1 challenges of developing natural gas infrastructure in india
TRANSCRIPT
1
Challenges of Developing Natural Gas Infrastructure in India
2
Presentation Flow
Demand- Supply Scenario Supply Outlook Demand Outlook Emerging Scenario Supply Augmentation
LNGTransnational PipelinesAdditional Sources
End-Use Outlook Gas Sector Policy Developments Gas Sector Infrastructure – Present & Future Goals to achieve the vision Issues to be addressed Policy, Regulatory & Fiscal Provisions Required
3
Domestic Reserves : 1,072 BCM (37.8 TCF)
(Balance Recoverable Reserve as on April 1, 2005)
R/P : 33.5 yrs Existing Producing Fields
Declining
Domestic Production 32 (1.1)
Domestic Availability 27(1.0)
LNG Imports* 6(0.2)
Total Availability 33(1.2)
INDIAN GAS SECTOR: SUPPLY OUTLOOK
CURRENT SUPPLIES (2005-06)
BCM (TCF)
Domestic Sources
LNG Import
CURRENT SUPPLIES – 33.5 BCM (1.2 TCF)
• HAZIRA (3.2BCM) YET TO STABILISE NOTINCLUDED UNDER CURRENT SUPPLIES
CURRENT SUPPLY SOURCES
4
INDIAN GAS SECTOR: DEMAND OUTLOOK
POWER FERTILISER PETROCHEM/LPG
STEEL INDUSTRIES CITYGAS/ CNG
CONSUMPTION – 33 BCM (1.2 TCF)
DEMAND PROJECTIONSCURRENT CONSUMPTION
(2005-06)
HYDROCARBON VISION 2025
40%
29%
15% 4%
3%
9% 114
143
80
100
120
140
160
2007 2012 2017 2022
84
2025
Demand estimated to grow at 4.2% CAGR
DEMAND BY 2025 – 143 BCM (5 TCF)
(4 TCF)
(5 TCF)
5
SUPPLY-DEMAND OUTLOOK :EMERGING SCENARIO
SUPPLY BCM TCF
SUB TOTAL FROM CURRENT SOURCES (2012) 26 0.9
TOTAL NEW DISCOVERIES 36 1.3
SUB TOTAL NEW LNG IMPORTS 24 0.8
TOTAL (PROJECTED CURRENT SOURCES + NEW DICOVERIES + NEW LNG)
86 3.0
DEMAND (BY 2012) 114 4.0
DEMAND (BY 2025) 143 5.0
PROJECTED SHORTFALL (2012) 28 1.0
PROJECTED SHORTFALL (2025) 57 2.0
6
SUPPLY AUGMENTATION : LNG
LNG TO BECOME A SIGNIFICANT SUPPLY SOURCE
LNG share in India’s total Gas Consumption to grow from 11% in 2004-05 to 38.4% by 2009-10
12.5 MMTPA of LNG already tied up
10 MMTPA of LNG to be tied up
7
SUPPLY AUGMENTATION :TRANSNATIONAL PIPELINES
India strategically located for gas imports through trans-national pipelines
Projected shortfall of 28 BCM in 2012 to double in 2025
SUPPLY BCM TCF
NEW PIPELINE IMPORTS
- Iran-Pakistan-India
- Turkmenistan-Afghanistan-Pakistan-India
- Myanmar-India
32.8
21
09
1.2
0.7
0.3
TOTAL PIPELINE SUPPLIES 52 1.8
TRANSNATIONAL PIPELINES TO PROVIDE COST EFFECTIVE SUPPLY SECURITY
8
SUPPLY OUTLOOK :ADDITIONAL SOURCES
India has the 4th largest coal reserves in the world (247 Billion Tons)
Ranks 3rd in coal production (355 Million TPA)
Total Recoverable reserves of only about 20%
Exploitation of current unrecoverable reserves is a major challenge
Coal Bed Methane (CBM), Underground Coal Gasification (UCG) and Surface Coal Gasification hold significant potential for gas
9
COAL BED METHANE (CBM)
INSITU COAL / LIGNITE
GASIFICATION
SURFACE COAL GASIFICATION
16 blocks awarded under 2 CBM rounds
Estimated reserves~ 1400 – 2600 BCM (50 – 92 TCF)
Equivalent to 40 - 75 yrs of current levels of natural gas consumption
First CBM Gas Expected by 2007
Total potential – 15,820 BCM (565 TCF), as per projections of UK based UCG Parnership
Equivalent to 450 - 500 yrs of current levels of natural gas consumption
Focus Areas - 5 States
(Gujarat, Rajasthan, TN, AP, W Bengal)
Total Coal Reserves – 247 BT
Focus Areas – 2 States (Orissa, W Bengal)
Syn gas potential identified 2.3 BCM (0.1 TCF)
SUPPLY OUTLOOK :ADDITIONAL SOURCES
10
INDIAN GAS SECTOR: END USE OUTLOOK
Gas Based Power
Gas Based Fertilizer
LPG & Petrochemicals
CNG, PNG
City Gas- Industrial, Domestic, Commercial
11
SECTORAL DRIVERS FOR CURRENT GAS DEMAND IN INDIA
12%12%
43%43%31%31%
58%58%
Non gas based units
10894 MW 12 MMTPA
1 MMTPA 2.5 MMTPA
POWER FERTILISER
LPG + LIQUID HYDROCARBONPETROCHEMICALS
12
Urban Pollution - A major issue Successful Experience in Delhi,
Mumbai Currently in 10 cities Plans to introduce CNG and
city gas in28 cities
Segment Total
Vehicles 259836
Domestic 413115
Commercial 2664
Small Industries
559
Gas Used (BCM)
1.86
CITY, CNG GAS SECTORS EMERGING AS AN IMPORTANT END-USE SEGMENT
CNG, PNG, CITY GAS DISTRIBUTION
13
GAS SECTOR INFRASTRUCTURE :CURRENT OUTLOOK
LNG Terminals – 2 Terminals (Dahej, Hazira), 7.5 MMTPA capacity
Transmission Network – 6,300 KmsGAIL – 5,300 KmsGSPL – 525 KmsAssam Gas – 300 KmsOIL – 175 Kms
Distribution Network – 6,000 Kms (Delhi, Mumbai, Ankaleshwar, Bharuch, Surat, Baroda, Agartala)
CNG Stations – 278 (Delhi, Mumbai, Surat, Vijayawada, Ankaleshwar, Bharuch,Baroda)
14
GAS SECTOR POLICY :SIGNIFICANT DEVELOPMENTS
100% FDI in E&P under NELP
100% FDI in natural gas pipelines
LNG imports, Gas Marketing under Open General Licence
Petroleum and Natural Gas Regulatory Board Bill under Finalisation (Unbundling, Third Party Access)
Gas Pipeline Policy under finalisation
Progressive Decontrol of prices
Policy Thrust to ensure Energy Security
15
TUTICORIN
MANGLORE
HASANBANGLORE
CHENNAI
TUTICORIN
KOLKATA
RAJAMUNDRY
DABHOL
MUMBAI PUNE
BHARUCH
VIJAIPUR
HYDERABAD
BHUBANESHWAR
KRISHNAPATNAM
JAGDISHPUR
KANJIRKKOD
KOCHI
A 1 BLOCK, MYANMAR
KOTA
MATHANIA
PHOOLPUR
BHATINDA
NELLORE
TIRUCHCHIRAPALLI
KOLHAPUR
GAYA
BOKARO
COIMBTORE
JAMNAGAR
BAREILLY
AURAIYA
DELHI
BANGLADESH
MYANMAR-India Pipeline
NEPAL BHUTAN
AIZAWLAGARTALA
SHILLONG
DISPUR
GANGTOK
GAS SECTOR INFRASTRUCTURE:CURRENT AND FUTURE – A
COMPOSITE PICTURE
DAHEJ I & II10 mmtpa*
HAZIRA2.5 mmtpa
DABHOL5 mmtpa
COCHIN5 mmtpa
BARODASURAT
ANKLESHWAR
KANPUR
LUCKNOW
LNGExisting (7.5 MMTPA)
Upcoming (22.5 MMTPA)
Transmission PipelinesExisting (6,300 Kms)
Planned (8,400 Kms, US$ 4.2 Billion)
City Gas/ CNGExisting (10 cities)
Planned (28 cities)
VIJAYAWADA
PATNA
AHMEDABAD
SURENDARNAGARRAJKOT
FARIDABAD
GWALIOR
INDORE
UJJAIN
SOLAPUR
AGRAALLAHABAD
VARANASI
MATHURA
JHANSI
Iran-Pak-India Pipeline
Turk-Afg-Pak-India Pipeline
DAMRA
Gas By Sea Receipt (Likely Location)
16
Points of Concern
True implementation of unbundled system Sourcing & customer tie-ups should be under the domain of
Gas Trading activities Minimum Excess capacity should be maintained One uniform model of transportation tariff to be adopted.
17
Requirement of Provisions
Direct taxes Infrastructure status to cross country pipelines Tax Holiday Benefits for Gas pipelines
Indirect taxes Zero customs duty on supplies required for Natural Gas
Pipelines Zero custom duty on LNG/Natural Gas ‘Declared Goods’ status to Natural Gas under Central Sales
tax Act, 1956
A. Financial
18
Cont..
Development of Indigenous Steel Mills for API 5L grade steel production
Encourage Indigenous Steel Mills to produce API grade steel Encourage new players in line pipe manufacturing and pipe
laying
B. Technology
C. Statutory Single Window Clearance at State Level for all statutory
clearances Single Window Clearance at Center for Environmental Clearance
and ROU Acquisition Common Corridor for Transmission Pipelines
19
Thank You