1 aena’s new aeronautical information management system: implementation of an aixm-based gis...

12
1 Aena’s New Aeronautical Aena’s New Aeronautical Information Management Information Management System: System: Implementation of an AIXM-based Implementation of an AIXM-based GIS Environment GIS Environment

Upload: philip-porter

Post on 11-Jan-2016

218 views

Category:

Documents


5 download

TRANSCRIPT

Page 1: 1 Aena’s New Aeronautical Information Management System: Implementation of an AIXM-based GIS Environment

11

Aena’s New Aeronautical Aena’s New Aeronautical Information Management System: Information Management System:

Implementation of an AIXM-based GIS Implementation of an AIXM-based GIS EnvironmentEnvironment

Page 2: 1 Aena’s New Aeronautical Information Management System: Implementation of an AIXM-based GIS Environment

Current environment at AenaCurrent environment at Aena

• Legacy systems; difficult data flow to other systems Legacy systems; difficult data flow to other systems (EAD, ATC system (SACTA), etc)(EAD, ATC system (SACTA), etc)

• Manual data exchange prone to errorsManual data exchange prone to errors

• Product centric, CAD-based environmentProduct centric, CAD-based environment– No centralized aeronautical data managementNo centralized aeronautical data management

– Difficult to automate…low productivityDifficult to automate…low productivity

– Labor intensive update processLabor intensive update process

– Edits made in multiple places (data, charts, etc)Edits made in multiple places (data, charts, etc)

– Non-automated QC processNon-automated QC process

22

Page 3: 1 Aena’s New Aeronautical Information Management System: Implementation of an AIXM-based GIS Environment

Scope of ProjectScope of Project

Revamp current system to a GIS-based approach to Revamp current system to a GIS-based approach to managing aeronautical data and productsmanaging aeronautical data and products

33

•Automate aeronautical information system

•Manage central database

•Automate charting–Approach / Departure Charts

–Enroute Charts

–Visual Charts

• Production to start end of 2008; progressive production schedule

Page 4: 1 Aena’s New Aeronautical Information Management System: Implementation of an AIXM-based GIS Environment

ESRI Technology ESRI Technology Modernizing Aena’s operationsModernizing Aena’s operations

• Centralized GeodatabaseCentralized Geodatabase– Schema based on AICM 4.5Schema based on AICM 4.5

– Single edits reflected on all productsSingle edits reflected on all products

– AIXM ingest and outputAIXM ingest and output

– GIS repository ready for enterprise / web service publication and GIS repository ready for enterprise / web service publication and consumptionconsumption

• Data management with GIS-based editing toolsData management with GIS-based editing tools

• Quality control via GIS-based spatial and non-spatial Quality control via GIS-based spatial and non-spatial checkschecks

• Automated charting with database driven charting toolsAutomated charting with database driven charting tools

• End-to-end workflow management applicationEnd-to-end workflow management application

44

Page 5: 1 Aena’s New Aeronautical Information Management System: Implementation of an AIXM-based GIS Environment

55

Geodatabase(Oracle)

ArcGIS Desktop

PLTS Aeronautical

Solution

Technology PlatformTechnology Platform

• PLTS Aeronautical SolutionPLTS Aeronautical Solution

• ArcGIS Desktop (ArcInfo)ArcGIS Desktop (ArcInfo)

• ArcGIS ServerArcGIS Server

• Standard Relational DB (Oracle)Standard Relational DB (Oracle)

• Other extensions:Other extensions:– 3D Analyst3D Analyst

– Data Interoperability Data Interoperability ArcGIS Server

Page 6: 1 Aena’s New Aeronautical Information Management System: Implementation of an AIXM-based GIS Environment

Aero Database

Wo

rkfl

ow

Rules

Metadata

Features

History

66

Aena AIS ArchitectureAena AIS Architecture

End Users

Charts on Demand

Data

Services

TraditionalCharts

DataWarehouse

Cartography

Input Sources

Workflow ManagerData Update Jobs Product Output Jobs

Web Services

Replication

(Cartography)

AICM-Based Model

Page 7: 1 Aena’s New Aeronautical Information Management System: Implementation of an AIXM-based GIS Environment

Centralized GeodatabaseCentralized Geodatabase

• Data centric environmentData centric environment

• Consolidates disparate data Consolidates disparate data sourcessources

• Central database supports Central database supports agency GISagency GIS

• One touch editsOne touch edits

• Centralized chart managementCentralized chart management

77

Page 8: 1 Aena’s New Aeronautical Information Management System: Implementation of an AIXM-based GIS Environment

Data ManagementData Management

• Rich ingest capabilityRich ingest capability– Data Interoperability Data Interoperability

ExtensionExtension

– Including AIXM 4.5Including AIXM 4.5

• Export to AIXM (EAD)Export to AIXM (EAD)

• GIS Graphical editing GIS Graphical editing environmentenvironment

• Precise creation of Precise creation of navigational features navigational features with Feature Builderwith Feature Builder

88

Page 9: 1 Aena’s New Aeronautical Information Management System: Implementation of an AIXM-based GIS Environment

Systemic Quality in AISSystemic Quality in AIS

99

Topology Rules

DB Domains / Ranges

PLTS Condition Tables

PLTS GIS Data ReViewer

Feature Builder

Page 10: 1 Aena’s New Aeronautical Information Management System: Implementation of an AIXM-based GIS Environment

Automated ChartingAutomated Charting

• Database driven chartingDatabase driven charting

• Advanced symbologyAdvanced symbology

• Management of chart textManagement of chart text

• Review of chart updatesReview of chart updates

1010

Page 11: 1 Aena’s New Aeronautical Information Management System: Implementation of an AIXM-based GIS Environment

Managing workflowsManaging workflows

1111

• Enterprise GIS workflow management Enterprise GIS workflow management solutionsolution

• Toolset for…Toolset for…– Tracking the status and progress of workTracking the status and progress of work

– Recording user activityRecording user activity

– Standardizing, streamlining data Standardizing, streamlining data management strategiesmanagement strategies

• Centralized repository of job related Centralized repository of job related informationinformation

• Comprehensive transaction Comprehensive transaction management infrastructuremanagement infrastructure– Historical tracking of feature editsHistorical tracking of feature edits

Page 12: 1 Aena’s New Aeronautical Information Management System: Implementation of an AIXM-based GIS Environment

Benefits to AenaBenefits to Aena

• Data investment maximizedData investment maximized

• Efficiency gainsEfficiency gains– One touch edits reflected on all productsOne touch edits reflected on all products

• Less manual data entryLess manual data entry– AIXM messages propagated to other systems (charting, EAD, AIXM messages propagated to other systems (charting, EAD,

SACTA, etc)SACTA, etc)

• Standardized workflowsStandardized workflows

• Opens the door for digital AISOpens the door for digital AIS

• Improved QCImproved QC

1212