CMNO Feb. 2013
Change …Make it right … Make it easy … Make it stick
Scan to Vehicle Operations Engagement
Insert Site Name
CMNO Feb. 2013
Not for Distribution
2
CMNO Feb. 2013
Agenda
Overview
Scope In & Out
Key Solution Elements
STV / STR Integration
Dock Summaries
Training
Change Management
STV Production Hardware Deployment
Round Table
3
CMNO Feb. 2013
Scan to Vehicle - Overview
As part of ongoing efforts to modernize and improve efficiency, we are introducing a new scanning process within our dock operations called Scan to Vehicle.
The new application will replace the Surface Transportation Report (STR) and automate the current manual process of creating shipment manifests through the use of Portable Data Terminals (PDTs).
The objectives of this initiative are to:
• Capture real-time accurate transportation data electronically, including load
details, product, shipping unit to transportation service, shipment status,
despatch and arrival times;
• Provide real-time user alerts and accurate loading and shipping
documentation;
• Make real-time shipment information available to the receiving facilities.
4
CMNO Feb. 2013
Overview continued…
• Automate the current manual process of creating shipping manifests to
electronically capture despatch and load details data; and
• Increase surface transportation data collection and quality.
8.5 x 11
8.5 x 14
5
CMNO Feb. 2013
In Scope
All National Highway Services
All Regional Highway Services using the current STR form
Out of Scope
All Regional Highway Services not using the STR form
All Depot and Airport Shuttles
Scope In & Out
6
CMNO Feb. 2013
Key Solution Elements
STV Web Application for Dock Supervisors, TCOs, NCC/APC etc.
PDT for
Dock Employees
8
CMNO Feb. 2013
Key Solution Elements – Load Screens
Select “Load Application”once logged in
Select appropriate service
Complete service details
Manually enter load details
Complete Trailer Info (e.g. trailer number, seal number); Enter any remarks; Collect Signatures; Print and Despatch
NOTE: These screens are taken from the Functional Designs and may look slightly different in the final product.
9
CMNO Feb. 2013
NOTE: These screens are taken from the Functional Designs and may look slightly different in the final product.
Key Solution Elements – Unload Screens
Select “Unload Application” once logged in
Select appropriate service (manually or scan barcode on STV-generated STR form)
Complete service details
Scan, manually unload or “Unload All”
Capture arrival details (e.g. Late Code if appropriate) and signatures
10
CMNO Feb. 2013
Key Solution Elements – STV Web App
View Shipment information
View Service Schedules View incoming services and load
information View current dock status Manage Ad-Hoc Services Cancel Scheduled Services
Can be accessed remotely (e.g. NCC, Helpdesk)
Export data (queries)
Manage dock printers
STV Web Application for Dock Supervisors, TCOs, NCC/APC etc.
Status on Services Arrivals Loading Unloading Despatched
11
CMNO Feb. 2013
Key Solution Elements – STR Form
8.5 x 11 paper, prints 3 copies
Title names (slightly modified)
Carrier signature not required if signed on the PDT (signature will be displayed from PDT when STR printed)
Printed barcode and human readable text
3 new columns
Quantity (skids, logistic trailers)
LVM (identify LVM code)
Red Flag (special mailings, SOM’s)
NOTE: STR codes will be available in printable job aid format and will be included in drop down.
STR Form
12
CMNO Feb. 2013
STV and STR Integration
STV Despatch STR Receipt
1 Leverage PDTs / Web app to despatch service and print STR form
Use STR form as currently, manual updates in STR systemSTV to STR System Communication
STR Despatch STV Receipt
2 Handwrite and send manual STR form; Manual updates in STR system
Use STV (PDT / Web App) to acknowledge and unload service. File manual STR form
STV to STR System Communication
13
CMNO Feb. 2013
Change Management - Change Network
Insert Name, Site Lead
AREA TRANSPORATION and National Transportation - SUBJECT MATTER EXPERT
PROJECT SUPPORT (Hotline)
Neal Dawe, National Change
Management Lead
Daunna Gauthier, National
Transportation Lead
Guy St. Jean, National Project
Lead
14
CMNO Feb. 2013
STV Training – PDT (Dock Operators, Dock Supervisors)
Classroom – Full Day PDT, Routing Cards and STR Form PDT Orientation – componets, navigation etc. Scenarios - Load, Despatch, Receive and Unload Health & Saftey PDT Mounting – MMHE equipmenet PDT Cradles Printer(s)
Support Network / Transportation Operations to be trained
15
CMNO Feb. 2013
STV Training – Web Application (Dock Supervisors, Shift Managers)
Classroom - Full Day
Interaction with PDT
Scenarios - Load, Despatch, Receive and Unload
Search for Information
Views & Status’
What if scenarios
Printer Management
Mentor and Coach
16
CMNO Feb. 2013
Change Tool Kit
A “Scan to Vehicle Change” Tool Kit will be distributed to Supervisors.
The Change Tool Kit will include the following: Overview Talk Tracks (Walkabouts) Get Ready Checklist Go Live Checklist Post Go Live Checklist Cut-Over Strategies STV Helpsite Support Network Issue Resolution Process Contacts Appendixes
Impacted Highway Services Carrier Info Notice
17
CMNO Feb. 2013
Welcome to the Scan to Vehicle Help Site
http://paw.mailposte.ca/SAPPST/Content/STV/main_STV-e.shtm
18
CMNO Feb. 2013
STV Production Hardware Deployment
PDT in Cradles (Ethernet Multi-dock)
PDT battery charger (Quad Charger)
PDT Holster with belt clip