1 2 dr.chandan chowdhury ceo, ifs india 3 agenda 1.india as an it major 2.it solution for energy...
TRANSCRIPT
1
2
Dr.Chandan ChowdhuryCEO, IFS India
3
Agenda
1. India as an IT major
2. IT solution for energy sector
3. Understanding solution through case studies
4. Highlight of energy solution
5. IT challenges as market gets deregulated
4
5
Bandwidth
Food
Cloth Shelter
Political Slogan – Paradigm Shift
6
Matrimonial: an example
27 years boy IT grad in computing, techno savvy seeks confident girl , Java & C++ knowledge essential. Caste, religion no bar
7
ENERGY
Major Focus Vertical;ENERGY
GENERATION TRANSMISSION DISTRIBUTION
8
Hundreds of power plants/groups using IFS solutions
• OKG Nuclear Power Plant, Sweden• Barsebäck Nuclear Power Plant, Sweden• Forsmarks Nuclear Power Plant, Sweden• Ignalina Nuclear Power Plant, Lithuania • Swedish National Grid• ABB Generation, Sweden • Birka and Gullspångs Power, Sweden• BÅKAB, Sweden• Nordkraft Service, Sweden• Vannkraft Öst, Norway• Akershus Energyworks, Norway• Brista Power, Sweden• Helsingborg Energy, Sweden• Birka Service, Sweden• Oslo Energy, Norway• Tekniska Verken i Linköping, Sweden• Trondheim Energyworks, Norway• Viken, Norway• Norwegian State Power, Norway• Buskerud Energy Production, Norway• National Power Company of Iceland• Southern Energy Group, Poland• ECO Vankraft, Norway• AES, Sri Lanka• Byreiskaya Hydro Power, Russia
• Elektrocieplownia Zabrze, Poland• Elektrocieplownia Ostroleka, Poland• Elektrocieplownia Warszawskie, Poland• Elektrownia Laziska, Poland• Elektrownia Jaworzno, Poland• Belchatow Power Plant, Poland• WPEC Zielona Gora, Poland• Zespol Elektrociepl Poznan, Poland• Siersza Power Plant, Poland• PT PLN, Indonesia• Vattenfall Generation Services, Sweden• Växjö Energi, Sweden• Oxelö Energi, Sweden• Hafslund Energiverk, Norway• Vattenfall Power Generation, Sweden• Vattenfall Energy Distribution, Sweden• Fagersta Energi, Sweden• Jönköping Energi, Sweden• Norrköping Miljö & Energi, Sweden• Qin Shan, China• Tennet, Power Grid of Netherland• United Networks, New Zealand• Siemens Network Services, Australia• Zeya Hydropower, Russia• Three Gorges Power Group, China• Etc ....
9
Global Power Market Size49% of Spend is Asia and 24% North America
From IIR 2005 Global Industry Outlook
Global Region Project Count TIV (in billions)
North America 849 $46.66
Middle America 7 $0.75
South America 45 $15.76
Europe 96 $21.87
Africa 28 $12.56
Asia 233 $95.07
Oceania 18 $2.68
Total 1,276 $195.36
2005 Project Spending by Global RegionThe current estimation of the worldwide need for new power generation equates to about 325 large new power stations per year.
10
Basic Functions
NIS/GIS ERP/CMMS
SCADA
CIS
MarketBillingMeter readingCRMetc.
Generic functions Work Order ManagementProject ManagementProcurementsFinancial Managementetc.
Network specific functionsNetwork DocumentationNetwork CalculationsGeographical analysis Technical Planningetc.
Operation SCADATrouble CallEnergy ManagementDispatchetc.
11
Basic Information
NIS/GIS ERP/CMMS
SCADA
CIS
Customer DataMeter Data
Assets Data Financial FocusFinancial DataMaintenance Data Plans and schedules
Assets Data Technical FocusAssets Relations Topology and Connectivity Spatial Information (GIS) Real Time Data
Asset Data Real time Focus
12
IFS Foundation1
IFSFINANCIALS
GENERALLEDGER
REPORTGENERATOR
FIXEDASSETS
ACCOUNTSRECEIVABLE
CONSOLIDATEDACCOUNTS
ACCOUNTS PAYABLE
CASH FLOW
IFS eBUSINESS
eMARKETS
MOBILE & WIRELESSSERVICES
EMPLOYEEPORTALS
ePROCUREMENT
COLLABORATIONPORTALS
ACCOUNTINGRULES
CUSTOMERRELATIONSHIPMANAGEMENT
DOCUMENTMANAGEMENT
PROJECTMANAGEMENT
SUPPLY CHAIN MANAGEMENT
BUSINESS PERFORMANCE
IFSDISTRIBUTION
DEMAND PLANNING
SUPPLIERSCHEDULES
PURCHASING
INVENTORY
INVOICING
IFSMAINTENANCE
EQUIPMENT
EQUIPMENTPERFORMANCE
EQUIPMENTMETERING
WORK | SERVICEORDER
EQUIPMENTMONITORING
SCHEDULING
DCS/SCADAINTEGRATION
PREVENTIVEMAINTENANCE
IFS HUMAN
RESOURCES
RECRUITING
TRAINING ADMINISTRATION
PAYROLLADMINISTRATION
TIME &ATTENDANCE
HUMANCAPITAL
MANAGEMENT
PROJECTREPORTING
EXPENSEREPORTING
EMPLOYEESELF-SERVICE
QUALITYMANAGEMENT
IFS ENGINEERING
PDMCONFIGURATION
ASSET DATAMANAGEMENT
ELECTRICALDESIGN
PROJECTDELIVERY
INSTRUMENTATIONDESIGN
INTEGRATION PLATFORM
IFSOPERATION
OPERATIONMANAGEMENT
SAFETY ANDRELIABILITY
PLANNING ANDCONTRACT
FUELMANAGEMENT
IFSBILLING
BILLING
METERING &COLLECTIONS
RECEIVABLES
IFS Utility Solution
13
14
15
PROJECTQUALITY
MANAGEMENTACCOUNTING
RULESDOCUMENT
MANAGEMENTBUSINESS
PERFORMANCE
IFSDISTRIBUTION
IFSMAINTENANCE
IFS ENGINEERING
IFS FRONT OFFICE
IFS HUMAN
RESOURCES
INVENTORYEQUIPMENTMONITORING
PDMCONFIGURATION
MARKETINGENCYCLOPEDIA
SKILLS &QUALIFICATIONS
EQUIPMENTINVOICINGSALES
CONFIGURATORPLANT LAYOUT &
PIPING DESIGNRECRUITMENT
CUSTOMERORDERS
WORKORDER
PROPOSALGENERATION
ELECTRICALDESIGN
PROJECTREPORTING
CUSTOMERSCHEDULING
PREVENTIVEMAINTENANCE
FIELD SERVICE &OPERATIONS
INSTRUMENTATIONDESIGN
TIME &ATTENDANCE
EQUIPMENTPERFORMANCE
PROJECTDELIVERY
PURCHASINGSALES &
MARKETINGEMPLOYEE
DEVELOPMENT
SCHEDULINGSUPPLIER
SCHEDULINGPROCESSDESIGN
EXPENSEREPORTING
IFSFINANCIALS
GENERALLEDGER
ACCOUNTSRECEIVABLE
FIXEDASSETS
CONSOLIDATEDACCOUNTS
ACCOUNTSPAYABLE
REPORTGENERATOR
FINANCIAL LEDGER
PAYROLLINTERFACE
TECHNOLOGY PLATFORM -OPEN, FLEXIBLE, EASY TO USE
VEHICLEINFORMATIONMANAGEMENT
ENTERPRISESTOREFRONT
IFS eBUSINESS
WIRELESSSERVICES
COLLABORATIONPORTALS
CONTACTCENTER
eMARKETS
EMPLOYEEPORTALS
ePROCUREMENT
WEB STORE
PERSONAL PORTAL MANAGEMENT
IFS SPECIALMODULES
OPERATIONMANAGEMENT
SAFETY ANDRELIABILITY
SCADA (ABBADVANT OCS &
SPIDER)INTERFACE
TGPMSINTERFACE
PLANNING ANDCONTRACT
OA (LOTUSNOTES)
INTERFACE
BUSINESSMODELLER
The Three Gorges ePMS system.
Went Live Jan 2003Implementation started in May 2002.
27*700=18,900 MW project
16
Scenario #1: power system outage
Work flow instance NIS/GIS
EAM/ERP
SCADA/DCS
Other systems
Identify disturbance CRM, CIS
Analyze the extent and significance of the disturbance
Minimize the outage by remote control
Inform Call Center and others and keep them informed
CRM
Create Outage Work Order
Assign Crews to the work HR
17
Scenario #1: power system outage
Work flow instance NIS/GIS
EAM/ERP
SCADA/DCS
Other systems
Perform ultimate fault location and supply restoration
MCMS (=Mobile Crew Mgmt System)
Issue work permit certificate Initiate and plan remaining repair work
Perform ultimate repair work Submit work ready certificate Plan reenergize switching Perform switching for reenergizing the repaired part
Register time and materials used Create disturbance report
Register disturbance on equipment causing the disturbance
18
19
FinanceFinance
PurchasePurchaseMaintenanceMaintenance
Payroll
Stores
Project &Engineering
HRCustomer Customer ServicesServices
Legacy applications – “Islands” of Information
Enterprise
Material receiptMaterial receiptMaterial Material accountingaccounting
Operations
20
22
China Yangtze River Three Gorges Project Development Corporation
Three Gorges Power Plant, the largest hydro plant in the world with 18,900 MW (27x700MW).
The first batch of units have already been commissioned
Other associated projects:
Gezhouba Power Plant 2,715MW.New construction projects (Xiangjiaba 6,000 MW,
Xiluodu 12,600MW, Wudongde 7,400MW and Baihetan 12,500MW).
Total – 60,115 MW
23
The Transmission System Operatorof Norway
24
Assets and Maintenance
10,000 km of high voltage power lines (132, 220, 300 and 420 kV)
Transformers, switching and compensator stations
25
PROJECTQUALITY
MANAGEMENTACCOUNTING
RULESDOCUMENT
MANAGEMENTBUSINESS
PERFORMANCE
IFSDISTRIBUTION
IFSMAINTENANCE
IFS ENGINEERING
IFS FRONT OFFICE
IFS HUMAN
RESOURCES
INVENTORYEQUIPMENTMONITORING
PDMCONFIGURATION
MARKETINGENCYCLOPEDIA
SKILLS &QUALIFICATIONS
EQUIPMENTINVOICINGSALES
CONFIGURATORPLANT LAYOUT &
PIPING DESIGNRECRUITMENT
CUSTOMERORDERS
WORKORDER
PROPOSALGENERATION
ELECTRICALDESIGN
PROJECTREPORTING
CUSTOMERSCHEDULING
PREVENTIVEMAINTENANCE
FIELD SERVICE &OPERATIONS
INSTRUMENTATIONDESIGN
TIME &ATTENDANCE
EQUIPMENTPERFORMANCE
PROJECTDELIVERY
PURCHASINGSALES &
MARKETINGEMPLOYEE
DEVELOPMENT
SCHEDULINGSUPPLIER
SCHEDULINGPROCESSDESIGN
EXPENSEREPORTING
IFSFINANCIALS
GENERALLEDGER
ACCOUNTSRECEIVABLE
FIXEDASSETS
CONSOLIDATEDACCOUNTS
ACCOUNTSPAYABLE
REPORTGENERATOR
FINANCIAL LEDGER
PAYROLLINTERFACE
IFS Foundation1 V5
VEHICLEINFORMATIONMANAGEMENT
ENTERPRISESTOREFRONT
IFS eBUSINESS
WIRELESSSERVICES
COLLABORATIONPORTALS
CONTACTCENTER
eMARKETS
EMPLOYEEPORTALS
ePROCUREMENT
WEB STORE
PERSONAL PORTAL MANAGEMENT
IFSOPERATIONS
OPERATIONMANAGEMENT
BUDGETTING
SCADAINTERFACE
FUELMANAGEMENT
The IFS solution
28
Recovery information
Scenario #1 : power system outage
Real-time informationDisturbance records
Customer Service
Type of disturbanceTime to recoverNo. of customers affected
Work order
Asset Management
SparesSales
Customers affected
Customer complaints
Engineering
Disturbance information
Accounting
Asset records
Reports
Reports
SubstationAutomation
Repair and Maintenance
Customer
Work report
Fault statistics
Disturbance report
Disturbance report
Compensation
Control Center
Pro-Active information
29
30
Finance PortalExample of a measure areaMeasure Areas
31
32
EAM Portal
33
34
Finance PortalExample of a measure areaMeasure Areas
35
36
EAM Portal
37
Alerts
Portal is configured to display only
measures where indicators are red
Current view of the organization. How
much has each Profit Center sold so far in
this month? Current view of the organization. How many orders do we have right now and
how does that compare to history?
38
39
Areas to focus
Expansion Projects – Generation, Transmission, Distribution
Effective Planning, Monitoring and Execution of Projects
Controlling time and cost overrun of Projects through Exception Based Project Monitoring
Asset Life Cycle Management
Operation and Maintenance
Increased availability through incorporation of Best Operation & Maintenance Practices like RCM (Reliability Centered Maintenance), TPM
Improved spare parts management system
Reduction in cost of operation
On-line real time information through integration with SCADA system
Increase predictability of the plant
Integration
Business intelligence solution (multi dimensional analysis)
High quality timely information for decision support & proactive management
Management dashboard
40
41