements (Green Forest) (Phase I) (S) Widening 2.00 2013State State9,000

4,800 - STP

1,200 - State Match

- TOTAL

3,000 - 100% State

009784 Newton 007 Buffalo River Br. & Apprs. (Pruitt) (S) Str. & Apprs. 2010State State2,600

2,080 - BR

520 - State Match

- TOTAL

Page 84 of 115

STATE AND LOCAL PROJECTS SORTED BY JOB NUMBER

An (S) or (F) following the termini indicates federal or state oversight.For those projects located in a Transportation Improvement Plan (TIP) Area, additional information is available. See the Introduction for further details.

Page 107: 1 - Cover Page STIP 2010-2013 Web Version.pdf · iii TUTS - Texarkana Urban Transportation Study (Miller County) CEO of Texarkana, Texas Dr. Larry Sullivan P. O. Box 1967 Texarkana,

JOB / ITEM

NUMBER COUNTY RTE TERMINI TYPE WORK LENGTH

ESTIMATED COSTLET

YEAR

PROVIDING MATCHING

FUNDS

CARRYINGOUT THE PROJECT TIP AREA

AGENCY RESPONSIBLE FOR:

Funding Breakdown

(x $1,000)

4/14/2010 9:46:42 AM

009901 Carroll 062 Hwy. 143-Berryville (S) Widening 2.80 2010State State13,300

10,640 - STP

2,660 - State Match

- TOTAL

009951 Madison 412 Hindsville-Huntsville Bypass (F) Widening 4.92 2010State State18,000

14,400 - NHS

3,600 - State Match

- TOTAL

090065 Benton 062 Avoca-North Garfield (S) Widening 6.43 2012State State NARTS28,000

22,400 - NHS

5,600 - State Match

- TOTAL

090069 Benton NEW Northwest Arkansas Regional Airport Access (F) New Location 2010Local Local NARTS35,000

10,651 - Earmarks

24,349 - Local

- TOTAL

090169 Newton 007 Jasper-Co. Rd. 46 (Passing Lanes) (S) Passing Lanes 1.00 2010State State3,000

2,400 - STP

600 - State Match

- TOTAL

090174 Benton 102 Hwy. 102B-Greenhouse Rd. (Centerton) (S) Widening 1.79 2010Local State NARTS12,000

10,000 - STP

2,000 - Local

- TOTAL

090213 Newton 007 Co. Rd. 46-Buffalo River (Safety Impvts.) (S) Reconstruction 0.60 2010State State8,600

7,740 - HSIP

860 - State Match

- TOTAL

090218 Benton CS 8th Street Improvements (Bentonville) (S) Widening 2011Local Local NARTS38,586

30,869 - Earmarks

7,717 - Local

- TOTAL

090221 Newton 007 Mill Cr.-Hwy. 7S Safety Impvts. (Marble Falls) (S) Reconstruction 0.83 2010State State5,700

5,130 - HSIP

570 - State Match

- TOTAL

Page 85 of 115

STATE AND LOCAL PROJECTS SORTED BY JOB NUMBER

An (S) or (F) following the termini indicates federal or state oversight.For those projects located in a Transportation Improvement Plan (TIP) Area, additional information is available. See the Introduction for further details.

Page 108: 1 - Cover Page STIP 2010-2013 Web Version.pdf · iii TUTS - Texarkana Urban Transportation Study (Miller County) CEO of Texarkana, Texas Dr. Larry Sullivan P. O. Box 1967 Texarkana,

JOB / ITEM

NUMBER COUNTY RTE TERMINI TYPE WORK LENGTH

ESTIMATED COSTLET

YEAR

PROVIDING MATCHING

FUNDS

CARRYINGOUT THE PROJECT TIP AREA

AGENCY RESPONSIBLE FOR:

Funding Breakdown

(x $1,000)

4/14/2010 9:46:42 AM

090223 Baxter 177 Hwy. 5-Izard Co. Line (Passing Lanes) (S) Passing Lanes 2.50 2010State State6,400

5,760 - HSIP

640 - State Match

- TOTAL

090224 Benton 071 Bella Vista Bypass (Phase I) (F) New Location 14.60 2011State State NARTS33,584

12,000

15,032

- STP

- Earmarks

6,552 - State Match

- TOTAL

090228 Benton CR War Eagle Bridge Rehab. (Benton Co.) (S) New Location 2010Local State NARTS494

395 - Earmarks

99 - Local

- TOTAL

090232 Benton CS East Monroe Ave. Extension (Sel. Secs.) (Lowell) (S) New Location 0.32 2010Local State NARTS2,100

1,100 - Local

- STP < 200,000

- TOTAL

1,000

090235 Carroll 412 Dryfork-Hwy. 103 (Passing Lane) (S) Passing Lanes 1.30 2012State State4,000 - TOTAL

4,000 - 100% State

090236 Benton 540 I-540/Hwy. 62/102 Interch Interim Impvts. (Bentonvl) (F) Interchange 2010State/Local State NARTS6,598

4,000

1,278

- NHS

- Earmarks

320 - State Match

1,000 - Local

- TOTAL

090251 Benton 012 Hwy. 71B-Shell Rd. (Hwy. 12) (Bentonville) (S) Capacity Imprvmnts 2.70 2012Local State NARTS20,400

10,400 - Local

- TOTAL

10,000 - 100% State

090254 Benton CS Shell Road Str. & Apprs. (Bentonville) (S) Str. & Apprs. 2010Local State NARTS1,404

1,000 - BR

404 - Local

- TOTAL

090260 Benton 071 Hwy. 71/NE J St. Intchng. (Bentonville) (F) Interchange 2011Local Local NARTS37,676

37,676 - Local

- TOTAL

Page 86 of 115

STATE AND LOCAL PROJECTS SORTED BY JOB NUMBER

An (S) or (F) following the termini indicates federal or state oversight.For those projects located in a Transportation Improvement Plan (TIP) Area, additional information is available. See the Introduction for further details.

Page 109: 1 - Cover Page STIP 2010-2013 Web Version.pdf · iii TUTS - Texarkana Urban Transportation Study (Miller County) CEO of Texarkana, Texas Dr. Larry Sullivan P. O. Box 1967 Texarkana,

JOB / ITEM

NUMBER COUNTY RTE TERMINI TYPE WORK LENGTH

ESTIMATED COSTLET

YEAR

PROVIDING MATCHING

FUNDS

CARRYINGOUT THE PROJECT TIP AREA

AGENCY RESPONSIBLE FOR:

Funding Breakdown

(x $1,000)

4/14/2010 9:46:42 AM

090272 Madison 412 Hwy. 412/Hwy. 45 Inters. Impvts. (N. of Hindsville) (S) Safety Improvements 2011State State650

585 - HSIP

65 - State Match

- TOTAL

090280 Searcy 065 Cove Creek Str. & Apprs. (S) Str. & Apprs. 2011State State2,000

1,600 - BR

400 - State Match

- TOTAL

090281 Baxter 005 North Fork River Str. & Apprs. (Norfork) (S) Str. & Apprs. 2011State State3,000

2,400 - BR

600 - State Match

- TOTAL

090282 Benton 016 Illinois River Str. & Apprs. (S) Str. & Apprs. 2012State State NARTS5,000

4,000 - BR

1,000 - State Match

- TOTAL

090283 Carroll 021 Indian Creek Str. & Apprs. (S) Str. & Apprs. 2012State State1,000

800 - BR

200 - State Match

- TOTAL

090284 Benton 264 Hwy. 71B-Hwy. 265 (Springdale) (S) Widening 1.40 2013State State NARTS11,000

8,800 - STP

2,200 - State Match

- TOTAL

090X03 Benton VAR District 9 Improvements TBD 2013State State NARTS5,000

4,000 - STP

1,000 - State Match

- TOTAL

R90097 Marion 062 Flippin Bypass-Hwy. 62B (S) Widening 0.65 2010State State5,300 - TOTAL

5,300 - 100% State

100307 Mississippi 018 Hwy. 181-West (S) Widening 2.74 2010State State17,000

12,400

1,200

- STP

- BR

3,400 - State Match

- TOTAL

Page 87 of 115

STATE AND LOCAL PROJECTS SORTED BY JOB NUMBER

An (S) or (F) following the termini indicates federal or state oversight.For those projects located in a Transportation Improvement Plan (TIP) Area, additional information is available. See the Introduction for further details.

Page 110: 1 - Cover Page STIP 2010-2013 Web Version.pdf · iii TUTS - Texarkana Urban Transportation Study (Miller County) CEO of Texarkana, Texas Dr. Larry Sullivan P. O. Box 1967 Texarkana,

JOB / ITEM

NUMBER COUNTY RTE TERMINI TYPE WORK LENGTH

ESTIMATED COSTLET

YEAR

PROVIDING MATCHING

FUNDS

CARRYINGOUT THE PROJECT TIP AREA

AGENCY RESPONSIBLE FOR:

Funding Breakdown

(x $1,000)

4/14/2010 9:46:42 AM

100308 Craighead 018 St. Francis River-North of Black Oak (S) Widening 5.60 2010State State33,000

26,400 - STP

6,600 - State Match

- TOTAL

100412 Craighead 226 Hwy. 67-Hwy. 49 (Phase II) (F) Widening 12.45 2011State State JATS49,717

22,160

19,092

- STP

- Earmarks

8,465 - State Match

- TOTAL

100445 Greene 412 Hwy. 412 Improvements (Paragould) (Phase I) (F) New Location 9.90 2011State State28,625

3,400 - Earmarks

- TOTAL

25,225 - 100% State

100567 Craighead 018 North of Black Oak-Monette Bypass (S) Widening 1.40 2013State State11,600

9,280 - STP

2,320 - State Match

- TOTAL

100639 Craighead CS Mt. Carmel Rd-S Culberhouse Rd (Lawson Rd)(Jonesboro)(S) Widening 1.20 2010Local State JATS4,900

3,900 - Local

- STP < 200,000

- TOTAL

1,000

100653 Craig/Miss 018 Monette Bypass-Manila (S) Widening 6.00 2012State State41,700

33,360 - STP

8,340 - State Match

- TOTAL

100662 Craighead CS Caraway Rd. Safety Enhancement (Jonesboro) (Ph. II) (S) New Location 2010Local Local JATS9,185

5,848 - Earmarks

1,837 - Local

1,500 - RRP

- TOTAL

100663 Mississippi 018 Hwy. 18 Improvements (Blytheville) (S) Safety Improvements 2011State State15,876

6,000

500

2,588

- STP

- Earmarks

- HSIP

1,788 - State Match

- TOTAL

5,000 - 402-Safety

Page 88 of 115

STATE AND LOCAL PROJECTS SORTED BY JOB NUMBER

An (S) or (F) following the termini indicates federal or state oversight.For those projects located in a Transportation Improvement Plan (TIP) Area, additional information is available. See the Introduction for further details.

Page 111: 1 - Cover Page STIP 2010-2013 Web Version.pdf · iii TUTS - Texarkana Urban Transportation Study (Miller County) CEO of Texarkana, Texas Dr. Larry Sullivan P. O. Box 1967 Texarkana,

JOB / ITEM

NUMBER COUNTY RTE TERMINI TYPE WORK LENGTH

ESTIMATED COSTLET

YEAR

PROVIDING MATCHING

FUNDS

CARRYINGOUT THE PROJECT TIP AREA

AGENCY RESPONSIBLE FOR:

Funding Breakdown

(x $1,000)

4/14/2010 9:46:42 AM

100675 Greene 135 Cache River & Relief Strs. & Apprs. (S) Str. & Apprs. 2011State State6,120

4,896 - BR

1,224 - State Match

- TOTAL

100682 Poinsett 063 Future I-555 Access Roads (S) Project Development 2011State State2,946

2,357 - Earmarks

589 - State Match

- TOTAL

100686 Lawrence 063 Black Rock-Portia (Phase I) (F) Widening 3.50 2013State State15,900

12,720 - STP

3,180 - State Match

- TOTAL

100687 Lawrence 063 Black River & Relief Strs. & Apprs. (F) Str. & Apprs. 2013State State33,000

26,400 - BR

6,600 - State Match

- TOTAL

100722 Greene 034 Lafe-Marmaduke Strs. & Apprs. (S) Str. & Apprs. 2011State State2,500

2,000 - BR

500 - State Match

- TOTAL

100723 Mississippi 148 Clear Lake Str. & Apprs. (S) Str. & Apprs. 2011State State900

720 - BR

180 - State Match

- TOTAL

100724 Mississippi 312 Ditch No. 6 Str. & Apprs. (Blytheville) (S) Str. & Apprs. 2011State State800

640 - BR

160 - State Match

- TOTAL

100X01 Greene 412 Hwy. 412 Improvements (Paragould) (Phase II) (F) New Location 10.43 2013State State14,800

11,840 - NHS

2,960 - State Match

- TOTAL

001966 Benton/Wash 412 Springdale Northern Bypass (Phase I) (F) New Location 20.60 2011State State NARTS11,521

8,000

1,217

- NHS

- Earmarks

2,304 - State Match

- TOTAL

Page 89 of 115

STATE AND LOCAL PROJECTS SORTED BY JOB NUMBER

An (S) or (F) following the termini indicates federal or state oversight.For those projects located in a Transportation Improvement Plan (TIP) Area, additional information is available. See the Introduction for further details.

Page 112: 1 - Cover Page STIP 2010-2013 Web Version.pdf · iii TUTS - Texarkana Urban Transportation Study (Miller County) CEO of Texarkana, Texas Dr. Larry Sullivan P. O. Box 1967 Texarkana,

JOB / ITEM

NUMBER COUNTY RTE TERMINI TYPE WORK LENGTH

ESTIMATED COSTLET

YEAR

PROVIDING MATCHING

FUNDS

CARRYINGOUT THE PROJECT TIP AREA

AGENCY RESPONSIBLE FOR:

Funding Breakdown

(x $1,000)

4/14/2010 9:46:42 AM

012007 Benton/Wash 265 Randall Wobbe Lane-Hwy. 264 (Springdale) (S) Widening 1.55 2011Local State NARTS5,000

2,500 - STP

2,500 - Local

- TOTAL

012060 Clev/Jeff/Linc 530 Co. Rd. 35-Hwy. 212 (Bs. & Surf.) (F) New Location 11.14 2011State State39,300

31,440 - Earmarks

7,860 - State Match

- TOTAL

012111 Benton/Wash 540 Hwy. 112/265-Hwy. 62/102 Cable Median Barrier (F) Safety Improvements 24.45 2012State NARTS6,500 - TOTAL

6,500 - 402-Safety

012X01 Benton/Wash 540 Major Widening and/or Interchange Improvements (F) Capacity Imprvmnts 2011State State NARTS15,890

8,000

5,335

- NHS

- Earmarks

2,555 - State Match

- TOTAL

012X02 Benton/Wash 540 Major Widening and/or Interchange Improvements (F) Capacity Imprvmnts 2013State State NARTS20,000

16,000 - NHS

4,000 - State Match

- TOTAL

Page 90 of 115

STATE AND LOCAL PROJECTS SORTED BY JOB NUMBER

An (S) or (F) following the termini indicates federal or state oversight.For those projects located in a Transportation Improvement Plan (TIP) Area, additional information is available. See the Introduction for further details.

Page 113: 1 - Cover Page STIP 2010-2013 Web Version.pdf · iii TUTS - Texarkana Urban Transportation Study (Miller County) CEO of Texarkana, Texas Dr. Larry Sullivan P. O. Box 1967 Texarkana,

State and Local Projects Sorted by County

Page 114: 1 - Cover Page STIP 2010-2013 Web Version.pdf · iii TUTS - Texarkana Urban Transportation Study (Miller County) CEO of Texarkana, Texas Dr. Larry Sullivan P. O. Box 1967 Texarkana,

JOB / ITEM

NUMBER COUNTY RTE TERMINI TYPE WORK LENGTH

ESTIMATED COSTLET

YEAR

PROVIDING MATCHING

FUNDS

CARRYINGOUT THE PROJECT TIP AREA

AGENCY RESPONSIBLE FOR:

Funding Breakdown

(x $1,000)

4/14/2010 9:46:31 AM

020509 Ashley 082 Hwy. 165 Str. & Apprs. (Montrose) (S) Str. & Apprs. 2012State State2,200

1,760 - BR

440 - State Match

- TOTAL

090223 Baxter 177 Hwy. 5-Izard Co. Line (Passing Lanes) (S) Passing Lanes 2.50 2010State State6,400

640 - State Match

- TOTAL

5,760 - HSIP

090281 Baxter 005 North Fork River Str. & Apprs. (Norfork) (S) Str. & Apprs. 2011State State3,000

2,400 - BR

600 - State Match

- TOTAL

090065 Benton 062 Avoca-North Garfield (S) Widening 6.43 2012State State NARTS28,00022,400 - NHS

5,600 - State Match

- TOTAL

090069 Benton NEW Northwest Arkansas Regional Airport Access (F) New Location 2010Local Local NARTS35,00010,651 - Earmarks

24,349 - Local

- TOTAL

090174 Benton 102 Hwy. 102B-Greenhouse Rd. (Centerton) (S) Widening 1.79 2010Local State NARTS12,00010,000 - STP

2,000 - Local

- TOTAL

090218 Benton CS 8th Street Improvements (Bentonville) (S) Widening 2011Local Local NARTS38,586

30,869 - Earmarks

7,717 - Local

- TOTAL

090224 Benton 071 Bella Vista Bypass (Phase I) (F) New Location 14.60 2011State State NARTS33,58412,000

15,032

- STP

- Earmarks

6,552 - State Match

- TOTAL

090228 Benton CR War Eagle Bridge Rehab. (Benton Co.) (S) New Location 2010Local State NARTS494

395 - Earmarks

99 - Local

- TOTAL

Page 91 of 115

STATE AND LOCAL PROJECTS SORTED BY COUNTY

An (S) or (F) following the termini indicates federal or state oversight.For those projects located in a Transportation Improvement Plan (TIP) Area, additional information is available. See the Introduction for further details.

Page 115: 1 - Cover Page STIP 2010-2013 Web Version.pdf · iii TUTS - Texarkana Urban Transportation Study (Miller County) CEO of Texarkana, Texas Dr. Larry Sullivan P. O. Box 1967 Texarkana,

JOB / ITEM

NUMBER COUNTY RTE TERMINI TYPE WORK LENGTH

ESTIMATED COSTLET

YEAR

PROVIDING MATCHING

FUNDS

CARRYINGOUT THE PROJECT TIP AREA

AGENCY RESPONSIBLE FOR:

Funding Breakdown

(x $1,000)

4/14/2010 9:46:31 AM

090232 Benton CS East Monroe Ave. Extension (Sel. Secs.) (Lowell) (S) New Location 0.32 2010Local State NARTS2,100

1,100 - Local

- STP < 200,000

- TOTAL

1,000

090236 Benton 540 I-540/Hwy. 62/102 Interch Interim Impvts. (Bentonvl) (F) Interchange 2010State/Local State NARTS6,5984,000

1,278

- NHS

- Earmarks

320 - State Match

1,000 - Local

- TOTAL

090251 Benton 012 Hwy. 71B-Shell Rd. (Hwy. 12) (Bentonville) (S) Capacity Imprvmnts 2.70 2012Local State NARTS20,400

10,400 - Local

- TOTAL

10,000 - 100% State

090254 Benton CS Shell Road Str. & Apprs. (Bentonville) (S) Str. & Apprs. 2010Local State NARTS1,404

1,000 - BR

404 - Local

- TOTAL

090260 Benton 071 Hwy. 71/NE J St. Intchng. (Bentonville) (F) Interchange 2011Local Local NARTS37,676

37,676 - Local

- TOTAL

090282 Benton 016 Illinois River Str. & Apprs. (S) Str. & Apprs. 2012State State NARTS5,000

4,000 - BR

1,000 - State Match

- TOTAL

090284 Benton 264 Hwy. 71B-Hwy. 265 (Springdale) (S) Widening 1.40 2013State State NARTS11,0008,800 - STP

2,200 - State Match

- TOTAL

090X03 Benton VAR District 9 Improvements TBD 2013State State NARTS5,0004,000 - STP

1,000 - State Match

- TOTAL

001966 Benton/Wash 412 Springdale Northern Bypass (Phase I) (F) New Location 20.60 2011State State NARTS11,5218,000

1,217

- NHS

- Earmarks

2,304 - State Match

- TOTAL

Page 92 of 115

STATE AND LOCAL PROJECTS SORTED BY COUNTY

An (S) or (F) following the termini indicates federal or state oversight.For those projects located in a Transportation Improvement Plan (TIP) Area, additional information is available. See the Introduction for further details.

Page 116: 1 - Cover Page STIP 2010-2013 Web Version.pdf · iii TUTS - Texarkana Urban Transportation Study (Miller County) CEO of Texarkana, Texas Dr. Larry Sullivan P. O. Box 1967 Texarkana,

JOB / ITEM

NUMBER COUNTY RTE TERMINI TYPE WORK LENGTH

ESTIMATED COSTLET

YEAR

PROVIDING MATCHING

FUNDS

CARRYINGOUT THE PROJECT TIP AREA

AGENCY RESPONSIBLE FOR:

Funding Breakdown

(x $1,000)

4/14/2010 9:46:31 AM

012007 Benton/Wash 265 Randall Wobbe Lane-Hwy. 264 (Springdale) (S) Widening 1.55 2011Local State NARTS5,0002,500 - STP

2,500 - Local

- TOTAL

012111 Benton/Wash 540 Hwy. 112/265-Hwy. 62/102 Cable Median Barrier (F) Safety Improvements 24.45 2012State NARTS6,500

6,500 - 402-Safety

- TOTAL

012X01 Benton/Wash 540 Major Widening and/or Interchange Improvements (F) Capacity Imprvmnts 2011State State NARTS15,8908,000

5,335

- NHS

- Earmarks

2,555 - State Match

- TOTAL

012X02 Benton/Wash 540 Major Widening and/or Interchange Improvements (F) Capacity Imprvmnts 2013State State NARTS20,00016,000 - NHS

4,000 - State Match

- TOTAL

070345 Calhoun 274 Ditch at L.M. 1.8 Str. & Apprs. (S) Str. & Apprs. 2011State State1,000

800 - BR

200 - State Match

- TOTAL

009702 Carroll 062 Hwy. 62 Improvements (Green Forest) (Phase I) (S) Widening 2.00 2013State State9,0004,800 - STP

1,200 - State Match

- TOTAL

3,000 - 100% State

009901 Carroll 062 Hwy. 143-Berryville (S) Widening 2.80 2010State State13,30010,640 - STP

2,660 - State Match

- TOTAL

090235 Carroll 412 Dryfork-Hwy. 103 (Passing Lane) (S) Passing Lanes 1.30 2012State State4,000 - TOTAL

4,000 - 100% State

090283 Carroll 021 Indian Creek Str. & Apprs. (S) Str. & Apprs. 2012State State1,000

800 - BR

200 - State Match

- TOTAL

Page 93 of 115

STATE AND LOCAL PROJECTS SORTED BY COUNTY

An (S) or (F) following the termini indicates federal or state oversight.For those projects located in a Transportation Improvement Plan (TIP) Area, additional information is available. See the Introduction for further details.

Page 117: 1 - Cover Page STIP 2010-2013 Web Version.pdf · iii TUTS - Texarkana Urban Transportation Study (Miller County) CEO of Texarkana, Texas Dr. Larry Sullivan P. O. Box 1967 Texarkana,

JOB / ITEM

NUMBER COUNTY RTE TERMINI TYPE WORK LENGTH

ESTIMATED COSTLET

YEAR

PROVIDING MATCHING

FUNDS

CARRYINGOUT THE PROJECT TIP AREA

AGENCY RESPONSIBLE FOR:

Funding Breakdown

(x $1,000)

4/14/2010 9:46:31 AM

R20098 Chicot 082 Fairview-Mississippi River Br. (S) Widening 4.10 2011State State25,250800

1,800

- STP

- Earmarks

650 - State Match

- TOTAL

22,000 - 100% State

070240 Clark 051 Ouachita River Str. & Apprs. (Arkadelphia) (S) Str. & Apprs. 2012State State3,000

2,400 - BR

600 - State Match

- TOTAL

070344 Clark 067 Gurdon-Oak Grove Strs. & Apprs. (S) Str. & Apprs. 2013State State5,000

4,000 - BR

1,000 - State Match

- TOTAL

050166 Cleburne 025 Faulkner Co. Line-Hwy. 107 (Passing Lanes) (S) Passing Lanes 2.20 2012State State6,5005,200 - STP

1,300 - State Match

- TOTAL

050228 Cleburne 225 Midway Branch Str. & Apprs. (S) Str. & Apprs. 2011State State3,500

2,800 - BR

700 - State Match

- TOTAL

012060 Clev/Jeff/Linc 530 Co. Rd. 35-Hwy. 212 (Bs. & Surf.) (F) New Location 11.14 2011State State39,300

31,440 - Earmarks

7,860 - State Match

- TOTAL

070289 Cleve/Dallas 167 Hwy. 273-Peters Rd. (CR 24) (Phase I) (S) Widening 5.30 2013State State38,36429,600

1,364

- STP

- Earmarks

7,400 - State Match

- TOTAL

070291 Cleve/Dallas 167 Saline River-South (S) Widening 5.50 2012State State54,50043,600 - NHS

10,900 - State Match

- TOTAL

070290 Cleveland 167 Peters Rd. (CR 24)-North (S) Widening 5.10 2011State State32,50026,000 - NHS

6,500 - State Match

- TOTAL

Page 94 of 115

STATE AND LOCAL PROJECTS SORTED BY COUNTY

An (S) or (F) following the termini indicates federal or state oversight.For those projects located in a Transportation Improvement Plan (TIP) Area, additional information is available. See the Introduction for further details.

Page 118: 1 - Cover Page STIP 2010-2013 Web Version.pdf · iii TUTS - Texarkana Urban Transportation Study (Miller County) CEO of Texarkana, Texas Dr. Larry Sullivan P. O. Box 1967 Texarkana,

JOB / ITEM

NUMBER COUNTY RTE TERMINI TYPE WORK LENGTH

ESTIMATED COSTLET

YEAR

PROVIDING MATCHING

FUNDS

CARRYINGOUT THE PROJECT TIP AREA

AGENCY RESPONSIBLE FOR:

Funding Breakdown

(x $1,000)

4/14/2010 9:46:31 AM

070301 Columbia 079 Magnolia-Ouachita Co. Line (Passing Lanes) (S) Passing Lanes 2.50 2010State State6,200

620 - State Match

- TOTAL

5,580 - HSIP

070304 Columbia CS Frederick St.-Hwy. 82 (E. North St.) (Magnolia) (S) Widening 0.70 2011Local State2,840

1,840 - Local

- STP < 200,000

- TOTAL

1,000

080382 Conway 124 Cove Creek Str. & Apprs. (S) Str. & Apprs. 2011State State1,500

1,200 - BR

300 - State Match

- TOTAL

080383 Conway 124 Point Remove Creek Str. & Apprs. (S) Str. & Apprs. 2011State State1,500

1,200 - BR

300 - State Match

- TOTAL

080386 Conway 095 East Fork Point Remove Creek-North & South Grade Impvts (S)

Reconstruction 0.80 2012State State6,000

4,800 - STP

1,200 - State Match

- TOTAL

080387 Conway 095 Overcup Creek-North & South Grade Impvts. (S) Reconstruction 1.20 2012State State4,0003,200 - STP

800 - State Match

- TOTAL

100653 Craig/Miss 018 Monette Bypass-Manila (S) Widening 6.00 2012State State41,70033,360 - STP

8,340 - State Match

- TOTAL

100308 Craighead 018 St. Francis River-North of Black Oak (S) Widening 5.60 2010State State33,00026,400 - STP

6,600 - State Match

- TOTAL

100412 Craighead 226 Hwy. 67-Hwy. 49 (Phase II) (F) Widening 12.45 2011State State JATS49,71722,160

19,092

- STP

- Earmarks

8,465 - State Match

- TOTAL

Page 95 of 115

STATE AND LOCAL PROJECTS SORTED BY COUNTY

An (S) or (F) following the termini indicates federal or state oversight.For those projects located in a Transportation Improvement Plan (TIP) Area, additional information is available. See the Introduction for further details.

Page 119: 1 - Cover Page STIP 2010-2013 Web Version.pdf · iii TUTS - Texarkana Urban Transportation Study (Miller County) CEO of Texarkana, Texas Dr. Larry Sullivan P. O. Box 1967 Texarkana,

JOB / ITEM

NUMBER COUNTY RTE TERMINI TYPE WORK LENGTH

ESTIMATED COSTLET

YEAR

PROVIDING MATCHING

FUNDS

CARRYINGOUT THE PROJECT TIP AREA

AGENCY RESPONSIBLE FOR:

Funding Breakdown

(x $1,000)

4/14/2010 9:46:31 AM

100567 Craighead 018 North of Black Oak-Monette Bypass (S) Widening 1.40 2013State State11,6009,280 - STP

2,320 - State Match

- TOTAL

100639 Craighead CS Mt. Carmel Rd-S Culberhouse Rd (Lawson Rd)(Jonesboro)(S) Widening 1.20 2010Local State JATS4,900

3,900 - Local

- STP < 200,000

- TOTAL

1,000

100662 Craighead CS Caraway Rd. Safety Enhancement (Jonesboro) (Ph. II) (S) New Location 2010Local Local JATS9,185

5,848 - Earmarks

1,837 - Local

1,500 - RRP

- TOTAL

040345 Crawford CS Hwy. 59-West (Rena Road) (Van Buren) (S) Widening 1.10 2010Local State BI-STATE5,4003,240

80

- Earmarks

- BR

1,080 - Local

- STP < 200,000

- TOTAL

1,000

040464 Crawford CS West of Ham Town Rd.-East (Wire Rd.) (Mulberry) (S) Reconstruction 0.94 2012Local State2,350

1,350 - Local

- STP < 200,000

- TOTAL

1,000

110473 Crittenden 040 I-40 Miss. River Bridge Seismic Retrofit (Phase VII) (S) Str. & Apprs. 2010State TDOT WMATS11,040

8,832 - BR

2,208 - State Match

- TOTAL

110509 Crittenden CS BNSF Railroad Overpass (Marion) (S) Str. & Apprs. 2010Local Local WMATS6,061

5,206 - Earmarks

855 - Local

- TOTAL

110530 Crittenden CS Southland Dr.-MLK, Jr. Dr.-West (S) Rehabilitation 0.42 2010Local Local WMATS1,300

260 - Local

- STP > 200,000

- TOTAL

1,040

110542 Crittenden 040 I-40 Miss. Rv. Br. Seismic Retrofit (Phase VIII) (S) Str. & Apprs. 2011State TDOT WMATS26,000

20,800 - BR

5,200 - State Match

- TOTAL

Page 96 of 115

STATE AND LOCAL PROJECTS SORTED BY COUNTY

An (S) or (F) following the termini indicates federal or state oversight.For those projects located in a Transportation Improvement Plan (TIP) Area, additional information is available. See the Introduction for further details.

Page 120: 1 - Cover Page STIP 2010-2013 Web Version.pdf · iii TUTS - Texarkana Urban Transportation Study (Miller County) CEO of Texarkana, Texas Dr. Larry Sullivan P. O. Box 1967 Texarkana,

JOB / ITEM

NUMBER COUNTY RTE TERMINI TYPE WORK LENGTH

ESTIMATED COSTLET

YEAR

PROVIDING MATCHING

FUNDS

CARRYINGOUT THE PROJECT TIP AREA

AGENCY RESPONSIBLE FOR:

Funding Breakdown

(x $1,000)

4/14/2010 9:46:31 AM

110547 Crittenden VAR District 1 Bridge Painting (S) Str. & Apprs. 2010State State WMATS2,040

1,632 - BR

408 - State Match

- TOTAL

110X01 Crittenden CS Southland Dr., Ingram Blvd.-East (S) Miscellaneous 0.83 2013Local Local WMATS2,695

539 - Local

- STP > 200,000

- TOTAL

2,156

110504 Cross 064 Hwy. 1 North-West (Wynne) (S) Widening 0.65 2010State State6,4005,120 - STP

1,280 - State Match

- TOTAL

020316 Desha 069 I-69 Corridor (Hwy. 65-Miss. Rt. 1) (GRB) (Ph I) (F) Phase I 2010State State10,346

8,666 - Earmarks

1,680 - State Match

- TOTAL

020451 Desha 054 Waterman St.-West (Dumas) (S) Reconstruction 0.81 2010State State3,300 - TOTAL

3,300 - 100% State

020462 Drew 069 Monticello Bypass (Phase I) (F) New Location 8.60 2010State State88,10770,486 - Earmarks

17,621 - State Match

- TOTAL

020480 Drew Southeast Arkansas Intermodal Facility (Wilmar) (S) Roadside Appurt 2010Local Local1,752

1,401 - Earmarks

351 - Local

- TOTAL

080273 Faulkner 065B Hwy 266-Hwy. 64 (Conway) (S) Widening 0.51 2010State State CARTS2,250

225 - State Match

- TOTAL

2,025 - HSIP

080329 Faulkner Vilonia Middle SRTS I (2007) (Supplemental Funds) Enhancement 2010Local State/Local CARTS106

21 - Local

- STP > 200,000

- TOTAL

85

080339 Faulkner 036 Hwys. 36/107 Inters. Impvts. (S. of Enola) (S) Safety 2011State State900720 - STP

180 - State Match

- TOTAL

Page 97 of 115

STATE AND LOCAL PROJECTS SORTED BY COUNTY

An (S) or (F) following the termini indicates federal or state oversight.For those projects located in a Transportation Improvement Plan (TIP) Area, additional information is available. See the Introduction for further details.

Page 121: 1 - Cover Page STIP 2010-2013 Web Version.pdf · iii TUTS - Texarkana Urban Transportation Study (Miller County) CEO of Texarkana, Texas Dr. Larry Sullivan P. O. Box 1967 Texarkana,

JOB / ITEM

NUMBER COUNTY RTE TERMINI TYPE WORK LENGTH

ESTIMATED COSTLET

YEAR

PROVIDING MATCHING

FUNDS

CARRYINGOUT THE PROJECT TIP AREA

AGENCY RESPONSIBLE FOR:

Funding Breakdown

(x $1,000)

4/14/2010 9:46:31 AM

080384 Faulkner 287 Branch of Cadron Creek Str. & Apprs. (Holland) (S) Str. & Apprs. 2011State State600

480 - BR

120 - State Match

- TOTAL

080388 Faulkner 040 Conway-Pulaski Co. Line (Widening) (Phase I) (F) Widening 2012State State CARTS36,00028,800 - NHS

7,200 - State Match

- TOTAL

080X01 Faulkner 025 Hwy. 25 Relocation (S) New Location 1.70 2013Local State CARTS9,0004,500 - STP

3,621 - Local

- STP > 200,000

- TOTAL

879

080X03 Faulkner NEW Conway South Interchange-Hwy. 365 (Gr. & Strs.) (F) New Location 2011Local State CARTS12,0005,589

1,836

- NHS

- Earmarks

41 - State Match

4,534 - Local

- TOTAL

080X04 Faulkner NEW Conway South Interchange-Hwy. 365 (Bs. & Surf.) (F) New Location 2013Local State CARTS11,0005,500 - NHS

4,329 - Local

- STP > 200,000

- TOTAL

1,171

080X12 Faulkner NEW Hwy. 365-Sturgis Road (Phase I) (S) New Location 2012Local State CARTS5,437

5,437 - Local

- TOTAL

040438 Franklin 023 Arkansas River Bridge Painting (Ozark) (S) Str. & Apprs. 2011State State870

696 - BR

174 - State Match

- TOTAL

040493 Franklin CS Hillbilly Lane-Hwy. 23 (Ozark) (S) New Location 0.90 2011Local State1,935

935 - Local

- STP < 200,000

- TOTAL

1,000

040506 Franklin CS Gar Creek Str. & Apprs. (2nd Street) (Ozark) (S) Str. & Apprs. 2010Local State425

340 - BR

85 - Local

- TOTAL

Page 98 of 115

STATE AND LOCAL PROJECTS SORTED BY COUNTY

An (S) or (F) following the termini indicates federal or state oversight.For those projects located in a Transportation Improvement Plan (TIP) Area, additional information is available. See the Introduction for further details.

Page 122: 1 - Cover Page STIP 2010-2013 Web Version.pdf · iii TUTS - Texarkana Urban Transportation Study (Miller County) CEO of Texarkana, Texas Dr. Larry Sullivan P. O. Box 1967 Texarkana,

JOB / ITEM

NUMBER COUNTY RTE TERMINI TYPE WORK LENGTH

ESTIMATED COSTLET

YEAR

PROVIDING MATCHING

FUNDS

CARRYINGOUT THE PROJECT TIP AREA

AGENCY RESPONSIBLE FOR:

Funding Breakdown

(x $1,000)

4/14/2010 9:46:31 AM

050230 Fulton 063 Hwy. 9-Hwy. 342 Strs. & Apprs. (Mammoth Spring) (S) Str. & Apprs. 2012State State7,000

5,600 - BR

1,400 - State Match

- TOTAL

061059 Garland 270 Hot Springs-West (Passing Lanes) (S) Passing Lanes 4.55 2010State HSA-MPO12,800

12,800 - 402-Safety

- TOTAL

061113 Garland 088 Hwy. 270-Printers Place (Higdon Ferry Rd.) (Hot Springs) (S) Widening 0.46 2010State State HSA-MPO3,0002,400 - STP

600 - State Match

- TOTAL

061214 Garland 088 Printers Place-Hwy 7 North (Higdon Ferry Rd)(Hot Sprs) (S) Widening 0.36 2013State/Local State HSA-MPO5,6864,000

549

- STP

- Earmarks

1,000 - State Match

137 - Local

- TOTAL

061259 Garland 005 Hwy. 7-Hot Springs Village (Safety Impvts) (S) Safety Improvements 1.08 2012State State HSA-MPO3,500

350 - State Match

- TOTAL

3,150 - HSIP

R60016 Garland NEW East-West Arterial (Hot Springs) (P.E.) Project Development 2011State State HSA-MPO7,234

5,787 - Earmarks

1,447 - State Match

- TOTAL

Note: Contingent upon approval from National Parks Service

020464 Grant 167 Hwy. 167 Bypass (Sheridan) (Bs. & Surf.) (S) New Location 8.63 2010State State43,00034,400 - NHS

8,600 - State Match

- TOTAL

100445 Greene 412 Hwy. 412 Improvements (Paragould) (Phase I) (F) New Location 9.90 2011State State28,625

3,400 - Earmarks

- TOTAL

25,225 - 100% State

100675 Greene 135 Cache River & Relief Strs. & Apprs. (S) Str. & Apprs. 2011State State6,120

4,896 - BR

1,224 - State Match

- TOTAL

Page 99 of 115

STATE AND LOCAL PROJECTS SORTED BY COUNTY

An (S) or (F) following the termini indicates federal or state oversight.For those projects located in a Transportation Improvement Plan (TIP) Area, additional information is available. See the Introduction for further details.

Page 123: 1 - Cover Page STIP 2010-2013 Web Version.pdf · iii TUTS - Texarkana Urban Transportation Study (Miller County) CEO of Texarkana, Texas Dr. Larry Sullivan P. O. Box 1967 Texarkana,

JOB / ITEM

NUMBER COUNTY RTE TERMINI TYPE WORK LENGTH

ESTIMATED COSTLET

YEAR

PROVIDING MATCHING

FUNDS

CARRYINGOUT THE PROJECT TIP AREA

AGENCY RESPONSIBLE FOR:

Funding Breakdown

(x $1,000)

4/14/2010 9:46:31 AM

100722 Greene 034 Lafe-Marmaduke Strs. & Apprs. (S) Str. & Apprs. 2011State State2,500

2,000 - BR

500 - State Match

- TOTAL

100X01 Greene 412 Hwy. 412 Improvements (Paragould) (Phase II) (F) New Location 10.43 2013State State14,80011,840 - NHS

2,960 - State Match

- TOTAL

030387 Hempstead 371 Ozan Creek & Relief Strs. & Apprs. (S) Str. & Apprs. 2011State State2,000

1,600 - BR

400 - State Match

- TOTAL

050186 Independence 167 Hwy. 69-Hwy. 394 (Batesville) (S) Widening 2.70 2010State State12,4009,920 - STP

2,480 - State Match

- TOTAL

050207 Independence 069 Hwy. 69/Hwy. 122 Inters. Impvts. (S. of Newark) (S) Safety Improvements 2011State State130

13 - State Match

- TOTAL

117 - HSIP

050213 Independence 167 Hwy. 394-North (S) Widening 5.11 2013State State18,00014,400 - STP

3,600 - State Match

- TOTAL

050012 Izard 009 Fulton Co. Line-South Strs. & Apprs.(Oxford) (S) Str. & Apprs. 2011State State3,300

2,640 - BR

660 - State Match

- TOTAL

005836 Jackson 367 White River Str. & Apprs. (Newport) (S) Str. & Apprs. 2013State State20,000

16,000 - BR

4,000 - State Match

- TOTAL

020070 Jefferson 079 Hwy. 65B-North (S) Widening 1.60 2010State State PBATS8,9004,240

2,880

- STP

- Earmarks

1,780 - State Match

- TOTAL

Page 100 of 115

STATE AND LOCAL PROJECTS SORTED BY COUNTY

An (S) or (F) following the termini indicates federal or state oversight.For those projects located in a Transportation Improvement Plan (TIP) Area, additional information is available. See the Introduction for further details.

Page 124: 1 - Cover Page STIP 2010-2013 Web Version.pdf · iii TUTS - Texarkana Urban Transportation Study (Miller County) CEO of Texarkana, Texas Dr. Larry Sullivan P. O. Box 1967 Texarkana,

JOB / ITEM

NUMBER COUNTY RTE TERMINI TYPE WORK LENGTH

ESTIMATED COSTLET

YEAR

PROVIDING MATCHING

FUNDS

CARRYINGOUT THE PROJECT TIP AREA

AGENCY RESPONSIBLE FOR:

Funding Breakdown

(x $1,000)

4/14/2010 9:46:31 AM

020354 Jefferson 530 I-530-Co. Rd. 35 (Bs. & Surf.) (F) New Location 4.60 2011State State PBATS26,900

21,520 - Earmarks

5,380 - State Match

- TOTAL

020445 Jefferson 270 Grant Co. Line-White Hall (Passing Lanes) (S) Passing Lanes 2.20 2010State PBATS5,700

5,700 - 402-Safety

- TOTAL

020505 Jefferson CS Nevins Creek Str. & Apprs. (Nevins Rd.) (Pine Bluff) (S) Str. & Apprs. 2012Local State PBATS350

280 - BR

70 - Local

- TOTAL

020507 Jefferson 054 Big Creek Str. & Apprs. (S) Str. & Apprs. 2011State State PBATS800

640 - BR

160 - State Match

- TOTAL

020508 Jefferson 054 Steep Bank Creek Str. & Apprs. (S) Str. & Apprs. 2011State State PBATS600

480 - BR

120 - State Match

- TOTAL

080314 Johnson CS Hwy. 123-Hwy. 21 (Clarksville) (S) Project Development 0.50 2011Local Local1,100

100 - Local

- STP < 200,000

- TOTAL

1,000

080340 Johnson 103 Market St.-I-40 WB Ramps (Clarksville) (S) Capacity Imprvmnts 0.40 2013State State7,5006,000 - STP

1,500 - State Match

- TOTAL

100686 Lawrence 063 Black Rock-Portia (Phase I) (F) Widening 3.50 2013State State15,90012,720 - STP

3,180 - State Match

- TOTAL

100687 Lawrence 063 Black River & Relief Strs. & Apprs. (F) Str. & Apprs. 2013State State33,000

26,400 - BR

6,600 - State Match

- TOTAL

110228 Lee 001 So. Marianna-South (S) Widening 1.80 2010State State9,5007,600 - NHS

1,900 - State Match

- TOTAL

Page 101 of 115

STATE AND LOCAL PROJECTS SORTED BY COUNTY

An (S) or (F) following the termini indicates federal or state oversight.For those projects located in a Transportation Improvement Plan (TIP) Area, additional information is available. See the Introduction for further details.

Page 125: 1 - Cover Page STIP 2010-2013 Web Version.pdf · iii TUTS - Texarkana Urban Transportation Study (Miller County) CEO of Texarkana, Texas Dr. Larry Sullivan P. O. Box 1967 Texarkana,

JOB / ITEM

NUMBER COUNTY RTE TERMINI TYPE WORK LENGTH

ESTIMATED COSTLET

YEAR

PROVIDING MATCHING

FUNDS

CARRYINGOUT THE PROJECT TIP AREA

AGENCY RESPONSIBLE FOR:

Funding Breakdown

(x $1,000)

4/14/2010 9:46:31 AM

110502 Lee 001 Cypress Corner-North (S) Widening 4.70 2012State State30,50024,400 - NHS

6,100 - State Match

- TOTAL

020356 Lincoln 530 Hwy. 212-Hwys. 11/425 Connector (Bs. & Surf) (Phase I) (F) New Location 7.40 2013State State7,131

5,855 - Earmarks

1,276 - State Match

- TOTAL

020506 Lincoln 011 Cane Creek Str. & Apprs. (S) Str. & Apprs. 2011State State1,000

800 - BR

200 - State Match

- TOTAL

060897 Lonoke 040 I-40/Hwy. 89 Intchg. (Lonoke) (Project Development) (F) Interchange 2010Local Local5,352

4,282 - Earmarks

1,070 - Local

- TOTAL

061215 Lonoke 013 I-40-South (Carlisle) (S) Rehabilitation 0.46 2012State State2,5002,000 - STP

500 - State Match

- TOTAL

061229 Lonoke 067 Hwy 67/Hwy 5 Interchange Ramp Modifications (Cabot) (S) Interchange 2010Local State CARTS860

172 - Local

- STP > 200,000

- TOTAL

688

061268 Lonoke 038 Hwy 367/Locust Signal (Cabot) (S) Safety & Traffic Eng. 2010Local State/Local CARTS130

26 - Local

- STP > 200,000

- TOTAL

104

061269 Lonoke CS Cabot Jr. High School North Sidewalks (Cabot) (S) Enhancement 2010Local State/Local CARTS60

12 - Local

- STP > 200,000

- TOTAL

48

061X01 Lonoke CS Cabot High School Roundabout (S) Reconstruction 2010Local State/Local CARTS211

43 - Local

- STP > 200,000

- TOTAL

168

Page 102 of 115

STATE AND LOCAL PROJECTS SORTED BY COUNTY

An (S) or (F) following the termini indicates federal or state oversight.For those projects located in a Transportation Improvement Plan (TIP) Area, additional information is available. See the Introduction for further details.

Page 126: 1 - Cover Page STIP 2010-2013 Web Version.pdf · iii TUTS - Texarkana Urban Transportation Study (Miller County) CEO of Texarkana, Texas Dr. Larry Sullivan P. O. Box 1967 Texarkana,

JOB / ITEM

NUMBER COUNTY RTE TERMINI TYPE WORK LENGTH

ESTIMATED COSTLET

YEAR

PROVIDING MATCHING

FUNDS

CARRYINGOUT THE PROJECT TIP AREA

AGENCY RESPONSIBLE FOR:

Funding Breakdown

(x $1,000)

4/14/2010 9:46:31 AM

061219 Lonoke/Pul 067 Hwy. 67 Cable Median Barrier (Jacksonville-Cabot) (S) Safety Improvements 4.80 2012State State CARTS1,500

150 - State Match

- TOTAL

1,350 - HSIP

009951 Madison 412 Hindsville-Huntsville Bypass (F) Widening 4.92 2010State State18,00014,400 - NHS

3,600 - State Match

- TOTAL

090272 Madison 412 Hwy. 412/Hwy. 45 Inters. Impvts. (N. of Hindsville) (S) Safety Improvements 2011State State650

65 - State Match

- TOTAL

585 - HSIP

R90097 Marion 062 Flippin Bypass-Hwy. 62B (S) Widening 0.65 2010State State5,300 - TOTAL

5,300 - 100% State

030100 Miller CS Jefferson Ave-Mount Olive Dr(McDonald Ln)(Texarkana)(S) New Location 0.25 2010Local Local TUTS1,913

913 - Local

- STP < 200,000

- TOTAL

1,000

030325 Miller 071 Arkansas Blvd.-I-30 (Bs. & Surf.) (F) New Location 2.43 2010State State TUTS14,80011,840 - NHS

2,960 - State Match

- TOTAL

030326 Miller 071 I-30-Hwy. 71 (Bs. & Surf.) (F) New Location 4.44 2010State State TUTS33,6006,720 - NHS

1,680 - State Match

- TOTAL

25,200 - 100% State

030388 Miller 071 Broad St. Str. & Apprs. (Texarkana) (S) Str. & Apprs. 2012State State TUTS6,500

5,200 - BR

1,300 - State Match

- TOTAL

030X01 Miller 071 LA Line-Doddridge (Phase III) (F) New Location 2.18 2012State State23,50515,200

3,800

- NHS

- Earmarks

4,505 - State Match

- TOTAL

Page 103 of 115

STATE AND LOCAL PROJECTS SORTED BY COUNTY

An (S) or (F) following the termini indicates federal or state oversight.For those projects located in a Transportation Improvement Plan (TIP) Area, additional information is available. See the Introduction for further details.

Page 127: 1 - Cover Page STIP 2010-2013 Web Version.pdf · iii TUTS - Texarkana Urban Transportation Study (Miller County) CEO of Texarkana, Texas Dr. Larry Sullivan P. O. Box 1967 Texarkana,

JOB / ITEM

NUMBER COUNTY RTE TERMINI TYPE WORK LENGTH

ESTIMATED COSTLET

YEAR

PROVIDING MATCHING

FUNDS

CARRYINGOUT THE PROJECT TIP AREA

AGENCY RESPONSIBLE FOR:

Funding Breakdown

(x $1,000)

4/14/2010 9:46:31 AM

100307 Mississippi 018 Hwy. 181-West (S) Widening 2.74 2010State State17,00012,400

1,200

- STP

- BR

3,400 - State Match

- TOTAL

100663 Mississippi 018 Hwy. 18 Improvements (Blytheville) (S) Safety Improvements 2011State State15,8766,000

500

5,000

- STP

- Earmarks

- 402-Safety

1,788 - State Match

- TOTAL

2,588 - HSIP

100723 Mississippi 148 Clear Lake Str. & Apprs. (S) Str. & Apprs. 2011State State900

720 - BR

180 - State Match

- TOTAL

100724 Mississippi 312 Ditch No. 6 Str. & Apprs. (Blytheville) (S) Str. & Apprs. 2011State State800

640 - BR

160 - State Match

- TOTAL

110394 Monroe 079 White River Str. & Apprs. (Clarendon) (Ph. II) (F) Str. & Apprs. 1.14 2010State State38,200

30,560 - BR

7,640 - State Match

- TOTAL

110478 Monroe 049 Hwy. 17-I-40 (Brinkley) (S) Widening 1.03 2010State State5,0004,000 - STP

1,000 - State Match

- TOTAL

110544 Monroe 070 Hwy. 17-St. Francis Co. Line Strs. & Apprs. (S) Str. & Apprs. 2013State State4,000

3,200 - BR

800 - State Match

- TOTAL

080310 Montgomery 270 Hwy. 270 Realignment (Blowout Mountain) (S) Reconstruction 1.35 2010State State4,360

436 - State Match

- TOTAL

3,924 - HSIP

Page 104 of 115

STATE AND LOCAL PROJECTS SORTED BY COUNTY

An (S) or (F) following the termini indicates federal or state oversight.For those projects located in a Transportation Improvement Plan (TIP) Area, additional information is available. See the Introduction for further details.

Page 128: 1 - Cover Page STIP 2010-2013 Web Version.pdf · iii TUTS - Texarkana Urban Transportation Study (Miller County) CEO of Texarkana, Texas Dr. Larry Sullivan P. O. Box 1967 Texarkana,

JOB / ITEM

NUMBER COUNTY RTE TERMINI TYPE WORK LENGTH

ESTIMATED COSTLET

YEAR

PROVIDING MATCHING

FUNDS

CARRYINGOUT THE PROJECT TIP AREA

AGENCY RESPONSIBLE FOR:

Funding Breakdown

(x $1,000)

4/14/2010 9:46:31 AM

080378 Montgomery 008 Lick Creek Str. & Apprs. (Norman) (S) Str. & Apprs. 2011State State1,200

960 - BR

240 - State Match

- TOTAL

080379 Montgomery 027 Ouachita River Str. & Apprs. (S) Str. & Apprs. 2012State State2,500

2,000 - BR

500 - State Match

- TOTAL

030386 Nevada 032 Little Bodcaw Creek & Relief Strs. & Apprs.(S) Str. & Apprs. 2011State State2,800

2,240 - BR

560 - State Match

- TOTAL

009784 Newton 007 Buffalo River Br. & Apprs. (Pruitt) (S) Str. & Apprs. 2010State State2,600

2,080 - BR

520 - State Match

- TOTAL

090169 Newton 007 Jasper-Co. Rd. 46 (Passing Lanes) (S) Passing Lanes 1.00 2010State State3,0002,400 - STP

600 - State Match

- TOTAL

090213 Newton 007 Co. Rd. 46-Buffalo River (Safety Impvts.) (S) Reconstruction 0.60 2010State State8,600

860 - State Match

- TOTAL

7,740 - HSIP

090221 Newton 007 Mill Cr.-Hwy. 7S Safety Impvts. (Marble Falls) (S) Reconstruction 0.83 2010State State5,700

570 - State Match

- TOTAL

5,130 - HSIP

100682 Poinsett 063 Future I-555 Access Roads (S) Project Development 2011State State2,946

2,357 - Earmarks

589 - State Match

- TOTAL

080157 Pope Intermodal Complex (Russellville) (F) Miscellaneous 2010Local Local3,488

2,790 - Earmarks

698 - Local

- TOTAL

Page 105 of 115

STATE AND LOCAL PROJECTS SORTED BY COUNTY

An (S) or (F) following the termini indicates federal or state oversight.For those projects located in a Transportation Improvement Plan (TIP) Area, additional information is available. See the Introduction for further details.

Page 129: 1 - Cover Page STIP 2010-2013 Web Version.pdf · iii TUTS - Texarkana Urban Transportation Study (Miller County) CEO of Texarkana, Texas Dr. Larry Sullivan P. O. Box 1967 Texarkana,

JOB / ITEM

NUMBER COUNTY RTE TERMINI TYPE WORK LENGTH

ESTIMATED COSTLET

YEAR

PROVIDING MATCHING

FUNDS

CARRYINGOUT THE PROJECT TIP AREA

AGENCY RESPONSIBLE FOR:

Funding Breakdown

(x $1,000)

4/14/2010 9:46:31 AM

080164 Pope 007 Hwy. 7 Improvements (Dover) (S) New Location 1.30 2013State State6,2505,000 - STP

1,250 - State Match

- TOTAL

080295 Pope CS W Main Pl-Honeysuckle Ln (Inglewood St) (Russellville)(S) Reconstruction 0.80 2010Local State2,850

1,850 - Local

- STP < 200,000

- TOTAL

1,000

080345 Pope 247 I-40 South (Russellville Bypass) (Bs. & Surf.) (S) New Location 2.43 2012State State16,60013,280 - STP

3,320 - State Match

- TOTAL

080380 Pope 064 Galla Creek Str. & Apprs. (Pottsville) (S) Str. & Apprs. 2011State State2,500

2,000 - BR

500 - State Match

- TOTAL

080389 Pope 326 Hob Nob Rd.-Hwy. 124 (S) Widening 0.45 2013Local State6,0003,000 - STP

3,000 - Local

- TOTAL

080392 Pope 007 Newton Co. Line-South (Passing Lanes) (S) Passing Lanes 2.30 2012State State5,0004,000 - STP

1,000 - State Match

- TOTAL

061280 Prairie 038 White River Bridge Rehab. (Des Arc) (S) Str. & Apprs. 2010State State1,600

1,280 - BR

320 - State Match

- TOTAL

060352 Pulaski 005 McHenry Creek & Relief Strs. & Apprs. (S) Str. & Apprs. 2011State State CARTS2,200

1,760 - BR

440 - State Match

- TOTAL

060395 Pulaski 367 Union Pacific RR Overpass (Arch St.) (LR) (S) Str. & Apprs. 2012State State CARTS6,200

4,960 - BR

1,240 - State Match

- TOTAL

Page 106 of 115

STATE AND LOCAL PROJECTS SORTED BY COUNTY

An (S) or (F) following the termini indicates federal or state oversight.For those projects located in a Transportation Improvement Plan (TIP) Area, additional information is available. See the Introduction for further details.

Page 130: 1 - Cover Page STIP 2010-2013 Web Version.pdf · iii TUTS - Texarkana Urban Transportation Study (Miller County) CEO of Texarkana, Texas Dr. Larry Sullivan P. O. Box 1967 Texarkana,

JOB / ITEM

NUMBER COUNTY RTE TERMINI TYPE WORK LENGTH

ESTIMATED COSTLET

YEAR

PROVIDING MATCHING

FUNDS

CARRYINGOUT THE PROJECT TIP AREA

AGENCY RESPONSIBLE FOR:

Funding Breakdown

(x $1,000)

4/14/2010 9:46:31 AM

060907 Pulaski CS Geyer Springs R.R. Grade Separation (L.R.) (PE) (S) RR Xing 2010Local Local CARTS734

587 - Earmarks

147 - Local

- TOTAL

061026A Pulaski CS Oak St.-Loop Rd. (Graham Rd.) (Jacksonville) (S) Utilities 2010Local State/Local CARTS2,026

405 - Local

- STP > 200,000

- TOTAL

1,621

061026B Pulaski CS Oak St.-Loop Rd. (Graham Rd.) (Jacksonville) (S) Widening 2011Local State/Local CARTS7,996

1,599 - Local

- STP > 200,000

- TOTAL

6,397

061080 Pulaski CS South Loop Bypass (Mabelvale Rd-Alexander Rd) (LR) (S) New Location 1.00 2010Local Local CARTS5,365

3,060 - Earmarks

1,073 - Local

- STP > 200,000

- TOTAL

1,232

061094A Pulaski CS Baseline Rd.-J.E. Davis Dr. (Scott Hamilton Dr.) (L.R.) (S) ROW/Utilities 1.00 2010Local State/Local CARTS470

94 - Local

- STP > 200,000

- TOTAL

376

061094B Pulaski CS Baseline Rd.-J.E. Davis Dr. (Scott Hamilton Dr.) (L.R.) (S) Widening 0.50 2010Local Local CARTS2,521

504 - Local

- STP > 200,000

- TOTAL

2,017

061190 Pulaski 040 I-40 Interchange (Maumelle) (F) Interchange 2010Local Local CARTS696

557 - Earmarks

139 - Local

- TOTAL

061194 Pulaski 010 Mississippi Ave.-Perryville Rd. (Hwy. 10) (Little Rock) (S) Safety Improvements 0.65 2013Local State CARTS9,000

900 - Local

- TOTAL

8,100 - HSIP

061201 Pulaski 030 I-30: South Terminal Interchange-I-630 (L.R.) (P.E.) (F) Safety & Traffic Eng. 1.40 2010State State CARTS1,350

1,080 - Earmarks

270 - State Match

- TOTAL

Page 107 of 115

STATE AND LOCAL PROJECTS SORTED BY COUNTY

An (S) or (F) following the termini indicates federal or state oversight.For those projects located in a Transportation Improvement Plan (TIP) Area, additional information is available. See the Introduction for further details.

Page 131: 1 - Cover Page STIP 2010-2013 Web Version.pdf · iii TUTS - Texarkana Urban Transportation Study (Miller County) CEO of Texarkana, Texas Dr. Larry Sullivan P. O. Box 1967 Texarkana,

JOB / ITEM

NUMBER COUNTY RTE TERMINI TYPE WORK LENGTH

ESTIMATED COSTLET

YEAR

PROVIDING MATCHING

FUNDS

CARRYINGOUT THE PROJECT TIP AREA

AGENCY RESPONSIBLE FOR:

Funding Breakdown

(x $1,000)

4/14/2010 9:46:31 AM

061202 Pulaski 005 Saline Co Line-Otter Creek Rd. (L.R.) (S) Widening 1.26 2010State State CARTS12,0009,600 - STP

2,400 - State Match

- TOTAL

061218 Pulaski 010 Union Pacific R.R. Viaduct Safety Impvts. (L.R) (S) Safety Improvements 0.20 2012State State CARTS1,700

170 - State Match

- TOTAL

1,530 - HSIP

061244 Pulaski 430 I-430/I-630 Interchange Modifications (Phase III) (F) Interchange 2011State State CARTS80,06930,600

9,825

- STP

- Earmarks

14,644 - State Match

25,000 - CMAQ FLEX

- TOTAL

061260 Pulaski 630 I-630 Corridor Fixed Guideway Alignment Study Planning 2010Local Metroplan CARTS188

38 - Local

- STP > 200,000

- TOTAL

150

061267A Pulaski CS W Main St/Harris Rd/Jacksonville Cutoff Inters Impvts (Jacksonville) (S)

PE 2010Local State/Local CARTS138

28 - Local

- STP > 200,000

- TOTAL

110

061267B Pulaski CS W Main St/Harris Rd/Jacksonville Cutoff Inters Impvts (Jacksonville) (S)

Safety & Traffic Eng. 2011Local State/Local CARTS439

88 - Local

- STP > 200,000

- TOTAL

351

061275 Pulaski 070 Arkansas River Str. & Apprs. (Broadway) (LR/NLR) (F) Str. & Apprs. 2013State State CARTS45,000

36,000 - BR

9,000 - State Match

- TOTAL

061276 Pulaski 067 Main Street Strs. & Apprs. (Jacksonville) (F) Str. & Apprs. 2013State State CARTS4,000

3,200 - BR

800 - State Match

- TOTAL

Page 108 of 115

STATE AND LOCAL PROJECTS SORTED BY COUNTY

An (S) or (F) following the termini indicates federal or state oversight.For those projects located in a Transportation Improvement Plan (TIP) Area, additional information is available. See the Introduction for further details.

Page 132: 1 - Cover Page STIP 2010-2013 Web Version.pdf · iii TUTS - Texarkana Urban Transportation Study (Miller County) CEO of Texarkana, Texas Dr. Larry Sullivan P. O. Box 1967 Texarkana,

JOB / ITEM

NUMBER COUNTY RTE TERMINI TYPE WORK LENGTH

ESTIMATED COSTLET

YEAR

PROVIDING MATCHING

FUNDS

CARRYINGOUT THE PROJECT TIP AREA

AGENCY RESPONSIBLE FOR:

Funding Breakdown

(x $1,000)

4/14/2010 9:46:31 AM

061277 Pulaski 070 Union Pacific RR Str. & Apprs. (Roosevelt Rd.) (LR) (S) Str. & Apprs. 2013State State CARTS6,500

5,200 - BR

1,300 - State Match

- TOTAL

061278 Pulaski 067 Redmond Rd. Strs. & Apprs. (Jacksonville) (F) Str. & Apprs. 2012State State CARTS6,500

5,200 - BR

1,300 - State Match

- TOTAL

061X03A Pulaski CS McCain Rail Grade Separation PE 2011Local State/Local CARTS1,338

268 - Local

- STP > 200,000

- TOTAL

1,070

061X03B Pulaski CS McCain Rail Grade Separation ROW/Utilities 2012Local State/Local CARTS4,294

859 - Local

- STP > 200,000

- TOTAL

3,435

061X03C Pulaski CS McCain Rail Grade Separation Str. & Apprs. 2013Local State/Local CARTS11,185

2,227 - Local

- STP > 200,000

- TOTAL

8,958

061X04A Pulaski CS Maryland Road Extension (Sherwood) PE 2011Local State/Local CARTS106

21 - Local

- STP > 200,000

- TOTAL

85

061X04B Pulaski CS Maryland Road Extension (Sherwood) New Location 2012Local State/Local CARTS960

192 - Local

- STP > 200,000

- TOTAL

768

061X05 Pulaski Levy UPRR Spur Bikeway (North Little Rock) ROW 2012Local State/Local CARTS1,803

361 - Local

- STP > 200,000

- TOTAL

1,442

061X07 Pulaski Maumelle Pedestrian/Bicycle Facilities (Phase II) Enhancement 2010Local State/Local CARTS536

107 - Local

- STP > 200,000

- TOTAL

429

Page 109 of 115

STATE AND LOCAL PROJECTS SORTED BY COUNTY

An (S) or (F) following the termini indicates federal or state oversight.For those projects located in a Transportation Improvement Plan (TIP) Area, additional information is available. See the Introduction for further details.

Page 133: 1 - Cover Page STIP 2010-2013 Web Version.pdf · iii TUTS - Texarkana Urban Transportation Study (Miller County) CEO of Texarkana, Texas Dr. Larry Sullivan P. O. Box 1967 Texarkana,

JOB / ITEM

NUMBER COUNTY RTE TERMINI TYPE WORK LENGTH

ESTIMATED COSTLET

YEAR

PROVIDING MATCHING

FUNDS

CARRYINGOUT THE PROJECT TIP AREA

AGENCY RESPONSIBLE FOR:

Funding Breakdown

(x $1,000)

4/14/2010 9:46:31 AM

061228 Saline 005 Hwy. 5 Drainage Structure (Bryant) (S) Str. & Apprs. 2011State State CARTS1,000800 - STP

200 - State Match

- TOTAL

061232 Saline CS Benton Downtown Streetscape (S) Enhancement 2010Local State/Local CARTS619

160 - Local

- STP > 200,000

- TOTAL

459

061256 Saline 030 Hwy. 70-Sevier St. Cable Median Barrier (S) Safety Improvements 5.21 2012State CARTS1,700

1,700 - 402-Safety

- TOTAL

061257 Saline CS Congo Rd.-I-30 (Military Rd.) (Benton) (S) Widening 2010Local State/Local CARTS8,250

1,650 - Local

- STP > 200,000

- TOTAL

6,600

061X06A Saline CS Alcoa Road: I-30 to Sidell Road (Saline County) PE 2010Local State CARTS900

180 - Local

- STP > 200,000

- TOTAL

720

061X06B Saline CS Alcoa Road: I-30 to Sidell Road (Saline County) Widening 2011Local State/Local CARTS1,047

209 - Local

- STP > 200,000

- TOTAL

838

090280 Searcy 065 Cove Creek Str. & Apprs. (S) Str. & Apprs. 2011State State2,000

1,600 - BR

400 - State Match

- TOTAL

040238 Sebastian 045 Hwy. 255-Phoenix Ave. (Widening) (Ft. Smith) (S) Widening 1.10 2010Local State BI-STATE9,4004,700 - STP

4,700 - Local

- TOTAL

040373 Sebastian 071 Jenny Lind-I-40 (Phase II) (F) New Location 6.04 2011State State BI-STATE29,90017,600

6,300

- NHS

- Earmarks

6,000 - State Match

- TOTAL

Page 110 of 115

STATE AND LOCAL PROJECTS SORTED BY COUNTY

An (S) or (F) following the termini indicates federal or state oversight.For those projects located in a Transportation Improvement Plan (TIP) Area, additional information is available. See the Introduction for further details.

Page 134: 1 - Cover Page STIP 2010-2013 Web Version.pdf · iii TUTS - Texarkana Urban Transportation Study (Miller County) CEO of Texarkana, Texas Dr. Larry Sullivan P. O. Box 1967 Texarkana,

JOB / ITEM

NUMBER COUNTY RTE TERMINI TYPE WORK LENGTH

ESTIMATED COSTLET

YEAR

PROVIDING MATCHING

FUNDS

CARRYINGOUT THE PROJECT TIP AREA

AGENCY RESPONSIBLE FOR:

Funding Breakdown

(x $1,000)

4/14/2010 9:46:31 AM

040443 Sebastian 252 Branch of Washburn Creek Str. & Apprs. (So. of Hwy. 10) (S) Str. & Apprs. 2011State State500

400 - BR

100 - State Match

- TOTAL

040471 Sebastian CS Jenny Lind Rd. & Ingersoll Rd. Widening (Fort Smith) (S) Widening 3.00 2010Local Local BI-STATE8,980

7,360 - Earmarks

1,620 - Local

- TOTAL

040545 Sebastian CS 9th St.-13th St. (Garrison Ave.) (Ft. Smith) (S) Enhancement 2010Local Local BI-STATE2,438

950 - Earmarks

488 - Local

- STP < 200,000

- TOTAL

1,000

050187 Sharp 167 Hwy. 354-Hwy. 62/412 (Ash Flat) (S) Widening 1.00 2010State State6,0004,800 - STP

1,200 - State Match

- TOTAL

110543 St. Francis 261 Hwys. 261, 38 & 149 Strs. & Apprs. (S) Str. & Apprs. 2012State State4,800

3,840 - BR

960 - State Match

- TOTAL

050231 Stone 066 Mt. View-West (Passing Lanes) (S) Passing Lanes 3.00 2013State State9,5007,600 - STP

1,900 - State Match

- TOTAL

R50116 Stone 005 Little Raccoon Creek-Cove Prong Creek (S) Reconst/Climb Lanes 4.00 2011State State11,5005,000 - STP

1,250 - State Match

- TOTAL

5,250 - 100% State

070273 Union 015 Hwy 335-Hwy 82 Strs & Apprs (S) Str. & Apprs. 2011State State2,650

2,120 - BR

530 - State Match

- TOTAL

080363 Van Buren 065 Hwys. 65/92 Signal & Inters. Impvts. (Bee Branch) (S) Inters Impvts 2011State State2,0001,600 - STP

400 - State Match

- TOTAL

Page 111 of 115

STATE AND LOCAL PROJECTS SORTED BY COUNTY

An (S) or (F) following the termini indicates federal or state oversight.For those projects located in a Transportation Improvement Plan (TIP) Area, additional information is available. See the Introduction for further details.

Page 135: 1 - Cover Page STIP 2010-2013 Web Version.pdf · iii TUTS - Texarkana Urban Transportation Study (Miller County) CEO of Texarkana, Texas Dr. Larry Sullivan P. O. Box 1967 Texarkana,

JOB / ITEM

NUMBER COUNTY RTE TERMINI TYPE WORK LENGTH

ESTIMATED COSTLET

YEAR

PROVIDING MATCHING

FUNDS

CARRYINGOUT THE PROJECT TIP AREA

AGENCY RESPONSIBLE FOR:

Funding Breakdown

(x $1,000)

4/14/2010 9:46:31 AM

080381 Van Buren 092 Scroggins Creek Str. & Apprs. (S) Str. & Apprs. 2011State State1,000

800 - BR

200 - State Match

- TOTAL

080390 Van Buren 065 Hwy. 16 East-Hwy. 65B South (Clinton) (S) Widening 1.41 2013State State15,00012,000 - NHS

3,000 - State Match

- TOTAL

080391 Van Buren 065 Hwy. 336 West-Co. Rd. 28 (Phase I) (S) Widening 9.30 2012State State15,00012,000 - NHS

3,000 - State Match

- TOTAL

030236A Various VAR District 3 Bridge Painting (Phase II) (S) Str. & Apprs. 2011State State TUTS995

797 - BR

198 - State Match

- TOTAL

030236B Various VAR District 3 Bridge Painting (Phase II) (S) Str. & Apprs. 2012State State TUTS980

784 - BR

196 - State Match

- TOTAL

050X04 Various VAR Districts 5 & 8 Highway Improvements Various 2013State State CARTS20,000 - TOTAL

20,000 - 100% State

040024 Washington 074 White River Bridge Str. & Apprs. (Elkins) (S) Str. & Apprs. 2011State State NARTS2,500

2,000 - BR

500 - State Match

- TOTAL

040272 Washington CS Johnson Road Reconst. (Springdale) P.E. Widening 2.20 2010Local Local NARTS14,586

10,669 - Earmarks

2,917 - Local

- STP < 200,000

- TOTAL

1,000

040418 Washington 112 Hwy. 180-Garland Ave. (Hwy. 112) (Fayetteville) (S) Widening 1.17 2012Local State NARTS1,250

250 - Local

- STP < 200,000

- TOTAL

1,000

Page 112 of 115

STATE AND LOCAL PROJECTS SORTED BY COUNTY

An (S) or (F) following the termini indicates federal or state oversight.For those projects located in a Transportation Improvement Plan (TIP) Area, additional information is available. See the Introduction for further details.

Page 136: 1 - Cover Page STIP 2010-2013 Web Version.pdf · iii TUTS - Texarkana Urban Transportation Study (Miller County) CEO of Texarkana, Texas Dr. Larry Sullivan P. O. Box 1967 Texarkana,

JOB / ITEM

NUMBER COUNTY RTE TERMINI TYPE WORK LENGTH

ESTIMATED COSTLET

YEAR

PROVIDING MATCHING

FUNDS

CARRYINGOUT THE PROJECT TIP AREA

AGENCY RESPONSIBLE FOR:

Funding Breakdown

(x $1,000)

4/14/2010 9:46:31 AM

040485 Washington 540 I-540/Hwy. 62/180 Interchg Interim Impvts. (Fayetteville) (F) Interchange 2010State State NARTS5,0004,000 - NHS

1,000 - State Match

- TOTAL

040486 Washington 016 College Ave.-Stone Bridge Rd. (Fayetteville) (S) Widening 2.68 2011Local State NARTS10,0005,000 - STP

5,000 - Local

- TOTAL

040489 Washington 112 Hwy. 112 Spur-North (Fayetteville) (S) Widening 0.75 2010Local State NARTS3,0001,500 - STP

1,500 - Local

- TOTAL

040490 Washington 265 South City Limits-Hwy. 412 (Springdale) (S) Widening 1.25 2010Local State NARTS4,7002,350 - STP

2,350 - Local

- TOTAL

040496 Washington CS Hwy. 112-Hwy. 71B (Cato Springs Rd.) (Fayetteville) (S) Reconstruction 1.00 2010Local Local NARTS3,5962,877 - Earmarks

719 - Local

- TOTAL

040517 Washington 265 Hwy. 45-E. Joyce Blvd. (Fayetteville) (S) Widening 2.19 2010Local State NARTS15,4007,700 - STP

7,700 - Local

- TOTAL

040518 Washington 265 E. Joyce Blvd.-City Limits (Fayetteville) (S) Widening 2.04 2012State State NARTS15,00012,000 - STP

3,000 - State Match

- TOTAL

040524 Washington 062 Hwy. 62 Bypass (Gr. & Strs.) (Prairie Grove) (S) New Location 4.20 2010State State NARTS15,00012,000 - STP

3,000 - State Match

- TOTAL

040527 Washington 540 I-540/Don Tyson Pkwy. Intchng. (Springdale) (F) Interchange 2012Local Local NARTS26,951

26,951 - Local

- TOTAL

040535 Washington CS Fulbright Expwy./Hwy. 71B Flyover (Fayetteville) (S) Str. & Apprs. 2011Local Local NARTS6,452

5,162 - Earmarks

1,290 - Local

- TOTAL

Page 113 of 115

STATE AND LOCAL PROJECTS SORTED BY COUNTY

An (S) or (F) following the termini indicates federal or state oversight.For those projects located in a Transportation Improvement Plan (TIP) Area, additional information is available. See the Introduction for further details.

Page 137: 1 - Cover Page STIP 2010-2013 Web Version.pdf · iii TUTS - Texarkana Urban Transportation Study (Miller County) CEO of Texarkana, Texas Dr. Larry Sullivan P. O. Box 1967 Texarkana,

JOB / ITEM

NUMBER COUNTY RTE TERMINI TYPE WORK LENGTH

ESTIMATED COSTLET

YEAR

PROVIDING MATCHING

FUNDS

CARRYINGOUT THE PROJECT TIP AREA

AGENCY RESPONSIBLE FOR:

Funding Breakdown

(x $1,000)

4/14/2010 9:46:31 AM

040536 Washington CS Fulbright Expwy./Futrall Dr. Roundabout (Fayetteville) (S) Inters Impvts 2010Local Local NARTS2,966

2,373 - Earmarks

593 - Local

- TOTAL

040561 Washington 540 Bobby Hopper Tunnel-Winslow (S) Safety Improvements 3.50 2012State NARTS900

900 - 402-Safety

- TOTAL

040569 Washington 016 West & Middle Forks of White River Strs. & Apprs. (Fayetteville) (S)

Str. & Apprs. 2012State State NARTS11,500

9,200 - BR

2,300 - State Match

- TOTAL

040570 Washington 170 Branch of Illinois River Str. & Apprs. (S) Str. & Apprs. 2012State State NARTS750

600 - BR

150 - State Match

- TOTAL

050189 White 013 Hwy. 13 Extension (Searcy) (Phase I) (S) New Location 4.60 2011State State10,0008,000 - STP

2,000 - State Match

- TOTAL

050198 White NEW North Searcy Connector (Phase I) (S) New Location 2013Local State12,0006,000 - STP

6,000 - Local

- TOTAL

050212 White 013 Hwy. 13 Extension (Searcy) (Phase II) (S) New Location 4.60 2013State State14,00011,200 - STP

2,800 - State Match

- TOTAL

050229 White 305 Brier Creek Str. & Apprs. (S) Str. & Apprs. 2011State State700

560 - BR

140 - State Match

- TOTAL

110541 Woodruff 038 Bayou Deview Str. & Apprs. (S) Str. & Apprs. 2011State State1,750

1,400 - BR

350 - State Match

- TOTAL

Page 114 of 115

STATE AND LOCAL PROJECTS SORTED BY COUNTY

An (S) or (F) following the termini indicates federal or state oversight.For those projects located in a Transportation Improvement Plan (TIP) Area, additional information is available. See the Introduction for further details.

Page 138: 1 - Cover Page STIP 2010-2013 Web Version.pdf · iii TUTS - Texarkana Urban Transportation Study (Miller County) CEO of Texarkana, Texas Dr. Larry Sullivan P. O. Box 1967 Texarkana,

JOB / ITEM

NUMBER COUNTY RTE TERMINI TYPE WORK LENGTH

ESTIMATED COSTLET

YEAR

PROVIDING MATCHING

FUNDS

CARRYINGOUT THE PROJECT TIP AREA

AGENCY RESPONSIBLE FOR:

Funding Breakdown

(x $1,000)

4/14/2010 9:46:31 AM

080377 Yell 007 Centerville-Dardanelle (Passing Lanes) (S) Passing Lanes 1.00 2013State State2,0001,600 - STP

400 - State Match

- TOTAL

080385 Yell 007 Little Rock & Western RR Str. & Apprs. (Ola) (S) Str. & Apprs. 2012State State1,250

1,000 - BR

250 - State Match

- TOTAL

Page 115 of 115

STATE AND LOCAL PROJECTS SORTED BY COUNTY

An (S) or (F) following the termini indicates federal or state oversight.For those projects located in a Transportation Improvement Plan (TIP) Area, additional information is available. See the Introduction for further details.