Overview• Introduction (5 minutes)
• Energy Division Lighting Studies (25 minutes)
• IOU Led Lighting Studies (15 minutes)
• Q&A (15 minutes)
DNV GL © 2013 January 15, 2014 SAFER, SMARTER, GREENERDNV GL © 2013
ENERGY
Jenna Canseco, DNV GLTyler Mahone, DNV GLRachel Harcharik, Itron
CPUC ED 2013-2014 Lighting Studies
3
Overview
DNV GL © 2013 January 15, 2014
2010-2012 Lighting Studies Managed by CPUC ED
4
Residential/Upstream Lighting Study Status
Residential/Advanced/Upstream Lighting Impact Evaluation Study To be completed Q2 2014
California Residential Replacement Lamp Market Characterization Study To be completed Q2 2014
Assessment of the Early Effects of EISA and AB 1109 in California Q1 2013
California LED Lamp Market Characterization Report Q2 2012
Fall 2011 California Lighting Retail Store Shelf Survey Report Q2 2012
Non-Residential Lighting Study Status
Non-Res Downstream Impact Evaluation To be completed Q2 2014
Related Studies and Other Activities Status
California Lighting and Appliance Saturation Study (CLASS) To be completed Q2 2014
California Commercial Saturation Survey (CSS)Complete – To be delivered to IOUs Q1 2014, Public Q2 2014
California Commercial Market Share Tracking (CMST)Complete – To be delivered to IOUs Q1 2014, Public Q2 2014
California Retail Lighting Shelf Survey Online Analysis Tool (bulbstockdata.com) Completed 2014
Development of Retail Storefront Weights for Phone/Shelf Surveys Completed 2014
DNV GL © 2013 January 15, 2014
2013-2014 Lighting Roadmap Studies to be Managed by CPUC ED
Original Study List
– Lighting-1: Overarching Lighting Market Transformation Indicators (MTI) and Market Indicators (MI)
– Lighting-5: 2013-2014 Lighting Market Assessment Study
– Lighting-7: LED Lab Test
– Lighting-8: Lighting Interactive Study
– Lighting-9: Focused Lighting Impact Evaluation for 2013-2014 Program Cycle
5
DNV GL © 2013 January 15, 2014
Proposed Changes to 2013-2014 Lighting Roadmap Studies
6
Proposed Change Rationale
Move nonresidential, non-upstream lighting impact evaluation activities into the Nonresidential Roadmap.
• Enables all impact evaluation work for all nonresidential measures (excluding upstream lighting) to occur within the same study
• May reduce some of the administrative costs associated with delivering the work
Combine the nonresidential upstream and residential impact evaluation with the market assessment study.
• Avoids duplicating tasks between separate impact evaluation and market research work orders
• Prevents artificial delineations within the work just to support invoicing functions
• Ensures that data collection instruments adequately address both market research and impact evaluation needs
• May reduce some of the administrative costs associated with delivering the work
DNV GL © 2013 January 15, 2014
Revised 2013-2014 Lighting Roadmap Studies
Lighting-1: Overarching Lighting MTI and MI
– Same as in original roadmap
Lighting-7: LED Lab Test
– Same as in original roadmap
Lighting-8: Lighting Interactive Study
– Same as in original roadmap
Lighting Market Assessment and Focused Lighting Impact Evaluation Study
– Combines 2 studies from original roadmap:
– Lighting-5: 2013-2014 Lighting Market Assessment Study
– Lighting-9: Focused Lighting Impact Evaluation for 2013-2014 Program Cycle
7
DNV GL © 2013 January 15, 2014
2013-2014 Lighting Study Overview: Overarching Lighting MTI and MI
Goals
– Conduct an evaluability assessment of the current MTI, MI and strategic plan indicators (SPI) and (where necessary/relevant) recommend improvements to support cost-effective measurement
– Provide a research plan for measuring and tracking MTI, MI, and SPI after 2014 that can be deployed when budget is available
– Relying upon the best available information, provide preliminary estimates of MTI, MI and SPI for 2013-2014 program cycle
Timing
– High Priority; work will begin Q2 2014
8
DNV GL © 2013 January 15, 2014
2013-2014 Lighting Study Overview: Market Assessment & Focused Impact Evaluation
Goals
– Collect impact evaluation data on selected lighting measures for the 2013-2014 IOU lighting programs (and provide results as rapidly as possible)
– Continue current efforts to monitor and profile market changes in the lighting sector
Timing
– High Priority; work will begin Q2 2014
9
DNV GL © 2013 January 15, 2014
2013-2014 Lighting Study Overview: LED Lab Test
Goals
– Assess how switching LED lamps on/off impacts lamp life and performance
– Assess whether manufacturers’ specifications for LED lamp EUL are accurate
– Assess whether LED workpaper assumptions are properly stated
Timing
– High Priority; research will begin Q2 2014
10
DNV GL © 2013 January 15, 2014
2013-2014 Lighting Study Overview: Lighting Interactive Study
Goals
– Quantify lighting interactive effects:
– Conclude if lighting interactive effects can be quantified reliably and if so, if they can be duplicated.
– To be done separately for residential and commercial buildings.
– Determine how to apply interactive effects to lighting energy savings estimates.
Timing
– Medium Priority; research review to determine proposed plan will begin Q2 2014
11
DNV GL © 2013 January 15, 2014
SAFER, SMARTER, GREENER
www.dnvgl.com
Questions…?
12
Jenna Canseco, Principal ConsultantPolicy Advisory and Research, Sustainable Energy UseDNV GL - [email protected]+1 510 891 0446 x44121
13
LightingM&E Roadmap Project Update
IOUs Studies
14
IOUS’ LIGHTING M&E ROADMAP STUDIES
By
Brian Smith & Doreen Caruth, PG&E
Caroline Chen for SCE
Rob Rubin, SDG&E
15
Residential Retrofit M&E Roadmap Overview
• 2010-2012– All projects are completed and posted.
• 2013-2014– All projects are underway.
16
A List of Completed 2010-2012 Studies
Study Names Study Type Status
(Statewide) 2010-2012 Lighting Solution Workbook Version-1.
Process Completed
(Statewide) Advanced Lighting Data Mining and Baseline Study
Market Completed
(SCE/PG&E) Lighting Process Evaluation & Non-Residential Lighting Customer Wants & Needs Assessment
Process Completed
(SDG&E) Residential Program Process Evaluation
Cross-cutting, Process
Completed
(SDG&E) Non-residential Process Evaluation
Cross-cutting, Process
Completed
17
Status of 2013-2014 Lighting Studies:
Study Names Study Type Status
(Statewide) Lighting Solution Workbook, Version-2
Process On Hold –Waiting for Data
(Statewide) LED Market Characterization & Workpaper Update Project
Early M&V Pending – PO Readiness
(SCE) Mid-stream Lighting Trial Study Early M&V Pending – Project Kick-off
Meeting
(PG&E) Mid-stream Lighting Trial Study Early M&V Pending – CPUC Approval
(Statewide) Lighting Certification Training Assessment
Process Pending – SOW Approval