1 agenda of wpg (8/12/2005) approval of agenda round table report on actions performed myorbite –...
TRANSCRIPT
1
Agenda of WPG (8/12/2005)
• Approval of Agenda
• Round table
• Report on actions performed
• myORBITe – the new employee portal (new concepts, presentation of new homepage proposal, discussion)
• Review of change proposals raised in OST• Contact template• Other change proposals and process changes
• Tips & Tricks: Removing deleted pages from Google results
• Review Action list
• Date of next meeting
• Wrap-up of the meeting
2
Round table
3
Report on Actions performed
IV.5. Check the CDMS naming conventions for library fields
All documents will be published together with the meeting minutes.
4
Report on Actions performed
IV.10. Investigate possibilities to order library items (CR 10)
Current sortings: We propose to add the following sorting possibilities:
- Status
- Edition
- Author
We also would add a new field (integer) where you can add the position of the library item. In the site preferences you would also be able to sort on this field (ASC and DESC).
5
Report on Actions performed
IV.12. Run Linkbot in a systematic way and report to sub-site administrators / authors
Results of November scan (public website only):
- 76 mails sent
- 46 sites with errors
- Sites built with IW templates (64): 145 errors
- Sites not built with IW templates (12): 704 errors
6
Report on Actions performed
IV.1. To incorporate all accepted change requests
implementation ongoing by Realise– 12/33 bug fixes in production next week– Other fixes by end of January– 2 POC: news and OpenDeploy– Other quotations: in progress
III.5. Analyse use of MediaBin for local images
IV.6. Find solution for: check of broken links, library items not used, orphaned files, files that have not been submitted…WatchFire – tool which checks broken links, unused items, … under evaluation
III.9. Investigate possibility to monitor Cor
7
myORBITethe new employee portal (new concepts, presentation of
new homepage proposal, discussion)
8
myORBITe – the new employee portal
• Implement OneSky Online Portal improvements in ORBITe– Single point of entry to online content and services– Search engine– Personalisation– Customisation– Channels– Tabs– Application integration– Common and new look&feel based on CSS
• Easy to adapt via Interwoven without MIS intervention
9
myORBITe – the new employee portal
• https://extranet.eurocontrol.int
• Portal concepts on http://my.yahoo.com
10
myORBITe – the new employee portal
– Technical Infrastructure is being installed– Building of new ORBITe Portal homepage
ongoing > 3/1/2006– Demo planned during Jan 2006– Production planned 31/1/2006– Communication 1/2/2006
11
myORBITe – the new employee portal
New main navigation – more service-to-staff oriented
Dropdowns
12
Directories Care for Staff Office & IT services Media Corporate information
Agency Directory Agency Contacts Suppliers Portal Compass
Information to Staff Office Notices Staff Regulations Vacancies Staff Committee Staff Development Welfare Office Travel Arrangements AIPE EUROKIDS Restaurants Pensioners website
Content & Document
Management System Interwoven TeamSite CMS Conference Management Outlook Web Access OneSky Online OneSky Teams Web statistics Visitor Registration PABX Telephone System Change your Internet password Service unavailability Helpdesks
Press Review E-news Journals Press Releases EUROCONTROL news EUROCONTROL events Publications
Insight Insight Online Skyway EUROCONTROL Publication & Information Centre
Communication Guidelines
Communication guidelines Guidelines for Media Relations Publication Rules EUROCONTROL Graphic Identity Internet Policy
Request an Advalvas Submit a Headline Webmasters & Content managers DG’s Suggestion box (?)
Agency Mission Corporate policies EFQM CISC (?)
Sub-dropdown
13
myORBITe – the new employee portal
SBU navigation General links
New search
14
myORBITe – the new employee portal
Headlines My favourites
Archives
Add applications and
services
My online services
Add bookmarks
15By default all selected
myORBITe – the new employee portal
Latest News Latest Events
PS. The dropdown will only contain SBUs using the Interwoven templating system.
You can choose which news or events you are
interested in
Jump to SBU news or event page
16
myORBITe – the new employee portal
Service unavailability
Direct access to your Outlook Inbox through Outlook Web
Access (OWA)
Will display all planned service interventions, but also service interruptions
17
Launch foreseen for beginning of February 2006
18
1. Could we have the possibility to add links in the contact page (for links to contact page of CFMU, CEATS,... for example). Now you have to use an image to create the link.
2. When a contact does NOT have an organisation or a function, the output template shows a empty coloured row with just a dash. Not very elegant. Is it possible to remove the row when it is empty.
Review of change proposals on Contact template
19
3. With modern communication technology, web visitors tend to expect a feedback form in addition to an e-mail address.
Could we add an optional standard simple feedback form to the contact page. This will most probably foster communication from our website.
Review of change proposals on Contact template
20
4. Bold and italic should be available in every field which is by default in normal font style. In particular in the text of the Category.
5. When an email address is long, it is touching the function text box. Can we have a least a few pixels between the two. (See attached image )
Review of change proposals on Contact template
21
6. It would be useful if we could put a "Introduction" contact field just after the introduction text and before the actual categories. This would be handy when an activity has a generic contact to be listed before the team members.
Review of change proposals on Contact template
22
Other change proposals and process changes
1. Can we get an increase in the number of content blocks on a standard page?
Alternatively, could we have an extended standard page template which would allow 30 or more content blocks?
23
Other change proposals and process changes
2. In the SRC system, there is no distinction between Internal and External Code, there is just one Document Reference or Identifier (e.g. ESARR 2, EAM 2/GUI 4) . Displaying either Internal or External Code in a Library list is therefore confusing.Could it be changed to accommodate a field simply called "Document Reference" or "Document Identifier"?
We see three options:
- Add a second free label- Make the labels user definable- Change the label to "Document Reference" or "Document Identifier"
24
Other change proposals and process changes
3. We received a complaint on the text size of the web pages.Can we change the CSS so people can enlarge the text using the Internet Explorer option (view - text size).
With the ORBITe re-engineering we could take it a step further and implement an A A A tool, which is also used by EEC (http://www-local.eurocontrol.fr/).
4. NEWS templateWhen introducing carriage returns in the text, they are not visible on the "homepage".
25
Tips & TricksRemoving deleted pages from Google results
If you removed a page from your website, but it still seems to be in the Google search results, you can manually remove it using this Google tool:
http://services.google.com/urlconsole/controller
First enter your EUROCONTROL email address
and a password (for you to choose) in the fields
on the left of the page.
You should almost immediately receive an email (from Googlebot) from which you can activate your account by clicking the link.
26
Tips & TricksRemoving deleted pages from Google results
After this you can login to the tool using
the box on the right of the page
Once logged in use the third link
called “Remove an outdated link.”
Enter the URL of the deleted page.
Select “anything associated with
this URL“
They obviously will only accept your
request if the page no longer exists
on the web!
It takes 1-5 business days to be removed.
27
Review Action list
28
Action No Person responsible
Action to be taken Status Deadline
III.5 MIS Analyse use of MediaBin for local images
In progress ASAP
III.6 MIS Analyse REVIEW 4 & 5 (page 7 & 8)
In progress For next WPG
III.9 MIS Investigate possibility to monitor Cor
In progress ASAP
III.10 MIS Add all staff to the template_support group
In progress ASAP
III.11 MIS / OCCS Set up SLA for bugs and CRs In progress ASAP
III.12 Bruno Lambin & Eric Roelants
Find solution for overlap of WPG and Portal User group meetings
In progress For next WPG
29
Action No Person responsible Action to be taken Status Deadline
IV.1 MIS / OCCS To incorporate all accepted change requests In progress ASAP
IV.2 OCCS Sent out invitation for next meeting DONE ASAP
IV.3 All Comment on layout proposal for Agenda and Proceedings section
DONE Before 8/11
IV.4 OCCS Proposal a new header In progress For January WPG
IV.5 OCCS Check the CDMS naming conventions for library fields DONE ASAP
IV.6 MIS Find solution for: check of broken links, library items not used, orphaned files, files that have not been submitted…
In progress For next WPG
IV.7 MIS Make a quotation to implement automatic propagation of category changes in the current Interwoven version and the new version
In progress For next WPG
IV.8 MIS Investigate the possibility to have multiple libraries in one branch with different access groups
In progress ASAP
IV.9 Rémy Bossert Check possibilities of OST for use in CR 9 In progress ASAP
IV.10 MIS / OCCS Investigate possibilities to order library items (CR 10) DONE For next WPG
IV.11 OCCS Add explanation in template_support on how to use Google before deleting the page to find pages that link to it
DONE ASAP
IV.12 OCCS Run Linkbot in a systematic way and report to sub-site administrators/authors
Continuously -
IV.13 Bruno Lambin Provide term of reference In progress ASAP
IV.14 MIS Provide performance indicators In progress ASAP
IV.15 MIS / OCCS Propose solution for deployment problems In progress ASAP
IV.16 All users & invitees to the meeting
Add comments to the OST newsgroup for the contact template by next WPG meeting
DONE 1 week before next WPG
30
Date of next meeting
12 January 200509h30 - 12h30
?
31
Wrap-up of the meeting