1 cost of controls tb 22.9.04 l.jirdén. 2 lan wan storage configuration db, archives fsm servers...

7
1 Cost of controls Cost of controls TB 22.9.04 TB 22.9.04 L.Jirdén L.Jirdén

Upload: laurence-douglas

Post on 03-Jan-2016

214 views

Category:

Documents


1 download

TRANSCRIPT

Page 1: 1 Cost of controls TB 22.9.04 L.Jirdén. 2 LAN WAN Storage Configuration DB, Archives FSM servers Terminal servers, ACR consoles, etc Experimental equipment

1

Cost of controlsCost of controlsTB 22.9.04TB 22.9.04

L.JirdénL.Jirdén

Page 2: 1 Cost of controls TB 22.9.04 L.Jirdén. 2 LAN WAN Storage Configuration DB, Archives FSM servers Terminal servers, ACR consoles, etc Experimental equipment

2

LAN

WAN

Storage

Configuration DB,ArchivesFSM serversTerminal servers,ACR consoles, etc

Experimental equipment

Controller/PLC VME

Field Bus

LAN

Node Node

coolin

g

gas

Magnets

Rack

contr

ol

Ele

ctri

city

Safe

ty:

DSS

Safe

ty:

CSA

M

Infr

ast

ruct

ure

Services

Central DCS

Detectors

DCS Hardware Architecture

Page 3: 1 Cost of controls TB 22.9.04 L.Jirdén. 2 LAN WAN Storage Configuration DB, Archives FSM servers Terminal servers, ACR consoles, etc Experimental equipment

3

General services

Magnet control L3 + Muon 664k

Electricity control 220k

Rack control 188k

Safety DSS 152k

Safety CSAM 203k

Infrastructure co 15k

total 1442k

Central DCS

Back-end hardware racks 32k

computers 180k

network 25k

peripherals 10k

cables 3k

total 250k

controls costs Icontrols costs I

Page 4: 1 Cost of controls TB 22.9.04 L.Jirdén. 2 LAN WAN Storage Configuration DB, Archives FSM servers Terminal servers, ACR consoles, etc Experimental equipment

4

controls costs IIcontrols costs II

Detectors: common supply

Cooling controls Included in global cooling

?

Gas controls Included in global gas ?

Detectors: common supply

Front-end hardware racks 32k

computers 180k

network 50k

cables 4k

total 266k

Page 5: 1 Cost of controls TB 22.9.04 L.Jirdén. 2 LAN WAN Storage Configuration DB, Archives FSM servers Terminal servers, ACR consoles, etc Experimental equipment

5

controls costs IIIcontrols costs IIIDetectors:DCS MOU figures

SPD 75k

SDD 50k

SSD 20k

TPC 300k

TRD 82k

TOF 89k

HMPID 15k

PHOS+CPV 150k

PMD 100k

FMD 0

V0, T0 0

ZDC 0

MUON TRK 200k

MUON TRG 50k

ACCORDE 0

total 1131k

Page 6: 1 Cost of controls TB 22.9.04 L.Jirdén. 2 LAN WAN Storage Configuration DB, Archives FSM servers Terminal servers, ACR consoles, etc Experimental equipment

6

LAN

WAN

Storage

Configuration DB,ArchivesFSM serversTerminal servers,ACR consoles, etc

Experimental equipment

Controller/PLC VME

Field Bus

LAN

Node Node

coolin

g

gas

Magnets

Rack

contr

ol

Ele

ctri

city

Safe

ty:

DSS

Safe

ty:

CSA

M

Infr

ast

ruct

ure

Services

Central DCS

Detectors

250K not budgeted

1442K budgeted !

Common supply: 266K budgeted?

Page 7: 1 Cost of controls TB 22.9.04 L.Jirdén. 2 LAN WAN Storage Configuration DB, Archives FSM servers Terminal servers, ACR consoles, etc Experimental equipment

7

QuestionsQuestions

How to fund central DCS costs? Have detectors included common

supply costs in their budget?