1 belle ii ir 2 shuji tanaka kek joint belle ii & superb background meeting 2012//feb/ 8-9th 1

27
1 Belle II IR 2 Shuji Tanaka KEK Joint Belle II & superB Background meeting 2012//Feb/8-9th 1

Upload: osborn-moore

Post on 31-Dec-2015

217 views

Category:

Documents


1 download

TRANSCRIPT

Page 1: 1 Belle II IR 2 Shuji Tanaka KEK Joint Belle II & superB Background meeting 2012//Feb/ 8-9th 1

11

Belle II IR 2

Shuji Tanaka

KEK

Joint Belle II & superB Background meeting

2012//Feb/8-9th

11

Page 2: 1 Belle II IR 2 Shuji Tanaka KEK Joint Belle II & superB Background meeting 2012//Feb/ 8-9th 1

22

Requested to discuss about IRRequested to discuss about IR

• IR magnets– magnetic filed calculation, canceling coils,canceling solenoid, leak fil

ed, fabrication status,cryostat (Ohuchi-san'talk)

• IR mechanical design – beam pipe design, fabrication process, cooling, heavy metal shield,in

stallation procedure, assembly, cabling space),

– Movable collimator(shape, material, instability, impedance, secondary particles)

– Vertex detectors

– Beast II( Belle II comissioning)

Page 3: 1 Belle II IR 2 Shuji Tanaka KEK Joint Belle II & superB Background meeting 2012//Feb/ 8-9th 1

33

Beam pipe : Rin = 2.0 cmSVD1 : R = 3.0, 4.5, 6.0 cmCDC : 3 layers of Cathode part

Beam pipe : Rin = 1.5 cmSVD2 : R = 2.0, 4.35, 7.0, 8.8 cmCDC : 2 layers of small cell chamber

History of Belle Vertex detectorSVD1->SVD2

History of Belle Vertex detectorSVD1->SVD2

Page 4: 1 Belle II IR 2 Shuji Tanaka KEK Joint Belle II & superB Background meeting 2012//Feb/ 8-9th 1

44

History of Vertex detector

SVD2-> BelleII SVDHistory of Vertex detector

SVD2-> BelleII SVD

1,Slant structure2,Hgh speed readout (800ns->20ns)3, 20mm diameter beam pipe4, PXD detector (NEW: R=14, 22mm)

Beam pipe radius:@IP (Tsukuba hall)

Topaz: 50mmBelle (SVD1): 20mm (SVD2): 15 mmBelleII: 10mmMore challenge on mechanics design

4 times larger volume coverage

Page 5: 1 Belle II IR 2 Shuji Tanaka KEK Joint Belle II & superB Background meeting 2012//Feb/ 8-9th 1

55

Assembly procedureAssembly procedure

Page 6: 1 Belle II IR 2 Shuji Tanaka KEK Joint Belle II & superB Background meeting 2012//Feb/ 8-9th 1

66

Half Mask

Temporary mask supports

Beam pipe positioner made of the heavy metal

Beam masks

Page 7: 1 Belle II IR 2 Shuji Tanaka KEK Joint Belle II & superB Background meeting 2012//Feb/ 8-9th 1

77

Beam pipeBeam pipe temporary support

The mass of the masks are supported at these points (close to the center of gravity of masks)

The position of the beam pipe is defined in the backward at this point after installation to CDC.

We need a mechanism that constrains the r-φ position of the beam pipe while allowing a slide in the Z direction. Otherwise, the PXD position can not be defined.

Page 8: 1 Belle II IR 2 Shuji Tanaka KEK Joint Belle II & superB Background meeting 2012//Feb/ 8-9th 1

88

Mask2

(1) The left side and right side masks are screwed into one piece.(2) Rotate by 90° so that the masks support the beam pipe form

left and right.

Page 9: 1 Belle II IR 2 Shuji Tanaka KEK Joint Belle II & superB Background meeting 2012//Feb/ 8-9th 1

99

Support flange

Support flange will be put in the forward side.

The support flange for supporting the IR system to QCS in the installation and to CDC after the installation

Page 10: 1 Belle II IR 2 Shuji Tanaka KEK Joint Belle II & superB Background meeting 2012//Feb/ 8-9th 1

1010

Masks are completed

The heavy metal masks are completed.

Page 11: 1 Belle II IR 2 Shuji Tanaka KEK Joint Belle II & superB Background meeting 2012//Feb/ 8-9th 1

1111

PXD

PXD is assembled to two halves in another stage and put together to the beam pipe. Cables and tubes will go to the slot in the masks.

need some flexibility for relative movement between beam pipe and heavy metal shield

Page 12: 1 Belle II IR 2 Shuji Tanaka KEK Joint Belle II & superB Background meeting 2012//Feb/ 8-9th 1

1212

Combine with SVD

SVD is also assembled in another stage. The forward and backward support cones are then fixed with the outer cover, made of CFRP. Then they are put together around the beam pipe.

Page 13: 1 Belle II IR 2 Shuji Tanaka KEK Joint Belle II & superB Background meeting 2012//Feb/ 8-9th 1

1313

VXD installation procedureVXD installation procedure

Page 14: 1 Belle II IR 2 Shuji Tanaka KEK Joint Belle II & superB Background meeting 2012//Feb/ 8-9th 1

1414

Assembly at KEK

Combined with QCS at Tsukuba hall

SVD support ring

Vertex detector installation

Page 15: 1 Belle II IR 2 Shuji Tanaka KEK Joint Belle II & superB Background meeting 2012//Feb/ 8-9th 1

1515

The sled guide is fixed on backward side

Vertex detector installation

Page 16: 1 Belle II IR 2 Shuji Tanaka KEK Joint Belle II & superB Background meeting 2012//Feb/ 8-9th 1

1616

How to connect with backward sledHow to connect with backward sled

16

Adapting support ring Connected with sled

Page 17: 1 Belle II IR 2 Shuji Tanaka KEK Joint Belle II & superB Background meeting 2012//Feb/ 8-9th 1

1717

Vertex detector installation

Guide pin to fix the VXD angle

Page 18: 1 Belle II IR 2 Shuji Tanaka KEK Joint Belle II & superB Background meeting 2012//Feb/ 8-9th 1

1818

Vertex detector installation

Temporal support guide

The VXD weight is keep by support guide and QCS

Page 19: 1 Belle II IR 2 Shuji Tanaka KEK Joint Belle II & superB Background meeting 2012//Feb/ 8-9th 1

1919

Vertex detector installation

This guide ring keep weight

Page 20: 1 Belle II IR 2 Shuji Tanaka KEK Joint Belle II & superB Background meeting 2012//Feb/ 8-9th 1

2020

Vertex detector installation

The backward weight is shift to this guide

SVD cover should not attach to another structure on installation at evertime

Page 21: 1 Belle II IR 2 Shuji Tanaka KEK Joint Belle II & superB Background meeting 2012//Feb/ 8-9th 1

2121

Vertex detector installation

Remove backward sled

Page 22: 1 Belle II IR 2 Shuji Tanaka KEK Joint Belle II & superB Background meeting 2012//Feb/ 8-9th 1

222222

Page 23: 1 Belle II IR 2 Shuji Tanaka KEK Joint Belle II & superB Background meeting 2012//Feb/ 8-9th 1

2323

How to fix at SVD backward How to fix at SVD backward

23VXD detector is fixed at backward endfor x, y, z axis

Remove sled

Remove support ring and adopt a bracketconnecting with CDC inner structure

Page 24: 1 Belle II IR 2 Shuji Tanaka KEK Joint Belle II & superB Background meeting 2012//Feb/ 8-9th 1

2424

SVD support ring at forward regionSVD support ring at forward region

Guide roller to keep weight of SVD

Positioning guide pin(CDC side)

Release control rod after install(QC cryostat side)

The VXD center position is arranged by those rollers.Forward region is fixed only for x and y axis

Page 25: 1 Belle II IR 2 Shuji Tanaka KEK Joint Belle II & superB Background meeting 2012//Feb/ 8-9th 1

2525

Vertex detector installation

Page 26: 1 Belle II IR 2 Shuji Tanaka KEK Joint Belle II & superB Background meeting 2012//Feb/ 8-9th 1

2626

Vertex detector installation

Page 27: 1 Belle II IR 2 Shuji Tanaka KEK Joint Belle II & superB Background meeting 2012//Feb/ 8-9th 1

272727

2011 Optimizing production procedure(writing rough sketch note for each procedure) for first prototype.

– Service space allocation will be decided

– Validate the technology of connectivity for each materials.

2012 From the end of 2012

– Starting VXD mock-up assembly

Mechanics check -> installation test , Cooling test

Beam pipe production(for BEASTII)

Freezing the mechanics design (including cooling system, cabling, monitors)

2013 SVD Ladder mount start (SVD) (2013 Sep.)

Beam pipe production

2014 End of 2014 -> BEAST

Beam pipe production

2015 Starting VXD assembly(Aug-Sep) (CR test ) and installation

27

Schedule (IR mechanics)