1 CAPACITY BUILDING AND SOCIAL MARKETING FOR ENVIRONMENTALLY SUSTAINABLE TRANSPORT (EST) Implemented by UP-NCTS for the DENR supported by the GRP-UNDP CPAP 2007 ENR-CORE Program 2007-2009 mples of Good Practices of in the Philippines presented by: B. N. Vergel Affiliate Faculty, Transportation & Environment Gr l Center for Transportation Studies (UP-NCTS) and te Professor, Institute of Civil Engineering ity of the Philippines Diliman WEB SITE: http://www.ncts.upd.edu.ph/capacity/ Tel/Fax: (02)-928-8305 presented at the Luzon Regional Consultation on the Formulation of a National Environmentally Sustainable Transport (EST) Strategy for the Philippines 11 June 2009, Hotel Elizabeth, Baguio City

Upload: collin-whitehead

Post on 11-Jan-2016

223 views

Category:

Documents


6 download

TRANSCRIPT

Page 1: 1 CAPACITY BUILDING AND SOCIAL MARKETING FOR ENVIRONMENTALLY SUSTAINABLE TRANSPORT (EST) Implemented by UP-NCTS for the DENR supported by the GRP-UNDP

1 CAPACITY BUILDING AND SOCIAL MARKETING FOR ENVIRONMENTALLY SUSTAINABLE TRANSPORT (EST)Implemented by UP-NCTS for the DENR supported by the GRP-UNDP CPAP 2007 ENR-CORE Program

2007-2009

Examples of Good Practices ofEST in the Philippinespresented by:

Karl B. N. VergelHead & Affiliate Faculty, Transportation & Environment GroupNational Center for Transportation Studies (UP-NCTS) andAssociate Professor, Institute of Civil EngineeringUniversity of the Philippines Diliman

WEB SITE: http://www.ncts.upd.edu.ph/capacity/Tel/Fax: (02)-928-8305

presented at the Luzon Regional Consultation on the

Formulation of a National Environmentally Sustainable Transport (EST) Strategy for the Philippines

11 June 2009, Hotel Elizabeth, Baguio City

Page 2: 1 CAPACITY BUILDING AND SOCIAL MARKETING FOR ENVIRONMENTALLY SUSTAINABLE TRANSPORT (EST) Implemented by UP-NCTS for the DENR supported by the GRP-UNDP

2 CAPACITY BUILDING AND SOCIAL MARKETING FOR ENVIRONMENTALLY SUSTAINABLE TRANSPORT (EST)Implemented by UP-NCTS for the DENR supported by the GRP-UNDP CPAP 2007 ENR-CORE Program

2007-2009

EST Case Studies

• Cebu City• Iligan City• Cagayan de Oro City• San Fernando City, La Union• Marikina City

Case studies were developed from the project “Capacity Building and Social Marketing for EST”

Page 3: 1 CAPACITY BUILDING AND SOCIAL MARKETING FOR ENVIRONMENTALLY SUSTAINABLE TRANSPORT (EST) Implemented by UP-NCTS for the DENR supported by the GRP-UNDP

3 CAPACITY BUILDING AND SOCIAL MARKETING FOR ENVIRONMENTALLY SUSTAINABLE TRANSPORT (EST)Implemented by UP-NCTS for the DENR supported by the GRP-UNDP CPAP 2007 ENR-CORE Program

2007-2009

Capacity Building and Social Marketing for EST 2007-2009

Implemented by:UP National Center for Transportation Studies (UP-NCTS)for the Department of Environment and Natural Resources (DENR)through the:Environment and Natural Resources Capacity and Operations Enhancement (ENR CORE) Programme under theGRP-UNDP Country Programme Action Plan (CPAP) 2007

Page 4: 1 CAPACITY BUILDING AND SOCIAL MARKETING FOR ENVIRONMENTALLY SUSTAINABLE TRANSPORT (EST) Implemented by UP-NCTS for the DENR supported by the GRP-UNDP

4 CAPACITY BUILDING AND SOCIAL MARKETING FOR ENVIRONMENTALLY SUSTAINABLE TRANSPORT (EST)Implemented by UP-NCTS for the DENR supported by the GRP-UNDP CPAP 2007 ENR-CORE Program

2007-2009

Capacity Building and Social Marketing for EST 2007-2009

The objective of the project is to enhance the capacities of a network of enabled and committed transport-related institutions, at the national and local levels, that are able to effectively identify, promote and undertake Environmentally Sustainable Transport (EST) strategies and initiatives, in support of national progress and development.

Page 5: 1 CAPACITY BUILDING AND SOCIAL MARKETING FOR ENVIRONMENTALLY SUSTAINABLE TRANSPORT (EST) Implemented by UP-NCTS for the DENR supported by the GRP-UNDP

5 CAPACITY BUILDING AND SOCIAL MARKETING FOR ENVIRONMENTALLY SUSTAINABLE TRANSPORT (EST)Implemented by UP-NCTS for the DENR supported by the GRP-UNDP CPAP 2007 ENR-CORE Program

2007-2009

Case Studies

EST Case Study Case WriterCebu City K. Vergel (UP-ICE/NCTS)Iligan City N. Tiglao (UP-NCPAG/NCTS)Cagayan de Oro City S. Napalang (UP-NCTS)San Fernando City, La Union

K. Vergel (UP-ICE/NCTS)

Marikina City N. Tiglao (UP-NCPAG/NCTS)

Page 6: 1 CAPACITY BUILDING AND SOCIAL MARKETING FOR ENVIRONMENTALLY SUSTAINABLE TRANSPORT (EST) Implemented by UP-NCTS for the DENR supported by the GRP-UNDP

6 CAPACITY BUILDING AND SOCIAL MARKETING FOR ENVIRONMENTALLY SUSTAINABLE TRANSPORT (EST)Implemented by UP-NCTS for the DENR supported by the GRP-UNDP CPAP 2007 ENR-CORE Program

2007-20096

Key Transport and Environment Issues/Problems

in Cities

Page 7: 1 CAPACITY BUILDING AND SOCIAL MARKETING FOR ENVIRONMENTALLY SUSTAINABLE TRANSPORT (EST) Implemented by UP-NCTS for the DENR supported by the GRP-UNDP

7 CAPACITY BUILDING AND SOCIAL MARKETING FOR ENVIRONMENTALLY SUSTAINABLE TRANSPORT (EST)Implemented by UP-NCTS for the DENR supported by the GRP-UNDP CPAP 2007 ENR-CORE Program

2007-2009

Cebu Iligan Cagayan de Oro

San Fernando(La Union)

• motorization: number of vehiclesannual growth rate (1994-2000): 7%annual growth rate (2000-2006): 4%

• travel demand private modes: 9.7% (1979) to 20.6% (1992) public modes: 90.3% (1979) to 79.4% (1992)

• number of vehicles has increased drastically between 2003 and 2004 by about 61.3 percent

• rise in number of motorcycles (113.94%) and jeepneys (81.50%)

• congestion along the national road

•  rapid growth in the number of vehicles

• rapid increase of motor vehicles

• high volume of pedestrians crossing the roads

Problems in Cities – Motorization

Page 8: 1 CAPACITY BUILDING AND SOCIAL MARKETING FOR ENVIRONMENTALLY SUSTAINABLE TRANSPORT (EST) Implemented by UP-NCTS for the DENR supported by the GRP-UNDP

8 CAPACITY BUILDING AND SOCIAL MARKETING FOR ENVIRONMENTALLY SUSTAINABLE TRANSPORT (EST)Implemented by UP-NCTS for the DENR supported by the GRP-UNDP CPAP 2007 ENR-CORE Program

2007-2009

Cebu Iligan Cagayan de Oro

San Fernando(La Union)

sidewalk encroachment and sidewalk vendors

commercial use of sidewalks

sidewalk vendors impeding pedestrian traffic along sidewalks

• encroachment of vendors and businesses• uneven sidewalks due to uncoordinated design and lay-out

illegal parking • indiscriminate parking along the streets• inadequate parking spaces of existing commercial establishments

lack of parking spaces

Problems in Cities – Sidewalk and Parking

Page 9: 1 CAPACITY BUILDING AND SOCIAL MARKETING FOR ENVIRONMENTALLY SUSTAINABLE TRANSPORT (EST) Implemented by UP-NCTS for the DENR supported by the GRP-UNDP

9 CAPACITY BUILDING AND SOCIAL MARKETING FOR ENVIRONMENTALLY SUSTAINABLE TRANSPORT (EST)Implemented by UP-NCTS for the DENR supported by the GRP-UNDP CPAP 2007 ENR-CORE Program

2007-2009

Cebu Iligan Cagayan de Oro

San Fernando(La Union)

reckless/ undisciplined driversfailure to enforce traffic rules particularly jay walking and unloading/no parking

undisciplined drivers and pedestrians on the streets

lack of discipline presence of unruly motorists specifically public utility vehicle drivers

Problems in Cities – Lack of Discipline

Page 10: 1 CAPACITY BUILDING AND SOCIAL MARKETING FOR ENVIRONMENTALLY SUSTAINABLE TRANSPORT (EST) Implemented by UP-NCTS for the DENR supported by the GRP-UNDP

10 CAPACITY BUILDING AND SOCIAL MARKETING FOR ENVIRONMENTALLY SUSTAINABLE TRANSPORT (EST)Implemented by UP-NCTS for the DENR supported by the GRP-UNDP CPAP 2007 ENR-CORE Program

2007-2009

Cebu Iligan Cagayan de Oro

San Fernando(La Union)

• too many jeepneys/ vehicles on the road uncontrolled/ unlimited issuance of franchise for the public utility vehicles and issues concerning travel lines• rampant use of motorcycles for public transport known as the “habal-habal”

• presence of unauthorized/ illegal terminals and stalled vehicles along restricted streets• out of line public transportation vehicles• duplicated lines or service routes of motorelas

• lack of loading and unloading stations for public utility vehicles

Problems in Cities – Public Transport

Page 11: 1 CAPACITY BUILDING AND SOCIAL MARKETING FOR ENVIRONMENTALLY SUSTAINABLE TRANSPORT (EST) Implemented by UP-NCTS for the DENR supported by the GRP-UNDP

11 CAPACITY BUILDING AND SOCIAL MARKETING FOR ENVIRONMENTALLY SUSTAINABLE TRANSPORT (EST)Implemented by UP-NCTS for the DENR supported by the GRP-UNDP CPAP 2007 ENR-CORE Program

2007-2009

Cebu Iligan Cagayan de Oro San Fernando• no new infra-structure improvement

• capacity is insufficient due to narrow roads

• insufficient network of roads (links, hierarchy)

• narrow road with poor pavement conditions

• limited bridges connecting east and west districts

• lack of traffic facilities at critical points

• lack of traffic management devices such as traffic signals and signages

• poor drainage system in certain areas which resulted to sparse flooding to these areas

Problems in Cities – Road and Traffic Facilities

Page 12: 1 CAPACITY BUILDING AND SOCIAL MARKETING FOR ENVIRONMENTALLY SUSTAINABLE TRANSPORT (EST) Implemented by UP-NCTS for the DENR supported by the GRP-UNDP

12 CAPACITY BUILDING AND SOCIAL MARKETING FOR ENVIRONMENTALLY SUSTAINABLE TRANSPORT (EST)Implemented by UP-NCTS for the DENR supported by the GRP-UNDP CPAP 2007 ENR-CORE Program

2007-2009

Cebu Iligan Cagayan de Oro

San Fernando(La Union)

• rampant traffic enforcement violations

• location of schools and other commercial establishments along main thoroughfares

• entry of delivery vans, trailers and trucks in the central business district during peak hours

• lack of manpower to direct traffic especially along intersections within the city

Problems in Cities – Other Problems

Page 13: 1 CAPACITY BUILDING AND SOCIAL MARKETING FOR ENVIRONMENTALLY SUSTAINABLE TRANSPORT (EST) Implemented by UP-NCTS for the DENR supported by the GRP-UNDP

13 CAPACITY BUILDING AND SOCIAL MARKETING FOR ENVIRONMENTALLY SUSTAINABLE TRANSPORT (EST)Implemented by UP-NCTS for the DENR supported by the GRP-UNDP CPAP 2007 ENR-CORE Program

2007-2009

MarikinaMarikina is basically a “bedroom community”- lower daytime population as a considerable number of people work outside the city

The city used to experience problems common to other middle-sized cities:• encroachment of sidewalks • traffic congestion• poor infrastructure• deteriorating urban environment

• added burden due to encroachment of river easements• flooding

Page 14: 1 CAPACITY BUILDING AND SOCIAL MARKETING FOR ENVIRONMENTALLY SUSTAINABLE TRANSPORT (EST) Implemented by UP-NCTS for the DENR supported by the GRP-UNDP

14 CAPACITY BUILDING AND SOCIAL MARKETING FOR ENVIRONMENTALLY SUSTAINABLE TRANSPORT (EST)Implemented by UP-NCTS for the DENR supported by the GRP-UNDP CPAP 2007 ENR-CORE Program

2007-200914

EST CASE STUDY: CEBU CITY

Karl VergelAssociate Professor

Institute of Civil Engineering/NCTSUniversity of the Philippines Diliman

Page 15: 1 CAPACITY BUILDING AND SOCIAL MARKETING FOR ENVIRONMENTALLY SUSTAINABLE TRANSPORT (EST) Implemented by UP-NCTS for the DENR supported by the GRP-UNDP

15 CAPACITY BUILDING AND SOCIAL MARKETING FOR ENVIRONMENTALLY SUSTAINABLE TRANSPORT (EST)Implemented by UP-NCTS for the DENR supported by the GRP-UNDP CPAP 2007 ENR-CORE Program

2007-200915

Key Transport and Environment Issues

143

212

148

88

127

276261

238

113

151

88

138

72

117

193

49.0239.9

83

9094

69

81

90

0

50

100

150

200

250

300

1994 1995 1996 1997 1998 1999 2000 2001 2002 2003 2004 2005 2006

Year

TS

P C

on

ce

ntr

ati

on

(mc

g/N

. cu

. M.)

DENR Region VII Office CENRO N. Bacalso Ave.Pardo Baranggay Hall Tonggo, San Fernando, Cebu CityLangtad, Naga, Cebu City Inayagan, Naga, Cebu CityOportos Residence, Cebu City Baricuatros Residence, Cebu City Canos Residence, Cebu City Valuerich FarmGuideline Value for TSP (1-year) = 90 mcg/N. cu. m.

Annual Average Concentration of Total Suspended Particulates (TSP) in Cebu City and Other Cities in Metro Cebu, 1995-2006Data Sources: 2002 and 2003-2004 National Air Quality Status Reports, Department of Environment and Natural Resources Environmental Management Bureau (DENR-EMB) and DENR-EMB Region VII

Page 16: 1 CAPACITY BUILDING AND SOCIAL MARKETING FOR ENVIRONMENTALLY SUSTAINABLE TRANSPORT (EST) Implemented by UP-NCTS for the DENR supported by the GRP-UNDP

16 CAPACITY BUILDING AND SOCIAL MARKETING FOR ENVIRONMENTALLY SUSTAINABLE TRANSPORT (EST)Implemented by UP-NCTS for the DENR supported by the GRP-UNDP CPAP 2007 ENR-CORE Program

2007-200916

MANAGEMENT CONTEXT

• planning has been anchored on its city and regional development planning and economy

• transport infrastructure projects that followed after the first cycle of development planning such as the Metro Cebu Development Project (MCDP) that started to operate in the 1990s were based on plans and recommendations of the Metro Cebu Land Use and Transport Study (MCLUTS) in 1981

• setting up of Mayor’s Management Team

Page 17: 1 CAPACITY BUILDING AND SOCIAL MARKETING FOR ENVIRONMENTALLY SUSTAINABLE TRANSPORT (EST) Implemented by UP-NCTS for the DENR supported by the GRP-UNDP

17 CAPACITY BUILDING AND SOCIAL MARKETING FOR ENVIRONMENTALLY SUSTAINABLE TRANSPORT (EST)Implemented by UP-NCTS for the DENR supported by the GRP-UNDP CPAP 2007 ENR-CORE Program

2007-200917

DESCRIPTION OF SPECIFIC PROGRAMS

Metropolitan Planning and Development

Metro Cebu Land Use and Transport Study (MCLUTS), 1978-1981

• first comprehensive planning for transport and land use of the City established in 1978 by the then MPWTC with technical assistance from the Government of Australia

Page 18: 1 CAPACITY BUILDING AND SOCIAL MARKETING FOR ENVIRONMENTALLY SUSTAINABLE TRANSPORT (EST) Implemented by UP-NCTS for the DENR supported by the GRP-UNDP

18 CAPACITY BUILDING AND SOCIAL MARKETING FOR ENVIRONMENTALLY SUSTAINABLE TRANSPORT (EST)Implemented by UP-NCTS for the DENR supported by the GRP-UNDP CPAP 2007 ENR-CORE Program

2007-200918

Metropolitan Planning and Development

The Metro Cebu Land Use and Transport Study (MCLUTS)

Plan 1: Concentrated, Without ReclamationPlan 2: Concentrated, With Mainland ReclamationPlan 3: Linear Dispersed, With Mainland ReclamationPlan 4: Mactan Expansion, With Mainland and Mactan Reclamation

Page 19: 1 CAPACITY BUILDING AND SOCIAL MARKETING FOR ENVIRONMENTALLY SUSTAINABLE TRANSPORT (EST) Implemented by UP-NCTS for the DENR supported by the GRP-UNDP

19 CAPACITY BUILDING AND SOCIAL MARKETING FOR ENVIRONMENTALLY SUSTAINABLE TRANSPORT (EST)Implemented by UP-NCTS for the DENR supported by the GRP-UNDP CPAP 2007 ENR-CORE Program

2007-200919

• Plan 2 was adopted by the Metro Cebu Council

• It recommended the radial-circumferential road network and new traffic signalization system

Page 20: 1 CAPACITY BUILDING AND SOCIAL MARKETING FOR ENVIRONMENTALLY SUSTAINABLE TRANSPORT (EST) Implemented by UP-NCTS for the DENR supported by the GRP-UNDP

20 CAPACITY BUILDING AND SOCIAL MARKETING FOR ENVIRONMENTALLY SUSTAINABLE TRANSPORT (EST)Implemented by UP-NCTS for the DENR supported by the GRP-UNDP CPAP 2007 ENR-CORE Program

2007-200920

Traffic Management Institutions

Cebu City Traffic Operations Management (CITOM), 1987

• created by City Ordinance No. 1264

• CITOM Board: membership of the committee were composed of 8 appointees of the City Mayor from the public and private sectors

• functions: coordination and monitoring of traffic management plans, review of traffic engineering and management schemes and routing of public transport

Page 21: 1 CAPACITY BUILDING AND SOCIAL MARKETING FOR ENVIRONMENTALLY SUSTAINABLE TRANSPORT (EST) Implemented by UP-NCTS for the DENR supported by the GRP-UNDP

21 CAPACITY BUILDING AND SOCIAL MARKETING FOR ENVIRONMENTALLY SUSTAINABLE TRANSPORT (EST)Implemented by UP-NCTS for the DENR supported by the GRP-UNDP CPAP 2007 ENR-CORE Program

2007-200921

Traffic Management Institutions

Adaptive Traffic Control System, 1993Phase I: 68 intersections (65 in Cebu City and 3 in

Mandaue City) and operation with the Traffic Control Center commenced in 1993

• made use of the system called SCATS (Sydney Coordinated Adaptive Traffic System) which was the first in the country

• The area-wide traffic control system is adaptive wherein traffic signal timings dynamically respond to detected traffic volumes

Page 22: 1 CAPACITY BUILDING AND SOCIAL MARKETING FOR ENVIRONMENTALLY SUSTAINABLE TRANSPORT (EST) Implemented by UP-NCTS for the DENR supported by the GRP-UNDP

22 CAPACITY BUILDING AND SOCIAL MARKETING FOR ENVIRONMENTALLY SUSTAINABLE TRANSPORT (EST)Implemented by UP-NCTS for the DENR supported by the GRP-UNDP CPAP 2007 ENR-CORE Program

2007-200922

Public Transport Improvement and Promotion

Establishment of Public Transport Terminals

• Cebu South Bus Terminal (CSBT), 1992 • Cebu North Bus Terminal, 1994

Ordinance on Designation of Travel Lines for Public Transport Vehicles

• enactment of local ordinances on “travel lines” for public utility vehicles traveling in Cebu City.

Page 23: 1 CAPACITY BUILDING AND SOCIAL MARKETING FOR ENVIRONMENTALLY SUSTAINABLE TRANSPORT (EST) Implemented by UP-NCTS for the DENR supported by the GRP-UNDP

23 CAPACITY BUILDING AND SOCIAL MARKETING FOR ENVIRONMENTALLY SUSTAINABLE TRANSPORT (EST)Implemented by UP-NCTS for the DENR supported by the GRP-UNDP CPAP 2007 ENR-CORE Program

2007-200923

Anti-Smoke Belching (ASB) Ordinance

• After the Clean Air Action Plan was passed in Cebu City Council in February 2006

• City Ordinance 2111 - Cebu City’s Vehicle Emissions Control Ordinance was enacted in March 2007

• Recent activities of the ASB program are supported by USAID-ECAP partnering city and national governments with civil society and academe and business sector

Page 24: 1 CAPACITY BUILDING AND SOCIAL MARKETING FOR ENVIRONMENTALLY SUSTAINABLE TRANSPORT (EST) Implemented by UP-NCTS for the DENR supported by the GRP-UNDP

24 CAPACITY BUILDING AND SOCIAL MARKETING FOR ENVIRONMENTALLY SUSTAINABLE TRANSPORT (EST)Implemented by UP-NCTS for the DENR supported by the GRP-UNDP CPAP 2007 ENR-CORE Program

2007-200924

Public Transport Improvement and Promotion

Bus Rapid Transit (BRT) Initiatives

Example of BRT in Quito, Ecuador

Page 25: 1 CAPACITY BUILDING AND SOCIAL MARKETING FOR ENVIRONMENTALLY SUSTAINABLE TRANSPORT (EST) Implemented by UP-NCTS for the DENR supported by the GRP-UNDP

25 CAPACITY BUILDING AND SOCIAL MARKETING FOR ENVIRONMENTALLY SUSTAINABLE TRANSPORT (EST)Implemented by UP-NCTS for the DENR supported by the GRP-UNDP CPAP 2007 ENR-CORE Program

2007-2009

But how did the Cebu City Initiative for But how did the Cebu City Initiative for the Bus Rapid Transit start?the Bus Rapid Transit start?

What steps were undertaken and how did What steps were undertaken and how did it come to a point where it is now?it come to a point where it is now?

(3 technical studies to start next month)(3 technical studies to start next month)

What were the challenges along the What were the challenges along the way?way?

source: Paul Villarete (2009) The CebuCity BRT Project

Page 26: 1 CAPACITY BUILDING AND SOCIAL MARKETING FOR ENVIRONMENTALLY SUSTAINABLE TRANSPORT (EST) Implemented by UP-NCTS for the DENR supported by the GRP-UNDP

26 CAPACITY BUILDING AND SOCIAL MARKETING FOR ENVIRONMENTALLY SUSTAINABLE TRANSPORT (EST)Implemented by UP-NCTS for the DENR supported by the GRP-UNDP CPAP 2007 ENR-CORE Program

2007-2009

The Cebu CityThe Cebu CityBus Rapid Transit (BRT) InitiativeBus Rapid Transit (BRT) Initiative

Cebu City BRT – how it started ...

• It started with Curitiba, Brazil.

• In 1996, Mayor Tomas Osmeña went to visit Curitiba with city traffic managers to see their bus system which was gaining worldwide popularity

• This was after he was mayor of Cebu City from 1988 – 1995.

source: Paul Villarete (2009) The CebuCity BRT Project

Page 27: 1 CAPACITY BUILDING AND SOCIAL MARKETING FOR ENVIRONMENTALLY SUSTAINABLE TRANSPORT (EST) Implemented by UP-NCTS for the DENR supported by the GRP-UNDP

27 CAPACITY BUILDING AND SOCIAL MARKETING FOR ENVIRONMENTALLY SUSTAINABLE TRANSPORT (EST)Implemented by UP-NCTS for the DENR supported by the GRP-UNDP CPAP 2007 ENR-CORE Program

2007-2009

The Cebu CityThe Cebu CityBus Rapid Transit (BRT) InitiativeBus Rapid Transit (BRT) Initiative

Cebu City BRT – how it started ...

When they came back, they shared what they learned to the then city leadership.

Specifically, through it’s political leader, Mayor Osmeña (a private citizen then), the city started to slowly move to two very important governance policy changes reflective of the transport and environment strategies of Curituba.

source: Paul Villarete (2009) The CebuCity BRT Project

Page 28: 1 CAPACITY BUILDING AND SOCIAL MARKETING FOR ENVIRONMENTALLY SUSTAINABLE TRANSPORT (EST) Implemented by UP-NCTS for the DENR supported by the GRP-UNDP

28 CAPACITY BUILDING AND SOCIAL MARKETING FOR ENVIRONMENTALLY SUSTAINABLE TRANSPORT (EST)Implemented by UP-NCTS for the DENR supported by the GRP-UNDP CPAP 2007 ENR-CORE Program

2007-2009

The Cebu CityThe Cebu CityBus Rapid Transit (BRT) InitiativeBus Rapid Transit (BRT) Initiative

Cebu City BRT – how it started ...

The two policy directions are:• “Land use planning and transport planning

cannot be separated: Osmeña preferred drawing out the transport corridors first, before laying the land use along it;”

• “Public Transport comes first, before Private Transport“

. . . both policies run counter to conventional wisdom

source: Paul Villarete (2009) The CebuCity BRT Project

Page 29: 1 CAPACITY BUILDING AND SOCIAL MARKETING FOR ENVIRONMENTALLY SUSTAINABLE TRANSPORT (EST) Implemented by UP-NCTS for the DENR supported by the GRP-UNDP

29 CAPACITY BUILDING AND SOCIAL MARKETING FOR ENVIRONMENTALLY SUSTAINABLE TRANSPORT (EST)Implemented by UP-NCTS for the DENR supported by the GRP-UNDP CPAP 2007 ENR-CORE Program

2007-2009

The Cebu CityThe Cebu CityBus Rapid Transit (BRT) InitiativeBus Rapid Transit (BRT) Initiative

Cebu City BRT – how it started ...

• Between 1996 and 2001, not much was done on the strengthening of these two policies and the establishment of a bus system similar to that of Curitiba, Brazil.

• CITOM continued to identify corridors and probable bus stations. Different LRT studies between 1992 and the present provided much information on these.

source: Paul Villarete (2009) The CebuCity BRT Project

Page 30: 1 CAPACITY BUILDING AND SOCIAL MARKETING FOR ENVIRONMENTALLY SUSTAINABLE TRANSPORT (EST) Implemented by UP-NCTS for the DENR supported by the GRP-UNDP

30 CAPACITY BUILDING AND SOCIAL MARKETING FOR ENVIRONMENTALLY SUSTAINABLE TRANSPORT (EST)Implemented by UP-NCTS for the DENR supported by the GRP-UNDP CPAP 2007 ENR-CORE Program

2007-2009

Light Rail Transit (LRT) Initiatives Light Rail Transit (LRT) Initiatives for Metro Cebufor Metro Cebu

It is significant to note that in all these initiatives,the Cebu City has opposed their approval

• 1992 – Pre-Feasibility Study for a Mass Transport System for Metro Cebu.

• 1996 – Technical Study for a Metro Cebu LRT submitted to DOTC

• 1999 – Feasibility Study for Mega-Cebu LRT/Rail Service

• 2005 – Unsolicited BOT Proposal submitted by AMA Group (still pending)

source: Paul Villarete (2009) The CebuCity BRT Project

Page 31: 1 CAPACITY BUILDING AND SOCIAL MARKETING FOR ENVIRONMENTALLY SUSTAINABLE TRANSPORT (EST) Implemented by UP-NCTS for the DENR supported by the GRP-UNDP

31 CAPACITY BUILDING AND SOCIAL MARKETING FOR ENVIRONMENTALLY SUSTAINABLE TRANSPORT (EST)Implemented by UP-NCTS for the DENR supported by the GRP-UNDP CPAP 2007 ENR-CORE Program

2007-2009

The Cebu CityThe Cebu CityBus Rapid Transit (BRT) InitiativeBus Rapid Transit (BRT) Initiative

Cebu City BRT – how it started ...

• In 2001, Mayor Osmeña got re-elected as mayor and revived his vision for an efficient bus system in Cebu City.

• CITOM attempted to steer to a new and less difficult strategy – The Stairless Jeepney concept. After a few technical studies, it was concluded that it won’t work as efficiently as desired.

source: Paul Villarete (2009) The CebuCity BRT Project

Page 32: 1 CAPACITY BUILDING AND SOCIAL MARKETING FOR ENVIRONMENTALLY SUSTAINABLE TRANSPORT (EST) Implemented by UP-NCTS for the DENR supported by the GRP-UNDP

32 CAPACITY BUILDING AND SOCIAL MARKETING FOR ENVIRONMENTALLY SUSTAINABLE TRANSPORT (EST)Implemented by UP-NCTS for the DENR supported by the GRP-UNDP CPAP 2007 ENR-CORE Program

2007-2009

The Cebu CityThe Cebu CityBus Rapid Transit (BRT) InitiativeBus Rapid Transit (BRT) Initiative

Cebu City BRT – how it started ...

• In 2007, Cebu City officials attended a forum with Enrique Peñalosa, former mayor of Bogota, Columbia.

• At about the same time, Cebu City started to discuss the BRT proposal with the DOTC, World Bank, JBIC, and ADB.

• Cebu City also joined in the EST consultations with DOTC and UP-NCTS.

source: Paul Villarete (2009) The CebuCity BRT Project

Page 33: 1 CAPACITY BUILDING AND SOCIAL MARKETING FOR ENVIRONMENTALLY SUSTAINABLE TRANSPORT (EST) Implemented by UP-NCTS for the DENR supported by the GRP-UNDP

33 CAPACITY BUILDING AND SOCIAL MARKETING FOR ENVIRONMENTALLY SUSTAINABLE TRANSPORT (EST)Implemented by UP-NCTS for the DENR supported by the GRP-UNDP CPAP 2007 ENR-CORE Program

2007-2009

The Cebu CityThe Cebu CityBus Rapid Transit (BRT) InitiativeBus Rapid Transit (BRT) Initiative

Cebu City BRT – how it started ...

• In 2008, Cebu City solicited the help of partner agencies for the promotion of a BRT system in Cebu – DOTC, UP-NCTS, USAID-ECAP and

CAI-Asia.

• In April of 2008, Cebu City submitted a request for assistance from PPIAF for a BRT demonstration corridor study for Cebu City through the World Bank

source: Paul Villarete (2009) The CebuCity BRT Project

Page 34: 1 CAPACITY BUILDING AND SOCIAL MARKETING FOR ENVIRONMENTALLY SUSTAINABLE TRANSPORT (EST) Implemented by UP-NCTS for the DENR supported by the GRP-UNDP

34 CAPACITY BUILDING AND SOCIAL MARKETING FOR ENVIRONMENTALLY SUSTAINABLE TRANSPORT (EST)Implemented by UP-NCTS for the DENR supported by the GRP-UNDP CPAP 2007 ENR-CORE Program

2007-2009

The Cebu CityThe Cebu CityBus Rapid Transit (BRT) InitiativeBus Rapid Transit (BRT) Initiative

Cebu City BRT – how it started ...

• Sept. 4-5, 2008, with the help of our partners, 4 sessions of seminars were held for different sectors in Cebu City – urban poor, politicians, transport groups, and academe.

• In September also, ADB-CDIA started a T/A study for the South Reclamation Proj. Which included a BRT system.

source: Paul Villarete (2009) The CebuCity BRT Project

Page 35: 1 CAPACITY BUILDING AND SOCIAL MARKETING FOR ENVIRONMENTALLY SUSTAINABLE TRANSPORT (EST) Implemented by UP-NCTS for the DENR supported by the GRP-UNDP

35 CAPACITY BUILDING AND SOCIAL MARKETING FOR ENVIRONMENTALLY SUSTAINABLE TRANSPORT (EST)Implemented by UP-NCTS for the DENR supported by the GRP-UNDP CPAP 2007 ENR-CORE Program

2007-2009

The Cebu CityThe Cebu CityBus Rapid Transit (BRT) InitiativeBus Rapid Transit (BRT) Initiative

Cebu City BRT – how it started ...

• Nov. 10-11, 2008, through the aid of CAI-Asia and ADB-CDIA, we invited Mayor Peñalosa to speak in Cebu City in relation to the BRT implementation in Bogota, Columbia.

• The visit of Mayor Peñalosa has stirred much interest in Cebu for the realization of it’s desired BRT system.

source: Paul Villarete (2009) The CebuCity BRT Project

Page 36: 1 CAPACITY BUILDING AND SOCIAL MARKETING FOR ENVIRONMENTALLY SUSTAINABLE TRANSPORT (EST) Implemented by UP-NCTS for the DENR supported by the GRP-UNDP

36 CAPACITY BUILDING AND SOCIAL MARKETING FOR ENVIRONMENTALLY SUSTAINABLE TRANSPORT (EST)Implemented by UP-NCTS for the DENR supported by the GRP-UNDP CPAP 2007 ENR-CORE Program

2007-2009

The Cebu CityThe Cebu CityBus Rapid Transit (BRT) InitiativeBus Rapid Transit (BRT) Initiative

Cebu City BRT – how it started ...

• September 2008, DOTC has committed to finance the Public Transport Strategic Plan for Metro Cebu.

• January 2009 – World Bank announced the approval of the PPIAF study;

• Today, there are three (3) studies about to start for the Cebu City – BRT.

source: Paul Villarete (2009) The CebuCity BRT Project

Page 37: 1 CAPACITY BUILDING AND SOCIAL MARKETING FOR ENVIRONMENTALLY SUSTAINABLE TRANSPORT (EST) Implemented by UP-NCTS for the DENR supported by the GRP-UNDP

37 CAPACITY BUILDING AND SOCIAL MARKETING FOR ENVIRONMENTALLY SUSTAINABLE TRANSPORT (EST)Implemented by UP-NCTS for the DENR supported by the GRP-UNDP CPAP 2007 ENR-CORE Program

2007-2009

The Cebu The Cebu CityCityBus Bus Rapid Rapid Transit Transit (BRT) (BRT) InitiativeInitiative

of course of course

this helps this helps

Cebu City BRT – how it started ...

source: Paul Villarete (2009) The CebuCity BRT Project

Page 38: 1 CAPACITY BUILDING AND SOCIAL MARKETING FOR ENVIRONMENTALLY SUSTAINABLE TRANSPORT (EST) Implemented by UP-NCTS for the DENR supported by the GRP-UNDP

38 CAPACITY BUILDING AND SOCIAL MARKETING FOR ENVIRONMENTALLY SUSTAINABLE TRANSPORT (EST)Implemented by UP-NCTS for the DENR supported by the GRP-UNDP CPAP 2007 ENR-CORE Program

2007-2009

The Cebu The Cebu CityCityBus Rapid Bus Rapid Transit Transit (BRT) (BRT) InitiativeInitiative

OR OR THIS! THIS! Cebu City BRT – how it started ... source: Paul Villarete (2009) The Cebu

City BRT Project

Page 39: 1 CAPACITY BUILDING AND SOCIAL MARKETING FOR ENVIRONMENTALLY SUSTAINABLE TRANSPORT (EST) Implemented by UP-NCTS for the DENR supported by the GRP-UNDP

39 CAPACITY BUILDING AND SOCIAL MARKETING FOR ENVIRONMENTALLY SUSTAINABLE TRANSPORT (EST)Implemented by UP-NCTS for the DENR supported by the GRP-UNDP CPAP 2007 ENR-CORE Program

2007-2009

Probable Metro Cebu Probable Metro Cebu Public Transportation/Public Transportation/BRT CorridorsBRT Corridors

source: Paul Villarete (2009) The CebuCity BRT Project

Page 40: 1 CAPACITY BUILDING AND SOCIAL MARKETING FOR ENVIRONMENTALLY SUSTAINABLE TRANSPORT (EST) Implemented by UP-NCTS for the DENR supported by the GRP-UNDP

40 CAPACITY BUILDING AND SOCIAL MARKETING FOR ENVIRONMENTALLY SUSTAINABLE TRANSPORT (EST)Implemented by UP-NCTS for the DENR supported by the GRP-UNDP CPAP 2007 ENR-CORE Program

2007-200940

LESSONS LEARNED• need for the establishment of a metropolitan

authority

• road capacity and network expansion alone is not the ultimate solution

• greater participation of the local government in public transport network development

Page 41: 1 CAPACITY BUILDING AND SOCIAL MARKETING FOR ENVIRONMENTALLY SUSTAINABLE TRANSPORT (EST) Implemented by UP-NCTS for the DENR supported by the GRP-UNDP

41 CAPACITY BUILDING AND SOCIAL MARKETING FOR ENVIRONMENTALLY SUSTAINABLE TRANSPORT (EST)Implemented by UP-NCTS for the DENR supported by the GRP-UNDP CPAP 2007 ENR-CORE Program

2007-2009

EST Case Study: Iligan City

Dr. Noriel Christopher C. TiglaoAssociate Professor, UP-NCPAG/ NCTS

Page 42: 1 CAPACITY BUILDING AND SOCIAL MARKETING FOR ENVIRONMENTALLY SUSTAINABLE TRANSPORT (EST) Implemented by UP-NCTS for the DENR supported by the GRP-UNDP

42 CAPACITY BUILDING AND SOCIAL MARKETING FOR ENVIRONMENTALLY SUSTAINABLE TRANSPORT (EST)Implemented by UP-NCTS for the DENR supported by the GRP-UNDP CPAP 2007 ENR-CORE Program

2007-2009

TRANSPORT MANAGEMENT CONTEXT

• Traffic Management Code of Iligan City has been in place since 1972– Banning of tricycles at an early stage

• Enabling role of development assistance (ADB, AusAid)– One of the beneficiary cities under the Philippine

Regional Municipal Development Project (PRMDP)

42

Page 43: 1 CAPACITY BUILDING AND SOCIAL MARKETING FOR ENVIRONMENTALLY SUSTAINABLE TRANSPORT (EST) Implemented by UP-NCTS for the DENR supported by the GRP-UNDP

43 CAPACITY BUILDING AND SOCIAL MARKETING FOR ENVIRONMENTALLY SUSTAINABLE TRANSPORT (EST)Implemented by UP-NCTS for the DENR supported by the GRP-UNDP CPAP 2007 ENR-CORE Program

2007-2009

TRANSPORT MANAGEMENT CONTEXT (cont.)

• Philippine Regional Municipal Development Project (PRMDP)– Objectives include the provision of basic

infrastructure, strengthening of the cities’ capability and capacity to provide and operate, manage, and maintain infrastructure and essential municipal services

– Projects were implemented a few years after the enactment of the 1991 Local Government Code

43

Page 44: 1 CAPACITY BUILDING AND SOCIAL MARKETING FOR ENVIRONMENTALLY SUSTAINABLE TRANSPORT (EST) Implemented by UP-NCTS for the DENR supported by the GRP-UNDP

44 CAPACITY BUILDING AND SOCIAL MARKETING FOR ENVIRONMENTALLY SUSTAINABLE TRANSPORT (EST)Implemented by UP-NCTS for the DENR supported by the GRP-UNDP CPAP 2007 ENR-CORE Program

2007-2009

TRANSPORT MANAGEMENT CONTEXT (cont.)

• Project design under PRMDP were based on:1) dispersing growth through the development of

important provincial cities;2) decentralizing authority; 3) devolving responsibilities for local development

to local government units (LGU); and4) improving local governance

44

Page 45: 1 CAPACITY BUILDING AND SOCIAL MARKETING FOR ENVIRONMENTALLY SUSTAINABLE TRANSPORT (EST) Implemented by UP-NCTS for the DENR supported by the GRP-UNDP

45 CAPACITY BUILDING AND SOCIAL MARKETING FOR ENVIRONMENTALLY SUSTAINABLE TRANSPORT (EST)Implemented by UP-NCTS for the DENR supported by the GRP-UNDP CPAP 2007 ENR-CORE Program

2007-2009

SPECIFIC PROGRAMS

1) Road Widening and Construction of Integrated Bus and Jeepney Public Transport Terminals

– Total costs of infrastructure projects totaled US$ 3.386 million

– Strategically located with complete amenities

45

Page 46: 1 CAPACITY BUILDING AND SOCIAL MARKETING FOR ENVIRONMENTALLY SUSTAINABLE TRANSPORT (EST) Implemented by UP-NCTS for the DENR supported by the GRP-UNDP

46 CAPACITY BUILDING AND SOCIAL MARKETING FOR ENVIRONMENTALLY SUSTAINABLE TRANSPORT (EST)Implemented by UP-NCTS for the DENR supported by the GRP-UNDP CPAP 2007 ENR-CORE Program

2007-2009

SPECIFIC PROGRAMS (cont.)2) New Traffic Code (2002)

– Provides the creation of the Iligan City Traffic Management and Engineering Board (ICTMEB) tasked to monitor, evaluate, review and approve all traffic and engineering management schemes

– Provisions are improperly implemented due to lack of manpower and logistical resources

– Needs some amendments to include entities/agencies with mandates relevant to its operations

46

Page 47: 1 CAPACITY BUILDING AND SOCIAL MARKETING FOR ENVIRONMENTALLY SUSTAINABLE TRANSPORT (EST) Implemented by UP-NCTS for the DENR supported by the GRP-UNDP

47 CAPACITY BUILDING AND SOCIAL MARKETING FOR ENVIRONMENTALLY SUSTAINABLE TRANSPORT (EST)Implemented by UP-NCTS for the DENR supported by the GRP-UNDP CPAP 2007 ENR-CORE Program

2007-2009

SUCCESSES ACHIEVED• The two newly constructed north and south

bound bus and jeepney terminals are already fully operational– Financial sustainability of terminals is supported

by user fees– Expected to accommodate buses and jeepneys en

route outside Iligan City until 2015– Has contributed to improvement of traffic

circulation

47

Page 48: 1 CAPACITY BUILDING AND SOCIAL MARKETING FOR ENVIRONMENTALLY SUSTAINABLE TRANSPORT (EST) Implemented by UP-NCTS for the DENR supported by the GRP-UNDP

48 CAPACITY BUILDING AND SOCIAL MARKETING FOR ENVIRONMENTALLY SUSTAINABLE TRANSPORT (EST)Implemented by UP-NCTS for the DENR supported by the GRP-UNDP CPAP 2007 ENR-CORE Program

2007-2009

SUCCESSES ACHIEVED (cont.)

• High level of research and development capability of local academic institutions– Vehicle parking watch device developed by

MSU-IIT

48

Courtesy of: Prof. Metodia M. Trinidad, MSU-IIT

Page 49: 1 CAPACITY BUILDING AND SOCIAL MARKETING FOR ENVIRONMENTALLY SUSTAINABLE TRANSPORT (EST) Implemented by UP-NCTS for the DENR supported by the GRP-UNDP

49 CAPACITY BUILDING AND SOCIAL MARKETING FOR ENVIRONMENTALLY SUSTAINABLE TRANSPORT (EST)Implemented by UP-NCTS for the DENR supported by the GRP-UNDP CPAP 2007 ENR-CORE Program

2007-2009

LESSONS LEARNED• Interventions have somewhat focused on additional

infrastructure– Need to pursue Transport Systems Management (TSM)

approach (e.g. parking facility, roadside traffic management schemes, etc.)

• Need to establish cooperation/ partnerships among local stakeholders– Local government unit– National government agency– Academic institutions

49

Page 50: 1 CAPACITY BUILDING AND SOCIAL MARKETING FOR ENVIRONMENTALLY SUSTAINABLE TRANSPORT (EST) Implemented by UP-NCTS for the DENR supported by the GRP-UNDP

50 CAPACITY BUILDING AND SOCIAL MARKETING FOR ENVIRONMENTALLY SUSTAINABLE TRANSPORT (EST)Implemented by UP-NCTS for the DENR supported by the GRP-UNDP CPAP 2007 ENR-CORE Program

2007-2009

CAGAYAN DE ORO CITY: BRIDGING THE GREAT DIVIDE

Dr. Ma. Sheilah G. NapalangUniversity Extension SpecialistUP-NCTS

Page 51: 1 CAPACITY BUILDING AND SOCIAL MARKETING FOR ENVIRONMENTALLY SUSTAINABLE TRANSPORT (EST) Implemented by UP-NCTS for the DENR supported by the GRP-UNDP

51 CAPACITY BUILDING AND SOCIAL MARKETING FOR ENVIRONMENTALLY SUSTAINABLE TRANSPORT (EST)Implemented by UP-NCTS for the DENR supported by the GRP-UNDP CPAP 2007 ENR-CORE Program

2007-200951

TRANSPORT AND ENVIRONMENT MANAGEMENT CONTEXT• Long term plans are prepared and

implemented by the city (CLUP 2000, Physical Framework Plan)

• Key projects from the Local Development Investment Plan (LDIP) such as terminal development (east and west) have been implemented

• Donor-driven implementation

Page 52: 1 CAPACITY BUILDING AND SOCIAL MARKETING FOR ENVIRONMENTALLY SUSTAINABLE TRANSPORT (EST) Implemented by UP-NCTS for the DENR supported by the GRP-UNDP

52 CAPACITY BUILDING AND SOCIAL MARKETING FOR ENVIRONMENTALLY SUSTAINABLE TRANSPORT (EST)Implemented by UP-NCTS for the DENR supported by the GRP-UNDP CPAP 2007 ENR-CORE Program

2007-2009

Western Urban Expansion EasternUrban Node

Major Urban Center

Eastern Urban Growth Center

West-Uptown Urban ExpansionEast-Uptown Urban Expansion

Urban NetworkUrban Network

Structure PlanStructure Plan

Specific Programs• Land Use Strategy to decongest the urban centers

Page 53: 1 CAPACITY BUILDING AND SOCIAL MARKETING FOR ENVIRONMENTALLY SUSTAINABLE TRANSPORT (EST) Implemented by UP-NCTS for the DENR supported by the GRP-UNDP

53 CAPACITY BUILDING AND SOCIAL MARKETING FOR ENVIRONMENTALLY SUSTAINABLE TRANSPORT (EST)Implemented by UP-NCTS for the DENR supported by the GRP-UNDP CPAP 2007 ENR-CORE Program

2007-200953

Specific Programs (cont.)• Institutionalization of the Road Traffic

Administration• Revitalization of the Divisoria Area

– Sidewalk clearing– Night café

• Bridge development• River taxi

Page 54: 1 CAPACITY BUILDING AND SOCIAL MARKETING FOR ENVIRONMENTALLY SUSTAINABLE TRANSPORT (EST) Implemented by UP-NCTS for the DENR supported by the GRP-UNDP

54 CAPACITY BUILDING AND SOCIAL MARKETING FOR ENVIRONMENTALLY SUSTAINABLE TRANSPORT (EST)Implemented by UP-NCTS for the DENR supported by the GRP-UNDP CPAP 2007 ENR-CORE Program

2007-200954

SUCCESSED ACHIEVED• Marked decrease in the number of buses in the city

center since the opening of the Westbound Terminal (2000) and Eastbound Terminal (2001)

• Increased urban amenity• Air quality has been found out to be relatively good

Page 55: 1 CAPACITY BUILDING AND SOCIAL MARKETING FOR ENVIRONMENTALLY SUSTAINABLE TRANSPORT (EST) Implemented by UP-NCTS for the DENR supported by the GRP-UNDP

55 CAPACITY BUILDING AND SOCIAL MARKETING FOR ENVIRONMENTALLY SUSTAINABLE TRANSPORT (EST)Implemented by UP-NCTS for the DENR supported by the GRP-UNDP CPAP 2007 ENR-CORE Program

2007-200955

LESSONS LEARNED• Although the terminal infrastructure are now

in place, there are still operational concerns that must be addressed such as the presence of barkers and undisciplined drivers and operators

• Government subsidy for terminal operations• Choice of a strategic location of terminals• Need for professionalization of RTA

Page 56: 1 CAPACITY BUILDING AND SOCIAL MARKETING FOR ENVIRONMENTALLY SUSTAINABLE TRANSPORT (EST) Implemented by UP-NCTS for the DENR supported by the GRP-UNDP

56 CAPACITY BUILDING AND SOCIAL MARKETING FOR ENVIRONMENTALLY SUSTAINABLE TRANSPORT (EST)Implemented by UP-NCTS for the DENR supported by the GRP-UNDP CPAP 2007 ENR-CORE Program

2007-200956

EST CASE STUDY:SAN FERNANDO CITY,

LA UNION

Karl VergelAssociate Professor

Institute of Civil Engineering/NCTSUniversity of the Philippines Diliman

Page 57: 1 CAPACITY BUILDING AND SOCIAL MARKETING FOR ENVIRONMENTALLY SUSTAINABLE TRANSPORT (EST) Implemented by UP-NCTS for the DENR supported by the GRP-UNDP

57 CAPACITY BUILDING AND SOCIAL MARKETING FOR ENVIRONMENTALLY SUSTAINABLE TRANSPORT (EST)Implemented by UP-NCTS for the DENR supported by the GRP-UNDP CPAP 2007 ENR-CORE Program

2007-200957

MANAGEMENT CONTEXT• the City wants to be known as an environment-

conscious place and clean and green city

• Clean Air Program is one of the 5 Clean and Green City programs

• Environment Code of 2006 – transportation and environment management is included incorporated in the chapter on Urban Air Quality Management

Page 58: 1 CAPACITY BUILDING AND SOCIAL MARKETING FOR ENVIRONMENTALLY SUSTAINABLE TRANSPORT (EST) Implemented by UP-NCTS for the DENR supported by the GRP-UNDP

58 CAPACITY BUILDING AND SOCIAL MARKETING FOR ENVIRONMENTALLY SUSTAINABLE TRANSPORT (EST)Implemented by UP-NCTS for the DENR supported by the GRP-UNDP CPAP 2007 ENR-CORE Program

2007-200958

DESCRIPTION OF SPECIFIC PROGRAMS• Tricycle Conversion (2000-present)

– conversion of the City’s three-wheeler public transport (tricycles) from 2-stroke to 4-stroke engine motorcycles

– dialogue with tricycle transport group in 2001– city offered interest-free loan programs in 2002– annual inspection of tricycles– franchise cap at 1,600 tricycles– rerouting and other traffic schemes

Page 59: 1 CAPACITY BUILDING AND SOCIAL MARKETING FOR ENVIRONMENTALLY SUSTAINABLE TRANSPORT (EST) Implemented by UP-NCTS for the DENR supported by the GRP-UNDP

59 CAPACITY BUILDING AND SOCIAL MARKETING FOR ENVIRONMENTALLY SUSTAINABLE TRANSPORT (EST)Implemented by UP-NCTS for the DENR supported by the GRP-UNDP CPAP 2007 ENR-CORE Program

2007-200959

• Tricycle Conversion (2000-present)

– preventive maintenance workshop in 2005– interest-free loans to tricycle cooperatives– annual sputum test check-up – Memorandum Order 116 (Conversion of All TODAs

to a Transport Service Cooperative/ Federation

TSP concentration was monitored as one of the measure the impacts of the program

Page 60: 1 CAPACITY BUILDING AND SOCIAL MARKETING FOR ENVIRONMENTALLY SUSTAINABLE TRANSPORT (EST) Implemented by UP-NCTS for the DENR supported by the GRP-UNDP

60 CAPACITY BUILDING AND SOCIAL MARKETING FOR ENVIRONMENTALLY SUSTAINABLE TRANSPORT (EST)Implemented by UP-NCTS for the DENR supported by the GRP-UNDP CPAP 2007 ENR-CORE Program

2007-200960

SUCCESSED ACHIEVED• without enacting an

ordinance to ban the use of the 2-stroke engines, the City Government was able to convince the operators and drivers to switch to 4-stroke engines

Page 61: 1 CAPACITY BUILDING AND SOCIAL MARKETING FOR ENVIRONMENTALLY SUSTAINABLE TRANSPORT (EST) Implemented by UP-NCTS for the DENR supported by the GRP-UNDP

61 CAPACITY BUILDING AND SOCIAL MARKETING FOR ENVIRONMENTALLY SUSTAINABLE TRANSPORT (EST)Implemented by UP-NCTS for the DENR supported by the GRP-UNDP CPAP 2007 ENR-CORE Program

2007-200961

SUCCESSED ACHIEVED• from 2001 to 2005, the percentage of 4-stroke

units has dramatically increased from 29% to 70%

• as of October 2007, the number of 2-stroke units decreased to 89 (6%) and the number of 4-stroke units increased to 1,511 (94%)

Page 62: 1 CAPACITY BUILDING AND SOCIAL MARKETING FOR ENVIRONMENTALLY SUSTAINABLE TRANSPORT (EST) Implemented by UP-NCTS for the DENR supported by the GRP-UNDP

62 CAPACITY BUILDING AND SOCIAL MARKETING FOR ENVIRONMENTALLY SUSTAINABLE TRANSPORT (EST)Implemented by UP-NCTS for the DENR supported by the GRP-UNDP CPAP 2007 ENR-CORE Program

2007-2009

1142

458

0

933

667

209

846754

87

656

944

190

499

1101

157

406

1194

93152

1448

254

81

1519

1071

1529

710

1600

00

200

400

600

800

1000

1200

1400

1600

2001 2002 2003 2004 2005 2006 2007 2008(Jan)

2008(Feb)

2008(July)

2 strokes 4 strokes converted to 4 strokes

In July 2008, roughly eight years after the Tricycle Conversion Program was introduced, the city is proud to announce that it has achieved zero 2-stroke engines in its tricycle fleet

Page 63: 1 CAPACITY BUILDING AND SOCIAL MARKETING FOR ENVIRONMENTALLY SUSTAINABLE TRANSPORT (EST) Implemented by UP-NCTS for the DENR supported by the GRP-UNDP

63 CAPACITY BUILDING AND SOCIAL MARKETING FOR ENVIRONMENTALLY SUSTAINABLE TRANSPORT (EST)Implemented by UP-NCTS for the DENR supported by the GRP-UNDP CPAP 2007 ENR-CORE Program

2007-200963

SUCCESSED ACHIEVED• average TSP concentration improved from

good to unhealthy in 2004 to good to fair

in 2005 and 2006

• City Ordinance No. 2006-013 (An

Ordinance Enacting the Environment

Code of the City of San Fernando,

Province of La Union) was enacted in 2006

Page 64: 1 CAPACITY BUILDING AND SOCIAL MARKETING FOR ENVIRONMENTALLY SUSTAINABLE TRANSPORT (EST) Implemented by UP-NCTS for the DENR supported by the GRP-UNDP

64 CAPACITY BUILDING AND SOCIAL MARKETING FOR ENVIRONMENTALLY SUSTAINABLE TRANSPORT (EST)Implemented by UP-NCTS for the DENR supported by the GRP-UNDP CPAP 2007 ENR-CORE Program

2007-200964

SUCCESSED ACHIEVED• Section IV2.11 (Abatement of Urban Air Pollution from

Motor Vehicles) under the   Chapter on Urban Air Quality Management

- institutionalized the tricycle conversion and clean air programs

- anti-smoke belching program

- incorporated public transport management

such as limitation of franchise of jeepneys

in cooperation with the LTFRB

Page 65: 1 CAPACITY BUILDING AND SOCIAL MARKETING FOR ENVIRONMENTALLY SUSTAINABLE TRANSPORT (EST) Implemented by UP-NCTS for the DENR supported by the GRP-UNDP

65 CAPACITY BUILDING AND SOCIAL MARKETING FOR ENVIRONMENTALLY SUSTAINABLE TRANSPORT (EST)Implemented by UP-NCTS for the DENR supported by the GRP-UNDP CPAP 2007 ENR-CORE Program

2007-200965

LESSONS LEARNED• the Tricycle Conversion Program which

became the Clean Air Program has shown that it is possible to voluntarily implement a local transport and environment program

• key elements: early engagement of the tricycle transport groups through IEC and dialogue and benefits and incentives from the City

Page 66: 1 CAPACITY BUILDING AND SOCIAL MARKETING FOR ENVIRONMENTALLY SUSTAINABLE TRANSPORT (EST) Implemented by UP-NCTS for the DENR supported by the GRP-UNDP

66 CAPACITY BUILDING AND SOCIAL MARKETING FOR ENVIRONMENTALLY SUSTAINABLE TRANSPORT (EST)Implemented by UP-NCTS for the DENR supported by the GRP-UNDP CPAP 2007 ENR-CORE Program

2007-200966

FUTURE DIRECTIONS• continuation of components of the Clean Air

    Program focusing on the tricycles

    (IEC, medical check-up, tricycle terminals)

• City has strong support for “walkable city” since

most major areas and institutions including the

proposed public transport terminals are within

walking distance (updates to be given in the presentation of the City of San Fernando)

Page 67: 1 CAPACITY BUILDING AND SOCIAL MARKETING FOR ENVIRONMENTALLY SUSTAINABLE TRANSPORT (EST) Implemented by UP-NCTS for the DENR supported by the GRP-UNDP

67 CAPACITY BUILDING AND SOCIAL MARKETING FOR ENVIRONMENTALLY SUSTAINABLE TRANSPORT (EST)Implemented by UP-NCTS for the DENR supported by the GRP-UNDP CPAP 2007 ENR-CORE Program

2007-2009

WALKABLE CITY (Clean and Beautiful)

Objectives

• LESSEN OCCURRENCE OF CRIMES

• KEEPS PEDESTRIANS SAFER FROM VEHICULAR ACCIDENT AND AWAY FROM HAZARDOUS GAS EMMISSION

• PROMOTES FREE ACCESS TO BUSINESS ENTERPRISE

Source: Office of the City Engineer, Office of the Licensing Section, Office of the City Planning and Development Officer, Office of the City Legal Officer and Law Enforcement Officer (2008) Report on Operation Clearing of Sidewalks within Central Business District, City of San Fernando, La Union

Page 68: 1 CAPACITY BUILDING AND SOCIAL MARKETING FOR ENVIRONMENTALLY SUSTAINABLE TRANSPORT (EST) Implemented by UP-NCTS for the DENR supported by the GRP-UNDP

68 CAPACITY BUILDING AND SOCIAL MARKETING FOR ENVIRONMENTALLY SUSTAINABLE TRANSPORT (EST)Implemented by UP-NCTS for the DENR supported by the GRP-UNDP CPAP 2007 ENR-CORE Program

2007-2009

Promoting Non-Motorized Transport in the Philippines:

The Marikina Experience

Dr. Noriel C. TiglaoAssociate Professor, UP-NCPAG/ NCTS

Page 69: 1 CAPACITY BUILDING AND SOCIAL MARKETING FOR ENVIRONMENTALLY SUSTAINABLE TRANSPORT (EST) Implemented by UP-NCTS for the DENR supported by the GRP-UNDP

69 CAPACITY BUILDING AND SOCIAL MARKETING FOR ENVIRONMENTALLY SUSTAINABLE TRANSPORT (EST)Implemented by UP-NCTS for the DENR supported by the GRP-UNDP CPAP 2007 ENR-CORE Program

2007-2009

MANAGEMENT CONTEXT

• The physical transformation of the city is anchored on promoting order on the city’s sidewalks– “Disiplina sa Bangketa” (Discipline along the

Sidewalk)

• The city government is a strong advocate of clean air

Page 70: 1 CAPACITY BUILDING AND SOCIAL MARKETING FOR ENVIRONMENTALLY SUSTAINABLE TRANSPORT (EST) Implemented by UP-NCTS for the DENR supported by the GRP-UNDP

70 CAPACITY BUILDING AND SOCIAL MARKETING FOR ENVIRONMENTALLY SUSTAINABLE TRANSPORT (EST)Implemented by UP-NCTS for the DENR supported by the GRP-UNDP CPAP 2007 ENR-CORE Program

2007-2009

PHYSICAL RECONSTRUCTION AND SOCIAL REORIENTATION

Page 71: 1 CAPACITY BUILDING AND SOCIAL MARKETING FOR ENVIRONMENTALLY SUSTAINABLE TRANSPORT (EST) Implemented by UP-NCTS for the DENR supported by the GRP-UNDP

71 CAPACITY BUILDING AND SOCIAL MARKETING FOR ENVIRONMENTALLY SUSTAINABLE TRANSPORT (EST)Implemented by UP-NCTS for the DENR supported by the GRP-UNDP CPAP 2007 ENR-CORE Program

2007-2009

THE MARIKINA BIKEWAYS PROJECT• The city of Marikina is an excellent site to

establish the pilot project as the city’s transport congestion has not yet reached intolerable levels

• About 10,500 daily trips (2.9% of all trips) are still made by bicycle (Based on 1996 MMUTIS)

• In comparison, approximately 160,200 trips (1.7 %) are made by bicycle in Metro Manila

Page 72: 1 CAPACITY BUILDING AND SOCIAL MARKETING FOR ENVIRONMENTALLY SUSTAINABLE TRANSPORT (EST) Implemented by UP-NCTS for the DENR supported by the GRP-UNDP

72 CAPACITY BUILDING AND SOCIAL MARKETING FOR ENVIRONMENTALLY SUSTAINABLE TRANSPORT (EST)Implemented by UP-NCTS for the DENR supported by the GRP-UNDP CPAP 2007 ENR-CORE Program

2007-2009

THE MARIKINA BIKEWAYS PROJECT (cont.)

• Under the baseline or “business-as-usual” scenario, increased motorized traffic in Marikina will reduce the safety of bicycle travel and the use of bicycles to the lower level now experienced in the rest of Metro Manila

Page 73: 1 CAPACITY BUILDING AND SOCIAL MARKETING FOR ENVIRONMENTALLY SUSTAINABLE TRANSPORT (EST) Implemented by UP-NCTS for the DENR supported by the GRP-UNDP

73 CAPACITY BUILDING AND SOCIAL MARKETING FOR ENVIRONMENTALLY SUSTAINABLE TRANSPORT (EST)Implemented by UP-NCTS for the DENR supported by the GRP-UNDP CPAP 2007 ENR-CORE Program

2007-2009

Marikina City’s Motivation

• We cannot widen our streets anymore; we have to plan and implement sustainable transport alternatives to make traffic manageable in the future

• In other words, our traffic situation doesn’t have to become chaotic in the future

Page 74: 1 CAPACITY BUILDING AND SOCIAL MARKETING FOR ENVIRONMENTALLY SUSTAINABLE TRANSPORT (EST) Implemented by UP-NCTS for the DENR supported by the GRP-UNDP

74 CAPACITY BUILDING AND SOCIAL MARKETING FOR ENVIRONMENTALLY SUSTAINABLE TRANSPORT (EST)Implemented by UP-NCTS for the DENR supported by the GRP-UNDP CPAP 2007 ENR-CORE Program

2007-2009

THE MARIKINA BIKEWAYS PROJECT (cont.)

• Components:– 49.7 km of segregated bikeways on existing roads, and 16.6 km of

bikeways along the Marikina river, connecting to the new LRT station;– Traffic slowing and pedestrian facilities around schools and market

areas, and provision of bicycle parking facilities at key interchanges;– Lighting, where necessary, to ensure safety after hours;– A public awareness campaign;– A bicycle safety program; and– A rigorous monitoring and evaluation program and major

dissemination effort

Page 75: 1 CAPACITY BUILDING AND SOCIAL MARKETING FOR ENVIRONMENTALLY SUSTAINABLE TRANSPORT (EST) Implemented by UP-NCTS for the DENR supported by the GRP-UNDP

75 CAPACITY BUILDING AND SOCIAL MARKETING FOR ENVIRONMENTALLY SUSTAINABLE TRANSPORT (EST)Implemented by UP-NCTS for the DENR supported by the GRP-UNDP CPAP 2007 ENR-CORE Program

2007-2009

Total length: 51,638.44 m (51.6 km) of bikeways as of 2008Total Project Cost: PhP146.8 million(from Marikina City – PhP82.9 millionfrom WB/GEF – PhP63.9 million)

Page 76: 1 CAPACITY BUILDING AND SOCIAL MARKETING FOR ENVIRONMENTALLY SUSTAINABLE TRANSPORT (EST) Implemented by UP-NCTS for the DENR supported by the GRP-UNDP

76 CAPACITY BUILDING AND SOCIAL MARKETING FOR ENVIRONMENTALLY SUSTAINABLE TRANSPORT (EST)Implemented by UP-NCTS for the DENR supported by the GRP-UNDP CPAP 2007 ENR-CORE Program

2007-2009

SUCCESSES ACHIEVED• Marikina City Bikeways Office

– The City government created an office to manage and supervise the bikeways system

– The office continues to conduct education and advocacy campaigns for Non-MotorizedTransport, e.g. Safe Cycling Education and Saturday Bicycle Clinic to promote "Bike-To-School“ commuting

Page 77: 1 CAPACITY BUILDING AND SOCIAL MARKETING FOR ENVIRONMENTALLY SUSTAINABLE TRANSPORT (EST) Implemented by UP-NCTS for the DENR supported by the GRP-UNDP

77 CAPACITY BUILDING AND SOCIAL MARKETING FOR ENVIRONMENTALLY SUSTAINABLE TRANSPORT (EST)Implemented by UP-NCTS for the DENR supported by the GRP-UNDP CPAP 2007 ENR-CORE Program

2007-2009

SUCCESSES ACHIEVED (cont.)

• To strengthen and to sustain the advocacy, the city government included the in traffic management code the rules and regulations of Non-Motorized Transport and the city construct a cycling track at the city's main sports park to support cycling enthusiasts in encouraging others to get into this sport.

Page 78: 1 CAPACITY BUILDING AND SOCIAL MARKETING FOR ENVIRONMENTALLY SUSTAINABLE TRANSPORT (EST) Implemented by UP-NCTS for the DENR supported by the GRP-UNDP

78 CAPACITY BUILDING AND SOCIAL MARKETING FOR ENVIRONMENTALLY SUSTAINABLE TRANSPORT (EST)Implemented by UP-NCTS for the DENR supported by the GRP-UNDP CPAP 2007 ENR-CORE Program

2007-2009

SUCCESSES ACHIEVED (cont.)• Bicycle Ownership Survey showed that 55% of

families in Marikina owned or has access to a bicycle, majority of which (or 22%) is used for bikes to work purposes

• Simultaneous efforts:– Discard the two stroke motorcycles, proper

maintenance of car, factories and industrial machinery, planting of trees, anti smoke belching and strict monitoring of industrial emissions

Page 79: 1 CAPACITY BUILDING AND SOCIAL MARKETING FOR ENVIRONMENTALLY SUSTAINABLE TRANSPORT (EST) Implemented by UP-NCTS for the DENR supported by the GRP-UNDP

79 CAPACITY BUILDING AND SOCIAL MARKETING FOR ENVIRONMENTALLY SUSTAINABLE TRANSPORT (EST)Implemented by UP-NCTS for the DENR supported by the GRP-UNDP CPAP 2007 ENR-CORE Program

2007-2009

SUCCESSES ACHIEVED (cont.)• In recognition of the city’s efforts, the Marikina

Bikeways Project was Awarded by the Gawad Galing Pook last 2005 as the Outstanding Program in Local Governance and addition to this, World Bank cited Marikina as one of the four Model Cities in the World during the World Bank’s Annual Bank Conference on Development Economics in June 2006 in Tokyo

Page 80: 1 CAPACITY BUILDING AND SOCIAL MARKETING FOR ENVIRONMENTALLY SUSTAINABLE TRANSPORT (EST) Implemented by UP-NCTS for the DENR supported by the GRP-UNDP

80 CAPACITY BUILDING AND SOCIAL MARKETING FOR ENVIRONMENTALLY SUSTAINABLE TRANSPORT (EST)Implemented by UP-NCTS for the DENR supported by the GRP-UNDP CPAP 2007 ENR-CORE Program

2007-2009

LESSONS LEARNED• Development funding and political will were

the main drivers of the success of Marikina Bikeways Project

• The city government was able to maintain and sustain the physical condition of the bikeway

• The city was able to reduce air pollution, noise pollution and it makes Marikina safe to live but sustainability of the project continues to be a big challenge

Page 81: 1 CAPACITY BUILDING AND SOCIAL MARKETING FOR ENVIRONMENTALLY SUSTAINABLE TRANSPORT (EST) Implemented by UP-NCTS for the DENR supported by the GRP-UNDP

81 CAPACITY BUILDING AND SOCIAL MARKETING FOR ENVIRONMENTALLY SUSTAINABLE TRANSPORT (EST)Implemented by UP-NCTS for the DENR supported by the GRP-UNDP CPAP 2007 ENR-CORE Program

2007-2009

FUTURE DIRECTIONS

• Continuous education of residents on the benefits of using bicycle as a transport mode

• Regular conduct of following programs:– Safe Cycling Education– Saturday Bicycle Clinic– Bicycle Loan Project (City Ordinance 92 Series of

2004)

Page 82: 1 CAPACITY BUILDING AND SOCIAL MARKETING FOR ENVIRONMENTALLY SUSTAINABLE TRANSPORT (EST) Implemented by UP-NCTS for the DENR supported by the GRP-UNDP

82 CAPACITY BUILDING AND SOCIAL MARKETING FOR ENVIRONMENTALLY SUSTAINABLE TRANSPORT (EST)Implemented by UP-NCTS for the DENR supported by the GRP-UNDP CPAP 2007 ENR-CORE Program

2007-2009

FUTURE DIRECTIONS (cont.)• Strengthen the Marikina Bikeways Program

through:– Permanent bicycle training camp and playground– Bicycle Museum of Marikina– Legislation of the Bicycle Code of Marikina– Continuously share the Marikina Bikeways

experience to internal communities and LGUs• Focus on replication