1%%% annual chance …

1
ARTESIAN ROAD

Upload: others

Post on 31-Oct-2021

2 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: 1%%% ANNUAL CHANCE …

AR

TE

SIA

N R

OA

D

AutoCAD SHX Text
GRAVEL
AutoCAD SHX Text
GRAVEL
AutoCAD SHX Text
GRAVEL
AutoCAD SHX Text
GRAVEL
AutoCAD SHX Text
EXISTING BUILDING
AutoCAD SHX Text
UN-NAMED CREEK
AutoCAD SHX Text
1%%% ANNUAL CHANCE FLOOD
AutoCAD SHX Text
50
AutoCAD SHX Text
100
AutoCAD SHX Text
50
AutoCAD SHX Text
SCALE 1"=50'
AutoCAD SHX Text
FEET
AutoCAD SHX Text
0
AutoCAD SHX Text
N
AutoCAD SHX Text
FF=1007.72
AutoCAD SHX Text
FF=1007.58
AutoCAD SHX Text
EXISTING BARN
AutoCAD SHX Text
EXISTING CREEK
AutoCAD SHX Text
C
AutoCAD SHX Text
33'
AutoCAD SHX Text
33'
AutoCAD SHX Text
66'
AutoCAD SHX Text
1%%% ANNUAL CHANCE FLOOD
AutoCAD SHX Text
& FLOODWAY
AutoCAD SHX Text
GRADING LIMITS
AutoCAD SHX Text
GRADING LIMITS
AutoCAD SHX Text
1"=50'
AutoCAD SHX Text
NA
AutoCAD SHX Text
ERO
AutoCAD SHX Text
MLA
AutoCAD SHX Text
ERO
AutoCAD SHX Text
4/26/2016
AutoCAD SHX Text
736.002
AutoCAD SHX Text
X
AutoCAD SHX Text
736-11-15004AB
AutoCAD SHX Text
4
AutoCAD SHX Text
11
AutoCAD SHX Text
FILE NO.
AutoCAD SHX Text
SHEET OF SHEETS
AutoCAD SHX Text
PHONE (920) 922-5703
AutoCAD SHX Text
FOND DU LAC, WISCONSIN 54935
AutoCAD SHX Text
ENGINEERS SURVEYORS
AutoCAD SHX Text
J.E. ARTHUR AND ASSOCIATES, INC.
AutoCAD SHX Text
PROJECT
AutoCAD SHX Text
CITY
AutoCAD SHX Text
ASSUMED
AutoCAD SHX Text
NAVD' 88
AutoCAD SHX Text
DATUM
AutoCAD SHX Text
MARK
AutoCAD SHX Text
BENCH
AutoCAD SHX Text
REVISIONS
AutoCAD SHX Text
DATE
AutoCAD SHX Text
PROJECT NO.
AutoCAD SHX Text
VERTICAL
AutoCAD SHX Text
HORIZONTAL
AutoCAD SHX Text
SCALES
AutoCAD SHX Text
APPROVED BY
AutoCAD SHX Text
CHECKED BY
AutoCAD SHX Text
DRAWN BY
AutoCAD SHX Text
DRAINAGE/EROSION CONTROL PLAN VIR CLAR ARTESIAN FARM, LLC GOEBEL HEIFER FACILITY TOWN OF EMPIRE, FOND DU LAC COUNTY, WISCONSIN
AutoCAD SHX Text
NGS STATION 3X17 - 34 FT WEST OF THE CENTERLINE OF COUNTY HIGHWAY K 0.30 MILES SOUTH OF COUNTY HIGHWAY T ELEVATION = 842.66 ±200' SOUTH FROM THE SOUTHEND OF THE FREESTALL BARN - CHISELED "X" ON THE SW CORNEROF THE CONCRETE SLAB ELEVATION = 1003.24
AutoCAD SHX Text
2
AutoCAD SHX Text
S9
AutoCAD SHX Text
SILT FENCE
AutoCAD SHX Text
5
AutoCAD SHX Text
S9
AutoCAD SHX Text
STORMWATER MANAGEMENT POND
AutoCAD SHX Text
6
AutoCAD SHX Text
S9
AutoCAD SHX Text
TEMPORARY SEDIMENT BASIN
AutoCAD SHX Text
1
AutoCAD SHX Text
S9
AutoCAD SHX Text
EROSION BALE DITCH CHECK
AutoCAD SHX Text
STAGES OF CONSTRUCTION DURATION DURATION 1. INSTALL SILT FENCE AND TRACKING PAD 1 DAY INSTALL SILT FENCE AND TRACKING PAD 1 DAY 1 DAY 2. STRIP TOPSOIL FROM TEMP. SEDIMENT BASIN/POND 2-3 DAYS STRIP TOPSOIL FROM TEMP. SEDIMENT BASIN/POND 2-3 DAYS 2-3 DAYS 3. CONSTRUCT SEDIMENT BASIN/POND 2-3 DAYS CONSTRUCT SEDIMENT BASIN/POND 2-3 DAYS 2-3 DAYS 4. STRIP TOPSOIL FROM PROJECT SITE 2-3 DAYS STRIP TOPSOIL FROM PROJECT SITE 2-3 DAYS 2-3 DAYS 5. EXCAVATED WSF 3-4 WEEKS EXCAVATED WSF 3-4 WEEKS 3-4 WEEKS 6. CONCRETE CONSTRUCTION 2 WEEKS CONCRETE CONSTRUCTION 2 WEEKS 2 WEEKS 7. GRADE FUTURE BARN SITE 1-2 WEEKS GRADE FUTURE BARN SITE 1-2 WEEKS 1-2 WEEKS 8. APPLY FINAL STABILIZATION TO ENTIRE SITE 1 WEEK APPLY FINAL STABILIZATION TO ENTIRE SITE 1 WEEK 1 WEEK 9. REMOVE TEMP SEDIMENT BASIN 2-3 DAYS REMOVE TEMP SEDIMENT BASIN 2-3 DAYS 2-3 DAYS
AutoCAD SHX Text