1 analysis for forklift

Upload: eiwaa

Post on 06-Jul-2018

215 views

Category:

Documents


0 download

TRANSCRIPT

  • 8/17/2019 1 Analysis for Forklift

    1/12

  • 8/17/2019 1 Analysis for Forklift

    2/12

    ar eer \SIDE  LI NE\job\EIWA\des\For l  lif  t\0\std\f  or k lif  t  pole  attach  R 0.

    std  03/ 22/ 16  14:37:38 

    :  2 

    70 473.125  0;  299 90 473.125  0;  300  -175  473.125  0;  301 -132.5  473.125  0; 132.5  473.125  0;  303 175 473.125  0;  304 8.03648e-016  473.125  0; 35  473.125  0;  306 -35  473.125  0;  307 -90  473.125  45;  308 -70  473.125  45; 70  473.125  45;  310 90 473.125  45;  311 8.03648e-016  473.125  45; 35  473.125  45;  313 -35  473.125  45;  314 0 500 -50;  315 70 500 -50; 

    15  183;  255  16  184;  256  17  185;  257  20  186;  258  21  187;  259  22  188; 

    23  189;  261  24  190;  262  27  191;  263  28  192;  264  29  193;  265  30  194; 31  195;  267  34  196;  268  35  197;  269  40  198;  270  41  199;  271  46  200; 47  201;  273  49  202;  274  51  203;  275  53  204;  276  57  205;  277  59  206; 61  207;  279  70  208;  280  72  209;  281  74  210;  282  76  211;  283  81  212; 83  213;  285 85 214;  286 87 215;  287 97  216;  288  99 217;  289 101  18; 105  219;  291 107 220;  292 109 221;  293  135 222;  294 144  223;  295  166  224; 169  225; E NT  I NCIDE NCES  SHELL 

    -90  475 -50;  283 -132.5  475 -50;  284 90 500 -50;  285 132.5  500 -50; 175 500 -50;  287 90 475 -50;  288 132.5  475 -50;  289 175 475 -50; -175  450 -50;  291 -132.5  450 -50;  292 -90  450 -50;  293 90 450 -50; 132.5  450 -50;  295 175 450 -50;  296 -90  473.125  0;  297 -70  473.125  0; 

    -70  500 -50;  317 35 500 -50;  318 -35  500 -50;ER   I NCIDE NCES 2 170;  242 3 171;  243 4 172;  244 5 173;  245 6 174;  246 7 175;  247 8 176; 9 177;  249 10 178;  250 11 179;  251 12 180;  252 13 181;  253 14 182; 

    0 49 54 77;  55 49 72 78 54;  56 72 51 55 78;  57 51 74 79 55;  58 74 53 56 79; 3 76 80 56;  60 76 40 37 80;  70 89 63 57 81;  71 63 90 83 57;  72 90 64 59 83; 4 91 85 59;  74 91 65 61 85;  75 65 92 87 61;  76 92 36 41 87;2 103 101 47;  100 103 23 28 101;  107 46 109 110 43;  108 109 27 24 110;2 112 99 21;  114 112 42 47 99;  115 36 113 97 41;  116 113 2 21 97; 40 105 114 37;  118 105 20 3 114;  119 20 107 115 3;  120 107 46 43 115; 69 48 118 116;  124 116 118 49 70;  125 48 71 119 118;  126 118 119 72 49; 71 50 120 119;  128 119 120 51 72;  129 50 73 121 120;  130 120 121 74 51; 73 52 122 121;  132 121 122 53 74;  133 52 75 123 122;  134 122 123 76 53; 

    75 38 124 123;  136 123 124 40 76;  139 81 57 127 125;  140 125 127 58 82; 57 83 128 127;  142 127 128 84 58;  143 83 59 129 128;  144 128 129 60 84; 59 85 130 129;  146 129 130 86 60;  147 85 61 131 130;  148 130 131 62 86; 61 87 132 131;  150 131 132 88 62;  151 87 41 133 132;  152 132 133 39 88; 93 66 136 134;  156 134 136 63 89;  157 66 94 137 136;  158 136 137 90 63; 94 67 138 137;  160 137 138 64 90;  161 67 95 139 138;  162 138 139 91 64; 95 68 140 139;  164 139 140 65 91;  165 68 96 141 140;  166 140 141 92 65; 96 14 142 141;  168 141 142 36 92;  171 77 54 145 143;  172 143 145 66 93; 54 78 146 145;  174 145 146 94 66;  175 78 55 147 146;  176 146 147 67 94; 55 79 148 147;  178 147 148 95 67;  179 79 56 149 148;  180 148 149 68 95; 56 80 150 149;  182 149 150 96 68;  183 80 37 151 150;  184 150 151 14 96; 41 97 152 133;  186 133 152 98 39;  187 97 21 153 152;  188 152 153 19 98; 21 99 154 153;  190 153 154 100 19;  191 99 47 155 154;  192 154 155 45 100; 47 101 156 155;  194 155 156 102 45;  195 101 28 157 156;  196 156 157 26 102; 38 104 158 124;  198 124 158 105 40;  199 104 18 159 158;  200 158 159 20 105; 18 106 160 159;  202 159 160 107 20;  203 106 44 161 160;  204 160 161 46 107; 44 108 162 161;  206 161 162 109 46;  207 108 25 163 162;  208 162 163 27 109; 

    43 110 164 165;  210 165 164 111 7;  211 110 24 166 164;  212 164 166 22 111; 7 111 167 168;  214 168 167 103 42;  215 111 22 169 167;  216 167 169 23 103; 37 16 151;  218 151 16 15;  219 151 15 14;  220 14 13 142;  221 13 12 142; 142 12 36;  223 36 12 113;  224 12 11 113;  225 11 2 113;  226 2 10 112; 10 9 112;  228 9 42 112;  229 9 168 42;  230 8 168 9;  231 8 7 168; 6 165 7;  233 5 165 6;  234 5 43 165;  235 115 43 5;  236 4 115 5;  237 3 115 4; 114 3 17;  239 16 114 17;  240 37 114 16;  298 208 202 227 226; 202 209 228 227;  300 209 203 229 228;  301 203 210 230 229; 210 204 231 230;  303 204 211 232 231;  304 211 198 233 232; 234 235 205 212;  307 235 236 213 205;  308 236 237 206 213; 237 238 214 206;  310 238 239 207 214;  311 239 240 215 207; 240 241 199 215;  313 242 243 218 201;  314 243 189 192 218; 200 221 244 245;  316 221 191 190 244;  317 170 246 217 187; 246 242 201 217;  319 241 247 216 199;  320 247 170 187 216; 198 219 248 233;  322 219 186 171 248;  323 186 220 249 171; 220 200 245 249;  327 250 252 253 251;  328 251 253 235 234; 252 254 255 253;  330 253 255 236 235;  331 254 256 257 255; 

    255 257 237 236;  333 256 258 259 257;  334 257 259 238 237; 258 260 261 259;  336 259 261 239 238;  337 260 262 263 261; 261 263 240 239;  339 262 182 264 263;  340 263 264 241 240; 226 227 266 265;  344 265 266 252 250;  345 227 228 267 266; 266 267 254 252;  347 228 229 268 267;  348 267 268 256 254; 229 230 269 268;  350 268 269 258 256;  351 230 231 270 269; 269 270 260 258;  353 231 232 271 270;  354 270 271 262 260; 232 233 272 271;  356 271 272 182 262;  357 245 244 273 274; 274 273 275 175;  359 244 190 224 273;  360 273 224 188 275; 175 275 276 277;  362 277 276 243 242;  363 275 188 225 276; 276 225 189 243;  365 233 184 272;  366 272 184 183;  367 272 183 182; 182 181 264;  369 181 180 264;  370 264 180 241;  371 241 180 247; 180 179 247;  373 179 170 247;  374 170 178 246;  375 178 177 246; 177 242 246;  377 177 277 242;  378 176 277 177;  379 176 175 277;

  • 8/17/2019 1 Analysis for Forklift

    3/12

    ar eer \SIDE  LI NE\job\EIWA\des\For l  lif  t\0\std\f  or k lif  t  pole  attach  R 0.

    std  03/ 22/ 16  14:37:38 

    :  3 

    174  274  175;  381 173 274 174;  382 173 245 274;  383 249 245 173; 172  249  173;  385 171 249 172;  386 248 171 185;  387 184 248 185; 233  248  184;  389 278 32 117 280;  390 280 117 34 279;  391 278 281 283 280; 280  283  282 279;  393 284 35 126 285;  394 285 126 33 286; 284  287  288 285;  396 285 288 289 286;  397 281 290 291 283; 283  291  292 282;  399 287 293 294 288;  400 288 294 295 289; 34  296  297 31;  402 296 70 77 297;  403 30 298 299 35;  404 298 89 81 299; 32  300  301 117;  406 300 69 116 301;  407 117 301 296 34;  408 301 116 70 296; 35  299  302 126;  410 299 81 125 302;  411 126 302 303 33;  412 302 125 82 303; 29  304  305 135;  414 304 93 134 305;  415 135 305 298 30;  416 305 134 89 298; 31  297  306 144;  418 297 77 143 306;  419 144 306 304 29;  420 306 143 93 304; 196  307  308 195;  422 307 208 226 308;  423 194 309 310 197; 309  234  212 310;  425 193 311 312 222;  426 311 250 251 312; 222  312  309 194;  428 312 251 234 309;  429 195 308 313 223; 

    308  226  265 313;  431 223 313 311 193;  432 313 265 250 311; 278  281  300 32;  434 279 282 296 34;  435 284 287 299 35;  436 286 289 303 33; 279  34  31 316;  438 316 31 144 318;  439 318 144 29 314;  440 314 29 135 317; 317 135 30 315;  442 315 30 35 284;E NT  PR OPER TY O 60 70 TO 76 99 100 107 108 113 TO 120 123 TO 136 139 TO 152 155 TO 168 - TO 240 389 TO 420 437 TO 442 THICKNESS  20 TO 436 THICKNESS  20 TO 304 306 TO 324 327 TO 340 343 TO 388 421 TO 432 THICKNESS  90 MMS  KN 

    NE  MATER IAL  STAR T R OPIC  STEEL5 SON  0.3 ITY  7.68195e-008 A 1.2e-005 

    0.03 

    DEFI NE  MATER IAL MMS   NEWTON 

    ER   PROPERTY BR ITISH TO 296 PR IS  YD 10 ZD 10 TANTS R IAL  STEEL ALL OR TS O 28 157 163 FIXED  BUT FX FY MX MY MZ TO 295 FIXED  BUT FX MX MY MZ E R IGID  MASTER   1 JOI NT  172 TO 185 

    1 LOADTYPE  None  TITLE  DL WEIGHT  Y -1.1 

    2 LOADTYPE  None  TITLE  SWL T  LOAD -30000 

    ********* COMB  101 1.25DL+1.25SWL 

    2  2 1.

    2 COMB  102 DL+SWL 

    0  2 1.0 ****** OR M  ANALYSIS 

    LIST  101 102 METER   1 AISC 

    SH

  • 8/17/2019 1 Analysis for Forklift

    4/12

     

    Sof twar e licensed to Micr osof t

    Job No  Sheet No 

    1 R ev

    Part

    Job Title  R ef  

    By Date22-Mar-16 Chd 

    Client File  forklift pole attach R0.std  Date/Time  22-Mar-2016 14:43 

    Job Inf ormation Engineer  Checked Approved 

    Name: 

    Date: 22-Mar-16 

    Comment  s 

    CLASS 4 SWL: 3000 K GSLENGTH: 2800MM 

    Structure Type SPACE FR AME 

     Number of Nodes 318 Highest Node 318 

     Number of Elements  56 Highest Beam 296 

     Number of Plates  278 Highest Plate  442 

     Number of Basic Load Cases 2 

     Number of Com bination Load Cases 2 

     I ncl ud ed  in t hi s  pr int out ar e data f or : 

    All The Whole Str uctur e 

     I ncl ud ed  in t hi s  pr int out ar e r esul t  s for l oad  ca ses : 

    Type L/C Name 

    Com bination  101 1.25DL+1.25SWL

    Com bination  102 DL+SWL 

    Pr int Time/Date: 22/03/2016 14:44  STAAD.Pro for Windows R elease 2007  Pr int Run 1 of 15

  • 8/17/2019 1 Analysis for Forklift

    5/12

  • 8/17/2019 1 Analysis for Forklift

    6/12

     

    Sof twar e licensed to Micr osof t

    Job No  Sheet No 

    3 R ev

    Part

    Job Title  R ef  

    By Date22-Mar-16 Chd 

    Client File  forklift pole attach R0.std  Date/Time  22-Mar-2016 14:43 

    Y X 

    Z Load 101 

    W hol e S t r uct ur e 

    Y X 

    Z Load 101 

    W hol e S t r uct ur e  Loads 0.1N :1mm 101 1.25 DL+1.25S W  L 

    Pr int Time/Date: 22/03/2016 14:44  STAAD.Pro for Windows R elease 2007  Pr int Run 3 of 15

  • 8/17/2019 1 Analysis for Forklift

    7/12

     

    Sof twar e licensed to Micr osof t

    Job No  Sheet No 

    4 R ev

    Part

    Job Title  R ef  

    By Date22-Mar-16 Chd 

    Client File  forklift pole attach R0.std  Date/Time  22-Mar-2016 14:43 

    Max A bsolute  N/mm2 

    = 187 

    Y X 

    Z Load 101 

    W hol e S t r uct ur e 

    R1RR 1

    RR1 1R 2 1 R1 R2 R 1R 1 

    R1R1

    R1

    R41

    R114R R 41 R 1 RR1 1 R1 R41R41 R 31R R 31 RR1 1 R2R14R41 R R 31

    R R 31R 43 R 1 R R 21

    R1R1 R1R R 31 R31 R 1 R1R1 R1

    R3 R3R R 31 

    R1 R4R3R R 31

    R1R3R3 R 1 R1 R3 R 4 

    R1R1

    R1R3

    R3R1R1

    R 1 

    RR3

    R1R1

    R3R3 R 1 4R1 R3 R 4 

    R1R1

    R1R3

    R3R1R1

    R 1 

    RR3

    R1R1

    R3R3 R 1 4R1 R3 R 4 

    R1R1

    R1R3

    R3R1R1

    R 1 

    RR3

    R1R1

    R3R3 R 1 4R1 R3 R 4 

    R1R1

    R1R3

    R3R1R1

    R 1 

    RR3

    R1R1

    R3R3 R 1 

    4 R 4 

    R1 R1R1

    R3 R3 R1 R 1 R1 R3R3 R1 R1 R 3 R4 R1 R3R4 R 1 

    R1 R1R1

    R3 R3 R1 R 1 R1 R3R3 R1

    R1R3 R 1 

    R1R1R1

    R 1R R R 131R 1RR 41

     R4 R 3 R1 R R 31

    R R 34R4

    R1 R 1 R1 R3R 1 1R4 R R 3R R 14R 3R 3R R 431

     3R 1R 41

    R3 R R 1R 413 

    R4R 3 3 R 1 

    R  R1 R1 RR 3 

    R1 R3R3 R 14RR 41 R R 141RR 4 3 R1 R 1 R1

    R1R R 33 RR 1R 

    4R 1R 3R 431 

    R1R R14R 14

    R R R1R3 R 1

     R1 R R 1R 343 R1

    1R 14RR 3R R 431 

    R1R 1R 4R 1R 1 1R 43R 14R R 4

    R 4R R 3R 31 R1 R3R R 3R R 313R31

    R R 31R3 R 1

     R 

    14R1 R3

    R 3R R 41 R1 R3

    R3 R 1R 1 R1R

    R3 R1R1

    R 3R 43 

    Y R1 14R1

    R3R R 34

    R 4 

    X R1 R 43R R 34 R 4 

    ZR4

    Load 101 

    W hol e S t r uct ur e 

    Pr int Time/Date: 22/03/2016 14:44  STAAD.Pro for Windows R elease 2007  Pr int Run 4 of 15

  • 8/17/2019 1 Analysis for Forklift

    8/12

     

    Job No Sheet No R ev

    Sof twar e licensed to Micr osof t

    Job Title 

    Part

    R ef  

    By Date22-Mar-16  Chd 

    Client File  forklift pole attach R0.std  Date/Time  22-Mar-2016 14:43 

    3D  Rend er ed  V iew 

    Plates Plate  Node A  Node B  Node C  Node D  Property 

    54  70  49  54  77  1 

    55  49  72  78  54  1 

    56  72  51  55  78  1 

    57  51  74  79  55  1 58  74  53  56  79  1 

    59  53  76  80  56  1 

    60  76  40  37  80  1 

    70  89  63  57  81  1 

    71  63  90  83  57  1 

    72  90  64  59  83  1 

    73  64  91  85  59  1 

    74  91  65  61  85  1 

    75  65  92  87  61  1 

    76  92  36  41  87  1 

    99  42  103  101  47  1 

    100  103  23  28  101  1 

    107  46  109  110  43  1 

    108  109  27  24  110  1 

    113  2  112  99  21  1 

    114  112  42  47  99  1 

    115  36  113  97  41  1 

    116  113  2  21  97  1 

    117  40  105  114  37  1 

    118  105  20  3  114  1 

    119  20  107  115  3  1 

    Pr int Time/Date: 22/03/2016 14:44  STAAD.Pro for Windows R elease 2007  Pr int Run 5 of 15

  • 8/17/2019 1 Analysis for Forklift

    9/12

     

    Sof twar e licensed to Micr osof t

    Job No  Sheet No 

    6 R ev

    Part

    Job Title  R ef  

    By Date22-Mar-16 Chd 

    Client File  forklift pole attach R0.std  Date/Time  22-Mar-2016 14:43 

    Plates Cont... Plate Node A Node B Node C Node D Property 

    120 107 46 43 115 1 

    123 69 48 118 116 1 

    124 116 118 49 70 1 

    125 48 71 119 118 1 

    126 118 119 72 49 1 

    127 71 50 120 119 1 

    128 119 120 51 72 1 

    129 50 73 121 120 1 

    130 120 121 74 51 1 

    131 73 52 122 121 1 132 121 122 53 74 1 

    133 52 75 123 122 1 

    134 122 123 76 53 1 

    135 75 38 124 123 1 

    136 123 124 40 76 1 

    139 81 57 127 125 1 

    140 125 127 58 82 1 

    141 57 83 128 127 1 

    142 127 128 84 58 1 

    143 83 59 129 128 1 

    144 128 129 60 84 1 

    145 59 85 130 129 1 

    146 129 130 86 60 1 

    147 85 61 131 130 1 

    148 130 131 62 86 1 

    149 61 87 132 131 1 

    150 131 132 88 62 1 

    151 87 41 133 132 1 

    152 132 133 39 88 1 

    155 93 66 136 134 1 

    156 134 136 63 89 1 

    157 66 94 137 136 1 

    158 136 137 90 63 1 

    159 94 67 138 137 1 

    160 137 138 64 90 1 

    161 67 95 139 138 1 

    162 138 139 91 64 1 

    163 95 68 140 139 1 

    164 139 140 65 91 1 

    165 68 96 141 140 1 

    166 140 141 92 65 1 

    167 96 14 142 141 1 

    168 141 142 36 92 1 

    171 77 54 145 143 1 

    172 143 145 66 93 1 

    Pr int Time/Date: 22/03/2016 14:44  STAAD.Pro for Windows R elease 2007  Pr int Run 6 of 15

  • 8/17/2019 1 Analysis for Forklift

    10/12

     

    Sof twar e licensed to Micr osof t

    Job No  Sheet No 

    7 R ev

    Part

    Job Title  R ef  

    By Date22-Mar-16 Chd 

    Client File  forklift pole attach R0.std  Date/Time  22-Mar-2016 14:43 

    Plates Cont... Plate Node A Node B Node C Node D Property 

    173 54 78 146 145 1 

    174 145 146 94 66 1 

    175 78 55 147 146 1 

    176 146 147 67 94 1 

    177 55 79 148 147 1 

    178 147 148 95 67 1 

    179 79 56 149 148 1 

    180 148 149 68 95 1 

    181 56 80 150 149 1 

    182 149 150 96 68 1 183 80 37 151 150 1 

    184 150 151 14 96 1 

    185 41 97 152 133 1 

    186 133 152 98 39 1 

    187 97 21 153 152 1 

    188 152 153 19 98 1 

    189 21 99 154 153 1 

    190 153 154 100 19 1 

    191 99 47 155 154 1 

    192 154 155 45 100 1 

    193 47 101 156 155 1 

    194 155 156 102 45 1 

    195 101 28 157 156 1 

    196 156 157 26 102 1 

    197 38 104 158 124 1 

    198 124 158 105 40 1 

    199 104 18 159 158 1 

    200 158 159 20 105 1 

    201 18 106 160 159 1 

    202 159 160 107 20 1 

    203 106 44 161 160 1 

    204 160 161 46 107 1 

    205 44 108 162 161 1 

    206 161 162 109 46 1 

    207 108 25 163 162 1 

    208 162 163 27 109 1 

    209 43 110 164 165 1 

    210 165 164 111 7 1 

    211 110 24 166 164 1 

    212 164 166 22 111 1 

    213 7 111 167 168 1 

    214 168 167 103 42 1 

    215 111 22 169 167 1 

    216 167 169 23 103 1 

    217 37 16 151 1 

    Pr int Time/Date: 22/03/2016 14:44  STAAD.Pro for Windows R elease 2007  Pr int Run 7 of 15

  • 8/17/2019 1 Analysis for Forklift

    11/12

     

    Sof twar e licensed to Micr osof t

    Job No  Sheet No 

    8 R ev

    Part

    Job Title  R ef  

    By Date22-Mar-16 Chd 

    Client File  forklift pole attach R0.std  Date/Time  22-Mar-2016 14:43 

    Plates Cont... Plate Node A Node B Node C Node D Property 

    218 151 16 15 1 

    219 151 15 14 1 

    220 14 13 142 1 

    221 13 12 142 1 

    222 142 12 36 1 

    223 36 12 113 1 

    224 12 11 113 1 

    225 11 2 113 1 

    226 2 10 112 1 

    227 10 9 112 1 228 9 42 112 1 

    229 9 168 42 1 

    230 8 168 9 1 

    231 8 7 168 1 

    232 6 165 7 1 

    233 5 165 6 1 

    234 5 43 165 1 

    235 115 43 5 1 

    236 4 115 5 1 

    237 3 115 4 1 

    238 114 3 17 1 

    239 16 114 17 1 

    240 37 114 16 1 

    298 208 202 227 226 3 

    299 202 209 228 227 3 

    300 209 203 229 228 3 

    301 203 210 230 229 3 

    302 210 204 231 230 3 

    303 204 211 232 231 3 

    304 211 198 233 232 3 

    306 234 235 205 212 3 

    307 235 236 213 205 3 

    308 236 237 206 213 3 

    309 237 238 214 206 3 

    310 238 239 207 214 3 

    311 239 240 215 207 3 

    312 240 241 199 215 3 

    313 242 243 218 201 3 

    314 243 189 192 218 3 

    315 200 221 244 245 3 

    316 221 191 190 244 3 

    317 170 246 217 187 3 

    318 246 242 201 217 3 

    319 241 247 216 199 3 

    320 247 170 187 216 3 

    Pr int Time/Date: 22/03/2016 14:44  STAAD.Pro for Windows R elease 2007  Pr int Run 8 of 15

  • 8/17/2019 1 Analysis for Forklift

    12/12

     

    Sof twar e licensed to Micr osof t

    Job No  Sheet No 

    9 R ev

    Part

    Job Title  R ef  

    By Date22-Mar-16 Chd 

    Client File  forklift pole attach R0.std  Date/Time  22-Mar-2016 14:43 

    Plates Cont... Plate Node A Node B Node C Node D Property 

    321 198 219 248 233 3 

    322 219 186 171 248 3 

    323 186 220 249 171 3 

    324 220 200 245 249 3 

    327 250 252 253 251 3 

    328 251 253 235 234 3 

    329 252 254 255 253 3 

    330 253 255 236 235 3 

    331 254 256 257 255 3 

    332 255 257 237 236 3 333 256 258 259 257 3 

    334 257 259 238 237 3 

    335 258 260 261 259 3 

    336 259 261 239 238 3 

    337 260 262 263 261 3 

    338 261 263 240 239 3 

    339 262 182 264 263 3 

    340 263 264 241 240 3 

    343 226 227 266 265 3 

    344 265 266 252 250 3 

    345 227 228 267 266 3 

    346 266 267 254 252 3 

    347 228 229 268 267 3 

    348 267 268 256 254 3 

    349 229 230 269 268 3 

    350 268 269 258 256 3 

    351 230 231 270 269 3 

    352 269 270 260 258 3 

    353 231 232 271 270 3 

    354 270 271 262 260 3 

    355 232 233 272 271 3 

    356 271 272 182 262 3 

    357 245 244 273 274 3 

    358 274 273 275 175 3 

    359 244 190 224 273 3 

    360 273 224 188 275 3 

    361 175 275 276 277 3 

    362 277 276 243 242 3 

    363 275 188 225 276 3 

    364 276 225 189 243 3 

    365 233 184 272 3 

    366 272 184 183 3 

    367 272 183 182 3 

    368 182 181 264 3 

    369 181 180 264 3 

    Pr int Time/Date: 22/03/2016 14:44  STAAD.Pro for Windows R elease 2007  Pr int Run 9 of 15